Prior art keywords
wall body
stake
width
prefabricated board
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821476773.7U
Other languages
Chinese (zh)
Inventor
何建栋
吉佳宇
谢政廷
李冬
毛欣
曹丽娟
钱惠英
林小明
蔡军
黄月朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Water Conservancy Design Institute Co Ltd
Original Assignee
Wuxi Water Conservancy Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Water Conservancy Design Institute Co Ltd filed Critical Wuxi Water Conservancy Design Institute Co Ltd
Priority to CN201821476773.7U priority Critical patent/CN209011083U/en
Application granted granted Critical
Publication of CN209011083U publication Critical patent/CN209011083U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a kind of peg board combination shore protections, including more first PC wall body stakes;It is opened up on opposite side in adjacent two the first PC wall body stakes fluted;Multiple groups prefabricated board, the both ends of every group of prefabricated board are plugged in the groove of adjacent two the first PC wall body stakes;Note is located at the injecting paste material between prefabricated board both ends and groove;The crown beam being formed at the top of the first PC wall body stake and prefabricated board;More 2nd PC wall body stakes are oppositely arranged and far from bank slope with the first PC wall body stake;First coupling beam is formed in the top of the 2nd PC wall body stake;More second coupling beams, one end is connected with crown beam and the other end is connected with the first coupling beam.Construction is simple is quick, reduces investment outlay, channel revetment belongs to environmentally friendly, it effectively prevent shore protection to occur leaking native phenomenon, the 2nd PC wall body stake and the first PC wall body stake and prefabricated board are formd entirety by this shore protection simultaneously, it is highly-safe and the higher-height bank slope of earth-retaining can be suitable for which the overall structure of shore protection is more stable.

