CN207485453U - A kind of telescopic tunnel support Mobile workbench - Google Patents

A kind of telescopic tunnel support Mobile workbench Download PDF

Info

Publication number
CN207485453U
CN207485453U CN201721510732.0U CN201721510732U CN207485453U CN 207485453 U CN207485453 U CN 207485453U CN 201721510732 U CN201721510732 U CN 201721510732U CN 207485453 U CN207485453 U CN 207485453U
Authority
CN
China
Prior art keywords
mobile workbench
steel structure
structure framework
tunnel support
trolley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721510732.0U
Other languages
Chinese (zh)
Inventor
魏昶帆
姜文涛
吴勇
魏再寻
叶云龙
余绍凡
陈府
张晓彪
张晓梅
刘浩杰
李庆明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN INSTITUTE OF BUILDING RESEARCH
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
YUNNAN INSTITUTE OF BUILDING RESEARCH
Yunnan Construction and Investment Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN INSTITUTE OF BUILDING RESEARCH, Yunnan Construction and Investment Holding Group Co Ltd filed Critical YUNNAN INSTITUTE OF BUILDING RESEARCH
Priority to CN201721510732.0U priority Critical patent/CN207485453U/en
Application granted granted Critical
Publication of CN207485453U publication Critical patent/CN207485453U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of telescopic tunnel support Mobile workbench, the steel structure framework (2) including four stabilizer blade of cuboid frame, four movable pulleys (1) for being located at steel structure framework (2) bottom, the pad rack (3) being symmetrically welded on steel structure framework (2) two sides, 8 casings (4) being symmetrically welded on steel structure framework (2) two sides, the joint steel pipe (5) for plug-in-sleeve (4);Casing (4) and joint steel pipe (5) are equipped with through bolt hole (6), and bolt hole (6) is inserted into using bolt (7).The utility model has following remarkable result:It is moved easily, adjustable trolley length, equal working space, the more traditional trolley light weight of the utility model trolley, it is mobile and assembled that trolley can be completed in 15 minutes, simple operation, at the same avoid the Mobile workbench when working space is too small it is long cause to stop work or avoid working space excessive and Mobile workbench it is too short cause repeatedly to move Mobile workbench influence construction efficiency.

