CN209013971U - Subway tunnel deformation auto-monitoring system - Google Patents

Subway tunnel deformation auto-monitoring system Download PDF

Info

Publication number
CN209013971U
CN209013971U CN201821879925.8U CN201821879925U CN209013971U CN 209013971 U CN209013971 U CN 209013971U CN 201821879925 U CN201821879925 U CN 201821879925U CN 209013971 U CN209013971 U CN 209013971U
Authority
CN
China
Prior art keywords
deformation
monitoring terminal
monitoring
communication link
subway tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821879925.8U
Other languages
Chinese (zh)
Inventor
孙太石
张奕斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821879925.8U priority Critical patent/CN209013971U/en
Application granted granted Critical
Publication of CN209013971U publication Critical patent/CN209013971U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides subway tunnel deformation auto-monitoring system, including settlement monitoring terminal, deformation monitoring terminal, server, radio station, first end PC and the 2nd end PC, settlement monitoring terminal connects server by communication link, server connects the first end PC by communication link, deformation monitoring terminal crosses communication link connection radio station, radio station connects the 2nd end PC by communication link, settlement monitoring terminal includes hydrostatic level and sedimentation communication unit, hydrostatic level connection sedimentation communication unit, the utility model is designed reasonably, it is easy to use, the safety monitoring work that existing building is worn under subway tunnel can preferably be completed, it is suitable for large area deformation monitoring, it and is three dimensionality deformation measurement data, system is arranged and work efficiency is high.

Description

Subway tunnel deformation auto-monitoring system
Technical field
The utility model is specifically related to subway tunnel deformation auto-monitoring system.
Background technique
Urban track traffic is often located in complicated urban environment condition, under geology Rock Conditions, and new route is frequent The buildings such as existing operating line, city public building, residential area, bridge are passed through, engineering construction is inevitably brought newly Security risk technical problem, destroy, stratum deformation and ground settlement etc., will endanger because construction wrong causes existing building structure And engineering itself and safety of surrounding environment, bring serious economic loss and casualties.
Utility model content
The purpose of this utility model is to provide subway tunnel deformation auto-monitoring system to solve above-mentioned deficiency.
The purpose of this utility model is achieved through the following technical solutions:
Subway tunnel deformation auto-monitoring system, including settlement monitoring terminal, deformation monitoring terminal, server, radio station, One end PC and the 2nd end PC, settlement monitoring terminal connect server by communication link, and server connects the by communication link One end PC, deformation monitoring terminal cross communication link connection radio station, and radio station connects the 2nd end PC by communication link, and settlement monitoring is whole End includes hydrostatic level and sedimentation communication unit, hydrostatic level connection sedimentation communication unit.
Deformation monitoring terminal includes robot measurement, deformation communication unit, Y shape cable and power supply unit, measurement machine and Deformation communication unit is separately connected Y shape cable, Y shape cable connection power supply unit.
Hydrostatic level uses differential level.
Deformation communication unit is communicated using GeoCom communication interface with the 2nd end PC.
The utility model has following beneficial effect:
The utility model is designed reasonably, it is easy to use, it can preferably complete the safety that existing building is worn under subway tunnel Monitoring is suitable for large area deformation monitoring, and is three dimensionality deformation measurement data, and system is arranged and work efficiency is high.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the deformation monitoring terminal structure figure of the utility model.
Specific embodiment
The utility model will be further described below with reference to the accompanying drawings:
As depicted in figs. 1 and 2, subway tunnel deformation auto-monitoring system, including settlement monitoring terminal 1, deformation monitoring are whole End 2, server 4, radio station 5, the first end PC 7 and the 2nd end PC 6, settlement monitoring terminal 1 connect server 4 by communication link 3, Server 4 connects the first end PC 7 by communication link, and deformation monitoring terminal 2 crosses communication link and connects radio station 5, and radio station 5 passes through logical The 2nd end PC 6 of link connection is interrogated, settlement monitoring terminal 1 includes hydrostatic level 8 and sedimentation communication unit 9, and hydrostatic level 8 connects Connect sedimentation communication unit 9.
Deformation monitoring terminal 2 includes robot measurement 10, deformation communication unit 11, Y shape cable 12 and power supply unit 13, is surveyed Amount machine 10 and deformation communication unit 11 are separately connected Y shape cable 12, and Y shape cable 12 connects power supply unit 13.
Hydrostatic level uses differential level.
Deformation communication unit is communicated using GeoCom communication interface with the 2nd end PC.
Working principle: after field monitoring terminal collects monitoring point deformation data, by communication unit monitoring information reality When be sent to network server or receive radio station, be equipped with monitoring of software pc client can real time inspection each monitoring terminal Monitoring information and export monitoring data as needed, with permission operator can pass through client remote configuration, update Field monitoring terminal.The liquid chamber of multiple hydrostatic levels of settlement monitoring terminal, which is connected to liquid storage by fluid-through tube, to be held The gas cavity of device, multiple sensors is connected using snorkel, is eventually connected to fluid reservoir, forms a closed air pressure certainly Balance system.Datum mark is placed in a stability region, when monitoring point is gone up and down relative to datum mark, will cause each monitoring point Thus the variation of pressure converses each measuring point relative datum point by the hydraulic size of high-precision silicon wafer core sensor measurement Pressure variety, and then calculate the deformation of sedimentation of monitoring point relative datum point.The measurement machine that DEFORMATION MONITORING SYSTEM is used People's working principle: must open the GeoCom communication interface of robot measurement first, carry out data biography by this interface and host computer It is defeated, and then realize the data exchange of robot measurement and remote computer or server.The setting of robot measurement measuring system Including survey station, datum mark, monitoring point.Survey station is used to set up robot measurement, it is desirable that has between datum mark, monitoring point good Sighting condition;Datum mark setting is consolidating motionless place, generally sets 2~3;Layout of the monitoring points is in deformable body key position.It surveys Amount robot monitors system before use, first passing through the study that manual measurement completes robot measurement, obtains each datum mark, prison The spatial positional information of measuring point, these information remote transmittings are to the host computer or server for being equipped with monitoring of software and save, rear to survey Amount robot makees full-automatic, uninterrupted, unattended deformation monitoring under the monitoring program of remote computer or server, The 3 D deformation size of each point is measured, and measurement data is shown into shape preservation, analysis, early warning, image, is printed out Deng.

Claims (4)

1. subway tunnel deformation auto-monitoring system, including settlement monitoring terminal, deformation monitoring terminal, server, radio station, first The end PC and the 2nd end PC, it is characterised in that: settlement monitoring terminal connects server by communication link, and server passes through communication link Road connects the first end PC, and deformation monitoring terminal crosses communication link connection radio station, and radio station connects the 2nd end PC by communication link, sinks Drop monitoring terminal includes hydrostatic level and sedimentation communication unit, hydrostatic level connection sedimentation communication unit.
2. subway tunnel deformation auto-monitoring system according to claim 1, it is characterised in that: the deformation monitoring is whole End includes robot measurement, deformation communication unit, Y shape cable and power supply unit, and measurement machine and deformation communication unit connect respectively Connect Y shape cable, Y shape cable connection power supply unit.
3. subway tunnel deformation auto-monitoring system according to claim 1, it is characterised in that: the hydrostatic level Using differential level.
4. subway tunnel deformation auto-monitoring system according to claim 2, it is characterised in that: the deformation communicates single Member is communicated using GeoCom communication interface with the 2nd end PC.
CN201821879925.8U 2018-11-15 2018-11-15 Subway tunnel deformation auto-monitoring system Active CN209013971U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821879925.8U CN209013971U (en) 2018-11-15 2018-11-15 Subway tunnel deformation auto-monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821879925.8U CN209013971U (en) 2018-11-15 2018-11-15 Subway tunnel deformation auto-monitoring system

Publications (1)

Publication Number Publication Date
CN209013971U true CN209013971U (en) 2019-06-21

Family

ID=66842376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821879925.8U Active CN209013971U (en) 2018-11-15 2018-11-15 Subway tunnel deformation auto-monitoring system

Country Status (1)

Country Link
CN (1) CN209013971U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113375633A (en) * 2021-06-15 2021-09-10 山东高速工程建设集团有限公司 Tunnel full-longitudinal ground surface settlement monitoring system and method based on static level gauge
CN113932766A (en) * 2021-11-13 2022-01-14 国网辽宁省电力有限公司沈阳供电公司 Tunnel settlement monitoring system based on static level gauge and monitoring method thereof
CN114413840A (en) * 2021-11-13 2022-04-29 国网辽宁省电力有限公司沈阳供电公司 Intelligent Internet of things differential pressure type static level gauge and detection system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113375633A (en) * 2021-06-15 2021-09-10 山东高速工程建设集团有限公司 Tunnel full-longitudinal ground surface settlement monitoring system and method based on static level gauge
CN113932766A (en) * 2021-11-13 2022-01-14 国网辽宁省电力有限公司沈阳供电公司 Tunnel settlement monitoring system based on static level gauge and monitoring method thereof
CN114413840A (en) * 2021-11-13 2022-04-29 国网辽宁省电力有限公司沈阳供电公司 Intelligent Internet of things differential pressure type static level gauge and detection system

Similar Documents

Publication Publication Date Title
CN209013971U (en) Subway tunnel deformation auto-monitoring system
KR102042616B1 (en) IoT Based Safety Management System of Urban Construction Site
CN206768889U (en) A kind of subway foundation pit automates DEFORMATION MONITORING SYSTEM
CN210154614U (en) Foundation pit and settlement monitoring device of peripheral stratum thereof based on BIM
CN105387274A (en) Underground pipeline repairing assisting method, device and system
CN105425752A (en) Real-time monitoring system of pipe network and working method of same
CN107893437A (en) Large-scale well-sinking foundation construction real-time monitoring system based on long range radio transmissions technology
CN101158993A (en) Civil construction engineering GPS-RTK measurement integrated PDA device
CN108280969A (en) A kind of high slope surface deformation monitoring and warning system and its method for early warning
CN109115174A (en) A kind of subsidence monitoring system
CN110927821A (en) BIM + GIS-based advanced geological forecast information system for tunnel construction
KR101958441B1 (en) System for digging, construction, safety management of country life line using electronic display device and AR
CN109374049A (en) A kind of tunnel wall rock deformation monitoring alarm
CN102979071B (en) Remote intelligent monitoring and three-dimensional early warning method and system for stress stability of deep foundation pit
CN207846495U (en) Large-scale well-sinking foundation construction real-time monitoring system based on long range radio transmissions technology
CN105588647A (en) Temperature long-term monitoring system in plateau permafrost region
CN112763001A (en) Intelligent monitoring and early warning system and processing method for road collapse in collapsible loess area
CN103046525A (en) Facility and method for mechanical stability remote intelligent monitoring and three-dimensional early warning of deep foundation pit
CN201828353U (en) Temperature-field testing device of artificially frozen soil
CN205177100U (en) It forms mud -rock flow and faces calamity early warning system to remain damming dam body under torrential rain
CN102842265B (en) Underground pipeline plane and cross section integration showing method
CN208172969U (en) A kind of high slope surface deformation monitoring and warning system
CN108594281A (en) Excavating equipment level based on carrier phase difference technology determines appearance positioning auxiliary method
CN217845170U (en) Automatic settlement monitoring system
CN216379680U (en) Deep foundation pit support safety intelligent monitoring system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant