CN205177100U - It forms mud -rock flow and faces calamity early warning system to remain damming dam body under torrential rain - Google Patents

It forms mud -rock flow and faces calamity early warning system to remain damming dam body under torrential rain Download PDF

Info

Publication number
CN205177100U
CN205177100U CN201520903832.4U CN201520903832U CN205177100U CN 205177100 U CN205177100 U CN 205177100U CN 201520903832 U CN201520903832 U CN 201520903832U CN 205177100 U CN205177100 U CN 205177100U
Authority
CN
China
Prior art keywords
dam body
module
early warning
damming dam
communication module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520903832.4U
Other languages
Chinese (zh)
Inventor
李佩佩
陈亮
燕俊松
蔺力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Univeristy of Technology
Original Assignee
Chengdu Univeristy of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Univeristy of Technology filed Critical Chengdu Univeristy of Technology
Priority to CN201520903832.4U priority Critical patent/CN205177100U/en
Application granted granted Critical
Publication of CN205177100U publication Critical patent/CN205177100U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Landscapes

  • Alarm Systems (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)
  • Emergency Alarm Devices (AREA)

Abstract

The utility model discloses an it forms mud -rock flow and faces calamity early warning system to remain damming dam body under torrential rain, including at least one basic station monitoring system and composite control system, basic station monitoring system includes GPS orientation module, wireless sensor, pressure sensor, hyetometer, level sensor, angular transducer and supersound mud position meter, and the composite control system includes wireless communication module, GIS module, composite control 0, composite control 1 and composite control 2, GPS orientation module, pressure sensor, hyetometer, level sensor, angular transducer and the score of supersound mud position bie are connected with wireless sensor, and wireless sensor and wireless communication module are connected, and wireless communication module links to each other with central processing unit. The utility model discloses according to pressure data, ground water level, inclination data, the mud figure place certificate of gathering, confirm that whether the mud -rock flow takes place and the size of scale, realized remaining after the barrier lake flood discharge damming dam body and formed the mud -rock flow face the early warning under the torrential rain.

