CN209066888U - A kind of Construction of High-rise building waste conveyance conduit - Google Patents
A kind of Construction of High-rise building waste conveyance conduit Download PDFInfo
- Publication number
- CN209066888U CN209066888U CN201821735568.8U CN201821735568U CN209066888U CN 209066888 U CN209066888 U CN 209066888U CN 201821735568 U CN201821735568 U CN 201821735568U CN 209066888 U CN209066888 U CN 209066888U
- Authority
- CN
- China
- Prior art keywords
- material blanking
- blanking tube
- plate
- construction
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to rooms to build technical field, disclose a kind of Construction of High-rise building waste conveyance conduit, including more material blanking tubes setting up and down being arranged on construction exterior rack, several linearly uniformly distributed annular convex ribs are formed on the outer wall of the material blanking tube, the every material blanking tube is fixedly connected at least through an interconnecting piece with construction exterior rack, the outer diameter of the light section of the lower end in the aperture and material blanking tube of the oral area of the upper end of the material blanking tube matches, the light section sleeve of the lower end of a piece material blanking tube of upside is in the oral area of the upper end of a material blanking tube of downside adjacent thereto, the junction of two adjacent material blanking tubes is fixedly connected by locking device.It can reduce hand haulage's expense and construction elevator electricity cost;Fugitive dust can be reduced simultaneously, it is environmentally protective.
Description
Technical field:
The utility model relates to rooms to build technical field, and in particular to a kind of Construction of High-rise building waste conveyance conduit.
Background technique:
In the high-rise main structure construction stage, floor garbage transporting becomes a big problem, because construction elevator is temporarily not mounted to
Position, causes rubbish that can not transport down;Secondly, garbage transporting increases many labour costs, and not after construction elevator installation
Environmental protection.Third, when floor concrete pours, the return water for cleaning pump line can not be solved, and cause floor and safety net seriously polluted.
Utility model content:
The purpose of the utility model is to overcome the deficiencies in the prior art, provide a kind of Construction of High-rise building waste delivery pipe
Road, it can reduce hand haulage's expense and construction elevator electricity cost;Fugitive dust can be reduced simultaneously, it is environmentally protective.
The scheme that the utility model solves the technical problem is:
A kind of Construction of High-rise building waste conveyance conduit, including more blankings setting up and down being arranged on construction exterior rack
Pipe forms several linearly uniformly distributed annular convex ribs on the outer wall of the material blanking tube, and the every material blanking tube is at least through one
Interconnecting piece is fixedly connected with construction exterior rack, outside the light section of the lower end in the aperture and material blanking tube of the oral area of the upper end of the material blanking tube
Diameter matches, and the light section sleeve of the lower end of a material blanking tube of upside is in the upper end of a material blanking tube of downside adjacent thereto
In oral area, the junction of two adjacent material blanking tubes is fixedly connected by locking device.
The construction exterior rack includes several cross bars and several vertical bars fixed with cross bar;The interconnecting piece includes briquetting and divides
A pair of of the right angle connecting rod not being installed on the left side wall and right side wall of briquetting, the other end of right angle connecting rod are fixed with limit
Block forms the arc inner wall matched with the outer wall of material blanking tube on the inner wall of the briquetting, forms on arc inner wall multiple
Arc groove arranged up and down, annular convex rib sleeve is in arc groove;It is formed on the rear wall of the limited block perforative up and down
Half slot, half slot are pressed against on the outer wall of vertical bar;The limited block is fixed on vertical bar by iron wire.
The locking device includes in the first hoop plate of semicircle shape and the second hoop plate, the both ends for being separately positioned on the first hoop plate
Two short limb plates and be separately positioned on the second hoop plate both ends two long wing plates, the oral area of the upper end of the material blanking tube it is outer
Wall is clamped between the first hoop plate and the second hoop plate, the screw rod of oriented long wing plate protrusion is fixed on the short limb plate, screw rod passes through
The end of long wing plate is bolted with locking nut;The locking device further includes a pair of auxiliary hoop plate setting up and down, the auxiliary
Binding round plate includes semi-circular plate and two stretching screws for being separately fixed at semicircle board ends, and semi-circular plate sleeve is in two neighboring convex annular
In groove between muscle;The upper end of the long wing plate forms bolt hole, and the lower end of long wing plate forms waist typed through hole, upside
The end of two stretching screws bolt hole for being each passed through two long wing plates of auxiliary hoop plate be respectively bolted with first spiral shell
The end of mother, the waist typed through hole that two stretching screws of the auxiliary hoop plate of downside are each passed through two long wing plates are respectively bolted with one
Second nut.
It is fixedly connected between two adjacent material blanking tubes by three-way connection, the light section sleeve of the lower end of the material blanking tube of upside
Interface in the upper end of three-way connection, the oral area of the upper end of the material blanking tube of downside are socketed in the outer of the interface of the lower end of three-way connection
On wall, the oral area of the third connector of the three-way connection is arranged upward.
The protrusion effect of the utility model is:
Compared with prior art, it can reduce hand haulage's expense and construction elevator electricity cost;It can reduce simultaneously
Fugitive dust, it is environmentally protective.
Detailed description of the invention:
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the partial front view of the utility model;
Fig. 3 is cross-sectional view of the Fig. 2 about A-A;
Fig. 4 is cross-sectional view of the Fig. 2 about B-B;
Fig. 5 is cross-sectional view of the Fig. 2 about C-C;
Fig. 6 is partial enlarged view of the Fig. 1 about D;
Fig. 7 is the structural schematic diagram of the locking device of the utility model.
Specific embodiment:
Embodiment is shown in as shown in Figures 1 to 7, a kind of Construction of High-rise building waste conveyance conduit, including setting is outer in building
More material blanking tubes 2 setting up and down on frame 1 form several linearly uniformly distributed annular convex ribs on the outer wall of the material blanking tube 2
21, the every material blanking tube 2 is fixedly connected at least through an interconnecting piece 3 with construction exterior rack 1, the upper end of the material blanking tube 2
The aperture of oral area 201 is matched with the outer diameter of the light section 202 of the lower end of material blanking tube 2, the light of the lower end of a material blanking tube 2 of upside
202 sleeves of section are in the oral area 201 of the upper end of a material blanking tube 2 of downside adjacent thereto, the company of two adjacent material blanking tubes 2
The place of connecing is fixedly connected by locking device 4, liftoff one meter or so of the lower end of the material blanking tube 2 of lower side.
Further, the construction exterior rack 1 includes several cross bars 11 and several vertical bars 12 fixed with cross bar 11;Institute
A pair of of right angle connecting rod 32 that interconnecting piece 3 includes briquetting 31 and is installed on the left side wall and right side wall of briquetting 31 respectively is stated, directly
The other end of angle connecting rod 32 is fixed with limited block 33, forms on the inner wall of the briquetting 31 and matches with the outer wall of material blanking tube 2
The arc inner wall of conjunction forms multiple arc grooves arranged up and down 311 on arc inner wall, and 21 sleeve of annular convex rib is in arc groove
In 311;Perforative half slot 331, half slot 331 up and down are formed on the rear wall of the limited block 33 is pressed against vertical bar 12
On outer wall;The limited block 33 is fixed on vertical bar 12 by iron wire, and iron wire is wrapped on limited block 33 and vertical bar 12.
Further, the locking device 4 includes binding round plate 42 in the first hoop plate 41, second of semicircle shape, setting respectively
Two short limb plates 43 at the both ends of the first hoop plate 41 and the two long wing plate 44 at the both ends for being separately positioned on the second hoop plate 42 are set,
The outer wall of the oral area 201 of the upper end of the material blanking tube 2 is clamped between the first hoop plate 41 and the second hoop plate 42, the short limb plate 43
The screw rod 45 of upper oriented long 44 protrusion of wing plate of fixation, the end that screw rod 45 passes through long wing plate 44 is bolted with locking nut 46;It is described
Locking device 4 further includes a pair of auxiliary hoop plate 47 setting up and down, and the auxiliary hoop plate 47 includes semi-circular plate 471 and fixes respectively
Two stretching screws 472 at 471 both ends of semi-circular plate, groove of 471 sleeve of semi-circular plate between two neighboring annular convex rib 21
It is interior;The upper end of the long wing plate 44 forms bolt hole, and the lower end of long wing plate 44 forms waist typed through hole 441, upside it is auxiliary
The end for the bolt hole for helping two stretching screws 472 of hoop plate 47 to be each passed through two long wing plate 44 is respectively bolted with one first
Nut, two stretching screws 472 of the auxiliary hoop plate 47 of downside are each passed through the end of the waist typed through hole 441 of two long wing plate 44
Respectively it is bolted with second nut.
Further, it is fixedly connected between two adjacent material blanking tubes 2 by three-way connection 5, the material blanking tube 2 of upside
Lower end 202 sleeve of light section in the interface of the upper end of three-way connection 5, the oral area 201 of the upper end of the material blanking tube 2 of downside is socketed in
On the outer wall of the interface of the lower end of three-way connection 5, the oral area of the third connector 51 of the three-way connection 5 is arranged upward.
Working principle: it is every in floor work progress to rise one layer, material blanking tube 2 is increased into the much the same height of floor, so
The rubbish generated in construction afterwards can fall down from the oral area of the material blanking tube 2 of top side;It, can also be in phase with the raising of construction floor
A three-way connection 5 is connected between two adjacent material blanking tubes 2, the rubbish that three-way connection 5 can be used to generate later passes through threeway
The third connector 51 of connector 5 is flowed into material blanking tube 2, and rubbish is fallen on ground from material blanking tube 2, is then cleaned again, this
Sample can reduce hand haulage's expense and construction elevator electricity cost;Fugitive dust can be reduced simultaneously, it is environmentally protective.
Finally, embodiment of above is merely to illustrate the utility model, and it is not limitation of the utility model, related skill
The those of ordinary skill in art field can also make various changes in the case where not departing from the spirit and scope of the utility model
Change and modification, therefore all equivalent technical solutions also belong to the scope of the utility model, the patent protection model of the utility model
Enclosing should be defined by the claims.
Claims (4)
1. a kind of Construction of High-rise building waste conveyance conduit, more including being arranged on construction exterior rack (1) setting up and down to be fallen
Expects pipe (2), it is characterised in that: form several linearly uniformly distributed annular convex ribs (21) on the outer wall of the material blanking tube (2), every
The material blanking tube (2) is fixedly connected at least through an interconnecting piece (3) with construction exterior rack (1), the upper end of the material blanking tube (2)
The aperture of oral area (201) is matched with the outer diameter of the light section (202) of the lower end of material blanking tube (2), a material blanking tube (2) of upside
Light section (202) sleeve of lower end is in the oral area (201) of the upper end of a material blanking tube (2) of downside adjacent thereto, two phases
The junction of adjacent material blanking tube (2) is fixedly connected by locking device (4).
2. a kind of Construction of High-rise building waste conveyance conduit according to claim 1, it is characterised in that: the construction exterior rack
It (1) include several cross bars (11) and several vertical bars (12) fixed with cross bar (11);The interconnecting piece (3) include briquetting (31) and
A pair of of the right angle connecting rod (32) being installed on the left side wall and right side wall of briquetting (31) respectively, right angle connecting rod (32) it is another
End is fixed with limited block (33), is formed in the arc matched with the outer wall of material blanking tube (2) on the inner wall of the briquetting (31)
Wall forms multiple arc grooves arranged up and down (311) on arc inner wall, and annular convex rib (21) sleeve is in arc groove (311);
Perforative half slot (331), half slot (331) up and down are formed on the rear wall of the limited block (33) is pressed against vertical bar (12)
Outer wall on;The limited block (33) is fixed on vertical bar (12) by iron wire.
3. a kind of Construction of High-rise building waste conveyance conduit according to claim 1, it is characterised in that: the locking device
(4) include in semicircle shape first hoop plate (41) and second bind round plate (42), be separately positioned on the first hoop plate (41) both ends two
A short limb plate (43) and be separately positioned on the second hoop plate (42) both ends two long wing plate (44), the material blanking tube (2) it is upper
The outer wall of the oral area (201) at end is clamped between the first hoop plate (41) and the second hoop plate (42), fixed on the short limb plate (43)
The screw rod (45) of oriented long wing plate (44) protrusion, the end that screw rod (45) passes through long wing plate (44) are bolted with locking nut (46);
The locking device (4) further includes a pair of auxiliary hoop plate (47) setting up and down, and auxiliary hoop plate (47) includes semi-circular plate
(471) and two stretching screws (472) at semi-circular plate (471) both ends are separately fixed at, semi-circular plate (471) sleeve is two neighboring
In groove between annular convex rib (21);The upper end of the long wing plate (44) forms bolt hole, the lower end of long wing plate (44)
It forms waist typed through hole (441), two stretching screws (472) of the auxiliary hoop plate (47) of upside are each passed through two long wing plates
(44) end of bolt hole is respectively bolted with first nut, two stretching screws of the auxiliary hoop plate (47) of downside
(472) end for being each passed through the waist typed through hole (441) of two long wing plate (44) is respectively bolted with second nut.
4. a kind of Construction of High-rise building waste conveyance conduit according to claim 1, it is characterised in that: two adjacent to fall
It is fixedly connected between expects pipe (2) by three-way connection (5), light section (202) sleeve of the lower end of the material blanking tube (2) of upside is in threeway
The interface of the upper end of connector (5), the oral area (201) of the upper end of the material blanking tube (2) of downside are socketed in the lower end of three-way connection (5)
On the outer wall of interface, the oral area of the third connector (51) of the three-way connection (5) is arranged upward.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821735568.8U CN209066888U (en) | 2018-10-25 | 2018-10-25 | A kind of Construction of High-rise building waste conveyance conduit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821735568.8U CN209066888U (en) | 2018-10-25 | 2018-10-25 | A kind of Construction of High-rise building waste conveyance conduit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209066888U true CN209066888U (en) | 2019-07-05 |
Family
ID=67096036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821735568.8U Expired - Fee Related CN209066888U (en) | 2018-10-25 | 2018-10-25 | A kind of Construction of High-rise building waste conveyance conduit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209066888U (en) |
-
2018
- 2018-10-25 CN CN201821735568.8U patent/CN209066888U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206319543U (en) | System is transported under skyscraper vertical garbage | |
CN205954868U (en) | Reserve entrance to a cave plugging device | |
CN205777482U (en) | A kind of back cord formula aluminum alloy mould plate | |
CN202788875U (en) | Tunnel second lining steel bar banding scaffolding | |
CN209066888U (en) | A kind of Construction of High-rise building waste conveyance conduit | |
CN208518307U (en) | A kind of fast pylon easy to install of adjustable platform width | |
CN205577093U (en) | Prefabricated pump station of integration with scrubbing device | |
CN210212495U (en) | Clamping device for pipeline transportation | |
CN211304577U (en) | Steel bar straightening device with rust removing structure | |
CN212405943U (en) | Novel be convenient for clear up building rubbish device | |
CN208152486U (en) | Multi-rise building refuse collection pipe-line system | |
CN103669222B (en) | The Combined sun-shading rainproof canopy of prefabricated case beam | |
CN206903257U (en) | A kind of climbing frame protection screen frame of adjustable-width | |
CN207727865U (en) | A kind of Assembled stairs | |
CN206245590U (en) | It is provided with the concrete inner wall plate for reinforcing door opening | |
CN209241937U (en) | A kind of adjustable conveyer belt guard bar device of fast assembling-disassembling | |
CN209556417U (en) | A kind of cover-lifting type hole protection | |
CN209011050U (en) | A kind of easy-to-dismount guardrail | |
CN215165765U (en) | Concrete pouring prefabricating tool | |
CN215754469U (en) | Construction waste transportation device | |
CN215750921U (en) | Multifunctional novel oak bucket | |
CN208858175U (en) | A kind of wallboard cleaning bracket | |
CN219992986U (en) | Can have enough to meet need assembled floor rubbish passageway and wash pump waste fitting discharging concurrently | |
CN204713948U (en) | For the conveyer in steel bar meter process | |
CN208618779U (en) | A kind of simple hanging basket steel wire support device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190705 Termination date: 20211025 |
|
CF01 | Termination of patent right due to non-payment of annual fee |