CN203755165U - Bracket structure for steel pipe pile - Google Patents

Bracket structure for steel pipe pile Download PDF

Info

Publication number
CN203755165U
CN203755165U CN201320896070.0U CN201320896070U CN203755165U CN 203755165 U CN203755165 U CN 203755165U CN 201320896070 U CN201320896070 U CN 201320896070U CN 203755165 U CN203755165 U CN 203755165U
Authority
CN
China
Prior art keywords
steel pipe
pipe pile
iron
longeron
bailey
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320896070.0U
Other languages
Chinese (zh)
Inventor
金春梅
徐先华
吴雪梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG HANGZHOU BAY CONSTRUCTION GROUP CO Ltd
ZHEJIANG XIAOFENG CONSTRUCTION GROUP Co Ltd
GAOYUN HOLDING Co Co Ltd
Original Assignee
ZHEJIANG HANGZHOU BAY CONSTRUCTION GROUP CO Ltd
ZHEJIANG XIAOFENG CONSTRUCTION GROUP Co Ltd
GAOYUN HOLDING Co Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG HANGZHOU BAY CONSTRUCTION GROUP CO Ltd, ZHEJIANG XIAOFENG CONSTRUCTION GROUP Co Ltd, GAOYUN HOLDING Co Co Ltd filed Critical ZHEJIANG HANGZHOU BAY CONSTRUCTION GROUP CO Ltd
Priority to CN201320896070.0U priority Critical patent/CN203755165U/en
Application granted granted Critical
Publication of CN203755165U publication Critical patent/CN203755165U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a constructional engineering structure and especially relates to a bracket structure for a steel pipe pile. The bracket structure for the steel pipe pile is composed of the steel pipe pile which is driven underground and the steel pipe pile which is on the ground; the steel pipe piles are integrally connected; an I-shaped steel is erected at the top of the steel pipe piles; Bailey longitudinal beams are erected on the I-shaped steel; the Bailey longitudinal beams are arrayed at intervals; the Bailey longitudinal beams and the I-shaped steel are erected in a form of being vertical to each other; the I-shaped steel and a bracket are paved on the Bailey longitudinal beams; adjusting timber tips are arranged between the I-shaped steel and the bracket. The bracket structure for the steel pipe pile has the characteristics of reasonable design, lower construction cost, higher reliability, and the like.

Description

Steel pipe pile supporting structure
Technical field
The utility model relates to a kind of building engineering structure, especially relates to a kind of steel pipe pile supporting structure.
Background technology
Full hall steel pipe floor stand has been widely used in, in the cast-in-situ bridge of city, being characterized in: set up and convenient disassembly, material turnover is high, but simultaneously higher to ground requirement for bearing capacity, and ground restriction is large, and can not be used for cross-line section.If striding across the bottomed rack construction of the soft Ji Chu enforcement steel pipe in two ditches and large stretch of marsh, ground must pass through a large amount of soil removal and replacement compaction treatment, does not calculate economically.It is tight to add this period of box girder construction duration, soil removal and replacement processing, and the pre-pressing bracket time is inadequate, does not therefore adopt full hall steel pipe floor stand scheme.
Summary of the invention
The utility model is mainly that construction cost is higher for the existing complex structure of prior art, and the technical problem that reliability is not high provides a kind of simple in structure, and construction cost is lower, the steel pipe pile supporting structure that reliability is higher.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals: steel pipe pile supporting structure forms by squeezing into the ground steel pipe pile of bottom and the steel pipe column of ground floor, steel pipe column and steel pipe pile link into an integrated entity, i iron has been set up at steel pipe column top, i iron is added shellfish thunder longeron, shellfish thunder longeron is spaced, shellfish thunder longeron and i iron are orthogonal to be set up, and on shellfish thunder longeron, is covered with i iron and support, is provided with and adjusts wood point between i iron and support.Bailey beam is the trusses being assembled into by Bailey bracket, between Bailey bracket, is connecting elements mainly with sending out a window, fixes with bolt.Bailey bracket is the steelframe that forms certain unit, can be assembled into a lot of members, equipment with its splicing.
As preferably, between steel pipe column, be provided with horizontal-associate i iron.
Therefore, the utlity model has design more reasonable, construction cost is lower, and reliability is compared with high.
Brief description of the drawings
Accompanying drawing 1 is overall structure schematic diagram of the present utility model.
Detailed description of the invention
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment 1: steel pipe pile supporting structure forms by squeezing into the ground steel pipe pile of bottom and the steel pipe column of ground floor, steel pipe column 1 links into an integrated entity with steel pipe pile 2, steel pipe column 1 top shelf is provided with i iron 3, i iron 3 is added shellfish thunder longeron 4, shellfish thunder longeron 4 is spaced, shellfish thunder longeron 4 sets up with i iron 3 is orthogonal, is covered with i iron 5 and support 6 on shellfish thunder longeron 4, is provided with and adjusts wood point 7 between i iron 5 and support 6.Between steel pipe column 1, be provided with horizontal-associate i iron 8 (as shown in Figure 1).

