CN219365374U - Tool for reinforcing front support arm of hanging basket - Google Patents
Tool for reinforcing front support arm of hanging basket Download PDFInfo
- Publication number
- CN219365374U CN219365374U CN202320821215.4U CN202320821215U CN219365374U CN 219365374 U CN219365374 U CN 219365374U CN 202320821215 U CN202320821215 U CN 202320821215U CN 219365374 U CN219365374 U CN 219365374U
- Authority
- CN
- China
- Prior art keywords
- support arm
- fixing rod
- flower
- basket
- front support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)
Abstract
The utility model relates to the technical field of building construction, in particular to a front support arm reinforcing tool for a hanging basket. The flower frame beam bottom is provided with two bottom plates in parallel along the length direction of the front support arm, the inner side and the outer side of the top surface of the bottom plate, which are positioned on the flower frame beam, are respectively and vertically fixed with an inner fixing rod and an outer fixing rod, the flower frame beam is clamped and fixed by the inner fixing rod and the outer fixing rod, two layers of clamping plates are detachably fixed between the adjacent inner fixing rods and between the adjacent outer fixing rods, the front support arm of the hanging basket is positioned between the two layers of clamping plates, and the front support arm of the hanging basket is clamped and fixed by the two layers of clamping plates. This instrument is through the bottom of two bottom plates card at flower frame roof beam, and the side of flower frame roof beam is pressed from both sides tightly through internal fixation pole and external fixation pole, and the top is pressed from both sides the preceding support arm of hanging flower basket tight through two-layer splint, and is fixed flower frame roof beam and preceding support arm through this instrument, even has increased the hanging flower basket and has erect the height of support arm and also can not cause empting, has improved hanging flower basket safety in utilization and anti effect of overturning.
Description
Technical Field
The utility model relates to the technical field of building construction, in particular to a front support arm reinforcing tool for a hanging basket.
Background
The hanging basket is a building machine for building engineering high-altitude operation and acts on curtain wall installation or outer wall cleaning. The hanging basket is novel high-place operation equipment which can replace the traditional scaffold, lighten labor intensity, improve working efficiency and be repeatedly used. The use of the building hanging basket is gradually becoming a trend, is widely accepted in the high-rise operations such as the outer wall construction, curtain wall installation, heat preservation construction, maintenance and cleaning of the outer wall and the like of the high-rise multi-layer high building, and can be used for the operations of engineering such as large tanks, bridges, dams and the like.
Aiming at the problem of how to install hanging basket on a roof, the prior patent 201721046043.9 discloses a hanging basket without counterweight, which comprises a cantilever, a first supporting device, a second supporting device and a hanging device, wherein the cantilever is arranged on the upper part of the roof of a building, the front end of the cantilever extends out of the building, the near front end of the cantilever is fixedly connected with a parapet through the first supporting device, the rear end of the cantilever is fixedly connected with the roof through the second supporting device, the hanging device is fixedly connected with the rear end of the cantilever through a connecting piece, and the hanging device is hung at the front end of the cantilever; however, with the increase of building roof decoration buildings, the size of a conventional parapet wall is 1.1-1.5m, the number of roof decoration pergola on a high-rise is 2.5m, 3m and the like, and the stand columns and other buildings are frequently arranged at the bottom of a pergola beam, so that the space for placing a front support arm is insufficient, and the construction of decoration of an outer wall is ensured, so that the front support arm of a hanging basket is required to be erected at the top of the pergola beam, but the height of the vertical support arm of the hanging basket is increased, the overall stability of the hanging basket is reduced, and the toppling risk is caused.
Disclosure of Invention
The utility model aims to solve the problems, and thus provides a hanging basket front support arm reinforcing tool meeting the requirement of an irregular height.
The utility model solves the problems, and adopts the following technical scheme:
the utility model provides a support arm reinforcement tool before hanging flower stand roof beam, two bottom plates of length direction parallel arrangement of support arm before the pergola roof beam bottom, and be located the pergola roof beam on the bottom plate top surface, the inside and outside is vertical respectively to be fixed with interior dead lever and outer dead lever, interior dead lever and outer dead lever press from both sides tight fixedly with the pergola roof beam, between the adjacent interior dead lever, all detachable be fixed with two-layer splint between the adjacent outer dead lever, the front support arm of hanging flower stand is located between the two-layer splint, the front support arm of hanging flower stand is pressed from both sides tightly fixedly through two-layer splint.
Compared with the prior art, the utility model adopting the technical scheme has the outstanding characteristics that:
this instrument is through the bottom of two bottom plates card at flower frame roof beam, and the side of flower frame roof beam is pressed from both sides tightly through internal fixation pole and external fixation pole, and the top is pressed from both sides the preceding support arm of hanging flower basket tight through two-layer splint, and is fixed flower frame roof beam and preceding support arm through this instrument, even has increased the hanging flower basket and has erect the height of support arm and also can not cause empting, has improved hanging flower basket safety in utilization and anti effect of overturning.
Preferably, the utility model further adopts the technical scheme that:
a fixing block is arranged between the lower clamping plate and the top surface of the flower frame beam, the flower frame beam extends outwards from the front end part and the rear end part of the front support arm in the length direction of the fixing block, and the fixing block is arranged between the lower clamping plate and the flower frame beam to strengthen the stability of the whole tool.
The upper portion of interior dead lever and external fixation pole is the helicitic texture, the through-hole that is used for the suit on interior dead lever and the external fixation pole is offered to the both sides of splint, the top cover that just is located upper strata splint on interior dead lever and the external fixation pole is equipped with lock nut, the below cover that just is located lower floor's splint on interior dead lever and the external fixation pole is equipped with lock nut, fix splint detachable on interior dead lever and the external fixation pole through the cooperation of helicitic texture and lock nut, it is tight to drive the front support arm clamp of two-layer splint with the hanging flower basket through lock nut during the use, make it firmly fix in flower frame roof beam top, threaded connection structure dismantles simply, and can guarantee the stability after the front support arm clamp of hanging flower basket tightly.
Drawings
FIG. 1 is a schematic perspective view of the tool in operation;
FIG. 2 is a schematic perspective view of the tool;
FIG. 3 is a schematic diagram of the front view of the tool;
FIG. 4 is a schematic side view of the present tool;
marked in the figure as: the flower stand comprises a bottom plate 1, an inner fixing rod 2, an outer fixing rod 3, a clamping plate 4, a fixing block 5, a locking nut 6, a flower stand beam 7 and a front support arm 8.
Description of the embodiments
The utility model is further described below in connection with the following examples which are provided for the purpose of better understanding of the present utility model and are, therefore, not to be construed as limiting the scope of the utility model.
The utility model provides a support arm strengthening tool before hanging flower stand roof beam 7 bottom along the length direction parallel arrangement of preceding support arm 8 two bottom plates 1, just be located on the bottom plate 1 top surface in the flower stand roof beam 7, the inside and outside is vertical respectively to be fixed with interior dead lever 2 and outer dead lever 3, interior dead lever 2 and outer dead lever 3 press from both sides tight fixedly with flower stand roof beam 7, between the adjacent interior dead lever 2, all detachable be fixed with two-layer splint 4 between the adjacent outer dead lever 3, the preceding support arm 8 of hanging flower stand is located between two-layer splint 4, press from both sides tight fixedly with the preceding support arm 8 of hanging flower stand through two-layer splint 4, when the width of current support arm 8 is less than the distance between the adjacent interior dead lever 2, in order to prevent that preceding support arm 8 from rocking about, the wooden wedge is stuffed in the both sides of preceding support arm 8.
A fixing block 5 is arranged between the lower clamping plate 4 and the top surface of the flower frame beam 7, the flower frame beam 7 extends outwards from the front end part and the rear end part of the fixing block 5 along the length direction of the front support arm 8, and the fixing block 5 is arranged between the lower clamping plate 4 and the flower frame beam 7 to strengthen the stability of the whole tool.
The upper portions of the inner fixing rod 2 and the outer fixing rod 3 are of threaded structures, through holes which are used for being sleeved on the inner fixing rod 2 and the outer fixing rod 3 are formed in the two sides of the clamping plate 4, a lock nut 6 is sleeved on the inner fixing rod 2 and the outer fixing rod 3 and located above the upper clamping plate 4, a lock nut 6 is sleeved on the inner fixing rod 2 and the outer fixing rod 3 and located below the lower clamping plate 4, the clamping plate 4 is detachably fixed on the inner fixing rod 2 and the outer fixing rod 3 through the cooperation of the threaded structures and the lock nut 6, and when the hanging basket is used, the two-layer clamping plate 4 is driven to clamp the front support arm 8 of the hanging basket through the lock nut 6, so that the hanging basket is firmly fixed above the flower frame beam 7, the threaded connection structure is simple to detach, and the stability of the hanging basket after the front support arm 8 is clamped can be guaranteed.
This instrument is through the bottom of two bottom plates card at flower frame roof beam, and the side of flower frame roof beam is pressed from both sides tightly through internal fixation pole and external fixation pole, and the top is pressed from both sides the preceding support arm of hanging flower basket tight through two-layer splint, and is fixed flower frame roof beam and preceding support arm through this instrument, even has increased the hanging flower basket and has erect the height of support arm and also can not cause empting, has improved hanging flower basket safety in utilization and anti effect of overturning.
The foregoing description of the preferred embodiments of the utility model is not intended to limit the scope of the claims, but rather to cover all equivalent modifications within the scope of the present utility model as defined by the appended claims.
Claims (3)
1. A support arm strengthening tool before hanging flower basket, its characterized in that: the flower frame beam bottom is provided with two bottom plates in parallel along the length direction of the front support arm, the inner side and the outer side of the top surface of the bottom plate, which are positioned on the flower frame beam, are respectively and vertically fixed with an inner fixing rod and an outer fixing rod, the flower frame beam is clamped and fixed by the inner fixing rod and the outer fixing rod, two layers of clamping plates are detachably fixed between the adjacent inner fixing rods and between the adjacent outer fixing rods, the front support arm of the hanging basket is positioned between the two layers of clamping plates, and the front support arm of the hanging basket is clamped and fixed by the two layers of clamping plates.
2. A basket front arm strengthening tool as recited in claim 1, wherein: a fixed block is arranged between the clamping plate of the lower layer and the top surface of the flower frame beam, and the fixed block extends out of the flower frame beam along the front end and the rear end of the front support arm in the length direction.
3. A basket front arm strengthening tool as recited in claim 1, wherein: the upper portions of the inner fixing rod and the outer fixing rod are of threaded structures, through holes for sleeving the inner fixing rod and the outer fixing rod are formed in two sides of the clamping plate, locking nuts are sleeved on the inner fixing rod and the outer fixing rod and above the upper clamping plate, and locking nuts are sleeved on the inner fixing rod and the outer fixing rod and below the lower clamping plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320821215.4U CN219365374U (en) | 2023-04-14 | 2023-04-14 | Tool for reinforcing front support arm of hanging basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320821215.4U CN219365374U (en) | 2023-04-14 | 2023-04-14 | Tool for reinforcing front support arm of hanging basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219365374U true CN219365374U (en) | 2023-07-18 |
Family
ID=87140378
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320821215.4U Active CN219365374U (en) | 2023-04-14 | 2023-04-14 | Tool for reinforcing front support arm of hanging basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219365374U (en) |
-
2023
- 2023-04-14 CN CN202320821215.4U patent/CN219365374U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214462437U (en) | Hanging basket wall-riding adjustable suspension bracket | |
CN214658667U (en) | Construction accessory installation operation frame | |
CN220432175U (en) | Cantilever type unit curtain wall lifting device | |
CN219365374U (en) | Tool for reinforcing front support arm of hanging basket | |
CN206844431U (en) | A kind of curtain wall construction support | |
CN219909911U (en) | Cantilever rest platform for hanging basket parking | |
CN211173007U (en) | Novel tripod of encorbelmenting | |
CN210713753U (en) | Hanging basket system for special-shaped curtain wall building construction platform | |
CN208716713U (en) | A kind of overhanging steel structure lifting auxiliary device | |
CN206844432U (en) | A kind of Multifunctional curtain-wall construction bracket | |
CN215167932U (en) | Flower basket pull rod type hanging scaffold support | |
CN114086752A (en) | Movable cantilever platform device for roof structure | |
CN112942789B (en) | Water drop type curtain wall construction method | |
CN214785847U (en) | Be applied to hanging flower basket device of single structure concrete beam | |
CN211286650U (en) | Foot-supported split heads for suspending high and large wall formworks | |
CN213418531U (en) | Supporting and adjusting device for connecting steel members with prefabricated wall panels | |
CN110821167B (en) | Construction method for cantilever formwork support | |
CN201292656Y (en) | Inner formwork construction support of shaft | |
CN220393232U (en) | Double-deck hanging flower basket platform reinforced structure | |
CN219863560U (en) | Building curtain wall aluminum veneer of high-efficient installation | |
CN213569398U (en) | Hanging basket device fixed by steel wire rope | |
CN218492701U (en) | Building structure with novel node | |
CN214575214U (en) | Improve prefabricated staircase of outer wall stability | |
CN219343939U (en) | Supporting framework | |
CN217000802U (en) | Fixed calipers for electric hanging basket suspension mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |