CN208858175U - A kind of wallboard cleaning bracket - Google Patents

A kind of wallboard cleaning bracket Download PDF

Info

Publication number
CN208858175U
CN208858175U CN201821421202.3U CN201821421202U CN208858175U CN 208858175 U CN208858175 U CN 208858175U CN 201821421202 U CN201821421202 U CN 201821421202U CN 208858175 U CN208858175 U CN 208858175U
Authority
CN
China
Prior art keywords
bracket
prefabricated panel
slide bar
fixedly connected
main support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821421202.3U
Other languages
Chinese (zh)
Inventor
穆华杰
黄鑫
张辰辰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Yuanda Chen Hing Housing Industry Co Ltd
Original Assignee
Tianjin Yuanda Chen Hing Housing Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Yuanda Chen Hing Housing Industry Co Ltd filed Critical Tianjin Yuanda Chen Hing Housing Industry Co Ltd
Priority to CN201821421202.3U priority Critical patent/CN208858175U/en
Application granted granted Critical
Publication of CN208858175U publication Critical patent/CN208858175U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of wallboard cleaning bracket, it is related to building support field, clamping device including being used to support the bottom bracket of prefabricated panel and for clamping prefabricated panel, clamping device includes the bottom plate being fixedly connected with the ground, two main support columns being fixedly connected vertical with bottom plate, the horizontal concrete chute being fixedly connected with the top of two main support columns, two in the supporting rod for being used to clamp prefabricated panel being fixed as one vertical with slide bar of the slide bar of horizontal concrete chute internal slide and two, slide bar is equipped with the retaining mechanism for locking slide bar, the utility model can guarantee that construction personnel's prefabricated panel during clearing up prefabricated panel will not topple over, the safety of construction personnel is further ensured.

Description

A kind of wallboard cleaning bracket
Technical field
The utility model relates to building support fields more particularly to a kind of wallboard to clear up bracket.
Background technique
As country reinforces the protection for environment, and for effective treatment construction dust and building waste, country Requirement for outdoor architecture construction is increasingly stringenter, and can use punching block mechanized construction by factory in view of prefabricated panel, The quality of prefabricated panel is greatly ensured, while being generally fitted with dust treatment device in precast construction factory, can be effective Reduction outdoor dust and building waste, so prefabricated panel in building manufacture using more and more extensive so that dry wall Plate is developed rapidly.
But existing prefabricated panel after reaching lifting intensity needs that prefabricated panel is lifted into dress vertically using overhead traveling crane The cleaning work that region carries out built-in fitting or foam is repaired, is generally hung prefabricated panel vertically using overhead traveling crane in scale removal process Dress, then construction personnel clears up, but the weight of general prefabricated panel weighs more than 1 ton, and if there is falling, topple over will Great bodily injury caused to construction personnel, thus how in scale removal process prefabricated panel will not topple over and become this field skill Art personnel's urgent problem to be solved.
Utility model content
Technical problem to be solved in the utility model is to overcome the deficiencies in the prior art, provides a kind of gripper wall The wallboard of plate clears up bracket.
The utility model is to be achieved by the following technical programs: a kind of wallboard cleaning bracket, including is used to support pre- The bottom bracket of wallboard processed and clamping device for clamping prefabricated panel, clamping device includes the bottom being fixedly connected with the ground Plate, the two main support columns being fixedly connected vertical with bottom plate, the horizontal concrete chutes being fixedly connected with the top of two main support columns, two Root is in the clamping for being used to clamp prefabricated panel being fixed as one vertical with slide bar of the slide bar of horizontal concrete chute internal slide and two Bar, slide bar are equipped with the retaining mechanism for locking slide bar.
According to the above technical scheme, it is preferable that retaining mechanism includes clamping screw and vertical with clamping screw tail portion solid Determine the handle of one, the screw hole for being socketed clamping screw is offered in the middle part of horizontal concrete chute both ends, clamping screw passes through screw hole For locking slide bar.
According to the above technical scheme, it is preferable that be fixedly connected equipped with more with main support column between two main support columns The horizontal ladder being spaced apart.
According to the above technical scheme, it is preferable that the connecting rod of two cross-fixings connection is equipped between main support column.
According to the above technical scheme, it is preferable that the bottom end of bottom bracket is fixedly connected with the ground, and the top of bottom bracket is set There is the chock for being used to support prefabricated panel.
According to the above technical scheme, it is preferable that two main support columns are U-lag steel.
It, can be with the beneficial effects of the utility model are: the utility model is by the clamping device for fixing prefabricated panel Accomplish to loosen even if the lifting rope of the hoisting prefabricated wall of overhead traveling crane or damage, precast wall body still are able to protect in the case where clamping device acts on It holds and does not topple over vertically, ensure that the safety of construction personnel;Retaining mechanism in the utility model can be lifted into precast wall body Behind position, rod locking will be clamped, so that the stabilization of precast wall body is further ensured that, so that cleaning work is safer.
Detailed description of the invention
Fig. 1 shows the schematic perspective view of embodiment according to the present utility model.
Fig. 2 shows the schematic view of the front view of embodiment according to the present utility model.
Fig. 3 shows the side structure schematic view of embodiment according to the present utility model.
In figure: 1. bottom brackets, 2. prefabricated panels, 3. clamping devices, 4. bottom plates, 5. main support columns, 6. horizontal concrete chutes, 7. Slide bar, 8. supporting rods, 9. retaining mechanisms, 10. clamping screws, 11. handles, 12. screw holes, 13. horizontal ladders, 14. connecting rods, 15. chock.
Specific embodiment
In order to make those skilled in the art more fully understand the technical solution of the utility model, with reference to the accompanying drawing The utility model is described in further detail with most preferred embodiment.
As shown, the utility model provides a kind of wallboard cleaning bracket, the bottom including being used to support prefabricated panel Bracket 1 and clamping device 3 for clamping prefabricated panel 2, clamping device 3 include bottom plate 4, two be fixedly connected with the ground The main support column 5 being fixedly connected vertical with bottom plate 4, the horizontal concrete chute being fixedly connected with the top of two main support columns 56, two In the folder for being used to clamp prefabricated panel 2 being fixed as one vertical with slide bar 7 of the slide bar 7 of 6 internal slide of horizontal concrete chute and two Bar 8 is held, slide bar 7 is equipped with the retaining mechanism 9 for locking slide bar 7.
According to above-described embodiment, it is preferable that retaining mechanism 9 includes clamping screw 10 and vertical with 10 tail portion of clamping screw The handle 11 being fixed as one offers the screw hole 12 for being socketed clamping screw 10, clamping screw in the middle part of 6 both ends of horizontal concrete chute 10 pass through screw hole 12 for locking slide bar 7.
According to above-described embodiment, it is preferable that be fixedly connected equipped with more with main support column 5 between two main support columns 5 The horizontal ladder 13 being spaced apart.
According to above-described embodiment, it is preferable that be equipped with the connecting rod 14 of two cross-fixings connection between main support column 5.
According to above-described embodiment, it is preferable that the bottom end of bottom bracket 1 is fixedly connected with the ground, and the top of bottom bracket 1 is set There is the chock 15 for being used to support prefabricated panel 2.
According to above-described embodiment, it is preferable that two main support columns 5 are U-lag steel.
It, can be with the beneficial effects of the utility model are: the utility model is by the clamping device for fixing prefabricated panel Accomplish to loosen even if the lifting rope of the hoisting prefabricated wall of overhead traveling crane or damage, precast wall body still are able to protect in the case where clamping device acts on It holds and does not topple over vertically, ensure that the safety of construction personnel;Retaining mechanism in the utility model can be lifted into precast wall body Behind position, rod locking will be clamped, so that the stabilization of precast wall body is further ensured that, so that cleaning work is safer;This is practical new Horizontal ladder in type is convenient to clean the top rubbish of personnel's cleaning prefabricated panel or built-in fitting, the personnel of being convenient to clean apply Work;The connecting rod of cross-fixing connection in the utility model, can increase the stability of bracket;The bottom branch of the utility model The top of frame is equipped with the chock for being used to support prefabricated panel, convenient for replacing the type of chock according to the type of different prefabricated panels, To enhance the practical function of wallboard cleaning bracket, construct more efficient.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and Retouching also should be regarded as the protection scope of the utility model.

Claims (6)

1. a kind of wallboard clears up bracket, which is characterized in that including being used to support the bottom bracket of prefabricated panel and for clamping The clamping device of prefabricated panel, the clamping device include the bottom plate being fixedly connected with the ground, two fixed companies vertical with bottom plate The main support column that connects, the horizontal concrete chute being fixedly connected with the top of two main support columns, two in horizontal concrete chute internal slide Slide bar and two supporting rods for being used to clamp prefabricated panel being fixed as one vertical with slide bar, the slide bar are equipped with for locking The retaining mechanism of tight slide bar.
2. a kind of wallboard according to claim 1 clears up bracket, which is characterized in that the retaining mechanism includes clamping screw And the handle being fixed as one vertical with clamping screw tail portion, it offers in the middle part of the horizontal concrete chute both ends for being socketed locking The screw hole of bolt, the clamping screw pass through screw hole for locking slide bar.
3. a kind of wallboard according to claim 1 clears up bracket, which is characterized in that be equipped between two main support columns The more horizontal ladders being spaced apart being fixedly connected with main support column.
4. a kind of wallboard according to claim 3 clears up bracket, which is characterized in that be equipped with two between the main support column The connecting rod of cross-fixing connection.
5. a kind of wallboard according to claim 1 clears up bracket, which is characterized in that the bottom end and ground of the bottom bracket It is fixedly connected, the top of the bottom bracket is equipped with the chock for being used to support prefabricated panel.
6. a kind of wallboard clears up bracket according to claim 1 or described in any one of 3, which is characterized in that two masters Support column is U-lag steel.
CN201821421202.3U 2018-08-31 2018-08-31 A kind of wallboard cleaning bracket Active CN208858175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821421202.3U CN208858175U (en) 2018-08-31 2018-08-31 A kind of wallboard cleaning bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821421202.3U CN208858175U (en) 2018-08-31 2018-08-31 A kind of wallboard cleaning bracket

Publications (1)

Publication Number Publication Date
CN208858175U true CN208858175U (en) 2019-05-14

Family

ID=66416445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821421202.3U Active CN208858175U (en) 2018-08-31 2018-08-31 A kind of wallboard cleaning bracket

Country Status (1)

Country Link
CN (1) CN208858175U (en)

Similar Documents

Publication Publication Date Title
CN207714310U (en) A kind of lowering device for reinforcing cage
CN2255468Y (en) External basket for building construction
CN208858175U (en) A kind of wallboard cleaning bracket
CN209384619U (en) A kind of hanging basket device that can be walked safely on foundation pit reinforced concrete
CN202658872U (en) Tool connecting tube of building scaffold
CN208603672U (en) A kind of well cover opening device
CN206971693U (en) Adjustable type welds hanging basket
CN206091308U (en) Be used for reinforced (rfd) supporting platform device of big steel form of outer wall
CN201339311Y (en) Turning plate device of hanging rack
CN209651709U (en) A kind of Super High large-scale pipeline self-action mounting platform
CN208815876U (en) A kind of fixed device of detachable suspended scaffold upright rod load
CN210455337U (en) Panel is piled up and is binded equipment for construction
CN209363227U (en) A kind of special fixture of lead screw dust removing machine lead screw pedestal
CN208215308U (en) Suspension type station
CN207749810U (en) A kind of Novel moveable scaffold
CN207415321U (en) A kind of prefabricated component storage rack
CN111688009A (en) Building maintenance spray set for construction
CN205976575U (en) Safety net fixing device is prevented weighing down in steel construction inboard
CN217296899U (en) Steel construction section bar hoist device
CN217776018U (en) Device for installing cross beam reinforcing steel bars
CN219365374U (en) Tool for reinforcing front support arm of hanging basket
CN208918419U (en) The construction site safety barrier opened may be reversed
CN209585766U (en) A kind of coal bunker umbrella steel platform support device of ease of assembly
CN210342704U (en) A concrete placement workstation for building in room
CN211716078U (en) On-spot mapping device that engineering cost used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant