CN208996763U - A kind of mine down-hole tunnel driving automatic drain system - Google Patents

A kind of mine down-hole tunnel driving automatic drain system Download PDF

Info

Publication number
CN208996763U
CN208996763U CN201821034434.3U CN201821034434U CN208996763U CN 208996763 U CN208996763 U CN 208996763U CN 201821034434 U CN201821034434 U CN 201821034434U CN 208996763 U CN208996763 U CN 208996763U
Authority
CN
China
Prior art keywords
pump
blowoff basin
water
drainage
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821034434.3U
Other languages
Chinese (zh)
Inventor
柯迈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Baodi Meishan Industrial City Development Co.,Ltd.
Original Assignee
Shanghai Meishan Iron and Steel Co Ltd
Nanjing Meishan Metallurgy Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Meishan Iron and Steel Co Ltd, Nanjing Meishan Metallurgy Development Co Ltd filed Critical Shanghai Meishan Iron and Steel Co Ltd
Priority to CN201821034434.3U priority Critical patent/CN208996763U/en
Application granted granted Critical
Publication of CN208996763U publication Critical patent/CN208996763U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a kind of mine down-hole tunnels to tunnel automatic drain system, and the automatic drain system includes the drainage equipment for meeting head on to produce waste water for pump drainage, for white-out at the gravity flow ditch of lane ponding;The gravity flow ditch is arranged to certain gradient, for collecting and the fixation blowoff basin of pump drainage ponding, is installed on the automatic pump of the tape travel switch at fixed blowoff basin;Top water discharging hard pipe is crossed for draining from blowoff basin to drainage sump;The top water discharging hard pipe of crossing is hung on tunnel using hook and helps, and the waste water that production generates of meeting head on passes through random water pump pump drainage to fixed blowoff basin;Side exudation ponding is pushed up at lane, and fixed blowoff basin is emitted by the ditch gravity that flows automatically;The ponding that water pump meets head on operation is extracted into fixed blowoff basin, and the ponding of fixed blowoff basin passed through top water discharging hard pipe with automatic pump and is pumped to drainage sump;The technical solution realizes the mechanization of excavation draining, automatic operating, facilitates power configuration and control.

Description

A kind of mine down-hole tunnel driving automatic drain system
Technical field
The utility model relates to a kind of drainage system, in particular to a kind of mine down-hole tunnel tunnels automatic drain system, Belong to mine drainage technical field.
Background technique
Mine down-hole tunnel driving automatic drain system is responsible for using the water burst of digging laneway and driving trolley hole flushing production Water drains into drainage sump, and the performance of system is directly related to the safety and production direct motion of driving face.The row of digging laneway at present Water, which relies primarily on, manually drags water pump to draw the original modes such as water band, and which needs to be equipped with special operative employee, draws very long water Pipe and cable are met head on to operation, and water pump and water-pump controlling box are put into operation and meet head on to draw water.The shortcomings which, mainly has following Three aspects: 1, drainage equipment is not readily transportable and installs;2, it is limited by manpower, light-duty water pump, this water pump row can only be selected Outlet capacity is small, cannot cope with biggish pit water inrush accident;3, water pipe is unfavorable for trackless equipment walking along roadway layout, is easy quilt Equipment is damaged by pressure;4, since water pump is unable to automatic control switch, dry combustion method is easily damaged water pump after water exhausts.In order to solve above ask Topic needs a kind of mine down-hole tunnel driving automatic drain system, various for solving to drain in existing roadway tunneling process Problem realizes mechanization, the automatic operating of excavation draining.
Summary of the invention
The utility model exactly for the technical problems in the prior art, provide a kind of mine down-hole tunnel driving from Dynamic drainage system, the technical solution realize the mechanization of excavation draining, automatic operating, facilitate power configuration and control.
To achieve the goals above, the technical solution of the utility model is as follows: a kind of automatic row of mine down-hole tunnel driving Water system, which is characterized in that the automatic drain system includes the drainage equipment for meeting head on to produce waste water for pump drainage, is used for white-out At the gravity flow ditch of lane ponding;The gravity flow ditch is arranged to certain gradient, using the flow by gravity of water into fixed blowoff basin, Equipment pump drainage is not needed.For collecting with the fixation blowoff basin of pump drainage ponding, the tape travel switch being installed at fixed blowoff basin Automatic pump;
Top water discharging hard pipe is crossed for draining from blowoff basin to drainage sump;The top water discharging hard pipe of crossing is hung on using hook Tunnel is helped, and avoiding influences trackless equipment walking.The waste water for meeting head on to produce generation is drained by random water pump pump drainage to fixed Pond;Side exudation ponding is pushed up at lane, and fixed blowoff basin is emitted by the ditch gravity that flows automatically;The ponding that water pump meets head on operation is extracted into Fixed blowoff basin, the ponding of fixed blowoff basin passed through top water discharging hard pipe with automatic pump and are pumped to drainage sump.
As a kind of improvement of the utility model, the drainage equipment is mounted on driving trolley, the drainage equipment packet Transformer, pump switch case, water pump and water pipe are included, the pump switch case connects power supply, and the ponding that water pump meets head on operation is taken out To fixed blowoff basin, pumping equipment draws electricity from driving trolley, and equipment carries at random, and transformer is responsible for that the random distribution of trolley will be tunneled The 1000V voltage that cabinet picks out becomes the 380V voltage of water pump.
As a kind of improvement of the utility model, the pump switch control cabinet includes an air switch and water pump start and stop Switch is responsible for control water pump start and stop and earth leakage protective.
As a kind of improvement of the utility model, the gravity flow ditch is to be arranged in driving will tunnel into lane at lane highwall Side water seepage in top dredges fixed blowoff basin, and gravity flow ditch is designed to 3 ‰ gradient, elevation height of meeting head on, high at fixed blowoff basin Journey is minimum.
As a kind of improvement of the utility model, the automatic pump includes water pump, pump switch case, according to water level control The travel switch of water pump automatic start-stop, the travel switch are fixed on above fixed blowoff basin with anchor pole, suspend one in midair below In float to pond.
As a kind of improvement of the utility model, water discharging hard pipe is laid with from blowoff basin to drainage sump, draining hard plastic tube is used Hook is fixed on tunnel arch camber position, rolls damage when avoiding influencing equipment walking.
Compared with the existing technology, as follows the advantages of the utility model: 1) Technical Design is compact ingenious, drainage equipment With driving trolley installation, the carrying of drainage equipment is facilitated;Draw electricity from driving trolley, it is convenient without individually connecing electricity from distribution board Power configuration and control;2) water pump carries at random in the program, is not limited by manpower, can choose the bigger water of drainability Pump promotes anti-disaster ability so as to cope with the larger water burst to happen suddenly in tunneling process;3) technical solution passes through travel switch Control water pump automatic start-stop, avoid occur occurring when manual control switch's water pump due to forgetting the water after causing water to drain that cuts out the pump Pump dry combustion method problem;4) hard plastic tube hook is drained in the program and is fixed on tunnel arch camber position, when avoiding influencing equipment walking Roll damage.
Detailed description of the invention
Fig. 1 is the floor map of automatic drain system in mine down-hole tunnel tunneling process;
Fig. 2 is the structural schematic diagram of automatic drain system in mine down-hole tunnel tunneling process
Fig. 3 is the driving random water pump structure schematic diagram of trolley;
Fig. 4 is blowoff basin and automatic pump structural schematic diagram;
Fig. 5 is that water discharging hard pipe crosses top schematic diagram.
Specific embodiment
It is practical new to this with reference to the accompanying drawings and detailed description in order to reinforce the understanding and cognition to the utility model Type makes further instructions and introduces.
Embodiment 1: referring to Fig. 1-Fig. 2, a kind of mine down-hole tunnel driving automatic drain system, Fig. 1 is mine down-hole lane The floor map of automatic drain system in road tunneling process, as shown, in the present embodiment mine down-hole tunnel tunneling process Automatic drain system includes the random water pump and water band on the driving trolley for boring head draining;For dredging driving into lane Gravity flow ditch;For collecting and the fixation blowoff basin of pump drainage ponding;It is installed on oneself of the tape travel switch at fixed blowoff basin Dynamic water pump;Top water discharging hard pipe is crossed for draining from blowoff basin to drainage sump.Fig. 2 is automatic in mine down-hole tunnel tunneling process The structural schematic diagram of drainage system, as shown, the waste water that production generates of meeting head on passes through random water pump pump drainage to fixed blowoff basin; Side exudation ponding is pushed up at lane, and fixed blowoff basin is emitted by the ditch gravity that flows automatically;The ponding of fixed blowoff basin is passed through with automatic pump It crosses top water discharging hard pipe and is pumped to drainage sump.The automatic water of fixed blowoff basin and the tape travel switch being installed at fixed blowoff basin Pump.Meet head on operation process discharge waste water and tunnel exudation ponding be discharged to fixed blowoff basin.A general nugget is arranged one admittedly Determine blowoff basin, the corner of connecting taxiway Yu crossing of route mouth is set.A travel switch is fixed above fixed blowoff basin to be used for The automatic start-stop of water pump is controlled, travel switch is picked out from pump switch control.Pump switch control cabinet includes an air switch With water pump start stop switch, it is responsible for control water pump start and stop and earth leakage protective.
Fig. 3 is the driving random water pump structure schematic diagram of trolley, drains as shown in the figure for boring head, is mounted on driving platform Drainage arrangement on vehicle includes a transformer, a pump switch control cabinet, a water pump and water pipe.Transformer is responsible for dig The 1000V voltage picked out into the random power distribution cabinet of trolley becomes the 380V voltage of water pump.Pump switch control cabinet includes a sky Air cock and water pump start stop switch are responsible for control water pump start and stop and earth leakage protective.The ponding that water pump meets head on operation is extracted into fixation Blowoff basin.When tunneling trolley operation, water pump and water band are put into operation and meet head on to draw water, and operation terminates, and water pump and water band receive driving With vehicle transportation on trolley.
Fig. 4 is blowoff basin and automatic pump structural schematic diagram, fixes a stroke above fixed blowoff basin as shown in the figure and opens It closes, hangs a float under travel switch, according to the automatic start-stop of water pump for water level control, travel switch connects from pump switch control cabinet Out.Pump switch control cabinet includes an air switch and water pump start stop switch, is responsible for control water pump start and stop and earth leakage protective.
Fig. 5 is that water discharging hard pipe crosses top schematic diagram, when water discharging hard pipe as shown in the figure passes through ore removal route, is linked up with by anchor pole outstanding It is hung on top plate.Water discharging hard pipe on connecting taxiway is suspended in tunnel arch camber position by anchor pole hook.
It should be noted that above-described embodiment, is not used to limit the protection scope of the utility model, on above-mentioned basis Upper made equivalent substitution or substitution belongs to the protection scope of the utility model claims.

Claims (6)

1. a kind of mine down-hole tunnel tunnels automatic drain system, which is characterized in that the automatic drain system includes for taking out Row meets head on to produce the drainage equipment of waste water, for white-out at the gravity flow ditch of lane ponding;The gravity flow ditch is arranged to certain The gradient,
For collecting and the fixation blowoff basin of pump drainage ponding, it is installed on the automatic pump of the tape travel switch at fixed blowoff basin; Top water discharging hard pipe is crossed for draining from blowoff basin to drainage sump;The top water discharging hard pipe excessively is hung on tunnel using hook and helps On, the waste water that production generates of meeting head on passes through random water pump pump drainage to fixed blowoff basin;Side exudation ponding, which is pushed up, at lane passes through artesian water Ditch gravity is emitted into fixed blowoff basin;The ponding that water pump meets head on operation is extracted into fixed blowoff basin, and the ponding of fixed blowoff basin is used Automatic pump passed through top water discharging hard pipe and is pumped to drainage sump.
2. mine down-hole tunnel according to claim 1 tunnels automatic drain system, which is characterized in that the drainage equipment It is mounted on driving trolley, the drainage equipment includes transformer, pump switch case, water pump and water pipe, the pump switch case Power supply is connected, the ponding that water pump meets head on operation is extracted into fixed blowoff basin, and pumping equipment draws electricity from driving trolley, and equipment is taken at random Band, transformer are responsible for that the 1000V voltage that the random power distribution cabinet of trolley picks out will be tunneled and become the 380V voltage of water pump.
3. mine down-hole tunnel according to claim 2 tunnels automatic drain system, which is characterized in that the pump switch Case includes an air switch and water pump start stop switch, is responsible for control water pump start and stop and earth leakage protective.
4. mine down-hole tunnel according to claim 1 tunnels automatic drain system, which is characterized in that the gravity flow ditch It is to be arranged in driving to help water seepage to dredge fixed blowoff basin at the pushing up driving at lane of lane highwall, gravity flow ditch is designed to 3 ‰ The gradient, elevation height of meeting head on, elevation is minimum at fixed blowoff basin.
5. mine down-hole tunnel according to claim 1 tunnels automatic drain system, which is characterized in that the automatic pump Including water pump, pump switch case, according to the travel switch of water pump for water level control automatic start-stop, the travel switch is fixed with anchor pole Above fixed blowoff basin, suspend in midair in a float to pond below.
6. mine down-hole tunnel according to claim 1 tunnels automatic drain system, which is characterized in that from blowoff basin to letting out Well is laid with water discharging hard pipe, and draining hard plastic tube hook is fixed on tunnel arch camber position, avoids stone roller when influencing equipment walking Crushing is bad.
CN201821034434.3U 2018-07-02 2018-07-02 A kind of mine down-hole tunnel driving automatic drain system Active CN208996763U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821034434.3U CN208996763U (en) 2018-07-02 2018-07-02 A kind of mine down-hole tunnel driving automatic drain system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821034434.3U CN208996763U (en) 2018-07-02 2018-07-02 A kind of mine down-hole tunnel driving automatic drain system

Publications (1)

Publication Number Publication Date
CN208996763U true CN208996763U (en) 2019-06-18

Family

ID=66796183

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821034434.3U Active CN208996763U (en) 2018-07-02 2018-07-02 A kind of mine down-hole tunnel driving automatic drain system

Country Status (1)

Country Link
CN (1) CN208996763U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113338938A (en) * 2021-04-21 2021-09-03 紫金矿业集团股份有限公司 Safety control method for open-pit and underground collaborative mining of metal mine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113338938A (en) * 2021-04-21 2021-09-03 紫金矿业集团股份有限公司 Safety control method for open-pit and underground collaborative mining of metal mine

Similar Documents

Publication Publication Date Title
CN110410143A (en) A kind of reverse-slope tunnel construction drainage system
CN103615010A (en) Construction method of digging and conveying earth of deep foundation pit through current scour
CN206386150U (en) A kind of Underground Subway Station draining and examination and repair system
CN107859064A (en) A kind of prefabricated piping lane is connected waterproof construction and construction method with cast-in-place piping lane
CN207110015U (en) A kind of integrated prefabricated pumping plant with automatic crushing function
CN111119210A (en) Drainage system of piping lane
CN208088344U (en) With waterproof, the underground pipe gallery structure of drain function
CN208996763U (en) A kind of mine down-hole tunnel driving automatic drain system
CN106545343B (en) Construction method for underground pipe gallery and storage well
CN108798775A (en) A kind of jacking construction active well
CN205475275U (en) Landing stage face rainwater collection heat -extraction system
CN203613522U (en) Easily-assembled-and-disassembled tunnel portal water-retaining device for power plant circulating water system
CN208039192U (en) Plugging structure for diversion tunnel based on karst landform
CN110905061A (en) Wharf face initial rainwater and flushing water collecting device and method
CN110374124A (en) Subway work drainage system
CN211773873U (en) Drainage system of piping lane
CN202055248U (en) Pile foundation mud pit
CN112459834B (en) Water collecting well, counter-slope tunnel and counter-slope tunnel drainage method
CN205776125U (en) Spillway gate recess ice breaker in winter
CN205369182U (en) A fill water energy absorber that is used for geomembrane storehouse basin prevention of seepage system
CN104074234A (en) Inland water collecting opening structure of power plant circulating water system and construction method thereof
CN109707445B (en) Dredgeable tunnel drainage system and method
CN103590379B (en) The easy mounted-dismounted type tunnel mouth baffle device for water of electric power plant circulating water system and construction method thereof
CN111139864A (en) Utility tunnel
CN106869236A (en) A kind of sponge urban rainwater collection system is with horizontal tank and its construction method of regulating and storing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 210039 new building, Zhonghua Gate, Yuhuatai District, Jiangsu, Nanjing

Patentee after: Nanjing Baodi Meishan Industrial City Development Co.,Ltd.

Patentee after: SHANGHAI MEISHAN IRON & STEEL Co.,Ltd.

Address before: 210039 new building, Zhonghua Gate, Yuhuatai District, Jiangsu, Nanjing

Patentee before: NANJING MEISHAN METALLURGY DEVELOPMENT Co.,Ltd.

Patentee before: SHANGHAI MEISHAN IRON & STEEL Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20211109

Address after: 210039 new building, Zhonghua Gate, Yuhuatai District, Jiangsu, Nanjing

Patentee after: Nanjing Baodi Meishan Industrial City Development Co.,Ltd.

Address before: 210039 new building, Zhonghua Gate, Yuhuatai District, Jiangsu, Nanjing

Patentee before: Nanjing Baodi Meishan Industrial City Development Co.,Ltd.

Patentee before: SHANGHAI MEISHAN IRON & STEEL Co.,Ltd.

TR01 Transfer of patent right