CN208328963U - A kind of polywater water trap for large-scale excavation precipitation - Google Patents

A kind of polywater water trap for large-scale excavation precipitation Download PDF

Info

Publication number
CN208328963U
CN208328963U CN201820853462.1U CN201820853462U CN208328963U CN 208328963 U CN208328963 U CN 208328963U CN 201820853462 U CN201820853462 U CN 201820853462U CN 208328963 U CN208328963 U CN 208328963U
Authority
CN
China
Prior art keywords
water
water tank
polywater
scale excavation
water trap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820853462.1U
Other languages
Chinese (zh)
Inventor
彦浩
温佳杰
王可新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING GEO-ENGINEERING Co
Original Assignee
BEIJING GEO-ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING GEO-ENGINEERING Co filed Critical BEIJING GEO-ENGINEERING Co
Priority to CN201820853462.1U priority Critical patent/CN208328963U/en
Application granted granted Critical
Publication of CN208328963U publication Critical patent/CN208328963U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of polywater water traps for large-scale excavation precipitation, are related to drainage of foundation pit technical field.Its drip irrigation device includes water tank, and drainage arrangement and multiple water inlet pipes are fixedly connected on water tank.The drainage arrangement includes the outlet pipe being connected to water tank, vertical drainpipe is connected with by ring flange in the one end of outlet pipe far from water tank, the upper end of drainpipe is connected to top of the slope.It is flow in water tank the utility model has the advantages that underground water can be drawn through each water inlet pipe concentration by suction pump, due to the increase of hydraulic pressure in water tank, the water in water tank can be pressed out to top of the slope along drainage arrangement by hydraulic pressure, so that water is discharged.

Description

A kind of polywater water trap for large-scale excavation precipitation
Technical field
The utility model relates to drainage of foundation pit technical field, in particular to a kind of polywater for large-scale excavation precipitation is arranged Hydrophone.
Background technique
Foundation pit is the heatable adobe sleeping platform excavated in basic engineering position by substrate absolute altitude and basic plane size.It should basis before excavation Geological hydrology data determines excavation plan in conjunction with live nearby buildings situation, and performs water-proof drainage work.
With the continuous development of urban construction, base pit engineering also gradually tends to be deeper wider, wherein underground water is for construction The influence of difficulty becomes key factor and level of ground water is therefore down to the following safe range in base in the construction process.
Fig. 1 is the structural schematic diagram drained in the prior art to foundation pit;
As shown in Figure 1, when being drained to foundation pit, it will usually multiple dewatering wells 4 are set in foundation pit, drinking-water pipe is straight It is connected to top of the slope in succession, is drawn water in dewatering well using suction pump, to pull water out to top of the slope, each suction pump is being taken out It is all separate operaton when water, hydraulic pressure is smaller and the lift of water pump is limited, so that drainage efficiency reduces, and construction site ratio It is more chaotic, reduce working efficiency.Thus it is proposed that a kind of polywater water trap for large-scale excavation precipitation.
Utility model content
The purpose of the utility model is to provide a kind of polywater water traps for large-scale excavation precipitation, its advantage is that underground Water can all be concentrated by each water inlet pipe and be flowed into water tank, and due to the continuous increase of hydraulic pressure in water tank, hydraulic pressure can will be stored up Water in water pot is pressed out to top of the slope along drainage arrangement.
The above-mentioned technical purpose of the utility model has the technical scheme that including water tank, described Drainage arrangement and multiple water inlet pipes are fixedly connected on water tank.
Through the above technical solutions, the drinking-water pipe in dewatering well is connected to water inlet pipe, the suction pump in dewatering well can be incited somebody to action Underground water extraction, is all flowed into water tank, due to the increase of hydraulic pressure in water tank, water flow is along draining by each water inlet pipe Device is pressed out to top of the slope, the problem of so as to avoid pump head is short and hydraulic pressure is not concentrated, improves drainage efficiency, simultaneously Improve construction efficiency.
The utility model is further arranged to: the drainage arrangement includes the outlet pipe being connected to water tank, in outlet pipe One end far from water tank is connected with vertical drainpipe by ring flange, and the upper end of drainpipe is connected to top of the slope.
Through the above technical solutions, suction pump extracts underground water out, water flow flows into water tank along water inlet pipe, due to Hydraulic pressure in water tank increases, and the water in water tank can flow out to top of the slope along outlet pipe and drainpipe, to make the work that draws water Industry enhanced convenience is quick, improves construction efficiency.
The utility model is further arranged to: the drainage arrangement further includes being connected to drainpipe far from outlet pipe one end Water pump.
Through the above technical solutions, hydraulic pressure caused by suction pump is not enough to store up when the depth of foundation pit is greater than 20 meters Water ejection in water pot assists the suction pump in foundation pit will at this point, connecting a water pump far from one end of outlet pipe in drainpipe Water in drainage arrangement is drawn to top of the slope.
The utility model is further arranged to: being equipped with water check valve on the water inlet pipe.
Through the above technical solutions, closing stopping for the water inlet pipe that operation is completed since the water in each dewatering well is different Water valve can prevent other water also in the water inlet pipe of work from flowing back, and improve drainage efficiency.
The utility model is further arranged to: the drainage arrangement is at least arranged one.
Through the above technical solutions, drainage efficiency can be improved when underground water is more.
The utility model is further arranged to: the diameter of the outlet pipe is greater than the diameter of water inlet pipe.
Through the above technical solutions, intaking simultaneously in multiple water inlet pipes, the hydraulic pressure in water tank increases, the diameter of outlet pipe Diameter greater than water inlet pipe can guarantee that water flow can be quickly forced out from outlet pipe.
The utility model is further arranged to: the diameter of the outlet pipe is 100mm-150mm, length 10mm- 20mm。
The utility model is further arranged to: the diameter of the water inlet pipe is 20mm-40mm, length 50mm-80mm.
The utility model is further arranged to: the diameter of the water tank is 400mm-600mm, length 2m-3m.
The utility model is further arranged to: steel plate is arranged in the lower section of the water tank, and steel plate is laid in foundation pit, in steel Support frame is erected on plate, the water tank is fixed on the support frame.
Through the above technical solutions, what water tank can not be stable is placed in foundation pit, therefore due to uneven in foundation pit It is laid with steel plate on foundation pit, guarantees stability of the water tank in operation, support frame is set up on foundation pit, water tank is fixed on On support frame, the stability of water tank can further improve, and the tidiness of water tank and drainage arrangement can be improved.
In conclusion the utility model has the following beneficial effects:
1, the underground water of bottom of foundation ditch can be concentrated in water tank by suction pump, passes through the increasing of hydraulic pressure in water tank Greatly, the water in water tank can be pressed out to top of the slope along drainage arrangement;
2, water check valve can control the work of each water inlet pipe, and since the water in each dewatering well is different, water check valve can Prevent other water also in the water inlet pipe of work from flowing back, to improve drainage efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for embodying background technique;
Fig. 2 is the overall structure diagram of the utility model;
Fig. 3 is the structural schematic diagram for embodying drainage arrangement.
In figure, 1, water tank;2, water inlet pipe;21, water check valve;3, drainage arrangement;31, outlet pipe;32, ring flange;33, it arranges Water pipe;4, dewatering well;41, drinking-water pipe;5, foundation pit side-wall;6, steel plate;7, support frame.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.The wherein identical attached drawing of identical components Label indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "upper", "lower", " bottom Face " and " top surface " refer to that the direction in attached drawing, word "inner" and "outside" are referred respectively to towards or away from particular elements geometry The direction at center.
Embodiment 1: a kind of polywater water trap for large-scale excavation precipitation is included in foundation pit as shown in Figures 2 and 3 The horizontally disposed water tank 1 of interior close foundation pit side-wall 5, the circumferential surface of water tank 1 are fixedly connected with more far from the side of foundation pit side-wall 5 A water inlet pipe 2, the side on the circumferential surface of water tank 1 close to foundation pit side-wall 5 are fixedly connected with the draining for extending upwardly to top of the slope Device 3.
Drinking-water pipe 41 in each dewatering well 4 of bottom of foundation ditch is all connected to water inlet pipe 2, the suction pump in dewatering well 4 The underground water of bottom of foundation ditch can be extracted out, all be concentrated and flowed into water tank 1 by each water inlet pipe 2, due to water in water tank 1 The increase of pressure, the water in water tank 1 are pressed out to top of the slope along drainage arrangement 3 in the presence of hydraulic pressure upwards.
As shown in figure 3, drainage arrangement 3 includes the outlet pipe 31 being fixedly connected on water tank 1, outlet pipe 31 is far from water storage One end of tank 1 is fixedly connected with vertical drainpipe 33 by ring flange 32, and the one end of drainpipe 33 far from outlet pipe 31 is upward Extend to top of the slope.Drainage arrangement 3 is at least provided with one.
Preferably, the diameter of water tank 1 may be configured as 400mm-600mm, and the length of water tank 1 is 2m-3m.Water tank 1 Size larger water tank 1 is enable to accommodate more water.
In order to make hydraulic pressure is sufficiently large and water energy is enough to be quickly ejected, the diameter of outlet pipe 31 is greater than the diameter of water inlet pipe 2.
Preferably, the diameter of outlet pipe 31 is 100mm-150mm, length 10mm-20mm.
Preferably, the diameter of water inlet pipe 2 is 20cm-40cm, length 50mm-80mm.
Water in multiple water inlet pipes 2 is moved into water tank 1 simultaneously, and hydraulic pressure increases in water tank, and water can be along outlet pipe 31 are ejected to top of the slope, and the diameter of outlet pipe 31 is bigger than the diameter of water inlet pipe 2, and water may make quickly to flow out from drainpipe, Improve construction efficiency.
As shown in figure 3, water check valve 21 is installed on water inlet pipe 2, when the underground water in dewatering well 4 is all extracted, Due to the reduction of hydraulic pressure, water flow can be back in water tank 1 along drainpipe 33, closed water check valve 21, can be prevented water flow from continuing It flows back into drinking-water pipe 41.And the water in each dewatering well is different, closes the water check valve 21 that the water inlet pipe 2 of operation is completed, It can prevent other water also in the water inlet pipe of work 2 from flowing back.
As shown in figure 3, steel plate 6 is equipped in foundation pit in order to keep polywater water trap more stable in operation process, Since silt soil is more in foundation pit, what water tank 1 can not be stable is placed in foundation pit, and steel plate 6 can provide one for water tank 1 Stable job platform.It is erected with support frame 7 in the top of steel plate 6, water tank 1 is fixedly connected on support frame 7, both ensure that Stability of the polywater water trap in operation process, while the tidiness of polywater water trap also can be improved, it will not be by foundation pit Cement sand splashes dirty, avoids construction chaotic.
Embodiment 2: a kind of polywater water trap for large-scale excavation precipitation, difference from example 1 is that, row Water installations 3 further include being connected to water pump of the drainpipe 33 far from 1 one end of water tank.When the depth of foundation pit is greater than 20 meters, draw water Hydraulic pressure caused by pumping is not enough to along drainage arrangement 3 eject the water in water tank 1 to top of the slope, at this point, in drainpipe upwards 33 one end far from outlet pipe 31 connect a water pump, assist the suction pump in foundation pit that the water in drainage arrangement 3 is drawn to slope Top.
The course of work: the drinking-water pipe 41 in bottom of foundation ditch dewatering well 4 is connected on water inlet pipe 2, in dewatering well 4 Suction pump can extract the underground water of bottom of foundation ditch out, and underground water is all flowed into water tank 1 by each water inlet pipe 2, due to storage The increase of hydraulic pressure in water pot 1, the water in water tank 1 are ejected along drainpipe 31 to top of the slope.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (10)

1. a kind of polywater water trap for large-scale excavation precipitation, it is characterized in that: including water tank (1), the water tank (1) On be communicated with drainage arrangement (3) and multiple water inlet pipes (2);
Water inlet pipe (2) other end is connected to dewatering well (4);The drainage arrangement (3) is in far from the one end of water tank (1) On the outside of foundation pit.
2. a kind of polywater water trap for large-scale excavation precipitation according to claim 1, it is characterized in that: the draining Device (3) includes the outlet pipe (31) being connected to water tank (1), passes through method far from the one end of water tank (1) in outlet pipe (31) Blue disk (32) is connected with vertical drainpipe (33), and the upper end of drainpipe (33) is connected to top of the slope.
3. a kind of polywater water trap for large-scale excavation precipitation according to claim 2, it is characterized in that: the draining Device (3) further includes the water pump for being connected to drainpipe (33) separate outlet pipe (31) one end.
4. a kind of polywater water trap for large-scale excavation precipitation according to claim 1, it is characterized in that: the water inlet Water check valve (21) are installed on pipe (2).
5. a kind of polywater water trap for large-scale excavation precipitation according to claim 1, it is characterized in that: the draining Device (3) is at least arranged one.
6. a kind of polywater water trap for large-scale excavation precipitation according to claim 2, it is characterized in that: the water outlet The diameter for managing (31) is greater than the diameter of water inlet pipe (2).
7. a kind of polywater water trap for large-scale excavation precipitation according to claim 6, it is characterized in that: the water outlet The diameter for managing (31) is 100mm-150mm, length 10mm-20mm.
8. a kind of polywater water trap for large-scale excavation precipitation according to claim 6, it is characterized in that: the water inlet The diameter for managing (2) is 20mm-40mm, length 50mm-80mm.
9. a kind of polywater water trap for large-scale excavation precipitation according to any one of claims 1 to 5, feature Be: the diameter of the water tank (1) is 400mm-600mm, length 2m-3m.
10. a kind of polywater water trap for large-scale excavation precipitation according to claim 1, it is characterized in that: the storage Steel plate (6) are arranged in the lower section of water pot (1), and steel plate (6) is laid in foundation pit, is erected on steel plate (6) support frame (7), described Water tank (1) is fixed on support frame (7).
CN201820853462.1U 2018-06-01 2018-06-01 A kind of polywater water trap for large-scale excavation precipitation Expired - Fee Related CN208328963U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820853462.1U CN208328963U (en) 2018-06-01 2018-06-01 A kind of polywater water trap for large-scale excavation precipitation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820853462.1U CN208328963U (en) 2018-06-01 2018-06-01 A kind of polywater water trap for large-scale excavation precipitation