Description

A kind of residual damming dam body forms rubble flow and faces calamity early warning system under heavy rain
Technical field
The utility model belongs to geological disaster risk and assessment technology field thereof, relate to a kind of residual damming dam body under heavy rain, to form rubble flow face calamity early warning system, particularly a kind of be used for checked-up lake flood discharge after residual damming dam body under heavy rain, form rubble flow face calamity early warning system.
Background technology
The a large amount of checked-up lake of on May 12nd, 2008 and earthquake-induced occurred below, the existence of checked-up lake causes safely serious threat just as a time bomb to the resident in downstream, so national relevant unit has carried out artificial flood discharge to a large amount of checked-up lakes, the threat of the downstream people is temporarily eliminated, but it is again a challenge that the damming dam body that the thing followed is the instability remained after checked-up lake flood discharge forms huge rubble flow for us under heavy rain effect.Under heavy rain, form rubble flow for damming dam body residual after checked-up lake flood discharge and face calamity early warning system so necessary formation is a kind of and reduce the life of downstream resident is had very important significance safely.
Rubble flow is a kind of global disaster, and rubble flow is because its forming process is complicated, outburst is unexpected, break with tremendous force, last of short duration, that destructive power becomes a by force mountain area economy construction large disaster.The rubble flow that after rubble flow checked-up lake flood discharge different from the past, residual damming dam body is formed under heavy rain effect, producing a large amount of solids sources instantaneously, can have great destructive power, seriously jeopardizing people's life and property under heavy rain effect.So how to accomplish that early warning is to reduce the harm of rubble flow as much as possible to this kind of debris flow, aobvious is very important, the utility model, for the principal element combining wireless Sensor Network technology of debris flow, has very important significance to debris flow early-warning to reach.
In mud-stone flow disaster, why rubble flow is rubble flow, and mainly it is the special mighty torrent containing a large amount of silt and stone, so its character determines it must abundant solids source, and residual damming dam body both sides are distributed with a large amount of gravelly soil after checked-up lake flood discharge, the gradient is steeper, self stability is poor, be easy to collapse under the flood effect that heavy rain and heavy rain thereof bring out, formation for rubble flow provides abundant thing source, and the sensing module that therefore emphasis will be used in this method for early warning is exactly liquid level sensor, obliquity sensor and rain sensor.Also to consider if by pressure transducer, how they guaranteed that this method for early warning can not lose efficacy after losing efficacy, by sensor network technology by wireless network autonomous for a large amount of multiple types sensor node (sensing, collection, process, transmitting-receiving, network are in one) composition, realize the dynamic cooperation perception to physical world.It in real time, dynamically can obtain the heat transfer agent of physical world, and relevant information and communication backbone network are merged, achieve the extension of existing computer network virtual world to real physical world, change the mode that Human and nature circle is mutual, construct complete information system truly.Just based on this, be necessary that providing one under heavy rain, to form rubble flow for damming dam body residual after checked-up lake flood discharge faces calamity early warning system.
Current rubble flow field monitoring and warning technology is also not overripened, and a series of achievements obtained, especially for rainfall induced debris flow.But in mountain area, Rain Location is difficult to hold, and cannot meet the mountain region disaster monitoring and warnings such as mountain torrents rubble flow to the demand of rainfall data; In addition, the measurement of rain gage just to a single point, can not represent other local rainfall amounts, will increase udometric density like that, cost can improve, the large and data of management difficulty easily make mistakes, cannot meet debris flow early-warning to condition of raining demand.This utility model is on the basis of existing mature technology, utilizing the singularity of such debris flow---source area is clearer and more definite, can provide to monitoring center and forecast more accurately, this method for early warning can arrange rain gage in several main point, and other places can be arranged.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, the pressure data providing a kind of basis to collect, underground water table, inclination data, mud bit data, determine that whether rubble flow occurs and the size of scale, after achieving checked-up lake flood discharge, residual damming dam body forms the rubble flow that rubble flow faces early warning and faces calamity early warning system under heavy rain.
The purpose of this utility model is achieved through the following technical solutions: a kind of residual damming dam body forms rubble flow and faces calamity early warning system under heavy rain, comprise at least one base station monitors system and complex control system, described base station monitors system comprises GPS locating module and wireless senser, and
Pressure transducer, is arranged on the two bottom sides of damming dam body;
Rain gage, is arranged on the spacious ground of have no occluder;
Multiple liquid level sensor, is separately positioned on and faces short side in each hole set gradually along damming dam body;
Multiple obliquity sensor, is separately positioned on and faces short side in each hole set gradually along damming dam body;
Ultrasonic mud level meter, is arranged in the Circulation Area of rubble flow, is positioned at the straight nothing of raceway groove and bends bifurcated and the ditch bank stable maintenance constant place of section;
Complex control system comprises wireless communication module, GIS module, central processing unit, memory module and alarm module;
GPS locating module, pressure transducer, rain gage, liquid level sensor, obliquity sensor are connected with wireless senser respectively with ultrasonic mud level meter, wireless senser is connected with wireless communication module, wireless communication module is connected with central processing unit, and central processing unit also connects GIS module, alarm module and memory module respectively.
Further, described early warning system also comprises a long distance control system, and described long distance control system is connected by wireless communication module with complex control system.
Further, described GPS locating module adopts the GPS orientator of olive core shape, because olive core shape resistance is minimum, the shell Basell company of GPS orientator releases transparent, to have rigidity and toughness concurrently the impact-resistant copolymerized thing of PP, because it has high fluidity energy, waterproof, toughness is comparatively strong, can resist stronger impact, have larger buoyancy simultaneously, positive and negative two GPS chips are installed, from tow sides Received signal strength in GPS orientator inside.
Further, described GPS positioning early-warning system is provided with multiple GPS locating module, and multiple GPS locating module is arranged in rubble flow relict sediment in the exit or entrance of a clitch, raceway groove of the top of the concave bank of cheuch, damming dam body, Zhigou early stage and the toe place of residual damming dam body respectively.
Further, described wireless communication module comprises one or more the combination in GPRS communication module, SMS communication module, 3G communication module or Wi-Fi communication module.
Further, described rain gage adopts pressure type rain gage.
The beneficial effects of the utility model are: the utility model adopts pressure transducer, rain gage, liquid level sensor, obliquity sensor and ultrasonic mud level meter to carry out Real-Time Monitoring to the main material source of rubble flow, and by GPS locating module, monitored area is positioned, the monitored area landforms obtained by GIS module; According to the pressure data collected, underground water table, inclination data, mud bit data, determine that whether rubble flow occurs and the size of scale, after achieving checked-up lake flood discharge, residual damming dam body forms rubble flow and faces early warning under heavy rain; By early warning system of the present utility model, grace time can be provided for local resident keeps away calamity, casualty loss be dropped to minimum.
Accompanying drawing explanation
Fig. 1 is early warning system construction module figure of the present utility model.
Embodiment
The technical solution of the utility model is further illustrated below in conjunction with accompanying drawing.
As shown in Figure 1, disclose a kind of residual damming dam body in an embodiment of the present utility model under heavy rain, to form rubble flow face calamity early warning system, comprise at least one base station monitors system and complex control system, base station monitors system comprises GPS locating module and wireless senser, and pressure transducer, be arranged on the two bottom sides of damming dam body.When damming dam body collapses under rainfall, the numerical value of pressure transducer can increase instantaneously, the force value recorded is passed to monitoring personnel and analyzes by pressure transducer, draws the size of the volume of this slump, predicts whether it can provide a large amount of thing sources for rubble flow.The force value recorded is passed to the GPRS module be integrated in wireless senser by pressure transducer, GPRS module will pass data back complex control system by GPRS network, for monitoring personnel treatment and analyses, judge whether this position collapses, and the scale collapsed.
Rain gage, is arranged on the spacious ground of have no occluder; This rain gage is connected with the GPRS module be integrated in wireless senser, to rainfall value Real-time Collection, process, upload, rain gage adopts pressure type rain gage, this pressure type rain gage has that real-time is good, precision is high, little advantage affected by environment, can meet the requirement of existing meteorological observation preferably; Run into the situations such as freezing or snowfall, bell mouth may be blocked, or when cannot measure in real time, low power electrothermal tube can be adopted to carry out heating and melting for future use.
Multiple liquid level sensor, is separately positioned on and faces short side in each hole set gradually along damming dam body;
Multiple obliquity sensor, is separately positioned on and faces short side in each hole set gradually along damming dam body;
Short side is faced to setting gradually multiple hole along damming dam body, use liquid level sensor and obliquity sensor, mainly due to damming dam body leading edge, by under the souring of current, unstable bolck slump, so be primary for the monitoring of underground water table, liquid level sensor is set in the bottom of each hole; Secondly the complex structure of damming dam body, large due to its material composition difference at every one deck, so its movement velocity is different, an obliquity sensor should be all set at different layers, to obtain the inclination data of different layers, good monitoring effect can be reached like this;
Ultrasonic mud level meter, is arranged in the Circulation Area of rubble flow, is positioned at the straight nothing of raceway groove and bends bifurcated and the ditch bank stable maintenance constant place of section; The mud bit depth of rubble flow can reflect debris flow scale and the extent of injury intuitively, is connected on hanger canal bed with ultrasonic sensor with GPRS module, implements to report to the police by the difference of mud position.
Complex control system comprises wireless communication module, GIS module, central processing unit, memory module and alarm module.
