CN209083149U - A kind of pipeline construction is with can flexibly dismantle suspension device - Google Patents

A kind of pipeline construction is with can flexibly dismantle suspension device Download PDF

Info

Publication number
CN209083149U
CN209083149U CN201821523126.7U CN201821523126U CN209083149U CN 209083149 U CN209083149 U CN 209083149U CN 201821523126 U CN201821523126 U CN 201821523126U CN 209083149 U CN209083149 U CN 209083149U
Authority
CN
China
Prior art keywords
plate
suspension device
retaining
shaft
pipeline construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821523126.7U
Other languages
Chinese (zh)
Inventor
范栢龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Wancheng Weiye Construction And Installation Co Ltd
Original Assignee
Tianjin Wancheng Weiye Construction And Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Wancheng Weiye Construction And Installation Co Ltd filed Critical Tianjin Wancheng Weiye Construction And Installation Co Ltd
Priority to CN201821523126.7U priority Critical patent/CN209083149U/en
Application granted granted Critical
Publication of CN209083149U publication Critical patent/CN209083149U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to suspension device technical fields, and disclose a kind of pipeline construction with can flexibly dismantle suspension device, including pedestal, rectangular channel are offered at the top of the pedestal, the inside of the rectangular channel is fixedly installed with the first shaft.The pipeline construction is with can flexibly dismantle suspension device, by pulling U-shaped handle, make retaining-plate that fixed plate and third shaft be driven to pull interior bar, fixture block compressed spring is set to be moved to the inside of outer bar, the telescopic rod for forming interior bar and outer bar is elongated, pedestal is set to rotate to the lower section of retaining-plate with the first shaft center of circle, retaining-plate and pedestal is set to be located at same perpendicular, solve the problems, such as that supporting bottom can be blocked by mounted pipeline, and it avoids the need for first separating supporting with pipeline construction crater wall, suspension device is transported to ground again, it could complete disassembly, step is relatively complicated, it is time-consuming and laborious, and the problem of being repeated installation steps is needed in use next time.

Description

A kind of pipeline construction is with can flexibly dismantle suspension device
Technical field
The utility model relates to suspension device technical field, specially a kind of pipeline construction is filled with can flexibly dismantle supporting It sets.
Background technique
To supporting and retaining system, reinforcing and safeguard measure that foundation pit side-wall and surrounding enviroment use, there is also land down for water conservancy and electric power The deep-foundation pit engineering of the Excavation problems of workshop and underground pump house, either skyscraper or subway, due to being all in city It is excavated in city, usually there are the various structures such as traffic main artery, built construction or pipeline around foundation pit, to protect its periphery The safe handling of structures, supporting are exactly the safety to guarantee Underground Construction and foundation pit surrounding environment.
The suspension device structure of existing pipeline is simple currently on the market, although can play a protective role, it makes Difficulty is dismantled after being finished, bottom is easy to be blocked by mounted pipeline, and needs first to separate supporting with pipeline construction crater wall, Suspension device is transported to ground again, disassembly could be completed, step is relatively complicated, and it is time-consuming and laborious, and need in use next time Installation steps are repeated, so propose that a kind of pipeline construction solves above-mentioned proposed ask with can flexibly dismantle suspension device Topic.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of pipeline construction with can flexibly dismantle suspension device, Has the advantages that disassembly is flexible, the suspension device structure for solving existing pipeline in the market is simple, although protection can be played Effect, but it dismantles difficulty after use, bottom is easy to be blocked by mounted pipeline, and needs first by supporting and pipeline Crater wall of constructing separation, then suspension device is transported to ground, disassembly could be completed, step is relatively complicated, and it is time-consuming and laborious, and under The problem of being repeated installation steps is needed when secondary use.
(2) technical solution
To realize the above-mentioned flexible purpose of disassembly, the utility model is provided the following technical solutions: a kind of pipeline construction is with can Suspension device, including pedestal are flexibly dismantled, rectangular channel is offered at the top of the pedestal, the inside of the rectangular channel is fixedly mounted There is the first shaft, the lateral wall of first shaft is socketed with one end and extends to retaining-plate above pedestal, the retaining-plate Top is fixedly installed with U-shaped handle, and the extension board that quantity is two and is symmetric is fixedly installed at the top of the pedestal, The opposite side of the extension board is fixedly installed with the second shaft, and the lateral wall of second shaft is socketed with outer bar, described outer Elongated slot is offered at the top of bar, the internal activity of the elongated slot is equipped with interior bar, and it is two that the side wall of the outer bar, which offers quantity, A through-hole, the side wall of the interior bar offer the card slot inside outer bar, and the inside of the card slot is fixedly installed with spring, It is fixedly installed with one end on the right side of the spring across the lower section through-hole and extends to the fixture block on the outside of outer bar, the retaining-plate To be fixedly installed with quantity be two and the fixed plate that is symmetric on right side, the opposite side of the fixed plate is fixedly installed with Third shaft, the third shaft are plugged in the inside of interior bar.
Preferably, the bottom of the retaining-plate is arc, and the slot inner sidewall and bottom wall of retaining-plate and rectangular channel do not connect Touching.
Preferably, the inside of the U-shaped handle is socketed with sponges cover, and the top right side of the pedestal is inclined-plane.
Preferably, the extension board is located at the right side of retaining-plate, and the left side of the rectangular channel is openning shape.
Preferably, first shaft and retaining-plate are flexibly connected, and second shaft and outer bar are flexibly connected, described interior Bar and third shaft are flexibly connected.
Preferably, the bottom of the interior bar is fixedly installed with rubber pad, and rubber pad is in contact with the slot inner bottom wall of elongated slot.
Preferably, the distance of the spring compressible is greater than fixture block and is located at the length on the outside of outer bar, the top of the fixture block For inclined-plane.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of pipeline construction with can flexibly dismantle suspension device, has Below the utility model has the advantages that
1, the pipeline construction be with can flexibly dismantle suspension device, by pulling U-shaped handle, make retaining-plate drive fixed plate and Third shaft pulls interior bar, and fixture block compressed spring is made to be moved to the inside of outer bar, and the telescopic rod for forming interior bar and outer bar is elongated, So that pedestal is rotated to the lower section of retaining-plate with the first shaft center of circle, so that retaining-plate and pedestal is located at same perpendicular, effectively It solves the problems, such as that supporting bottom can be blocked by mounted pipeline, and avoids the need for supporting and pipeline construction crater wall first Separation, then suspension device is transported to ground, disassembly could be completed, step is relatively complicated, and it is time-consuming and laborious, and in use next time Need the problem of being repeated installation steps.
2, the pipeline construction, by setting interior bar and outer bar, makes supporting when installing with can flexibly dismantle suspension device The bottom of interior bar is in contact with the slot inner bottom wall of elongated slot, fixes third shaft and fixed plate, to fix retaining-plate, makes to prop up Backplate supports retaining-plate, keeps retaining-plate bigger with the range of stress in the pressure by heatable adobe sleeping platform.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is enlarged drawing at A in the utility model Fig. 1.
In figure: 1 pedestal, 2 rectangular channels, 3 first shafts, 4 retaining-plates, 5 U-shaped handles, 6 extension boards, 7 second shafts, outside 8 Bar, 9 elongated slots, 10 interior bars, 11 through-holes, 12 card slots, 13 springs, 14 fixture blocks, 15 fixed plates, 16 third shafts.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of technical solution referring to FIG. 1-2: a kind of pipeline construction is with can flexibly dismantle supporting dress It sets, including pedestal 1, the top of pedestal 1 offers rectangular channel 2, and the inside of rectangular channel 2 is fixedly installed with the first shaft 3, first axle The lateral wall of bar 3 is socketed with the retaining-plate 4 that one end extends to the top of pedestal 1, and the bottom of retaining-plate 4 is arc, and retaining-plate 4 with The slot inner sidewall and bottom wall of rectangular channel 2 do not contact, and the top of retaining-plate 4 is fixedly installed with U-shaped handle 5, U-shaped handle 5 it is interior Portion is socketed with sponges cover, and the top right side of pedestal 1 is inclined-plane, and it is two and in symmetrical that the top of pedestal 1, which is fixedly installed with quantity, The extension board 6 of distribution, extension board 6 are located at the right side of retaining-plate 4, and the left side of rectangular channel 2 is openning shape, extension board 6 it is opposite one Side is fixedly installed with the second shaft 7, and the lateral wall of the second shaft 7 is socketed with outer bar 8, and the top of outer bar 8 offers elongated slot 9, long The internal activity of slot 9 is equipped with interior bar 10, and the bottom of interior bar 10 is fixedly installed with rubber pad, and in the slot of rubber pad and elongated slot 9 Bottom wall is in contact, and the side wall of outer bar 8 offers the through-hole 11 that quantity is two, and the side wall of interior bar 10 offers in outer bar 8 The card slot 12 in portion, the inside of card slot 12 are fixedly installed with spring 13, and it is logical across lower section that the right side of spring 13 is fixedly installed with one end Hole 11 and the fixture block 14 for extending to 8 outside of outer bar, the compressible distance of spring 13 are greater than the length that fixture block 14 is located at 8 outside of outer bar Degree, the top of fixture block 14 are inclined-plane, and the right side of retaining-plate 4 is fixedly installed with the fixed plate that quantity is two and is symmetric 15, the opposite side of fixed plate 15 is fixedly installed with third shaft 16, and third shaft 16 is plugged in the inside of interior bar 10, first axle Bar 3 and retaining-plate 4 are flexibly connected, and the second shaft 7 and outer bar 8 are flexibly connected, and interior bar 10 and third shaft 16 are flexibly connected, and are passed through U-shaped handle 5 is pulled, makes retaining-plate 4 that fixed plate 15 and third shaft 16 be driven to pull interior bar 10, moves 14 compressed spring 13 of fixture block The inside for moving outer bar 8, the telescopic rod for forming interior bar 10 and outer bar 8 is elongated, makes pedestal 1 with the rotation of 3 center of circle of the first shaft To the lower section of retaining-plate 4, retaining-plate 4 and pedestal 1 is set to be located at same perpendicular, efficiently solving supporting bottom can have been installed The problem of good pipeline blocks, and avoid the need for first separating supporting with pipeline construction crater wall, then suspension device is transported to Ground could complete disassembly, and step is relatively complicated, time-consuming and laborious, and need to be repeated installation steps in use next time Problem makes supporting bottom of interior bar 10 when installing connect with the slot inner bottom wall of elongated slot 9 by setting interior bar 10 and outer bar 8 Touching, fixes third shaft 16 and fixed plate 15, to fix retaining-plate 4, makes retaining-plate 4 in the pressure by heatable adobe sleeping platform, Retaining-plate 4 is supported, keeps retaining-plate 4 bigger with the range of stress.
In conclusion the pipeline construction, by pulling U-shaped handle 5, makes 4 band of retaining-plate with can flexibly dismantle suspension device Dynamic fixed plate 15 and third shaft 16 pull interior bar 10, so that 14 compressed spring 13 of fixture block is moved to the inside of outer bar 8, make interior bar 10 The telescopic rod formed with outer bar 8 is elongated, so that pedestal 1 is rotated to the lower section of retaining-plate 4 with 3 center of circle of the first shaft, makes retaining-plate 4 It is located at same perpendicular with pedestal 1, solves the problems, such as that supporting bottom can be blocked by mounted pipeline, and avoid It needs first to separate supporting with pipeline construction crater wall, then suspension device is transported to ground, could complete to dismantle, step is more It is cumbersome, it is time-consuming and laborious, and the problem of being repeated installation steps is needed in use next time, by the way that interior bar 10 and outer bar 8 is arranged, So that supporting bottom of interior bar 10 when installing is in contact with the slot inner bottom wall of elongated slot 9, fixes third shaft 16 and fixed plate 15, to fix retaining-plate 4, make retaining-plate 4 in the pressure by heatable adobe sleeping platform, support retaining-plate 4, allow retaining-plate 4 by The range of power is bigger.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of pipeline construction is with can flexibly dismantle suspension device, including pedestal (1), it is characterised in that: the top of the pedestal (1) Portion offers rectangular channel (2), and the inside of the rectangular channel (2) is fixedly installed with the first shaft (3), first shaft (3) Lateral wall is socketed with one end and extends to retaining-plate (4) above pedestal (1), is fixedly installed with U-shaped at the top of the retaining-plate (4) Handle (5) is fixedly installed with the extension board (6) that quantity is two and is symmetric, the extension at the top of the pedestal (1) The opposite side of plate (6) is fixedly installed with the second shaft (7), and the lateral wall of second shaft (7) is socketed with outer bar (8), institute It states and is offered at the top of outer bar (8) elongated slot (9), the internal activity of the elongated slot (9) is equipped with interior bar (10), the outer bar (8) Side wall to offer quantity be two through-holes (11), the side wall of the interior bar (10) offers the card internal positioned at outer bar (8) The inside of slot (12), the card slot (12) is fixedly installed with spring (13), is fixedly installed with one end on the right side of the spring (13) Across the lower section through-hole (11) and the fixture block (14) on the outside of outer bar (8) is extended to, the right side of the retaining-plate (4) is fixedly mounted The fixed plate (15) for having quantity for two and being symmetric, the opposite side of the fixed plate (15) is fixedly installed with third axis Bar (16), the third shaft (16) are plugged in the inside of interior bar (10).
2. a kind of pipeline construction according to claim 1 is with can flexibly dismantle suspension device, it is characterised in that: the supporting The bottom of plate (4) is arc, and retaining-plate (4) does not contact with the slot inner sidewall of rectangular channel (2) and bottom wall.
3. a kind of pipeline construction according to claim 1 is with can flexibly dismantle suspension device, it is characterised in that: the U-shaped The inside of handle (5) is socketed with sponges cover, and the top right side of the pedestal (1) is inclined-plane.
4. a kind of pipeline construction according to claim 1 is with can flexibly dismantle suspension device, it is characterised in that: the extension Plate (6) is located at the right side of retaining-plate (4), and the left side of the rectangular channel (2) is openning shape.
5. a kind of pipeline construction according to claim 1 is with can flexibly dismantle suspension device, it is characterised in that: described first Shaft (3) and retaining-plate (4) are flexibly connected, second shaft (7) and outer bar (8) flexible connection, the interior bar (10) and the Three shafts (16) are flexibly connected.
6. a kind of pipeline construction according to claim 1 is with can flexibly dismantle suspension device, it is characterised in that: the interior bar (10) bottom is fixedly installed with rubber pad, and rubber pad is in contact with the slot inner bottom wall of elongated slot (9).
7. a kind of pipeline construction according to claim 1 is with can flexibly dismantle suspension device, it is characterised in that: the spring (13) compressible distance is greater than fixture block (14) and is located at the length on the outside of outer bar (8), and the top of the fixture block (14) is inclined-plane.
CN201821523126.7U 2018-09-18 2018-09-18 A kind of pipeline construction is with can flexibly dismantle suspension device Expired - Fee Related CN209083149U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821523126.7U CN209083149U (en) 2018-09-18 2018-09-18 A kind of pipeline construction is with can flexibly dismantle suspension device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821523126.7U CN209083149U (en) 2018-09-18 2018-09-18 A kind of pipeline construction is with can flexibly dismantle suspension device

Publications (1)

Publication Number Publication Date
CN209083149U true CN209083149U (en) 2019-07-09

Family

ID=67116841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821523126.7U Expired - Fee Related CN209083149U (en) 2018-09-18 2018-09-18 A kind of pipeline construction is with can flexibly dismantle suspension device

Country Status (1)

Country Link
CN (1) CN209083149U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576998A (en) * 2020-05-11 2020-08-25 中国一冶集团有限公司 Assembled light color steel tile fence
CN111663537A (en) * 2020-06-24 2020-09-15 深圳市南华岩土工程有限公司 Temporary supporting structure for foundation pit construction and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576998A (en) * 2020-05-11 2020-08-25 中国一冶集团有限公司 Assembled light color steel tile fence
CN111663537A (en) * 2020-06-24 2020-09-15 深圳市南华岩土工程有限公司 Temporary supporting structure for foundation pit construction and construction method

Similar Documents

Publication Publication Date Title
CN209083149U (en) A kind of pipeline construction is with can flexibly dismantle suspension device
CN207847066U (en) A kind of construction formwork for placing
CN206016251U (en) A kind of elevator side wall Construction Support template
CN207332290U (en) A kind of pre-buried suspension scaffold I-steel snap ring of regularization
CN209723602U (en) A kind of architectural engineering reinforced support device
CN207375655U (en) A kind of tower crane of stable overturning-preventing
CN208039900U (en) A kind of late poured band support device
CN216382841U (en) Pipeline strutting arrangement for construction
CN210342734U (en) Support column for prefabricated building
CN204920200U (en) Fossil fragments template system
CN210917388U (en) Easy dismouting formula underground structure
CN203514353U (en) Glass fiber reinforced plastics inspection well
CN208023923U (en) A kind of dismountable architectural engineering holder
CN204960450U (en) Structure is built in antidetonation room
CN208088139U (en) A kind of bridge construction support device
CN206144154U (en) Novel template frame for external wall construction
CN220247004U (en) Environment-friendly inspection well convenient to assemble and disassemble
CN207467482U (en) A kind of installation casing for jumbo
CN105201259A (en) Anti-seismic house construction structure
CN211887797U (en) Sand drying and classifying screening device special for building
CN212508360U (en) Underground coal mine anchor net unfolding tool
CN215820151U (en) Drawing device for civil engineering
CN214272059U (en) Steel structure support frame
CN203334758U (en) Pi connection special-shape steel pipe rod
CN207063467U (en) Support for building convenient to dismantle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190709

Termination date: 20210918