CN207332290U - A kind of pre-buried suspension scaffold I-steel snap ring of regularization - Google Patents

A kind of pre-buried suspension scaffold I-steel snap ring of regularization Download PDF

Info

Publication number
CN207332290U
CN207332290U CN201720964535.XU CN201720964535U CN207332290U CN 207332290 U CN207332290 U CN 207332290U CN 201720964535 U CN201720964535 U CN 201720964535U CN 207332290 U CN207332290 U CN 207332290U
Authority
CN
China
Prior art keywords
supporting rod
casing
snap ring
steel
compressing member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720964535.XU
Other languages
Chinese (zh)
Inventor
盛光鑫
张彬
吕龙龙
刘博元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN201720964535.XU priority Critical patent/CN207332290U/en
Application granted granted Critical
Publication of CN207332290U publication Critical patent/CN207332290U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of pre-buried suspension scaffold I-steel snap ring of regularization, including concrete layer and the bottom plate for being embedded in bottom in concrete layer, the upper end of the bottom plate is equipped with two parallel abutment sleeves vertically, junction between the abutment sleeve and bottom plate is equipped with sealing ring, the inside of each abutment sleeve is inserted with supporting rod, the outside of the supporting rod is equipped with casing, the surface of the supporting rod is equipped with the first screw thread, the madial wall of described sleeve pipe is equipped with the second screw thread to match with the first screw thread, the side of the remotely located sleeve of described sleeve pipe is equipped with compressing member, the middle part of the compressing member is equipped with buffer board, the compressing member is equipped with the groove to match with casing close to the side of casing.The utility model is simple in structure, easy to operate, is easier to position when pre-buried fixed and fixes, is not in the phenomenon for rocking and being disturbed displacement, also, after scaffold dismounting, single unit system structure is easier to dismantle, easy to recycle.

Description

A kind of pre-buried suspension scaffold I-steel snap ring of regularization
Technical field
It the utility model is related to I-steel snap ring technical field, more particularly to a kind of pre-buried suspension scaffold I-steel card of regularization Ring.
Background technology
I-steel is also referred to as girder steel, is the strip steel that section is I-shaped shape.I-steel point common I-steel and light-duty I-steel, in the prior art, the general pre-buried ring of external scaffolding I-steel are to carry out screwed ring set in pvc pipe in advance Bury, easily displacement after not allowing to be fixed easily when pre-buried and being disturbed, and after scaffold dismounting, though U-shaped ring can recycle, need Special messenger is wanted to be chiselled, work efficiency is not high.
Utility model content
The purpose of this utility model be in order to solve the problems, such as that I-steel snap ring is not easy to remove in the prior art, and propose A kind of pre-buried suspension scaffold I-steel snap ring of regularization.
To achieve these goals, the utility model employs following technical solution:
A kind of pre-buried suspension scaffold I-steel snap ring of regularization, including concrete layer and the bottom for being embedded in bottom in concrete layer Plate, the upper end of the bottom plate are equipped with two parallel abutment sleeves vertically, and the junction between the abutment sleeve and bottom plate is set There is sealing ring, the inside of each abutment sleeve is inserted with supporting rod, and the outside of the supporting rod is equipped with casing, the branch The surface of strut is equipped with the first screw thread, and the madial wall of described sleeve pipe is equipped with the second screw thread to match with the first screw thread, described The side of the remotely located sleeve of casing is equipped with compressing member, and the middle part of the compressing member is equipped with buffer board, and the compressing member is close to set The side of pipe is equipped with the groove to match with casing, and all side walls of the described sleeve pipe in groove are equipped with fixed block, described It is equipped with the inner wall of compressing member and rotates chamber and shifting chute, and rotated chamber and connected with shifting chute, the inside for rotating chamber is by turning Moving axis is equipped with gear, and the shifting chute is internally provided with rack bar, and wheel and rack bar is meshed, the compressing member, coagulation I-steel is equipped between soil layer, casing and abutment sleeve, and the recess of I-steel both sides goes out equipped with supporting block.
Preferably, it is filled with vulcanie between the madial wall of the supporting rod and seal sleeve.
Preferably, the diameter of described sleeve pipe and the diameter of abutment sleeve are identical, and described sleeve pipe is close to the side of abutment sleeve Equipped with convex block, and the upper side wall of abutment sleeve is equipped with the annular groove with convex block rubber tissue.
Preferably, the rotation axis is fixed on the inside for rotating chamber by fixing piece.
Preferably, the fixed block is equipped with fluting close to the side of shifting chute, and the height slotted is slightly larger than rack bar Highly.
Preferably, the upper surface of the bottom plate is equipped with connecting hole, and the diameter of the connecting hole is identical with the diameter of supporting rod, The supporting rod is welded on the inside of connecting hole.
In the utility model, after determining pre-buried position, supporting rod is welded in the connecting hole on bottom plate, is then being propped up Abutment sleeve on the outer sheath of strut, then sets sealing ring in the junction of abutment sleeve and bottom plate, ensures leakproofness, support The upper end of bar is threaded, and casing can be connected by screw thread with supporting rod, and in compressing member, concrete layer, casing and is determined I-steel is equipped between the sleeve of position, casing moves up and down on supporting rod, drives compressing member to move down, is compressed to I-steel, And casing can be pulled down easily under the action of rack bar, gear and fixed block from compressing member, facilitate I-steel Take out, then the i.e. recyclable snap ring disassembled, snap ring are the connection structure of bottom plate and supporting rod, pre-buried are made easy to next time With, the utility model is simple in structure, easy to operate, is easier to position when pre-buried fixed and fixes, be not in rock and by The phenomenon of displacement is disturbed, also, after scaffold dismounting, single unit system structure is easier to dismantle, and easy to recycle, carries significantly High workload efficiency.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of pre-buried suspension scaffold I-steel snap ring of regularization structure diagram;
Fig. 2 be the utility model proposes a kind of pre-buried suspension scaffold I-steel snap ring part A of regularization structure diagram.
In figure:1 bottom plate, 2 abutment sleeves, 3 sealing rings, 4 supporting rods, 5 I-steel, 6 supporting blocks, 7 casings, 8 compressing members, 9 Buffer board, 10 concrete layers, 11 fixed blocks, 12 shifting chutes, 13 rack bars, 14 gears.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
In the description of the utility model, it is to be understood that term " on ", " under ", "front", "rear", "left", "right", The orientation or position relationship of the instruction such as " top ", " bottom ", " interior ", " outer " are based on orientation shown in the drawings or position relationship, are only Described for the ease of description the utility model and simplifying, rather than instruction or imply signified device or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model.
With reference to Fig. 1-2, a kind of pre-buried suspension scaffold I-steel snap ring of regularization, including concrete layer 10 and it is embedded in concrete The bottom plate 1 of bottom in layer 10, the upper end of bottom plate 1 is equipped with two parallel abutment sleeves 2 vertically, between abutment sleeve 2 and bottom plate 1 Junction be equipped with sealing ring 3, the inside of each abutment sleeve 2 is inserted with supporting rod 4, and the upper surface of bottom plate 1 is equipped with connection Hole, the diameter of connecting hole is identical with the diameter of supporting rod 4, and supporting rod 4 is welded on the inside of connecting hole, supporting rod 4 and sealing shroud Vulcanie is filled between the madial wall of cylinder 2, the outside of supporting rod 4 is equipped with casing 7, diameter and the abutment sleeve 2 of casing 7 Diameter is identical, and casing 7 is equipped with convex block close to the side of abutment sleeve 2, and the upper side wall of abutment sleeve 2 is equipped with and convex block rubber tissue Annular groove, the surface of supporting rod 4 is equipped with the first screw thread, and the madial wall of casing 7 is equipped with match with the first screw thread second Screw thread, the side of the remotely located sleeve 2 of casing 7 are equipped with compressing member 8, and the middle part of compressing member 8 is equipped with buffer board 9, and compressing member 8 is close The side of casing 7 is equipped with the groove to match with casing 7, and all side walls of the casing 7 in groove are equipped with fixed block 11, presses It is equipped with the inner wall of tight part 8 and rotates chamber and shifting chute 12, and rotated chamber and connected with shifting chute 12, the inside for rotating chamber passes through rotation Axis is equipped with gear 14, and rotation axis is fixed on the inside for rotating chamber by fixing piece, and shifting chute 12 is internally provided with rack bar 13, and Gear 14 is meshed with rack bar 13, and fixed block 11 is equipped with fluting close to the side of shifting chute 12, and the height slotted is slightly larger than The height of rack bar 13, is equipped with I-steel 5, and 5 liang of I-steel between compressing member 8, concrete layer 10, casing 7 and abutment sleeve 2 The recess of side goes out equipped with supporting block 6.
In the utility model, after determining pre-buried position, supporting rod 4 is welded in the connecting hole on bottom plate 1, Ran Hou Abutment sleeve 2 on the outer sheath of supporting rod 4, then sets sealing ring 3 in the junction of abutment sleeve 2 and bottom plate 1, ensures sealing Property, the upper end of supporting rod 4 are threaded, and casing 7 can be connected by screw thread with supporting rod 4, and in compressing member 8, concrete I-steel 5 is equipped between layer 10, casing 7 and abutment sleeve 2, casing 7 moves up and down on supporting rod 4, drives under compressing member 8 Move, compressed to I-steel 5, and casing 7 under the action of rack bar 13, gear 14 and fixed block 11 can easily from Pulled down on compressing member 8, facilitate the taking-up of I-steel 5, then the i.e. recyclable snap ring disassembled, snap ring be bottom plate 1 with The connection structure of supporting rod 4, easy to pre-buried use next time.
The above, is only the preferable embodiment of the utility model, but the scope of protection of the utility model is not This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality New technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of pre-buried suspension scaffold I-steel snap ring of regularization, including concrete layer (10) and it is embedded in concrete layer (10) interior bottom The bottom plate (1) in portion, the upper end of the bottom plate (1) is vertical to be equipped with two parallel abutment sleeves (2), the abutment sleeve (2) and Junction between bottom plate (1) is equipped with sealing ring (3), it is characterised in that the inside of each abutment sleeve (2) is inserted with Supporting rod (4), the outside of the supporting rod (4) are equipped with casing (7), and the surface of the supporting rod (4) is equipped with the first screw thread, described The madial wall of casing (7) is equipped with the second screw thread to match with the first screw thread, described sleeve pipe (7) remotely located sleeve (2) Side is equipped with compressing member (8), and the middle part of the compressing member (8) is equipped with buffer board (9), and the compressing member (8) is close to casing (7) Side is equipped with the groove to match with casing (7), and all side walls of the described sleeve pipe (7) in groove are equipped with fixed block (11), it is equipped with the inner wall of the compressing member (8) and rotates chamber and shifting chute (12), and is rotated chamber and connected with shifting chute (12), institute The inside for stating rotation chamber is equipped with gear (14) by rotation axis, and the shifting chute (12) is internally provided with rack bar (13), and tooth Wheel (14) is meshed with rack bar (13), between the compressing member (8), concrete layer (10), casing (7) and abutment sleeve (2) Recess equipped with I-steel (5), and I-steel (5) both sides goes out equipped with supporting block (6).
A kind of 2. pre-buried suspension scaffold I-steel snap ring of regularization according to claim 1, it is characterised in that the supporting rod (4) vulcanie is filled between the madial wall of seal sleeve (2).
A kind of 3. pre-buried suspension scaffold I-steel snap ring of regularization according to claim 1, it is characterised in that described sleeve pipe (7) diameter is identical with the diameter of abutment sleeve (2), and described sleeve pipe (7) is equipped with convex block close to the side of abutment sleeve (2), and The upper side wall of abutment sleeve (2) is equipped with the annular groove with convex block rubber tissue.
A kind of 4. pre-buried suspension scaffold I-steel snap ring of regularization according to claim 1, it is characterised in that the rotation axis The inside for rotating chamber is fixed on by fixing piece.
A kind of 5. pre-buried suspension scaffold I-steel snap ring of regularization according to claim 1, it is characterised in that the fixed block (11) fluting is equipped with close to the side of shifting chute (12), and the height slotted is slightly larger than the height of rack bar (13).
A kind of 6. pre-buried suspension scaffold I-steel snap ring of regularization according to claim 5, it is characterised in that the bottom plate (1) upper surface is equipped with connecting hole, and the diameter of the connecting hole is identical with the diameter of supporting rod (4), supporting rod (4) welding In the inside of connecting hole.
CN201720964535.XU 2017-08-03 2017-08-03 A kind of pre-buried suspension scaffold I-steel snap ring of regularization Expired - Fee Related CN207332290U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720964535.XU CN207332290U (en) 2017-08-03 2017-08-03 A kind of pre-buried suspension scaffold I-steel snap ring of regularization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720964535.XU CN207332290U (en) 2017-08-03 2017-08-03 A kind of pre-buried suspension scaffold I-steel snap ring of regularization

Publications (1)

Publication Number Publication Date
CN207332290U true CN207332290U (en) 2018-05-08

Family

ID=62378013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720964535.XU Expired - Fee Related CN207332290U (en) 2017-08-03 2017-08-03 A kind of pre-buried suspension scaffold I-steel snap ring of regularization

Country Status (1)

Country Link
CN (1) CN207332290U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083393A (en) * 2018-09-11 2018-12-25 中建三局第建设工程有限责任公司 The I-shaped guide rail of rack gear and elevating scaffold
CN109914393A (en) * 2019-02-28 2019-06-21 温州国宁建设有限公司 A kind of bored concrete pile being readily transported and its construction technology
CN111877723A (en) * 2020-06-24 2020-11-03 东阳市伟欣悬挑设备有限公司 Anti-vibration cantilever frame of split type connection anchoring superimposed sheet
CN112663937A (en) * 2019-10-16 2021-04-16 新疆苏中建设工程有限公司 A turnover formula anchor ring for scaffold frame of encorbelmenting

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083393A (en) * 2018-09-11 2018-12-25 中建三局第建设工程有限责任公司 The I-shaped guide rail of rack gear and elevating scaffold
CN109914393A (en) * 2019-02-28 2019-06-21 温州国宁建设有限公司 A kind of bored concrete pile being readily transported and its construction technology
CN109914393B (en) * 2019-02-28 2021-01-05 温州国宁建设有限公司 Cast-in-place pile convenient to transport and construction process thereof
CN112663937A (en) * 2019-10-16 2021-04-16 新疆苏中建设工程有限公司 A turnover formula anchor ring for scaffold frame of encorbelmenting
CN111877723A (en) * 2020-06-24 2020-11-03 东阳市伟欣悬挑设备有限公司 Anti-vibration cantilever frame of split type connection anchoring superimposed sheet

Similar Documents

Publication Publication Date Title
CN207332290U (en) A kind of pre-buried suspension scaffold I-steel snap ring of regularization
CN205063308U (en) Outer hanging protection frame and outer hanging protective structure
CN103510625A (en) Top-bottom T-shaped steel type node for connecting H-shaped steel beam with rectangular tubular column through unilateral bolts
CN103114722A (en) Three-sectional water stopping screw for basement exterior wall
CN204716271U (en) A kind of steel band suspension device that intersects
CN105019647A (en) Telescopic sleeve
CN202017352U (en) Combined supporting pillar
CN104669225A (en) Novel welding rod box
CN208149399U (en) A kind of material clamping and fixing device
CN209040867U (en) A kind of U-shaped steel bracket improving support pattern
CN207261823U (en) A kind of civil engineering plastic conduit supporting device
CN206204992U (en) Detachable waterproof node structure between prefabricated comprehensive pipe gallery joints
CN102121252B (en) Method for constructing pile plate retaining wall
CN103925421B (en) A kind of pump line special stand
CN203964914U (en) A kind of total powerstation support for metro automatic monitoring
CN204475349U (en) Modular support device
CN207485453U (en) A kind of telescopic tunnel support Mobile workbench
CN203395395U (en) Detachable pipeline buttress
CN203795824U (en) Suspension type fastener scaffold erecting device
CN203515613U (en) Structure for connecting ejector rods between steel tube concrete supports
CN204151807U (en) The assembled steel open caisson that can reuse
CN207620118U (en) A kind of steel frame construction of folding steel structure movable board room
CN209106781U (en) A kind of displaying rack device for museum
CN105756067A (en) Method for horizontally and temporarily supporting and changing support in deep foundation pit
CN206889858U (en) Ceiling mount bracket below interim pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180508

Termination date: 20180803

CF01 Termination of patent right due to non-payment of annual fee