Publications (1)

Publication Number Publication Date
CN208328963U true CN208328963U (en) 2019-01-04

Family

ID=64773034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820853462.1U Expired - Fee Related CN208328963U (en) 2018-06-01 2018-06-01 A kind of polywater water trap for large-scale excavation precipitation

Country Status (1)

Country Link
CN (1) CN208328963U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112252381A (en) * 2020-10-26 2021-01-22 张家港宏昌钢板有限公司 Valve table transformation device and transformation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112252381A (en) * 2020-10-26 2021-01-22 张家港宏昌钢板有限公司 Valve table transformation device and transformation method

Similar Documents

Publication Publication Date Title
CN202644552U (en) Light well-point dewatering device for cofferdam foundation pit
CN105625483A (en) Water pressure control method for underground construction
CN205954648U (en) Light well point precipitation device
CN208328963U (en) A kind of polywater water trap for large-scale excavation precipitation
CN206721904U (en) A kind of integrated precipitation pumping system
CN214460605U (en) Construction structure for preventing basement from floating up integrally in construction stage
CN103452124B (en) Pit water accumulation method for removing and device
CN205530388U (en) Forced induction water pressure control system for underground works
CN105696611A (en) Foundation pit dewatering device for sand layer with high water permeability
CN106939610A (en) A kind of integrated precipitation pumping system
CN106988296A (en) A kind of method of vacuum drainage bracing means and application device progress reinforced soft soil ground
CN110230895A (en) Buried hiding GEOTHERMAL WATER the same well and layer takes out filling heat-source Cycles and utilizes system and working method
CN207032270U (en) Catch pit immersible pump precipitation system
CN202055248U (en) Pile foundation mud pit
CN105672370A (en) Water pressure control system for underground engineering
CN205348204U (en) Light well point precipitation system
CN206396771U (en) Building basement ground construction conserves discharge structure
KR100964741B1 (en) Intake structure for preventing underground water pollution
CN208634046U (en) A kind of river water extraction safety device
CN203213129U (en) Controllable non-return drainer
CN209523210U (en) A section Novel flush system is secretly buried in lid digging in subway station
CN208815552U (en) A kind of anti-clogging foundation pit side priming device
CN203284787U (en) Composite pipe well precipitation system
CN105604076A (en) Vacuum pump water-discharging device suitable for tunnel excavation
CN201406689Y (en) Bottom-sealing drainage structure of sunk well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Yan Hao

Inventor after: Wen Jiajie

Inventor after: Wang Kexin

Inventor before: Yan Hao

Inventor before: Wen Jiajie

Inventor before: Wang Kexin

CB03 Change of inventor or designer information
EE01 Entry into force of recordation of patent licensing contract

Assignee: Beijing Geotechnical Engineering Association

Assignor: BEIJING GEO-ENGINEERING Co.

Contract record no.: X2021990000087

Denomination of utility model: A water collecting drainage device for dewatering of large area foundation pit

Granted publication date: 20190104

License type: Exclusive License

Record date: 20210205

EE01 Entry into force of recordation of patent licensing contract
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190104

CF01 Termination of patent right due to non-payment of annual fee