CN209040542U - Die worker's tool is hung in a kind of concrete construction - Google Patents
Die worker's tool is hung in a kind of concrete construction Download PDFInfo
- Publication number
- CN209040542U CN209040542U CN201821791306.3U CN201821791306U CN209040542U CN 209040542 U CN209040542 U CN 209040542U CN 201821791306 U CN201821791306 U CN 201821791306U CN 209040542 U CN209040542 U CN 209040542U
- Authority
- CN
- China
- Prior art keywords
- square steel
- supporting part
- tool
- steel supporting
- hung
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Die worker is hung the utility model discloses a kind of concrete construction to have, the square steel supporting part being interconnected and fixed including two, at right angles fix between square steel supporting part;Every square steel supporting part is provided with reinforcing bolt apart from link position pre-determined distance, reinforces bolt and is respectively used to be connected and fixed with the secondary joist of slab form.Construction provided by the utility model is hung in die worker's tool, the square steel supporting part of right angle is connected with each other and is fixed by two, the support for hanging mould template is fixed in realization, bolt is reinforced in suitable position installation on square steel supporting part, the secondary joist of supporting element and slab form is fixed by the bolt, and the support to mould is hung is formed by the square steel supporting part of form right angle in tool itself, it avoids hanging the tenesmus of mould positional shift, caused by concrete formation it is of poor quality, the especially situation of corner out-of-flatness height inaccuracy, the tool construction is simple, it is convenient that assembling uses at any time at the construction field (site), it is also convenient for disassembly storage, with preferable practicability.
Description
Technical field
The utility model relates to technical field of building construction, hang die worker's tool more specifically to a kind of concrete construction.
Background technique
In concrete structure engineering work progress, encountering the positions such as bathroom floor reduces elevation location, referred to as drop plate,
Drop plate in construction site mostly uses traditional flitch to hang mould at present, but usually concrete formation is second-rate, losing fangle, and flitch is easily loose
It is dynamic, concrete reason are as follows: the prior art mostly uses iron wire to bind using flitch as the fixation for carrying out hoisting die construction flitch, fixed
Loosely, easy positioning during concrete vibrating;And flitch is easily-deformable, causes concrete to survive the easy losing fangle in face, survives face
Absolute altitude is not easy to control.Cause sectional descending board absolute altitude inaccurate, influence concrete Survival Rate, increases later period concrete and pick chisel amount.
In conclusion the molding effect for how efficiently solving concrete in concrete hoisting die construction is poor, increase subsequent apply
The technical problem of work difficulty etc. is current those skilled in the art's urgent problem.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of concrete constructions to hang die worker's tool, the concrete construction
Hang die worker's tool structure design can efficiently solve concrete in concrete hoisting die construction molding effect it is poor, increase and subsequent apply
The technical problem of work difficulty etc..
In order to achieve the above object, the utility model provides the following technical solutions:
Die worker's tool, the square steel supporting part being interconnected and fixed including two, the square steel supporting are hung in a kind of concrete construction
It is at right angles fixed between part;The every square steel supporting part is provided with reinforcing bolt apart from link position pre-determined distance, described to add
Fixing bolt is respectively used to be connected and fixed with the secondary joist of slab form.
Preferably, above-mentioned concrete construction is hung in die worker's tool, and the position of the square steel supporting part connection is provided with connection gasket
Plate, described connection backing plate one end and the end of a wherein square steel supporting part are connected and fixed, the other end and another square steel branch
The end of support member is connected and fixed.
Preferably, above-mentioned concrete construction is hung in die worker's tool, is between the connection backing plate and square steel supporting part end
The bolt of length 100mm, M12 connects.
Preferably, above-mentioned concrete construction is hung in die worker's tool, and the square steel supporting part is the square steel of section 50mm*50mm
Pipe profile.
Preferably, above-mentioned concrete construction is hung in die worker's tool, and the reinforcing bolt is specially that three-stage split bolt is hinged.
Preferably, above-mentioned concrete construction is hung in die worker's tool, described bolt distance two square steel supporting parts of reinforcing
The distance between link position is 300mm.
Preferably, above-mentioned concrete construction is hung in die worker's tool, and it further includes positioned at described that die worker's tool is hung in the concrete construction
Protective layer backing plate between square steel supporting part and the template of floor secondary joist.
Preferably, above-mentioned concrete construction is hung in die worker's tool, and the protective layer backing plate is specially slab muscle.
Concrete construction provided by the utility model is hung die worker and is had, the square steel supporting part being interconnected and fixed including two,
It is at right angles fixed between the square steel supporting part;The every square steel supporting part is provided with reinforcing apart from link position pre-determined distance
Bolt, the reinforcing bolt are respectively used to be connected and fixed with the secondary joist of slab form.Mould is hung in construction provided by the utility model
In tool, the square steel supporting part of right angle is connected with each other and is fixed by two, the support for hanging mould template is fixed in realization,
Bolt is reinforced in suitable position installation on square steel supporting part, is fixed the secondary joist of supporting element and slab form by the bolt, and
The support to mould is hung is formed by the square steel supporting part of form right angle in tool itself, avoids hanging the tenesmus of mould positional shift, cause
Concrete formation it is of poor quality, the especially situation of corner out-of-flatness height inaccuracy, the tool construction is simple, convenient to construct
Assembling uses at any time at scene, is also convenient for disassembly storage, has preferable practicability.In conclusion provided by the utility model mixed
Solidifying soil construction hang die worker's tool efficiently solve concrete in concrete hoisting die construction molding effect it is poor, it is tired to increase subsequent construction
Difficult technical problem.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor
Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram that die worker's tool is hung in concrete construction provided by the embodiment of the utility model;
Fig. 2 hangs the partial cross section's structure of die worker's tool when in use for concrete construction provided by the embodiment of the utility model and shows
It is intended to.
It is marked in attached drawing as follows:
Square steel supporting part 1 reinforces bolt 2, connection backing plate 3, bolt 4, protective layer backing plate 5.
Specific embodiment
The utility model embodiment discloses a kind of concrete construction and hangs die worker's tool, to solve to mix in concrete hoisting die construction
The molding effect for coagulating soil is poor, increases the technical problem of subsequent construction difficulty etc..
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, Fig. 2, Fig. 1 are the structural representation that die worker's tool is hung in concrete construction provided by the embodiment of the utility model
Figure;Fig. 2 is that the partial cross section's structural schematic diagram of die worker's tool when in use is hung in concrete construction provided by the embodiment of the utility model.
Concrete construction provided by the utility model is hung die worker and is had, the square steel supporting part 1 being interconnected and fixed including two,
It is at right angles fixed between square steel supporting part 1;Every square steel supporting part 1 is provided with apart from link position pre-determined distance and reinforces bolt 2,
Bolt 2 is reinforced to be respectively used to be connected and fixed with the secondary joist of slab form.
Construction provided by the utility model is hung in die worker's tool, the square steel for being connected with each other by two and being fixed into right angle
The support for hanging mould template is fixed in supporting element 1, realization, and bolt 2 is reinforced in suitable position installation on square steel supporting part 1, passes through the spiral shell
Bolt fixes the secondary joist of supporting element and slab form, and passes through the formation pair of square steel supporting part 1 of form right angle in tool itself
The support for hanging mould avoids hanging the tenesmus of mould positional shift, caused by concrete formation it is of poor quality, especially corner out-of-flatness height is not
Accurate situation, the tool construction is simple, and convenient assembling uses at any time at the construction field (site), is also convenient for disassembly storage, has preferable
Practicability.To sum up, concrete construction provided by the utility model is hung die worker's tool and is efficiently solved in concrete hoisting die construction
The molding effect of concrete is poor, increases the technical problem of subsequent construction difficulty.
To advanced optimize above-mentioned technical proposal, on the basis of the above embodiments preferably, above-mentioned concrete construction is hung
In die worker's tool, the position that square steel supporting part 1 connects is provided with connection backing plate 3,3 one end of connection backing plate and a wherein square steel supporting
The end of part 1 is connected and fixed, and the end of the other end and another square steel supporting part 1 is connected and fixed.
In technical solution provided in this embodiment, two square steel are realized by the design of the connection backing plate 3 with good stiffness
End docking, connection backing plate 3 cover two sides docking end, in the case that two sides docking end mutually hold out against, respectively and even
Connection pad plate 3 is connected and fixed, and forms right angle limit, the simple fixation of the structure, and have enough locating stiffnesses.
To advanced optimize above-mentioned technical proposal, on the basis of the above embodiments preferably, above-mentioned concrete construction is hung
It is that the M12 bolt 4 of length 100mm is connected and fixed between 1 end of connection backing plate 3 and square steel supporting part, above-mentioned in die worker's tool
Preferably design is in design basis: square steel supporting part 1 is the square steel pipe profile of section 50mm*50mm.
Technical solution provided in this embodiment has advanced optimized the use of square steel supporting part 1 and connector, enables tool
Materials can satisfy mould demand of hanging, and the advantage being easy to get with construction site first.
To advanced optimize above-mentioned technical proposal, on the basis of the above embodiments preferably, above-mentioned concrete construction is hung
In die worker's tool, reinforcing bolt 2 is specially that three-stage split bolt is hinged.Reinforcing is optimized in technical solution provided in this embodiment
The design of bolt 2 enables square steel supporting part 1 connect with slab form secondary joist stronger by three-stage split bolt, and applies
Work is also more easier.
The pre-buried split bolt when lower layer's exterior wall concrete pours, to fix the tool.When outer wall template is reinforced, holding
The flitch that 40mm × 70mm is placed in support top fastens the work to hold outer wall template secondary joist, while by tightening to spiral shell is drawn
Tool, has the function that outboard template horizontal reinforcing.
To advanced optimize above-mentioned technical proposal, on the basis of the above embodiments preferably, above-mentioned concrete construction is hung
In die worker's tool, the distance between the link position for reinforcing 2 distance of bolt, two square steel supporting parts 1 is 300mm.
To advanced optimize above-mentioned technical proposal, on the basis of the above embodiments preferably, above-mentioned concrete construction is hung
In die worker's tool, it further includes the protection between square steel supporting part 1 and the template of floor secondary joist that die worker's tool is hung in concrete construction
Layer backing plate 5, being preferably designed as protective layer backing plate 5 is specially slab muscle.By the design enable square steel supporting part 1 and it is wooden or its
Protection is set between his non-rigid template, it is ensured that template service life is avoided since pressure is excessive, due to supporting the work of square steel
The case where with damaged template is caused.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other
The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
The foregoing description of the disclosed embodiments can be realized professional and technical personnel in the field or using originally practical new
Type.Various modifications to these embodiments will be readily apparent to those skilled in the art, and determine herein
The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause
This, the present invention will not be limited to the embodiments shown herein, and is to fit to and principles disclosed herein
The widest scope consistent with features of novelty.
Claims (8)
1. die worker's tool is hung in a kind of concrete construction, which is characterized in that the square steel supporting part being interconnected and fixed including two, it is described
It is at right angles fixed between square steel supporting part;The every square steel supporting part is provided with reinforcing spiral shell apart from link position pre-determined distance
Bolt, the reinforcing bolt are respectively used to be connected and fixed with the secondary joist of slab form.
2. die worker's tool is hung in concrete construction according to claim 1, which is characterized in that the position of the square steel supporting part connection
It installs and is equipped with connection backing plate, described connection backing plate one end and the end of a wherein square steel supporting part are connected and fixed, the other end
It is connected and fixed with the end of another square steel supporting part.
3. die worker's tool is hung in concrete construction according to claim 2, which is characterized in that the connection backing plate and square steel supporting
It is the bolt connection of length 100mm, M12 between part end.
4. die worker's tool is hung in concrete construction according to claim 3, which is characterized in that the square steel supporting part is section
The square steel pipe profile of 50mm*50mm.
5. die worker's tool is hung in concrete construction according to claim 2, which is characterized in that the reinforcing bolt is specially three sections
Formula split bolt is hinged.
6. die worker's tool is hung in concrete construction according to claim 4, which is characterized in that described two institutes of reinforcing bolt distance
The distance between the link position for stating square steel supporting part is 300mm.
7. hanging die worker's tool according to the described in any item concrete constructions of claim 2 to 6, which is characterized in that the concrete is applied
It further includes the protective layer backing plate between the square steel supporting part and the template of floor secondary joist that work, which hangs die worker's tool,.
8. die worker's tool is hung in concrete construction according to claim 7, which is characterized in that the protective layer backing plate is specially plate
Reinforcing bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821791306.3U CN209040542U (en) | 2018-10-31 | 2018-10-31 | Die worker's tool is hung in a kind of concrete construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821791306.3U CN209040542U (en) | 2018-10-31 | 2018-10-31 | Die worker's tool is hung in a kind of concrete construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209040542U true CN209040542U (en) | 2019-06-28 |
Family
ID=67040662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821791306.3U Active CN209040542U (en) | 2018-10-31 | 2018-10-31 | Die worker's tool is hung in a kind of concrete construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209040542U (en) |
-
2018
- 2018-10-31 CN CN201821791306.3U patent/CN209040542U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201292587Y (en) | Connecting piece for tall building combined stone curtain wall | |
CN105781089A (en) | Construction method for outer wall socket type plate buckle steel pipe scaffold | |
CN207228617U (en) | A kind of concrete-pouring template float Structure for basement barricade single side formwork | |
CN105133755B (en) | A kind of construction method and shear wall structure of reinforcement welding rack composite shear wall | |
CN201140783Y (en) | Composed scaffold | |
CN206625428U (en) | Floor closed system is poured after a kind of pipe well | |
CN212001800U (en) | Connecting assembly and connecting structure of external wall panel | |
CN105438965B (en) | The hanging method of glomeration pattern masonry wall 2 centering hanging apparatus of piece | |
CN214696357U (en) | Post-cast strip construction structure of coincide floor | |
CN209040542U (en) | Die worker's tool is hung in a kind of concrete construction | |
CN205839701U (en) | Concrete formwork complexes at a kind of expansion joint | |
CN109208785B (en) | Assembled superposed structure system | |
CN209227594U (en) | A kind of aluminum wood gang form applied to pipe gallery construction | |
CN204690801U (en) | Formwork erecting structure is hung in basement roof ater-casting | |
CN207245188U (en) | A kind of basement barricade single side formwork bracing means | |
CN208073001U (en) | A kind of cast-in-site concrete floor thickness control tool | |
CN206232306U (en) | A kind of glomeration building concrete hollow block wall piece banding system colligation beam | |
CN205840082U (en) | A kind of BRT Lightweight core mould close rib composite floor structure | |
CN212376009U (en) | Prefabricated assembled reinforced concrete structure house | |
CN211173101U (en) | Hanging-free hole type embedded sleeve device | |
CN211114318U (en) | Composite floor slab structure based on non-dismantling formwork | |
CN211421839U (en) | Hoop type concrete pouring template system for plugging through floor slab pipeline hole gap | |
CN207392752U (en) | For preventing the constructing device of grout leakage of formwork root | |
CN112942777A (en) | Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method | |
CN206722392U (en) | A kind of structure of transvers plate of shear wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |