CN216382841U - Pipeline strutting arrangement for construction - Google Patents

Pipeline strutting arrangement for construction Download PDF

Info

Publication number
CN216382841U
CN216382841U CN202122326785.XU CN202122326785U CN216382841U CN 216382841 U CN216382841 U CN 216382841U CN 202122326785 U CN202122326785 U CN 202122326785U CN 216382841 U CN216382841 U CN 216382841U
Authority
CN
China
Prior art keywords
plate
clamping
sleeve
clamping plate
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122326785.XU
Other languages
Chinese (zh)
Inventor
邢晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122326785.XU priority Critical patent/CN216382841U/en
Application granted granted Critical
Publication of CN216382841U publication Critical patent/CN216382841U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

本申请公开了一种建筑施工用管道支撑装置,包括四方体结构的底座,所述底座底部四角处分别安装有万向轮,所述底座上表面中间位置安装有固定板,所述固定板上安装有套筒,所述套筒上安装有螺纹轴,所述螺纹轴上端固定有承重板,所述承重板上设置有夹紧结构,所述夹紧结构包括夹紧板、螺纹杆和橡胶垫,所述承重板上左右两端分别固定有挡板,所述挡板上分别安装有螺纹杆。通过螺纹杆和夹紧板的设置,转动螺纹杆带动夹紧板左右移动,从而完成了对直径大小不同的管道的支撑固定,增大了该装置的适用范围,方便转运,在夹紧板内侧壁上设置有橡胶垫,避免在移动时震动对管道造成损伤。

Figure 202122326785

The application discloses a pipeline support device for building construction, comprising a base with a square structure, universal wheels are respectively installed at the four corners of the bottom of the base, a fixing plate is installed in the middle of the upper surface of the base, and the fixing plate is A sleeve is installed, a threaded shaft is installed on the sleeve, a bearing plate is fixed on the upper end of the threaded shaft, and a clamping structure is arranged on the bearing plate, and the clamping structure includes a clamping plate, a threaded rod and a rubber The left and right ends of the load-bearing plate are respectively fixed with baffles, and threaded rods are respectively installed on the baffles. Through the setting of the threaded rod and the clamping plate, rotating the threaded rod drives the clamping plate to move left and right, thereby completing the support and fixing of pipes with different diameters, increasing the applicable range of the device, and facilitating transportation. Rubber pads are arranged on the wall to avoid damage to the pipeline caused by vibration when moving.

Figure 202122326785

Description

一种建筑施工用管道支撑装置A kind of pipeline support device for building construction

技术领域technical field

本申请涉及建筑施工技术领域,尤其是一种建筑施工用管道支撑装置。The present application relates to the technical field of building construction, in particular to a pipeline support device for building construction.

背景技术Background technique

建筑施工是指工程建设实施阶段的生产活动,是各类建筑物的建造过程,也可以说是把设计图纸上的各种线条,在指定的地点变成实物的过程,管道广泛应用在给排水、压缩空气、化工管道、油管道、灌浆管道、冲洗系统和喷淋系统等方面,应用越来越广,对管道准确安装的需求越来越高,建筑施工用的管道支撑装置就是对用于建筑施工的管道进行固定安装,进而以满足建筑施工的需要。Building construction refers to the production activities in the implementation stage of project construction. It is the construction process of various buildings. It can also be said that the various lines on the design drawings are turned into real objects at the designated location. Pipes are widely used in water supply and drainage. , compressed air, chemical pipelines, oil pipelines, grouting pipelines, flushing systems and sprinkler systems, etc., are more and more widely used, and the demand for accurate pipeline installation is getting higher and higher. The pipelines for building construction are fixedly installed to meet the needs of building construction.

现有的土木工程建筑施工管道支撑装置多使用特定的固定装置对管道进行固定,再通过钢丝绳或吊绳进行悬吊,最后通过吊车和外界人力进行配合,使其接口处对接,施工人员再进行焊接操作,存在的不足之处有:由于特定的固定装置只能对单一类型的管道进行固定,无法根据管道直径的变化进行调整,需要施工人员不断的进行更换固定装置,操作繁琐,易降低工程进度。因此,针对上述问题提出一种建筑施工用管道支撑装置。Existing civil engineering construction pipeline support devices mostly use specific fixing devices to fix the pipelines, and then use steel wire ropes or suspending ropes to suspend them. Finally, the cranes cooperate with external manpower to make the interface docked, and the construction personnel will then carry out The disadvantages of welding operation are: because a specific fixture can only fix a single type of pipeline, it cannot be adjusted according to the change of the pipe diameter, and the construction personnel need to constantly replace the fixture, which is cumbersome to operate and easy to reduce the engineering cost. schedule. Therefore, in view of the above problems, a pipeline support device for building construction is proposed.

发明内容SUMMARY OF THE INVENTION

在本实施例中提供了一种建筑施工用管道支撑装置用于解决现有的土木工程建筑施工管道支撑装置多使用特定的固定装置对管道进行固定,再通过钢丝绳或吊绳进行悬吊,最后通过吊车和外界人力进行配合,使其接口处对接,施工人员再进行焊接操作,存在的不足之处有:由于特定的固定装置只能对单一类型的管道进行固定,无法根据管道直径的变化进行调整,需要施工人员不断的进行更换固定装置,操作繁琐,易降低工程进度的问题。In this embodiment, a pipeline support device for building construction is provided, which is used to solve the problem that the existing pipeline support device for civil engineering construction mostly uses a specific fixing device to fix the pipeline, and then suspends it by a steel wire rope or a hanging rope, and finally Through the cooperation of the crane and the external manpower, the joints are connected, and the construction personnel then carry out the welding operation. The shortcomings are: because the specific fixing device can only fix a single type of pipeline, it cannot be carried out according to the change of the diameter of the pipeline. Adjustment requires the construction personnel to constantly replace the fixtures, which is cumbersome to operate and easily reduces the progress of the project.

根据本申请的一个方面,提供了一种建筑施工用管道支撑装置,包括四方体结构的底座,所述底座底部四角处分别安装有万向轮,所述底座上表面中间位置安装有固定板,所述固定板上安装有套筒,所述套筒上安装有螺纹轴,所述螺纹轴上端固定有承重板,所述承重板上设置有夹紧结构,所述夹紧结构包括夹紧板、螺纹杆和橡胶垫。According to one aspect of the present application, a pipeline support device for building construction is provided, comprising a base with a square structure, universal wheels are respectively installed at four corners of the bottom of the base, and a fixing plate is installed in the middle of the upper surface of the base, A sleeve is installed on the fixing plate, a threaded shaft is installed on the sleeve, a bearing plate is fixed on the upper end of the threaded shaft, and a clamping structure is arranged on the bearing plate, and the clamping structure includes a clamping plate , threaded rod and rubber pad.

进一步地,所述套筒下端与固定板转动连接,所述套筒内部螺纹与螺纹轴外部的螺纹相互齿合,所述套筒和螺纹轴螺纹连接。Further, the lower end of the sleeve is rotatably connected with the fixing plate, the internal thread of the sleeve and the external thread of the threaded shaft are engaged with each other, and the sleeve and the threaded shaft are threadedly connected.

进一步地,所述承重板上左右两边对称设置有滑槽,所述滑槽上分别安装有夹紧板,所述夹紧板与滑槽滑动连接。Further, sliding grooves are symmetrically arranged on the left and right sides of the load-bearing plate, clamping plates are respectively installed on the sliding grooves, and the clamping plates are slidably connected with the sliding grooves.

进一步地,所述承重板上左右两端分别固定有挡板,所述挡板上分别安装有螺纹杆,所述螺纹杆与挡板螺纹连接,所述螺纹杆远离夹紧板的一端分别固定安装有旋钮。Further, baffles are respectively fixed on the left and right ends of the load-bearing plate, threaded rods are respectively installed on the baffles, the threaded rods are threadedly connected with the baffles, and the ends of the threaded rods away from the clamping plate are respectively fixed. A knob is installed.

进一步地,所述螺纹杆分别穿过挡板与夹紧板侧壁连接,所述夹紧板内侧壁分别设置成弧形,所述夹紧板内侧壁上分别设置有橡胶垫。Further, the threaded rods are respectively connected to the side walls of the clamping plates through the baffle plates, the inner side walls of the clamping plates are respectively arranged in an arc shape, and rubber pads are respectively arranged on the inner side walls of the clamping plates.

进一步地,所述夹紧板弧形内壁上下两端分别设置有卡槽,所述卡槽上分别安装有橡胶垫,所述橡胶垫两端分别与卡槽相互卡合。Further, the upper and lower ends of the arc-shaped inner wall of the clamping plate are respectively provided with clamping grooves, rubber pads are respectively installed on the clamping grooves, and the two ends of the rubber pads are respectively engaged with the clamping grooves.

通过本申请上述实施例,通过螺纹杆和夹紧板的设置,转动螺纹杆带动夹紧板左右移动,从而完成了对直径大小不同的管道的支撑固定,增大了该装置的适用范围,方便转运,在夹紧板内侧壁上设置有橡胶垫,避免在移动时震动对管道造成损伤。Through the above embodiments of the present application, through the arrangement of the threaded rod and the clamping plate, rotating the threaded rod drives the clamping plate to move left and right, thereby completing the support and fixing of pipes with different diameters, increasing the applicable range of the device, and facilitating During transportation, rubber pads are arranged on the inner side wall of the clamping plate to avoid damage to the pipeline caused by vibration during movement.

附图说明Description of drawings

为了更清楚地说明本申请实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本申请的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其它的附图。In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the following briefly introduces the accompanying drawings required for the description of the embodiments or the prior art. Obviously, the drawings in the following description are only These are some embodiments of the present application, and for those of ordinary skill in the art, other drawings can also be obtained from these drawings without any creative effort.

图1为本申请一种实施例的整体结构示意图;1 is a schematic diagram of the overall structure of an embodiment of the application;

图2为本申请一种实施例的平面结构示意图;2 is a schematic plan view of an embodiment of the application;

图3为本申请一种实施例的俯视结构示意图。FIG. 3 is a schematic top-view structural diagram of an embodiment of the present application.

图中:1、底座;2、万向轮;3、固定板;4、套筒;5、螺纹轴;6、承重板;7、挡板;8、螺纹杆;9、旋钮;10、夹紧板;11、滑槽;12、橡胶垫;13、卡槽。In the figure: 1. Base; 2. Universal wheel; 3. Fixed plate; 4. Sleeve; 5. Threaded shaft; 6. Bearing plate; 7. Baffle plate; 8. Threaded rod; 9. Knob; 10. Clip Tighten plate; 11, chute; 12, rubber pad; 13, card slot.

具体实施方式Detailed ways

为了使本技术领域的人员更好地理解本申请方案,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分的实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都应当属于本申请保护的范围。In order to make those skilled in the art better understand the solutions of the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present application. Obviously, the described embodiments are only The embodiments are part of the present application, but not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the scope of protection of the present application.

需要说明的是,本申请的说明书和权利要求书及上述附图中的术语“第一”、“第二”等是用于区别类似的对象,而不必用于描述特定的顺序或先后次序。应该理解这样使用的数据在适当情况下可以互换,以便这里描述的本申请的实施例。此外,术语“包括”和“具有”以及他们的任何变形,意图在于覆盖不排他的包含,例如,包含了一系列步骤或单元的过程、方法、系统、产品或设备不必限于清楚地列出的那些步骤或单元,而是可包括没有清楚地列出的或对于这些过程、方法、产品或设备固有的其它步骤或单元。It should be noted that the terms "first", "second", etc. in the description and claims of the present application and the above drawings are used to distinguish similar objects, and are not necessarily used to describe a specific sequence or sequence. It is to be understood that the data so used are interchangeable under appropriate circumstances for the embodiments of the application described herein. Furthermore, the terms "comprising" and "having" and any variations thereof, are intended to cover non-exclusive inclusion, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those expressly listed Rather, those steps or units may include other steps or units not expressly listed or inherent to these processes, methods, products or devices.

在本申请中,术语“上”、“下”、“左”、“右”、“前”、“后”、“顶”、“底”、“内”、“外”、“中”、“竖直”、“水平”、“横向”、“纵向”等指示的方位或位置关系为基于附图所示的方位或位置关系。这些术语主要是为了更好地描述本申请及其实施例,并非用于限定所指示的装置、元件或组成部分必须具有特定方位,或以特定方位进行构造和操作。In this application, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle", The orientation or positional relationship indicated by "vertical", "horizontal", "horizontal", "longitudinal", etc. is based on the orientation or positional relationship shown in the drawings. These terms are primarily used to better describe the present application and its embodiments, and are not intended to limit the fact that the indicated device, element, or component must have a particular orientation, or be constructed and operated in a particular orientation.

并且,上述部分术语除了可以用于表示方位或位置关系以外,还可能用于表示其他含义,例如术语“上”在某些情况下也可能用于表示某种依附关系或连接关系。对于本领域普通技术人员而言,可以根据具体情况理解这些术语在本申请中的具体含义。In addition, some of the above-mentioned terms may be used to express other meanings besides orientation or positional relationship. For example, the term "on" may also be used to express a certain attachment or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in the present application can be understood according to specific situations.

此外,术语“安装”、“设置”、“设有”、“连接”、“相连”、“套接”应做广义理解。例如,可以是固定连接,可拆卸连接,或整体式构造;可以是机械连接,或电连接;可以是直接相连,或者是通过中间媒介间接相连,又或者是两个装置、元件或组成部分之间内部的连通。对于本领域普通技术人员而言,可以根据具体情况理解上述术语在本申请中的具体含义。Furthermore, the terms "installed", "set up", "provided with", "connected", "connected", "socketed" should be construed broadly. For example, it may be a fixed connection, a detachable connection, or a unitary structure; it may be a mechanical connection, or an electrical connection; it may be directly connected, or indirectly connected through an intermediary, or between two devices, elements, or components. internal communication. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific situations.

需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本申请。It should be noted that the embodiments in the present application and the features of the embodiments may be combined with each other in the case of no conflict. The present application will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

本实施例中的建筑施工用管道支撑装置可以适用于不同的施工用管道,例如,在本实施例提供的防回流的建筑施工用排水管道,本实施例中的建筑施工用管道支撑装置可以适用于以下结构的防回流的建筑施工用排水管道。The pipeline support device for building construction in this embodiment can be applied to different construction pipelines. For example, in the backflow prevention drainage pipeline for building construction provided in this embodiment, the pipeline support device for building construction in this embodiment can be applied to Drainage pipes for building construction with backflow prevention in the following structures.

一种防回流的建筑施工用排水管道,包括水管,所述水管内部的左侧竖向固定连接有挡水环,所述水管内壁的顶部和底部均开设有导向槽,所述导向槽的内部滑动连接有导向块,所述导向块的内侧固定连接有连杆,所述连杆远离导向块的一端固定连接有横杆,所述横杆的左端固定连接有圆台,所述横杆的右端固定连接有空心柱,所述空心柱的内部设置有第一弹簧,所述第一弹簧的顶部和底部均固定连接有限位柱,所述限位柱远离第一弹簧的一侧固定连接有支架,所述支架远离限位柱的一端贯穿空心柱并延伸至空心柱的外部活动连接有滚轮,所述水管内壁的顶部和底部且对应滚轮的位置均固定连接有梯形块,所述梯形块的内侧开设有轮槽,所述滚轮的表面与轮槽的内壁接触,所述水管的内部且位于梯形块的右侧竖向固定连接有竖板。A backflow prevention drainage pipeline for construction, comprising a water pipe, a water retaining ring is vertically fixedly connected to the left side of the water pipe, and guide grooves are provided on the top and bottom of the inner wall of the water pipe, and the interior of the guide groove is provided with a guide groove. A guide block is slidably connected, a connecting rod is fixedly connected to the inner side of the guide block, a crossbar is fixedly connected to one end of the connecting rod away from the guide block, a round table is fixedly connected to the left end of the crossbar, and the right end of the crossbar is fixedly connected. A hollow column is fixedly connected, a first spring is arranged inside the hollow column, the top and bottom of the first spring are fixedly connected to a limit column, and a bracket is fixedly connected to the side of the limit column away from the first spring , the end of the bracket away from the limiting column penetrates the hollow column and extends to the outside of the hollow column, and is movably connected with a roller, and the top and bottom of the inner wall of the water pipe and the position corresponding to the roller are fixedly connected with a trapezoidal block. The inner side is provided with a wheel groove, the surface of the roller is in contact with the inner wall of the wheel groove, and a vertical plate is vertically fixedly connected to the inside of the water pipe and located on the right side of the trapezoidal block.

上述防回流的建筑施工用排水管道,其中,所述圆台的左侧固定连接有密封环,所述密封环的左侧与挡水环的右侧紧密接触。In the above-mentioned backflow prevention drainage pipeline for building construction, a sealing ring is fixedly connected to the left side of the round table, and the left side of the sealing ring is in close contact with the right side of the water retaining ring.

上述防回流的建筑施工用排水管道,其中,所述导向槽内壁的左侧固定连接有限位垫,所述限位垫的右侧与导向块的左侧接触。In the above-mentioned backflow prevention drainage pipeline for construction, the left side of the inner wall of the guide groove is fixedly connected with a limit pad, and the right side of the limit pad is in contact with the left side of the guide block.

上述防回流的建筑施工用排水管道,其中,所述空心柱的顶部和底部均开设有通孔,且通孔与支架配合使用。In the above-mentioned backflow prevention drainage pipeline for building construction, the top and bottom of the hollow column are provided with through holes, and the through holes are used in cooperation with the brackets.

上述防回流的建筑施工用排水管道,其中,所述竖板的左侧固定连接有第二弹簧,所述第二弹簧的左端与空心柱的右侧固定连接。In the above-mentioned backflow prevention drainage pipe for building construction, a second spring is fixedly connected to the left side of the vertical plate, and the left end of the second spring is fixedly connected to the right side of the hollow column.

当然本实施例中的建筑施工用管道支撑装置可以用于其他不同的施工用管道。在此不再一一赘述,下面对本申请实施例的一种建筑施工用管道支撑装置进行介绍。Of course, the pipe supporting device for building construction in this embodiment can be used for other different construction pipes. Without repeating them one by one, a pipeline supporting device for building construction according to an embodiment of the present application will be introduced below.

请参阅图1-3所示,一种建筑施工用管道支撑装置,包括四方体结构的底座1,所述底座1底部四角处分别安装有万向轮2,所述底座1上表面中间位置安装有固定板3,所述固定板3上安装有套筒4,所述套筒4上安装有螺纹轴5,所述螺纹轴5上端固定有承重板6,所述承重板6上设置有夹紧结构,所述夹紧结构包括夹紧板10、螺纹杆8和橡胶垫12。Please refer to FIGS. 1-3 , a pipeline support device for building construction includes a base 1 with a square structure, universal wheels 2 are installed at the four corners of the bottom of the base 1 respectively, and the middle position of the upper surface of the base 1 is installed There is a fixing plate 3, a sleeve 4 is installed on the fixing plate 3, a threaded shaft 5 is installed on the sleeve 4, a bearing plate 6 is fixed on the upper end of the threaded shaft 5, and a clamp is arranged on the bearing plate 6 The clamping structure includes a clamping plate 10 , a threaded rod 8 and a rubber pad 12 .

所述套筒4下端与固定板3转动连接,所述套筒4内部螺纹与螺纹轴5外部的螺纹相互齿合,所述套筒4和螺纹轴5螺纹连接。The lower end of the sleeve 4 is rotatably connected with the fixing plate 3 , the internal thread of the sleeve 4 and the external thread of the threaded shaft 5 are engaged with each other, and the sleeve 4 and the threaded shaft 5 are threadedly connected.

所述承重板6上左右两边对称设置有滑槽11,所述滑槽11上分别安装有夹紧板10,所述夹紧板10与滑槽11滑动连接。On the load-bearing plate 6 , the left and right sides are symmetrically provided with sliding grooves 11 , and clamping plates 10 are respectively installed on the sliding grooves 11 , and the clamping plates 10 are slidably connected with the sliding grooves 11 .

所述承重板6上左右两端分别固定有挡板7,所述挡板7上分别安装有螺纹杆8,所述螺纹杆8与挡板7螺纹连接,所述螺纹杆8远离夹紧板10的一端分别固定安装有旋钮9。The left and right ends of the load-bearing plate 6 are respectively fixed with baffles 7, and threaded rods 8 are respectively installed on the baffles 7. The threaded rods 8 are threadedly connected with the baffles 7, and the threaded rods 8 are far away from the clamping plate. One end of 10 is respectively fixed with knobs 9 .

所述螺纹杆8分别穿过挡板7与夹紧板10侧壁连接,所述夹紧板10内侧壁分别设置成弧形,所述夹紧板10内侧壁上分别设置有橡胶垫12。The threaded rods 8 are respectively connected to the side walls of the clamping plate 10 through the baffle plate 7 , the inner side walls of the clamping plates 10 are respectively arranged in an arc shape, and rubber pads 12 are respectively arranged on the inner side walls of the clamping plates 10 .

所述夹紧板10弧形内壁上下两端分别设置有卡槽13,所述卡槽13上分别安装有橡胶垫12,所述橡胶垫12两端分别与卡槽13相互卡合。The upper and lower ends of the arcuate inner wall of the clamping plate 10 are respectively provided with clamping grooves 13 , and rubber pads 12 are respectively installed on the clamping grooves 13 .

本申请在使用时,首先,根据需要支撑的高度转动套筒4,调节套筒4和螺纹轴5的长度,进而调节承重板6的高度,方便工作人员的使用,然后施工人员可以将管道放置在承重板6上,通过转动旋钮9调节螺纹杆8移动,能带动夹紧板10在滑槽11上移动,从而使得夹紧板10对管道夹紧,夹紧板10内设置有橡胶垫12,能够在管道移动时对管道造成损伤,螺纹杆8和夹紧板10的配合可以对不同规格的管道进行支撑,能够解决现有的建筑施工管道支撑装置固定管道类型单一的问题,管道固定后,可以推动管道移动支撑装置到施工位置,操作方便。When the application is in use, firstly, the sleeve 4 is rotated according to the required supporting height, the lengths of the sleeve 4 and the threaded shaft 5 are adjusted, and then the height of the bearing plate 6 is adjusted, which is convenient for the use of the staff, and then the construction staff can place the pipeline On the bearing plate 6, the movement of the threaded rod 8 is adjusted by rotating the knob 9, which can drive the clamping plate 10 to move on the chute 11, so that the clamping plate 10 clamps the pipeline, and the clamping plate 10 is provided with a rubber pad 12. , which can cause damage to the pipeline when the pipeline is moved. The cooperation of the threaded rod 8 and the clamping plate 10 can support pipelines of different specifications, which can solve the problem that the existing pipeline support device for construction has a single type of fixed pipeline. After the pipeline is fixed , it can push the pipeline moving support device to the construction position, and the operation is convenient.

本申请的有益之处在于:The benefits of this application are:

1、通过螺纹杆8和夹紧板10的设置,转动螺纹杆8带动夹紧板10左右移动,从而完成了对直径大小不同的管道的支撑固定,增大了该装置的适用范围,方便转运,在夹紧板10内侧壁上设置有橡胶垫12,避免在移动时震动对管道造成损伤。1. Through the setting of the threaded rod 8 and the clamping plate 10, rotating the threaded rod 8 drives the clamping plate 10 to move left and right, thereby completing the support and fixation of pipes with different diameters, increasing the scope of application of the device, and facilitating transportation , A rubber pad 12 is arranged on the inner side wall of the clamping plate 10 to avoid damage to the pipeline caused by vibration during movement.

2、通过设置升降结构,根据管道施工的高度,转动套筒4来调节套筒4和螺纹轴5的高度,从而调整承重板6的高度,方便工作人员的使用,操作更方便,节省了工作人员的体力,解决上述问题。2. By setting the lifting structure, according to the height of the pipeline construction, turn the sleeve 4 to adjust the height of the sleeve 4 and the threaded shaft 5, so as to adjust the height of the bearing plate 6, which is convenient for the staff to use, the operation is more convenient, and the work is saved The physical strength of the personnel can solve the above problems.