Claims (2)

1. a steel pipe pile supporting structure, form by squeezing into the ground steel pipe pile of bottom and the steel pipe column of ground floor, it is characterized in that described steel pipe column (1) and steel pipe pile (2) link into an integrated entity, steel pipe column (1) top shelf is provided with i iron (3), i iron (3) is added shellfish thunder longeron (4), shellfish thunder longeron (4) is spaced, shellfish thunder longeron (4) and orthogonal the setting up of i iron (3), on shellfish thunder longeron (4), be covered with i iron (5) and support (6), between i iron (5) and support (6), be provided with and adjust wood point (7).
2. steel pipe pile supporting structure according to claim 1, is characterized in that being provided with between described steel pipe column (1) horizontal-associate i iron (8).
CN201320896070.0U 2013-12-30 2013-12-30 Bracket structure for steel pipe pile Expired - Fee Related CN203755165U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320896070.0U CN203755165U (en) 2013-12-30 2013-12-30 Bracket structure for steel pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320896070.0U CN203755165U (en) 2013-12-30 2013-12-30 Bracket structure for steel pipe pile

Publications (1)

Publication Number Publication Date
CN203755165U true CN203755165U (en) 2014-08-06

Family

ID=51250462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320896070.0U Expired - Fee Related CN203755165U (en) 2013-12-30 2013-12-30 Bracket structure for steel pipe pile

Country Status (1)

Country Link
CN (1) CN203755165U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400696A (en) * 2016-11-29 2017-02-15 广州市市政工程机械施工有限公司 Mobile combined bailey frame platform, movable combined bailey frame erecting platform and steel platform erecting method
CN110453609A (en) * 2019-08-28 2019-11-15 中铁建大桥工程局集团第一工程有限公司 A kind of simplicity steel-pipe pile bracket piling prepressing structure and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400696A (en) * 2016-11-29 2017-02-15 广州市市政工程机械施工有限公司 Mobile combined bailey frame platform, movable combined bailey frame erecting platform and steel platform erecting method
CN106400696B (en) * 2016-11-29 2018-01-16 广州市市政工程机械施工有限公司 Mobile type combination Bailey bracket platform, packaged type combination Bailey bracket set up platform and the erection method of steel platform
CN110453609A (en) * 2019-08-28 2019-11-15 中铁建大桥工程局集团第一工程有限公司 A kind of simplicity steel-pipe pile bracket piling prepressing structure and method
CN110453609B (en) * 2019-08-28 2020-12-11 中铁建大桥工程局集团第一工程有限公司 Simple and convenient steel pipe pile support preloading structure and method

Similar Documents

Publication Publication Date Title
CN102839678B (en) Structure for improving rigidity and stability of foundation pit steel support
CN202787271U (en) Stacked inner supporting structure for foundation pit supporting
CN203768788U (en) Tool type foundation pit soil conveying trestle bridge
CN203755165U (en) Bracket structure for steel pipe pile
CN202755370U (en) Structure for improving rigidity and stability of foundation pit steel support
CN102817617B (en) Novel inhaul cable type shield originating backrest substrate system
CN106351429B (en) A kind of Process for Heavy Support system and its construction method
CN204000885U (en) Metro Deep Excavation concrete support hangs mould mould
EA201101049A1 (en) DEVICE FOR STRENGTHENING DESIGN STRUCTURES
CN205100527U (en) A cantilever construction platform for surmounting retaining wall
CN205443900U (en) Multiple spot restraint and distributed tied arch bridge in arch rib face
CN102852150B (en) Superposed inner support structure for foundation pit support
CN203834492U (en) Major diameter round steel sheet pile cofferdam in water
CN202767281U (en) Assembly type reinforced concrete combination back wall
CN202969278U (en) Molding frame for assembling of bridge frameworks
CN205224272U (en) Steel construction factory building is with structure of encorbelmenting
CN206736743U (en) Lay the easy structure of mountable steel bridge
CN202247830U (en) Novel underwater steel platform
CN202298901U (en) Annular column grid steel beam connecting system with statically indeterminate structure
CN203701627U (en) Shaped spliceable protective shed
CN203593967U (en) Rigid frame beam combined support
CN204000579U (en) Steel bridge column and foundation connection structure
CN204456655U (en) A kind of overlength composite steel concrete column batter post structure
CN203755130U (en) Front beam and rear arch stacking device for steel arch bridge
CN204298993U (en) A kind of large floor height frame-shear-wall structure system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140806

Termination date: 20151230

EXPY Termination of patent right or utility model