Description

A kind of peg board combination shore protection
Technical field
The utility model relates to a kind of peg board combination shore protections.
Background technique
In channel revetment design work, implements according to conventional concrete barricade or Gravity Retaining Wall, foundation pit need to be carried out and opened It digs, generally requires the construction area for having 5~10m other than water front, but have buried pipe after being frequently encountered wall in practical projects Situations such as line, house, road, greening, causes channel revetment not have the condition of excavation of foundation pit, lead to not construct, and it is previous It encounters such situation and uses filling pile structure often to avoid excavating, but since filling pile construction speed is slow, need to continuously arrange, Waste that is huge, and will form such as mud etc is invested, seeks a kind of non-excavation type thus, construction is simple is quick, section Investment-saving, environmentally friendly channel revetment, to meet the needs of non-excavation type bank protection construction.Simultaneously for earth-retaining height compared with High river, safety and stability requirement for channel revetment will be higher.
Summary of the invention
The technical problem to be solved by the present invention is to provide a kind of peg board combination shore protections that stability is high.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:
A kind of sheet pile combination shore protection, it includes:
More first PC wall body stakes, the more first PC wall body stakes are alternatively arranged along bank slope;Adjacent two described first It is opened up on opposite side in PC wall body stake fluted;
Multiple groups prefabricated board, the both ends of prefabricated board described in every group are plugged in the groove of adjacent two the first PC wall body stakes It is interior;
Injecting paste material, the injecting paste material note are located between the prefabricated board both ends and the groove;
Crown beam, the crown beam are formed in the top of the first stake of PC wall body and the prefabricated board;
More 2nd PC wall body stakes, the more 2nd PC wall body stakes are oppositely arranged with the first PC wall body stake described in more And far from the bank slope;
First coupling beam, first coupling beam are formed in the top of the 2nd PC wall body stake;
The one end of more second coupling beams, second coupling beam is connected with the crown beam and the other end and described first Coupling beam is connected.
Specifically, the prefabricated board is assembled by muti-piece splice plate, and the upper side of every piece of splice plate forms splicing Slot and downside form splicing protrusion.
Specifically, the groove includes the first groove body and on the inside of first groove body and coupled logical second Groove body, the width of first groove body are less than the width of second groove body.
Specifically, first through hole concentric with it is also provided at the center of the first PC wall body stake.
Specifically, the second through-hole concentric with it is also provided at the center of the 2nd PC wall body stake.
Specifically, the width of the crown beam is greater than the width of the first PC wall body stake, the width of the first PC wall body stake Degree is greater than the width of the prefabricated board.
Specifically, the width of first coupling beam is greater than the width of the 2nd PC wall body stake, the width of second coupling beam Degree is greater than the width of the 2nd PC wall body stake.
The distance of length, that is, Fig. 1 left and right directions of the utility model, width are the distance of the up and down direction of Fig. 1, high Degree is the distance of the up and down direction of Fig. 3.
The scope of the utility model, however it is not limited to technical solution made of the specific combination of above-mentioned technical characteristic, while The other technical solutions for being carried out any combination by above-mentioned technical characteristic or its equivalent feature and being formed should be covered.Such as features described above The technical solution that with (but being not limited to) disclosed herein there is the technical characteristic of similar functions to be replaced mutually and formed Deng.
Since above-mentioned technical proposal is used, the utility model has the advantage that compared with prior art
The utility model construction is simple is quick, reduces investment outlay, and channel revetment belongs to environmentally friendly, and shore protection is effectively prevent to go out Native phenomenon is now leaked, while the 2nd PC wall body stake and the first PC wall body stake and prefabricated board are formd entirety by coupling beam by this shore protection, It is highly-safe and the higher-height bank slope of earth-retaining can be suitable for which the overall structure of shore protection is more stable.
Detailed description of the invention
Attached drawing 1 is the bottom view of the utility model;
Attached drawing 2 is the top view of the first PC wall body stake;
Attached drawing 3 is the cross-sectional view in the direction A-A of attached drawing 1;
Attached drawing 4 is the cross-sectional view in the direction B-B of attached drawing 1;
Attached drawing 5 is the structural schematic diagram of splice plate;
Wherein: 2, the first PC wall body stake;21, groove;211, the first groove body;212, the second groove body;22, through-hole;3, prefabricated Plate;31, splicing protrusion;32, splice plate;33, splice slot;4, injecting paste material;5, crown beam;6, the 2nd PC wall body stake;61, second is logical Hole;71, the first coupling beam;72, the second coupling beam.
Specific embodiment
A kind of sheet pile combination shore protection of the utility model, it includes: more first PC wall body stakes 2, multiple groups prefabricated board 3, note Pulp material 4, crown beam 5, bis- PC wall body stake 6 of Duo Gen, the first coupling beam 71, more second coupling beams 72.
More first PC wall body stakes 2 are alternatively arranged along bank slope;It is opened on opposite side in adjacent two the first PC wall body stakes 2 Equipped with groove 21;The both ends of every group of prefabricated board 3 are plugged in the groove 21 of adjacent two the first PC wall body stakes 2;Injecting paste material 4 Note is located between 3 both ends of prefabricated board and groove 21;Crown beam 5 is formed in the top of the first PC wall body stake 2 and prefabricated board 3;More 2nd PC wall body stake 6 and more first PC wall body stakes 2 are oppositely arranged and far from bank slopes;First coupling beam 71,71 shape of the first coupling beam The top of bis- PC wall body stake 6 of Cheng;The one end of second coupling beam 72 is connected with crown beam 5 and the other end and the first coupling beam 71 are connected.
The design of crown beam 5, the first coupling beam 71 and the second coupling beam 72, so that the first PC wall body stake 2,6 and of the 2nd PC wall body stake The combination of prefabricated board 3 is more firm.
In order to facilitate processing with transport, prefabricated board 3 is assembled by muti-piece splice plate 32, the upside of every piece of splice plate 32 Face forms splicing slot 31 and downside forms splicing protrusion 33.In actual production, we only need pre-processed splicing Plate 32 is transported to designated position, is assembled, i.e., available prefabricated board 3 required for forming us.
Groove 21 is including the first groove body 211 and positioned at 211 inside of the first groove body and coupled the second logical groove body 212, the width for the second groove body 212 that the width of the first groove body 211 is less than.In the present embodiment, prefabricated board 3 is just plugged in groove In 21, due to the width for the second groove body 212 that the width of the first groove body 211 is less than, injecting paste material 4 can be in the second groove body It in the big part space of 212 to the first groove body, 211 width, is sufficiently submerged in, to be formd between prefabricated board 3 and groove 21 Preferable sealing function, thus anti-leak-stopping sandy soil or water, so that prefabricated board 3 and the first PC wall body stake 2 are ideally incorporated in one It rises.
In addition, in order to save material, be also provided at the center of the first PC wall body stake 2 first through hole 22 concentric with it, The second through-hole 61 concentric with it, the first PC wall body stake 2, the 2nd PC wall body stake are also provided at the center of 2nd PC wall body stake 6 It is not solid construction among 6, but can equally plays the role of solid construction, simultaneous with first through hole 22, second The design of through-hole 61 enables the first PC wall body stake 2, the 2nd PC wall body stake 6 that can preferably be combined with bank slope, is more preferably plugged in In bank slope.
The width of crown beam 5 is greater than the width of the first PC wall body stake 2, and the width of the first PC wall body stake 2 is greater than the width of prefabricated board 3 Degree.
The width of first coupling beam 71 is greater than the width of the 2nd PC wall body stake 6, and the width of the second coupling beam 72 is greater than the 2nd PC wall The width of body stake 6.
The width of crown beam 5 is greater than the width of the first PC wall body stake 2, and the width of the first PC wall body stake 2 is greater than the width of prefabricated board 3 Degree, the width of the first coupling beam 71 are greater than the width of the 2nd PC wall body stake 6, the width of the second coupling beam 72 be greater than the 2nd PC wall body stake 6 width.The width of crown beam 5, width, height and the length of the first PC wall body stake 2, the width of the 2nd PC wall body stake 6, height And length, the height of prefabricated board 3, width, the first coupling beam 71, width of the second coupling beam 72 etc. can be selected specifically according to the actual situation It selects.
The utility model is assembled using assembled, easy for construction, and prefabricated board 3 and the first PC wall body stake 2 play water blocking gear The effect of soil, injecting paste material 4 play the role of sealing, while can according to need the depth and width of adjustment prefabricated board 3, together When can suitably increase spacing between the first adjacent PC wall body stake 2, strengthen the globality of supporting construction, effectively increase Furthermore the security and stability of shore protection increases the 2nd PC wall body stake 6, the first coupling beam 71 and the second coupling beam 72, so that shore protection is whole Body structure is more stable, highly-safe and can be suitable for the higher-height bank slope of earth-retaining.
As described above, we are illustrated fully according to the objective of the utility model, but the utility model not limits to In above-described embodiment and implementation method.The range that the practitioner of correlative technology field can permit in the technical idea of the utility model It is interior to carry out different variation and implementation.

Claims (7)

1. a kind of peg board combination shore protection, which is characterized in that it includes:
More first PC wall body stakes (2), the more first PC wall body stakes (2) are alternatively arranged along bank slope;Adjacent two described Fluted (21) are opened up on opposite side in one PC wall body stake (2);
Multiple groups prefabricated board (3), the both ends of prefabricated board described in every group (3) are plugged in adjacent two the first PC wall body stakes (2) Groove (21) in;
Injecting paste material (4), injecting paste material (4) note are located between the prefabricated board (3) both ends and the groove (21);
Crown beam (5), the crown beam (5) are formed in the top of the first PC wall body stake (2) and the prefabricated board (3);
More 2nd PC wall body stakes (6), the 2nd PC wall body stake (6) and the first PC wall body stake (2) are oppositely arranged and far From the bank slope;
First coupling beam (71), first coupling beam (71) are formed in the top of the 2nd PC wall body stake (6);
The one end of more second coupling beams (72), second coupling beam (72) be connected with the crown beam (5) and the other end with First coupling beam (71) is connected.
2. peg board combination shore protection according to claim 1, it is characterised in that: the prefabricated board (3) is by muti-piece splice plate (32) it is assembled, the upper side of every piece of splice plate (32) forms splicing slot (31) and downside forms splicing protrusion (33)。
3. peg board combination shore protection according to claim 1, it is characterised in that: the groove (21) includes the first groove body (211) and positioned at the first groove body (211) inside and coupled logical the second groove body (212), first groove body (211) width is less than the width of second groove body (212).
4. peg board combination shore protection according to claim 1, it is characterised in that: at the center of the first PC wall body stake (2) It is also provided with first through hole concentric with it (22).
5. peg board combination shore protection according to claim 1, it is characterised in that: at the center of the 2nd PC wall body stake (6) It is also provided with the second through-hole (61) concentric with it.
6. peg board combination shore protection according to claim 1, it is characterised in that: the width of the crown beam (5) is greater than described the The width of one PC wall body stake (2), the width of the first PC wall body stake (2) are greater than the width of the prefabricated board (3).
7. peg board combination shore protection according to claim 1, it is characterised in that: the width of first coupling beam (71) is greater than institute The width of the 2nd PC wall body stake (6) is stated, the width of second coupling beam (72) is greater than the width of the 2nd PC wall body stake (6).
CN201821476773.7U 2018-09-10 2018-09-10 A kind of peg board combination shore protection Expired - Fee Related CN209011083U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821476773.7U CN209011083U (en) 2018-09-10 2018-09-10 A kind of peg board combination shore protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821476773.7U CN209011083U (en) 2018-09-10 2018-09-10 A kind of peg board combination shore protection

Publications (1)

Publication Number Publication Date
CN209011083U true CN209011083U (en) 2019-06-21

Family

ID=66832692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821476773.7U Expired - Fee Related CN209011083U (en) 2018-09-10 2018-09-10 A kind of peg board combination shore protection

Country Status (1)

Country Link
CN (1) CN209011083U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056649A (en) * 2018-09-10 2018-12-21 无锡市水利设计研究院有限公司 A kind of sheet pile combination shore protection and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056649A (en) * 2018-09-10 2018-12-21 无锡市水利设计研究院有限公司 A kind of sheet pile combination shore protection and its construction method

Similar Documents

Publication Publication Date Title
CN109056650A (en) A kind of assembled sheet pile combination shore protection and its construction method
CN100535253C (en) Inter-embedding type slope protection block and construction method therefor
CN204780764U (en) Ecological wallboard formula barricade shore protection with ribbing of environment friendly
CN209011083U (en) A kind of peg board combination shore protection
CN203890958U (en) Ecotypic insert-block mutual embedding type soil retaining brick
CN203238642U (en) Supporting retaining wall of foundation pit
CN105256811B (en) Construction method for foundation pit supporting and protecting through sheet pile supporting structure with water stopping function
CN109056649A (en) A kind of sheet pile combination shore protection and its construction method
CN209011082U (en) A kind of assembled peg board combination shore protection
CN202023175U (en) Omnibearing interlocked revetment block
CN203530921U (en) Water-permeable pile foundation spur dike
CN104895008B (en) The construction method of environmentally friendly ecology wallboard type with ribbing barricade shore protection
CN206736929U (en) Protect the foundation pit structure of surrounding building
CN205296211U (en) Hydraulic engineering retaining wall
CN211498732U (en) Plant stone bank revetment
CN207812470U (en) A kind of plastic sheet pile with injected hole
CN209082421U (en) Ecological sheet pile
CN208545754U (en) A kind of argillaceous sandstone area deep foundation ditch steel plate pile structure
CN202359564U (en) Arch steel sheet pile supporting structure
CN204875665U (en) A power station tailrace barricade that is used for medium thickness sand gravel basis
CN207846336U (en) A kind of ecological riverway structure close to building
CN201620514U (en) Self-locking type earth-retaining blocks
CN206189428U (en) A steel sheet piling cofferdam for deep foundation construction
CN217325241U (en) Pile foundation gabion ecological retaining wall structure
CN217629990U (en) Supporting construction of slant anchor rope bracket formula sheet pile wall and counterfort formula barricade

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190621

CF01 Termination of patent right due to non-payment of annual fee