以上所述仅为本申请的优选实施例而已,并不用于限制本申请,对于本领域的技术人员来说,本申请可以有各种更改和变化。凡在本申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。The above descriptions are only preferred embodiments of the present application, and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of this application shall be included within the protection scope of this application.

Claims (6)

1.一种建筑施工用管道支撑装置,其特征在于:包括四方体结构的底座(1),所述底座(1)底部四角处分别安装有万向轮(2),所述底座(1)上表面中间位置安装有固定板(3),所述固定板(3)上安装有套筒(4),所述套筒(4)上安装有螺纹轴(5),所述螺纹轴(5)上端固定有承重板(6),所述承重板(6)上设置有夹紧结构,所述夹紧结构包括夹紧板(10)、螺纹杆(8)和橡胶垫(12)。1. A pipeline support device for building construction, characterized in that: a base (1) comprising a quadrangular structure is provided, and universal wheels (2) are respectively installed at the four corners of the base (1) bottom, and the base (1) A fixing plate (3) is installed on the middle position of the upper surface, a sleeve (4) is installed on the fixing plate (3), a threaded shaft (5) is installed on the sleeve (4), and the threaded shaft (5) is installed on the sleeve (4). A bearing plate (6) is fixed on the upper end of the ), and a clamping structure is arranged on the bearing plate (6), and the clamping structure includes a clamping plate (10), a threaded rod (8) and a rubber pad (12). 2.根据权利要求1所述的一种建筑施工用管道支撑装置,其特征在于:所述套筒(4)下端与固定板(3)转动连接,所述套筒(4)内部螺纹与螺纹轴(5)外部的螺纹相互齿合,所述套筒(4)和螺纹轴(5)螺纹连接。2. A pipeline support device for building construction according to claim 1, characterized in that: the lower end of the sleeve (4) is rotatably connected with the fixing plate (3), and the inner thread of the sleeve (4) is connected with the thread The external threads of the shaft (5) are engaged with each other, and the sleeve (4) and the threaded shaft (5) are threadedly connected. 3.根据权利要求1所述的一种建筑施工用管道支撑装置,其特征在于:所述承重板(6)上左右两边对称设置有滑槽(11),所述滑槽(11)上分别安装有夹紧板(10),所述夹紧板(10)与滑槽(11)滑动连接。3. A pipeline support device for building construction according to claim 1, characterized in that: the left and right sides of the bearing plate (6) are symmetrically provided with chute (11), and the chute (11) is respectively A clamping plate (10) is installed, and the clamping plate (10) is slidably connected with the chute (11). 4.根据权利要求1所述的一种建筑施工用管道支撑装置,其特征在于:所述承重板(6)上左右两端分别固定有挡板(7),所述挡板(7)上分别安装有螺纹杆(8),所述螺纹杆(8)与挡板(7)螺纹连接,所述螺纹杆(8)远离夹紧板(10)的一端分别固定安装有旋钮(9)。4. A pipeline support device for building construction according to claim 1, characterized in that: baffle plates (7) are respectively fixed on the left and right ends of the load-bearing plate (6), and baffle plates (7) are respectively fixed on the baffle plates (7). Threaded rods (8) are respectively installed, the threaded rods (8) are threadedly connected with the baffle plate (7), and knobs (9) are respectively fixedly installed at one end of the threaded rods (8) away from the clamping plate (10). 5.根据权利要求1所述的一种建筑施工用管道支撑装置,其特征在于:所述螺纹杆(8)分别穿过挡板(7)与夹紧板(10)侧壁连接,所述夹紧板(10)内侧壁分别设置成弧形,所述夹紧板(10)内侧壁上分别设置有橡胶垫(12)。5. A pipeline support device for building construction according to claim 1, characterized in that: the threaded rods (8) are respectively connected to the side walls of the clamping plate (10) through the baffle plate (7), and the The inner side walls of the clamping plate (10) are respectively arranged in an arc shape, and rubber pads (12) are respectively arranged on the inner side walls of the clamping plate (10). 6.根据权利要求1所述的一种建筑施工用管道支撑装置,其特征在于:所述夹紧板(10)弧形内壁上下两端分别设置有卡槽(13),所述卡槽(13)上分别安装有橡胶垫(12),所述橡胶垫(12)两端分别与卡槽(13)相互卡合。6. A pipeline support device for building construction according to claim 1, characterized in that: the upper and lower ends of the arc-shaped inner wall of the clamping plate (10) are respectively provided with clamping grooves (13), and the clamping grooves ( 13) Rubber pads (12) are respectively installed on the rubber pads (12), and both ends of the rubber pads (12) are respectively engaged with the card grooves (13).
CN202122326785.XU 2021-09-24 2021-09-24 Pipeline strutting arrangement for construction Expired - Fee Related CN216382841U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122326785.XU CN216382841U (en) 2021-09-24 2021-09-24 Pipeline strutting arrangement for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122326785.XU CN216382841U (en) 2021-09-24 2021-09-24 Pipeline strutting arrangement for construction