Description

A kind of telescopic tunnel support Mobile workbench
Technical field
The utility model is related in built tunnel supporting operation and detection operation field, multiple trolleys form trolley group, operation Trolley length is adjustable, and environmental suitability is strong, and construction operation is efficient and is convenient to supporting quality detection.It is being built suitable for majority Vcehicular tunnel.
Background technology
During constructing tunnel, supporting job platform is typically the Mobile workbench of steel construction, the work of supporting Mobile workbench Industry range is located at after two lining trolleys, and before inverted arch excavation face, which is typically 5~60m etc..Previous supporting operation post The length of vehicle is typically 5~10m, and when job area is too small, can only set aside concerns supporting Mobile workbench in work surface, can squeeze it The working space of his mechanical equipment, when job area is excessive, because sequentially to arrange geotextiles, splash guard, two lined steel muscle, so as to Lead to repeated multiple times mobile supporting Mobile workbench, significantly impact construction efficiency.
The movement of supporting trolley is necessarily dependent upon large-duty loader, repeated multiple times mobile trolley used to lead to mechanical equipment, people The long-time of member occupies, and influences production efficiency, and mobile number excessively also results in the loosening of steel construction, causes construction hidden danger.
If supporting Mobile workbench can be solved to repeat to move, and make full use of working space, then can greatly improve The working efficiency of tunnel support operation.
Invention content
The utility model makes full use of working space for tunnel support operating efficiency is improved, devise it is a kind of it is light-weight, Removable, telescopic trolley group.
A kind of telescopic tunnel support Mobile workbench, the steel structure framework including four stabilizer blade of cuboid frame are located at steel Four movable pulleys of structural framework bottom, are symmetrically welded at steel at the pad rack being symmetrically welded on steel structure framework two sides 8 casings, the joint steel pipe for plug-in-sleeve on structural framework two sides;Casing and joint steel pipe are equipped with through spiral shell Keyhole is inserted into bolt hole using bolt.
The utility model steel structure framework includes four pillars, four braces, four top cross bars, four middle cross bars, two Root sheer pole, two foundation cross bars.There are four movable pulleys for steel structure framework bottom side dress, are moved easily trolley.
In 8 casings of the utility model 6 respectively 3-3 be symmetrically welded at top cross bar, middle cross bar, sheer pole end in branch On column;2 are respectively welded in brace upper end on the cross bar of top.
The utility model pad rack includes parallel bar and supporting rod, divides three layers and is symmetrically welded, parallel bar is respectively parallel to Cross bar, middle cross bar, sheer pole are pushed up, is allowed in approximately the same plane.
The utility model is in parallel in a determining deviation using two steel structure frameworks, i.e., is inserted respectively using joint steel pipe both ends Enter in casing, being inserted into bolt hole by using bolt is fixed, and is laid with backing plate on pad rack adjacent two-by-two, makes adjacent Trolley forms the construction operation platform of an entirety.
Compared with conventional tunnel supporting Mobile workbench, which has following remarkable result:It is moved easily, is adjusted Trolley length, equal working space, the more traditional trolley light weight of the utility model trolley can complete trolley shifting in 15 minutes It is dynamic and assembled, simple operation, while avoid that the Mobile workbench when working space is too small is long to be caused to stop work or avoid operation empty Between excessive and Mobile workbench it is too short cause repeatedly to move Mobile workbench influence construction efficiency.
Description of the drawings
Fig. 1 is the positive structure diagram of the utility model;
Fig. 2 is the side structure schematic view of the utility model;
Fig. 3 is the utility model connection effect side structure schematic view;
Wherein, 1, movable pulley;2nd, steel structure framework;3rd, pad rack;4th, casing;5th, joint steel pipe;6th, bolt hole;7th, spiral shell Bolt.
Specific embodiment
As shown in FIG. 1 to 3, a kind of telescopic tunnel support Mobile workbench, the utility model include cuboid frame The steel structure framework 2 of four stabilizer blades, is symmetrically welded at 2 liang of steel structure framework at four movable pulleys 1 for being located at 2 bottom of steel structure framework Pad rack 3 on side, 8 casings 4 being symmetrically welded on 2 two sides of steel structure framework, the connection for plug-in-sleeve 4 Steel pipe 5;Casing 4 and joint steel pipe 5 are equipped with through bolt hole 6, and bolt hole 6 is inserted into using bolt 7.
According to construction demand, specific size, welded steel structure skeleton 2, including four pillars, four braces, four are determined Root top cross bar, four middle cross bars, two sheer poles, two foundation cross bars.
Four movable pulleys 1 are installed in 2 bottom side of steel structure framework, trolley is facilitated to move.
By 6 in 8 casings 4 respectively 3-3 be symmetrically welded at top cross bar, middle cross bar, sheer pole end on pillar;2 Root is respectively welded in brace upper end on the cross bar of top.
Pad rack 3 divides three layers to be symmetrically welded, and parallel bar is respectively parallel to top cross bar, middle cross bar, sheer pole, is allowed to be in Approximately the same plane.
Two steel structure frameworks 2 are in parallel in a determining deviation, i.e., distinguished in plug-in-sleeve 4 using 5 both ends of joint steel pipe, It is aligned bolt hole 6 and is inserted into bolt and fix, be laid with backing plate on pad rack 3 adjacent two-by-two, adjacent trolley is made to form one Whole construction operation platform.
According to practice of construction demand, the distance between adjacent steel structure framework is adjusted, realizes the scalability of trolley.
The utility model to apply mode without being limited thereto, according to content described in the utility model, with reference to the basic skill in this field Art knowledge and customary means, modification, replacement or the change of other diversified forms that the utility model can be made, all fall within this reality Within novel protection domain.

Claims (5)

1. a kind of telescopic tunnel support Mobile workbench, which is characterized in that include the steel construction bone of four stabilizer blade of cuboid frame Frame (2), is symmetrically welded on steel structure framework (2) two sides four movable pulleys (1) for being located at steel structure framework (2) bottom Pad rack (3), 8 casings (4), the connections for plug-in-sleeve (4) being symmetrically welded on steel structure framework (2) two sides Steel pipe (5);Casing (4) and joint steel pipe (5) are equipped with through bolt hole (6), and bolt hole (6) is inserted into using bolt (7).
A kind of 2. telescopic tunnel support Mobile workbench according to claim 1, which is characterized in that steel structure framework (2) including four pillars, four braces, four top cross bars, four middle cross bars, two sheer poles, two foundation cross bars.
3. a kind of telescopic tunnel support Mobile workbench according to claim 1, which is characterized in that in 8 casings (4) 6 respectively 3-3 be symmetrically welded at top cross bar, middle cross bar, sheer pole end on pillar;2 are respectively welded on brace It holds on the cross bar of top.
A kind of 4. telescopic tunnel support Mobile workbench according to claim 1, which is characterized in that pad rack (3) Including parallel bar and supporting rod, divide three layers and be symmetrically welded, parallel bar is respectively parallel to top cross bar, middle cross bar, sheer pole, makes part In approximately the same plane.
5. a kind of telescopic tunnel support Mobile workbench according to claim 1, which is characterized in that using two steel knots Structure skeleton (2) is in parallel in a determining deviation, i.e., interior using joint steel pipe (5) both ends difference plug-in-sleeve (4), by using bolt (7) it is inserted into bolt hole (6) to be fixed, backing plate is laid on pad rack (3) adjacent two-by-two, adjacent trolley is made to form one Whole construction operation platform.
CN201721510732.0U 2017-11-14 2017-11-14 A kind of telescopic tunnel support Mobile workbench Active CN207485453U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721510732.0U CN207485453U (en) 2017-11-14 2017-11-14 A kind of telescopic tunnel support Mobile workbench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721510732.0U CN207485453U (en) 2017-11-14 2017-11-14 A kind of telescopic tunnel support Mobile workbench

Publications (1)

Publication Number Publication Date
CN207485453U true CN207485453U (en) 2018-06-12

Family

ID=62476799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721510732.0U Active CN207485453U (en) 2017-11-14 2017-11-14 A kind of telescopic tunnel support Mobile workbench

Country Status (1)

Country Link
CN (1) CN207485453U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107676113A (en) * 2017-11-14 2018-02-09 云南省建筑科学研究院 A kind of telescopic tunnel support Mobile workbench

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107676113A (en) * 2017-11-14 2018-02-09 云南省建筑科学研究院 A kind of telescopic tunnel support Mobile workbench
CN107676113B (en) * 2017-11-14 2024-02-20 云南省建筑科学研究院 Telescopic tunnel supporting operation trolley

Similar Documents

Publication Publication Date Title
CN102979300B (en) Section-adjustable rectangular column framework assembly
JP2016084690A (en) Base type foundation unit
CN203779015U (en) Reinforcement cage forming machine
CN103397711A (en) Multi-tube lattice type buckling restraining support
CN207485453U (en) A kind of telescopic tunnel support Mobile workbench
CN104264962A (en) Sleeve combination tool type platform of cantilever scaffold and operating method thereof
CN206438405U (en) Concrete placings platform is fixed at a kind of round steel fence type Pier Formwork end
CN204040515U (en) Cat ladder
CN203514808U (en) Wall formwork supporting composite structure
CN107676113A (en) A kind of telescopic tunnel support Mobile workbench
CN207362872U (en) A kind of earth-retaining wall bracket for conveniently building dismounting
CN207210968U (en) Box beam roof steel bar skeleton colligation mold
CN107419733A (en) A kind of side slope down-the-hole drill drilling operation platform
CN203062760U (en) Assembled steel bar processing platform
CN204456656U (en) A kind of welding stirrup coordinates rod iron combined steel and concrete column
CN210239139U (en) Cornice template supporting device
CN203755165U (en) Bracket structure for steel pipe pile
CN203129944U (en) Vertical drilling device
CN206917061U (en) A kind of steel construction assembled wallboard
CN203412302U (en) Support steel frame with multi-row inclined reinforcing steel bar mesh
CN206205457U (en) A kind of steel reinforcement cage aids in colligation frame
CN208763043U (en) The stage apparatus of precipitation well servicing
CN205296917U (en) Polygonized structure stadiums convenient to dismantle
CN203984879U (en) A kind of composite electrician spade
CN203247546U (en) Combined type suspended wall formwork for pouring dam inclined portion

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant