CN202055248U - Pile foundation mud pit - Google Patents

Pile foundation mud pit Download PDF

Info

Publication number
CN202055248U
CN202055248U CN2011201519116U CN201120151911U CN202055248U CN 202055248 U CN202055248 U CN 202055248U CN 2011201519116 U CN2011201519116 U CN 2011201519116U CN 201120151911 U CN201120151911 U CN 201120151911U CN 202055248 U CN202055248 U CN 202055248U
Authority
CN
China
Prior art keywords
mud pit
mud
pile foundation
casing
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201519116U
Other languages
Chinese (zh)
Inventor
刘磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN2011201519116U priority Critical patent/CN202055248U/en
Application granted granted Critical
Publication of CN202055248U publication Critical patent/CN202055248U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a pile foundation mud pit which resolves the problems that the traditional mud pit is easy to collapse and a lot of mud is consumed away in the construction process of civil engineering pile foundation. The pile foundation mud pit comprises a mud pit body (1), a pile foundation pile casing (4) and a mud pump (6). The mud pit body (1) is a steel pile casing. A concave opening (2) is arranged at the top end of the mud pit body. A mud discharging groove (3) is arranged between the concave opening (2) of the mud pit body and the pipe foundation pile casing (4). A filtering sliding groove (8) is arranged above the mud pit body. An inlet of a suction pipe (5) of the mud pump (6) is arranged in the pile foundation pile casing (4). An outlet of an output pipe (7) of the mud pump (6) is arranged above the top end of the filtering sliding groove (8). The pile foundation mud pit has the advantages of being small in occupied space, material-saving, low in protection cost and not easy to collapse.

Description

A kind of pile foundation mud pit
Technical field
The utility model relates to the mud pit that uses in a kind of civil engineering.
Background technology
In pile foundation construction, the application of mud and processing are very important links, and it directly influences construction quality, progress, and the safety of pile foundation.When pile foundation is arranged in river, fill out the river if adopt the job practices of traditional mud pit need have bad luck a large amount of rock ballasts, smooth place, and also traditional mud pit wall hole is a lot, and a large amount of mud can be consumed, and the mud pit wall also is easy to cave in, and general effect is very poor.
Summary of the invention
The utility model provides a kind of pile foundation mud pit to solve in civil engineering pile foundation construction process, traditional mud pit wall technical problem that a large amount of mud can be consumed of caving in easily.
The utility model overcomes the above problems by following scheme:
A kind of pile foundation mud pit, comprise mud pit, pile foundation casing and slush pump, described mud pit is a steel casing, top at the mud pit of steel casing is provided with a recess, between the recess of mud pit and pile foundation casing, be provided with and let out stock tank, be provided with the filtration chute on the mud pit of steel casing, the inlet of the suction pipe of slush pump is arranged in the pile foundation casing, and the outlet of the efferent duct of slush pump is arranged on the top, top of filtering chute.
Around the steel casing of mud pit, be provided with the clay sealant.
The utlity model has take up an area of little, material saving, the protection expense is low and the advantage that is difficult for caving in.
Description of drawings
Fig. 1 is a structural representation of the present utility model
Specific embodiment
A kind of pile foundation mud pit, comprise mud pit 1, pile foundation casing 4 and slush pump 6, described mud pit 1 is a steel casing, top at the mud pit of steel casing is provided with a recess 2, between the recess 2 of mud pit and pile foundation casing 4, be provided with and let out stock tank 3, be provided with on the mud pit of steel casing and filter chute 8, the inlet of the suction pipe 5 of slush pump 6 is arranged in the pile foundation casing 4, and the outlet of the efferent duct 7 of slush pump 6 is arranged on the top, top of filtering chute 8.Around the steel casing of mud pit 1, be provided with the clay sealant.
Concrete constructure scheme is: in construction, remove in water and fill out stake position and the pioneer road, fill a small amount of place again and be used for embedding steel casing, as mud pit, seal with clay on every side at the bottom of the steel casing.The groove mouth of mud pit casing is higher than the casing of pile foundation, and making sluicing groove is connected to the pile foundation casing.Use during clear hole in the iron filtration chute that a slush pump is provided with the top of the mud suction mud pit in the hole, mud is filtered, rock ballast can be filtered out and be slipped to outside the mud pit along filtering chute, mud is then filtered mud unnecessary in the mud pit and can be got back in the boring along the sluicing concentrated flow by the groove mouth of mud pit, realizes the separation of rock ballast, mud.According to the contrast of practice of construction, new mud pit saves human and material resources than traditional mud pit and clear hole efficient is higher.
The utility model takes up an area of at 8m according to this bridge pier base situation tradition mud pit 2More than; It only is the occupation of land of a steel casing that new mud pit takes up an area of.Conventional method need be had bad luck a large amount of rock ballasts and be filled out the river guaranteeing the construction of mud pit, mud pit is big more then need more; The utility model only needs to fill the job platform of a steel casing.Conventional method needs the wall of a large amount of clay shutoff mud pits, and the later stage also will constantly be added clay to replenish the mud that runs off, and the wall mud in the pond finally must be cleared up mud pit because dehydration sticks together with rock ballast and be sticking more many more; Can get rid of mud in the mud pit when rock ballast that the utility model is released jolts, and the mud pit wall is steel that mud can not run off on slideway.Conventional method needs often the rock ballast in the mud pit to be cleared up, otherwise can't guarantee the circulation of mud; The utility model rock ballast separates automatically with mud, does not have rock ballast in the mud pit, need not clear up.Conventional method be water pump is extended the hole at the bottom of, rock ballast is suspended in the mud slowly overflows; Rock ballast is suspended at the bottom of the hole more during the clear hole of the utility model, and slush pump can be directly with its extraction.Mud pit is bigger in the conventional method, and protection expense nature is bigger than new method, and mud pit is higher than general ground in the utility model, and area is very little, and the protection expense seldom.The mud pit wall is washed away by water and is easy to cave in the conventional method; So mud pit in the utility model is owing to adopt the steel casing can not cave in.
Also can adopt the mud pit of this form in the pile foundation construction of land.Especially for the construction plant deficiency, geology mostly is gravel, erratic boulder, the area of features such as lithic drainage prosperity.The tradition mud pit is the difficult point of civilized construction, and fills out processing for guaranteeing to set a roof beam in place also need change mud pit in the future.Mud pit of the present utility model is removed outside the advantage that above water king-pile mentions, and the most important thing is that post-processed is very simple, only need change to fill out to the hole of its steel casing size, and the material-saving that saves time, and because it is small, regular.

Claims (2)

1. pile foundation mud pit, comprise mud pit (1), pile foundation casing (4) and slush pump (6), it is characterized in that, described mud pit (1) is a steel casing, top at the mud pit of steel casing is provided with a recess (2), between the recess (2) of mud pit and pile foundation casing (4), be provided with and let out stock tank (3), on the mud pit of steel casing, be provided with and filter chute (8), the inlet of the suction pipe (5) of slush pump (6) is arranged in the pile foundation casing (4), and the outlet of the efferent duct (7) of slush pump (6) is arranged on the top, top of filtering chute (8).
2. a kind of pile foundation mud pit according to claim 1 is characterized in that, is provided with the clay sealant around the steel casing of mud pit (1).
CN2011201519116U 2011-05-13 2011-05-13 Pile foundation mud pit Expired - Fee Related CN202055248U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201519116U CN202055248U (en) 2011-05-13 2011-05-13 Pile foundation mud pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201519116U CN202055248U (en) 2011-05-13 2011-05-13 Pile foundation mud pit

Publications (1)

Publication Number Publication Date
CN202055248U true CN202055248U (en) 2011-11-30

Family

ID=45015225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201519116U Expired - Fee Related CN202055248U (en) 2011-05-13 2011-05-13 Pile foundation mud pit

Country Status (1)

Country Link
CN (1) CN202055248U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350526A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Method for setting up steel platform
CN106320333A (en) * 2016-09-27 2017-01-11 中交天航南方交通建设有限公司 Row type water cast-in-place pile device and construction method
CN114541993A (en) * 2022-03-17 2022-05-27 中建八局第一建设有限公司 Totally-enclosed multistage sedimentation underground mud pit device and construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350526A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Method for setting up steel platform
CN105350526B (en) * 2015-11-27 2017-04-12 中国一冶集团有限公司 Method for setting up steel platform
CN106320333A (en) * 2016-09-27 2017-01-11 中交天航南方交通建设有限公司 Row type water cast-in-place pile device and construction method
CN106320333B (en) * 2016-09-27 2023-12-22 中交天航南方交通建设有限公司 Combined drainage type water filling pile device and construction method
CN114541993A (en) * 2022-03-17 2022-05-27 中建八局第一建设有限公司 Totally-enclosed multistage sedimentation underground mud pit device and construction method
CN114541993B (en) * 2022-03-17 2024-02-13 中建八局第一建设有限公司 Totally-enclosed multistage sedimentation underground slurry pond device and construction method

Similar Documents

Publication Publication Date Title
CN104060620A (en) Karst fissure water control method for deep foundation pit
CN202577326U (en) Water lowering device for mine pit
CN202055248U (en) Pile foundation mud pit
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN206721904U (en) A kind of integrated precipitation pumping system
CN204059460U (en) The interior river intake structure of electric power plant circulating water system
CN105178343A (en) Device for conducting siphon drainage by means of drainage ditch
CN106223351B (en) Self priming pump reduces local groundwater level construction method
CN105696611A (en) Foundation pit dewatering device for sand layer with high water permeability
CN204959781U (en) Dewatering well plugging device
CN204418194U (en) For high water-permeability layer of sand foundation pit dewatering device
CN106939610A (en) A kind of integrated precipitation pumping system
CN103741786A (en) Deep foundation pit rainwater storage pond
CN203022015U (en) Foundation raft bottom partial deep foundation pit dewatering device
CN206188616U (en) Mud mummification machine
CN102561373A (en) Pit dewatering device
CN205348204U (en) Light well point precipitation system
CN206188617U (en) Mud mummification system
CN214885968U (en) Automatic water filtering shield muck pool
CN201695412U (en) Automatic and safe anti-buoyancy device of differential pressure type
CN203222805U (en) Internal-supporting type deep foundation pit latticed column well-point rainfall system
CN203741983U (en) Deep foundation pit rainwater detention pond
CN209144964U (en) A kind of efficient rainwater isolation collection device
CN208328963U (en) A kind of polywater water trap for large-scale excavation precipitation
CN203213129U (en) Controllable non-return drainer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111130

Termination date: 20160513