Publications (1)

Publication Number Publication Date
CN216382841U true CN216382841U (en) 2022-04-26

Family

ID=81241089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122326785.XU Expired - Fee Related CN216382841U (en) 2021-09-24 2021-09-24 Pipeline strutting arrangement for construction

Country Status (1)

Country Link
CN (1) CN216382841U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114954836A (en) * 2022-05-31 2022-08-30 沪东中华造船(集团)有限公司 Auxiliary device and method for installing outfitting piece pipes in finished sections
CN117068859A (en) * 2023-07-13 2023-11-17 无锡金通高纤股份有限公司 A continuous feeding device for chemical fiber yarn bobbin transfer for chemical fiber processing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114954836A (en) * 2022-05-31 2022-08-30 沪东中华造船(集团)有限公司 Auxiliary device and method for installing outfitting piece pipes in finished sections
CN114954836B (en) * 2022-05-31 2024-05-14 沪东中华造船(集团)有限公司 Auxiliary device for installing outfitting pipe in finished section and installation method
CN117068859A (en) * 2023-07-13 2023-11-17 无锡金通高纤股份有限公司 A continuous feeding device for chemical fiber yarn bobbin transfer for chemical fiber processing

Similar Documents

Publication Publication Date Title
CN104627849A (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN108557655A (en) A kind of pipeline hanging device without spin
CN216549305U (en) Combined tripod for lifting and mounting pipeline
CN213622895U (en) Major diameter reinforced concrete pipe hoist
CN112897328B (en) Fixing tool for pipeline and supporting and hanging frame
CN217783427U (en) A pantographic casing righting device for oil-water well
CN205397941U (en) A Simple Lifting Facility with Variable Amplitude Rotation
RU2008136202A (en) INSTALLATION OF THE PIPELINE USING THE CRANE
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN207632338U (en) A kind of mechanical splice building pipeline lifting fixator
CN207660559U (en) Workover rig and well workover system
CN109138495A (en) System and construction method are lifted in a kind of construction of eminence pipe string
CN111115429B (en) A kind of underwater pipeline pull-out fixture, pull-out device and pull-out method
CN204899246U (en) Scalable operation platform is used in precast floor plank installation
CN115973950A (en) A Portable Water Pump Lifting Device for Cellar Wells
CN115557391A (en) An underground long-span and large space ultra-high column-free steel structure pipe truss suspension device
CN115465775A (en) Hydraulic hoisting equipment for pipeline in pipe well
CN116164171A (en) A locking device for building electromechanical support and hanger
CN210315660U (en) A kind of integrated pipe gallery support structure
CN107989355A (en) A kind of support platform and window construction method of floaing for window construction of floaing
CN220516711U (en) A simple roof bolt installation tool
CN207228590U (en) Building floor drilling and suspender installation equipment
CN207774666U (en) A kind of Crane Rail beam hanging apparatus
CN219860093U (en) Tool and installation equipment for installing large-diameter concrete grooved and tongued pipe
CN210397944U (en) Temporary supporting device for plastic pipeline in building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220426