GPS locating module, pressure transducer, rain gage, liquid level sensor, obliquity sensor are connected with wireless senser respectively with ultrasonic mud level meter, wireless senser is connected with wireless communication module, wireless communication module is connected with central processing unit, and central processing unit also connects GIS module, alarm module and memory module respectively.
The positional information that GIS module of the present utility model provides according to GPS locating module, adopts ARCGIS software to obtain the topography and geomorphology situation of monitored area, to carry out monitoring and warning in conjunction with concrete landforms to the rubble flow of this area.
In an embodiment of the present utility model, early warning system also comprises a long distance control system, and long distance control system is connected by wireless communication module with complex control system.GPS locating module adopts the GPS orientator of olive core shape, because olive core shape resistance is minimum, the shell Basell company of GPS orientator releases transparent, to have rigidity and toughness concurrently the impact-resistant copolymerized thing of PP, because it has high fluidity energy, waterproof, toughness is stronger, stronger impact can be resisted, have larger buoyancy, positive and negative two GPS chips are installed, from tow sides acknowledge(ment) signal in GPS orientator inside simultaneously.
In an embodiment of the present utility model, GPS positioning early-warning system is provided with multiple GPS locating module, multiple GPS locating module is arranged on respectively with upper/lower positions: the concave bank being 1. arranged on cheuch, one is installed every 30CM at concave bank, minimumly be installed to 2.5 meters of inside concave bank, GPS locator when not having rubble flow the closer to the inside does not have signal, if when occur rubble flow time this GPS have signal instruction sapping to relevant position, the degree of debris flow can be predicted; 2. be arranged on the top of damming dam body, but need certain degree of depth is installed; 3. the exit or entrance of a clitch of Zhigou is arranged on; 4. be arranged in raceway groove rubble flow relict sediment in interior early stage; 5. be arranged on the toe place of residual damming dam body, inwardly prolong raw certain depth, if changed, illustrate that flood is larger.
In an embodiment of the present utility model, wireless communication module comprises one or more the combination in GPRS communication module, SMS communication module, 3G communication module or Wi-Fi communication module.
The wireless senser that the utility model adopts is that a kind of network information obtains and treatment technology, has MANET, wireless multi-hop route and multi-path data transfer function, and in conjunction with Data fusion technique, balance network load, extends network lifecycle; Sensor node cost is low, can realize carrying out large-scale inserting knot to whole rubble flow monitored area, ensures the degree of depth of data acquisition, for realizing rubble flow status monitoring and early warning provides mass data basis.This method for early warning is based on wireless sensor network technology, build rubble flow monitored area wireless sensor monitoring network, in conjunction with the GPRS communication technology, or in inner other communication modules integrated of wireless senser, the transmission of data can be realized by communication, to monitored area real-time remote monitoring, and by the treatment and analysis to image data, the early-warning and predicting to rubble flow can be realized.
Liquid level sensor principle of the present utility model is: when liquid level sensor puts into a certain degree of depth in fluid to be measured, and the pressure that liquid level is subject to met by sensor.Simultaneously, by air guide stainless steel, the pressure of liquid is incorporated into the malleation chamber of sensor, again the atmospheric pressure on liquid level being connected with the negative pressure cavity of sensor, making sensor record pressure with offset sensor backside pressure, obviously can obtain the liquid level degree of depth by measuring pressure.
Obliquity sensor principle of the present utility model is: when obliquity sensor is static i.e. side and vertical direction there is no acceleration effect, so act on and only have acceleration of gravity above it.Angle between gravity Z-axis and acceleration transducer sensitive axis is exactly pitch angle.
The data feedback of early warning system of the present utility model and analysis are: when actual deployment, adopt the framework of hierarchical network, the radio sensing network of each base station monitors system forms a subnet, node in subnet relies on many self-organization agreements, by multi-hop mode, data are passed to complex control system, complex control system is to the various pressure transducer of above-mentioned node location, rain gage, liquid level sensor, obliquity sensor and ultrasonic mud level meter, GPS locator is to the pressure data passed back, rainfall product data, underground water table, inclination data, mud bit data and the GPS elements of a fix store, after complex control system carries out data prediction to collected information, at a distance data are sent to long distance control system by wireless network.Complex control system is or/and the rainfall amount of a single point is integrated by long distance control system, obtain the rainfall amount in this region, in conjunction with pressure data, underground water table, inclination data and mud bit data GPRS signal change and with presence or absence of data carry out statistical study and can judge that whether residual damming dam stability and rubble flow occur, and the place occurred, and make the decision-making of early warning, and feed back each base station monitors system and mass presdiction and disaster prevention station thereof, carry out the early warning of rubble flow.
Although describe in detail embodiment of the present utility model by reference to the accompanying drawings, should not be construed as the restriction of the protection domain to this patent.In the scope described by claims, the various amendment that those skilled in the art can make without creative work and distortion still belong to the protection domain of this patent.

Claims (6)

1. residual damming dam body forms rubble flow and faces a calamity early warning system under heavy rain, and it is characterized in that, comprise at least one base station monitors system and complex control system, described base station monitors system comprises GPS locating module and wireless senser, and
Pressure transducer, is arranged on the two bottom sides of damming dam body;
Rain gage, is arranged on the spacious ground of have no occluder;
Multiple liquid level sensor, is separately positioned on and faces short side in each hole set gradually along damming dam body;
Multiple obliquity sensor, is separately positioned on and faces short side in each hole set gradually along damming dam body;
Ultrasonic mud level meter, is arranged in the Circulation Area of rubble flow, is positioned at the straight nothing of raceway groove and bends bifurcated and the ditch bank stable maintenance constant place of section;
Described complex control system comprises wireless communication module, GIS module, central processing unit, memory module and alarm module;
Described GPS locating module, pressure transducer, rain gage, liquid level sensor, obliquity sensor are connected with wireless senser respectively with ultrasonic mud level meter, wireless senser is connected with wireless communication module, wireless communication module is connected with central processing unit, and central processing unit also connects GIS module, alarm module and memory module respectively.
2. one according to claim 1 remains damming dam body and under heavy rain, forms rubble flow face calamity early warning system, it is characterized in that, described early warning system also comprises a long distance control system, and described long distance control system is connected by wireless communication module with complex control system.
3. one according to claim 1 remains damming dam body and under heavy rain, forms rubble flow face calamity early warning system, it is characterized in that, described GPS locating module adopts the GPS orientator of olive core shape, and positive and negative two GPS chips are installed, from tow sides acknowledge(ment) signal in GPS orientator inside.
4. the one according to claim 1 or 3 remains damming dam body and under heavy rain, forms rubble flow face calamity early warning system, it is characterized in that, described GPS positioning early-warning system is provided with multiple GPS locating module, and multiple GPS locating module is arranged in rubble flow relict sediment in early stage in the concave bank of cheuch, the top of damming dam body, the exit or entrance of a clitch of Zhigou, raceway groove and the toe place of residual damming dam body respectively.
5. one according to claim 1 remains damming dam body and under heavy rain, forms rubble flow face calamity early warning system, it is characterized in that, described wireless communication module comprises one or more the combination in GPRS communication module, SMS communication module, 3G communication module or Wi-Fi communication module.
6. one according to claim 1 remains damming dam body and under heavy rain, forms rubble flow face calamity early warning system, and it is characterized in that, described rain gage adopts pressure type rain gage.
CN201520903832.4U 2015-11-13 2015-11-13 It forms mud -rock flow and faces calamity early warning system to remain damming dam body under torrential rain Expired - Fee Related CN205177100U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520903832.4U CN205177100U (en) 2015-11-13 2015-11-13 It forms mud -rock flow and faces calamity early warning system to remain damming dam body under torrential rain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520903832.4U CN205177100U (en) 2015-11-13 2015-11-13 It forms mud -rock flow and faces calamity early warning system to remain damming dam body under torrential rain

Publications (1)

Publication Number Publication Date
CN205177100U true CN205177100U (en) 2016-04-20

Family

ID=55741061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520903832.4U Expired - Fee Related CN205177100U (en) 2015-11-13 2015-11-13 It forms mud -rock flow and faces calamity early warning system to remain damming dam body under torrential rain

Country Status (1)

Country Link
CN (1) CN205177100U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109859442A (en) * 2019-04-02 2019-06-07 中国科学院、水利部成都山地灾害与环境研究所 Mountain region disaster chain prediction and monitoring and warning system and implementation process
CN110415491A (en) * 2019-08-09 2019-11-05 华北科技学院 Mud-stone flow disaster Integrated Monitoring System and visualization early warning cloud platform
CN111866453A (en) * 2020-06-30 2020-10-30 河海大学 Barrier dam emergency monitoring and early warning method based on artificial intelligence and BIM
CN112258792A (en) * 2020-10-16 2021-01-22 四川志德岩土工程有限责任公司 Geological monitoring system based on GNSS and RTU linkage

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109859442A (en) * 2019-04-02 2019-06-07 中国科学院、水利部成都山地灾害与环境研究所 Mountain region disaster chain prediction and monitoring and warning system and implementation process
CN110415491A (en) * 2019-08-09 2019-11-05 华北科技学院 Mud-stone flow disaster Integrated Monitoring System and visualization early warning cloud platform
CN111866453A (en) * 2020-06-30 2020-10-30 河海大学 Barrier dam emergency monitoring and early warning method based on artificial intelligence and BIM
CN112258792A (en) * 2020-10-16 2021-01-22 四川志德岩土工程有限责任公司 Geological monitoring system based on GNSS and RTU linkage

Similar Documents

Publication Publication Date Title
CN205177100U (en) It forms mud -rock flow and faces calamity early warning system to remain damming dam body under torrential rain
CN103743441B (en) The polynary of a kind of side slope safety is coupling in line monitoring system and method
KR102124546B1 (en) Management and warning system of falling rock and soil and stone measure facilities to be communicated with the slope warning device
CN110532952A (en) Flood disaster risk early warning and evacuation system based on GIS location technology
CN107067333A (en) A kind of high altitudes and cold stability of the high and steep slope monitoring method
CN106023530A (en) Heavy rain type diluted debris flow monitoring, forecast and early warning device and method
CN105424084B (en) Tidal flat erosion and deposition networking observation system
CN102943459A (en) Remote smart monitoring and three-dimensional early warning method and system for deformation stability of deep foundation pit
CN206034367U (en) Flood control water retaining device positioning system based on bluetooth communication
CN107808498A (en) A kind of monitoring method of landslide and the monitoring system of application this method
CN102979071B (en) Remote intelligent monitoring and three-dimensional early warning method and system for stress stability of deep foundation pit
CN205354288U (en) Mountain landslide monitoring and early warning device based on internet of things
CN202925536U (en) Deep foundation pit stress stability remote intelligent monitoring and three-dimensional early-warning system
CN110415491A (en) Mud-stone flow disaster Integrated Monitoring System and visualization early warning cloud platform
CN110082833B (en) Intelligent hydraulic engineering structure safety monitoring system and construction method
CN108917718A (en) A kind of wireless tilt and displacement monitoring device, system and method
CN107270863A (en) It is a kind of to assess early warning system and the method for early warning that vertical deep foundation pit deformation influences on embankment
CN207846495U (en) Large-scale well-sinking foundation construction real-time monitoring system based on long range radio transmissions technology
CN206959776U (en) High-rise building safe monitoring system based on big-dipper satellite
CN107884154A (en) Bed load discharge measuring system and measuring method based on cross-correlation method
CN107390716A (en) A kind of mining area safety monitoring system based on unmanned plane
CN103061322B (en) Deep foundation ditch stability remote intelligent monitoring 3-dimensional digital comprehensive pre-warning method and system
CN202969361U (en) Remote intelligent monitoring and three-dimensional pre-warning system for deformation stability of deep foundation pit
CN206741668U (en) A kind of Geological Hazards Monitoring source of early warning
CN110648504B (en) Landslide disaster monitoring device and method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160420

Termination date: 20161113