CN208996405U - Slurry tool is got rid of in a kind of plastering brooming of portable - Google Patents
Slurry tool is got rid of in a kind of plastering brooming of portable Download PDFInfo
- Publication number
- CN208996405U CN208996405U CN201821658385.0U CN201821658385U CN208996405U CN 208996405 U CN208996405 U CN 208996405U CN 201821658385 U CN201821658385 U CN 201821658385U CN 208996405 U CN208996405 U CN 208996405U
- Authority
- CN
- China
- Prior art keywords
- rid
- brooming
- slurry
- fixed plate
- plastering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model relates to building engineering construction apparatus field, slurry tool is got rid of in specially a kind of portable plastering brooming.End is bonded including operation handle and cement slurry;Operation handle is connected in sequence by least two standard knots, is connected between adjacent two standard knot by fixes sleeve;One end of operation handle is handle operating space, and the other end of operation handle is provided with cement slurry bonding end, and it includes fixed plate and steel wire that cement slurry, which is bonded end, fixed plate is fixedly connected with operation handle, wire sets are on the outside of fixed plate, and one end is detachably connected with fixed plate, and the other end is hanging.Cement slurry sufficiently effectively uses when being constructed using the tool, reduces waste, and wall brooming gets rid of slurry uniformly, and thickness is identical;It can be used for small space wall brooming and get rid of slurry construction, especially hitch or ring beam nest position is easy for construction, and wall plastering caused by construction dead angle is avoided to crack.
Description
Technical field
The utility model relates to building engineering construction apparatus field, slurry tool is got rid of in specially a kind of portable plastering brooming.
Background technique
Just enter Decorating Project after the completion of building engineering field, general subject's structure.Usually carrying out wall body structure
It needs to complete plastering engineering before part finishing.First procedure of plastering engineering is wall interface processing, i.e. slurry processing is got rid of in brooming, is used
In the cohesive force for enhancing lower road plastering mortar and wall body construction, avoid cracking.Specific practice are as follows: mixed in plain-water slurry certain
The building adhesive of dosage, then deployed cement slurry is uniformly thrown on wall body construction.
In the prior art, carrying out the method that slurry processing is got rid of in masonry panel brooming mainly has 2 kinds, and one is workers using rolling
The tools such as brush, besom carry out getting rid of slurry operation, and another kind is to carry out machinery using special-purpose machinery slurry throwing machine to get rid of slurry.
But for worker in such a way that the tools such as round brush, besom carry out getting rid of slurry operation, speed of application is slow, gets rid of slurry unevenly, thick
It spends inconsistent, is unable to control;Although another get rid of slurry uniformly but machinery expenses height in such a way that machinery gets rid of slurry, for narrow sky
Between construct it is inconvenient.
Based on above description, need a kind of portable plastering brooming get rid of slurry tool, to solve existing in the prior art apply
Work speed is slow, gets rid of slurry unevenly, and thickness is inconsistent, and machinery expenses are high, the technical problem inconvenient for small space construction.
Utility model content
In view of the deficienciess of the prior art, the purpose of the utility model is to provide a kind of plastering broomings of portable to get rid of slurry work
Tool, cement slurry sufficiently effectively uses when construction, reduces waste, and wall brooming gets rid of slurry uniformly, and thickness is identical;It can be used for small space
Slurry construction is got rid of in wall brooming, and especially hitch or ring beam nest position is easy for construction, and wall plastering caused by construction dead angle is avoided to open
It splits.
To achieve the above object, the technical solution that the utility model is taken are as follows:
Slurry tool is got rid of in a kind of plastering brooming of portable, including operation handle and cement slurry are bonded end;
The operation handle is connected in sequence by least two standard knots, passes through fixes sleeve between adjacent two standard knot
Connection;
One end of the operation handle is handle operating space, and the other end of the operation handle is provided with cement slurry bonding
End, it includes fixed plate and steel wire that cement slurry, which is bonded end, and the fixed plate is fixedly connected with operation handle, and the wire sets exist
On the outside of the fixed plate, and one end is detachably connected with fixed plate, and the other end is hanging.
Preferably, being connected through a screw thread between the fixes sleeve and standard knot.
Preferably, the standard knot of the operation handle uses diameter to make for the coating steel pipe of 20 ~ 25mm, standard knot
Length is 55cm ~ 65cm.
Preferably, the quantity of the standard knot is within 3 sections.
Preferably, the handle operating space is provided with anti-skid device or has done anti-skidding processing.
Preferably, the length of the handle operating space is 14cm ~ 16cm.
Preferably, the fixed plate is rectangular steel plates, with a thickness of 2 mm ~ 3mm, width is equal with steel wire width, high
Degree is 15cm ~ 17cm.
Preferably, be provided with connection through-hole in the fixed plate, the steel wire by galvanized wire pass through connection through-hole and
Binding is in fixed plate after mesh.
Preferably, the steel wire is made after folding 8 ~ 10 layers by zinc-coated wire mesh sheet, the fixed plate is located at
Among multilayer zinc-coated wire mesh sheet.
Preferably, the steel wire is detachably connected on of length no more than steel wire length at the position in fixed plate
1/3。
Compared with prior art, slurry tool is got rid of in portable plastering brooming provided by the utility model has following beneficial effect
Fruit:
The plastering brooming of portable disclosed in this programme gets rid of slurry tool application in the first procedure of masonry project: brooming is got rid of slurry and is applied
Work, cement slurry sufficiently effectively uses when construction, reduces waste, and wall brooming gets rid of slurry uniformly, and thickness is identical;It can be used for small space
Slurry construction is got rid of in wall brooming, and especially hitch or ring beam nest position is easy for construction, and wall plastering caused by construction dead angle is avoided to open
It splits.
The plastering brooming of this portable gets rid of slurry tool and is bonded in steel wire convenient for cement slurry, and cement slurry passes through steel wire when construction
Whipping can effectively be attached to wall, material utilization amount is controllable, and every square meter wall can save cement slurry dosage 20%, saves cement slurry
Dosage, construction rubbish are few;Construct it is convenient effectively, worker's effect be conventional construction method the effect of 1.5 times, lifting construction speed;
The caking property of good forming effect, later period finish plaster is good, reduces plaster cracking rate, and quality reaches good level.
The plastering brooming of this portable gets rid of slurry tool and utilizes steel wire according to layer top adjustment tool height using standard knot handle
Slurry process is got rid of in the suppleness of net, construction brooming, considers that 1/3 position of steel wire is fixed in fixed plate using bending moment envelope diagram,
One end cantilever, so that the deformation of steel wire end and moment of flexure are maximum.
Slurry tool is got rid of in the plastering brooming of this portable can make full use of the original tool in construction site to be made, operating method letter
Single quick, construction efficiency is high, can be replaced according to the actual situation to handle and steel wire specification, comprehensively consider corresponding engineering
Existing material is rationally turned waste into wealth using waste and old material recycling, secondary operation.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that slurry tool is got rid of in portable provided by the utility model plastering brooming;
Fig. 2 is the structural schematic diagram of constructing operation handle provided by the utility model;
Fig. 3 is the structural schematic diagram that cement slurry provided by the utility model is bonded end.
In figure: 1- operation handle, 2- fixes sleeve, 3- fixed plate, 4- steel wire, 5- handle operating space.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below
In conjunction with specific embodiment and attached drawing, the utility model is further described in detail.
As shown in Figure 1 to Figure 3, it includes 1 He of operation handle that slurry tool is got rid of in portable plastering brooming disclosed by the utility model
Cement slurry is bonded end.
The operation handle 1 is connected in sequence by least two standard knots, passes through fixing sleeve between adjacent two standard knot
Cylinder 2 is fixedly connected.Operation handle 1 is made of standard knot, and the quantity of required standard knot can be determined according to construction layer height, into
And the length of operation handle 1 is adjusted according to demand, so that portable plastering brooming gets rid of slurry tool and can be applied to different layers height
Building.
One end of the operation handle 1 be handle operating space 5, preferably, handle operating space 5 be provided with anti-skid device or
Anti-skidding processing has been done, slide handle when construction is avoided to slip out of the hand.The other end of the operation handle 1 is provided with cement slurry bonding
End, it includes fixed plate 3 and steel wire 4 that cement slurry, which is bonded end, and the fixed plate 3 is fixedly connected with operation handle 1, the steel wire
4 sets in 3 outside of the fixed plate, and one end is detachably connected with fixed plate 3, and the other end is hanging.Due to steel wire 4 and fixed plate
3 are detachably connected, and facilitate from fixed plate 3 to unload steel wire 4 down and clear up.It is viscous for main cement slurry that cement slurry is bonded end
Socket part position turns the sizing grid of cement slurry demand down according to the steel wire of engineering design, cement slurry is avoided excessively to trickle.
In this present embodiment, preferably, it is connected through a screw thread between the fixes sleeve 2 and standard knot.Solid
The inner wall setting internal screw thread for determining sleeve 2 is arranged external screw thread in the outer wall of standard knot, and then standard knot is screwed in fixes sleeve 2
In bucket.Certainly, it is not limited to be connected through a screw thread between fixes sleeve 2 and standard knot, other fixed forms can also be used
Connection.
In this present embodiment, preferably, the standard knot of the operation handle 1 uses diameter for the plating of 20 ~ 25mm
The production of zinc steel pipe, the length of standard knot are 55cm ~ 65cm.Certainly, the making material of standard knot is not limited thereto, can also root
According to the existing tool making of site operation, utilizing works working standard size, the production of incorporation engineering layer height.The length of standard knot is also simultaneously
It is not limited to this.
In this present embodiment, operation handle 1 can be lengthened according to construction demand, to avoid construction effect from reducing, operation
The length of handle 1 should control within 3 sections.
In this present embodiment, preferably, the length of the handle operating space 5 is 14cm ~ 16cm.Handle operating space
5 anti-skid device is preferably plastic sleeve, specifically, first carrying out polishing thread processing to handle operating space 5, is installed again later
Plastic sleeve.Certainly, the anti-skid device is not limited to plastic sleeve, or the sleeve of other materials.
In this present embodiment, preferably, cloth can be wrapped up in handle operating space 5 carry out anti-skidding processing.Certainly, prevent
Sliding processing mode is not limited to the above.
In this present embodiment, preferably, the fixed plate 3 is rectangular steel plates, thickness 2mm ~ 3mm, width and steel
Silk screen 4 is equal with wide width, is highly 15cm ~ 17cm, preferably 16cm.Certainly, the material of fixed plate 3 is not limited to
Steel material, size are also not limited thereto.The fixed plate 3 is fixed on 1 one end of operation handle by welding, certainly,
It is not limited thereto fixed form.
In this present embodiment, as another preferred embodiment, connection through-hole, the steel wire are provided in the fixed plate 3
Binding is in fixed plate 3 after net 4 passes through connection through-hole and mesh by galvanized wire.The galvanized wire is preferably 20# galvanized wire, but not office
It is limited to this number galvanized wire.
Steel wire suppleness is excessive when to avoid construction, and it is poor that cement gets rid of slurry effect.Steel wire 4 can also first be welded on fixation
On plate 3, connection through-hole is then passed through by galvanized wire again and is fixed in fixed plate 3.The welding manner is preferably spot welding, but not
It is confined to spot welding.
Certainly, the steel wire 4 is not limited to the above with the mode that is fixedly connected of fixed plate 3, can also be it
It is fixedly connected with mode.
In this present embodiment, preferably, the steel wire 4 uses diameter for 0.8 mm ~ 1mm, and mesh is
10.7 × 10.7 zinc-coated wire mesh sheet production, the diameter of zinc-coated wire mesh sheet is more preferably 0.9mm, monolithic zinc-coated wire
Mesh sheet area is 40cm × 40cm, and each steel wire 4 is formed after folding 8 ~ 10 layers by zinc-coated wire mesh sheet, the fixed plate 3
Among multilayer zinc-coated wire mesh sheet.According to construction depth of plastering demand, layer number of mesh is adjusted, can reach and most preferably get rid of capillary effect
Fruit.Certainly, the zinc-coated wire mesh sheet diameter and mesh size and monolithic area are not limited thereto.
In this present embodiment, preferably, determine that 1/3 position of steel wire 4 is fixed on admittedly using bending moment envelope diagram
On fixed board 3, the program makes the deformation of 4 end of steel wire and moment of flexure maximum.Certainly, steel wire 4 is fixed on the portion in fixed plate 3
Position is not limited to 1/3 steel wire 4, can also be more or less than 1/3 4 length of steel wire.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row
The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments
Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also
It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model
Claimed range is defined by the appending claims and its equivalent thereof.
Claims (10)
1. slurry tool is got rid of in a kind of portable plastering brooming, it is characterised in that: be bonded end including operation handle and cement slurry;
The operation handle is connected in sequence by least two standard knots, is connected between adjacent two standard knot by fixes sleeve
It connects;
One end of the operation handle is handle operating space, and the other end of the operation handle is provided with cement slurry bonding end, water
It includes fixed plate and steel wire that mud, which is bonded end, and the fixed plate is fixedly connected with operation handle, and the wire sets are described
On the outside of fixed plate, and one end is detachably connected with fixed plate, and the other end is hanging.
2. slurry tool is got rid of in portable plastering brooming according to claim 1, it is characterised in that: the fixes sleeve and standard
It is connected through a screw thread between section.
3. slurry tool is got rid of in portable plastering brooming according to claim 1, it is characterised in that: the standard of the operation handle
Section uses diameter to make for the coating steel pipe of 20 ~ 25mm, and the length of standard knot is 55cm ~ 65cm.
4. slurry tool is got rid of in portable according to claim 1 plastering brooming, it is characterised in that: the quantity of the standard knot is
Within 3 sections.
5. slurry tool is got rid of in portable plastering brooming according to claim 1, it is characterised in that: the handle operating space setting
There is anti-skid device or has done anti-skidding processing.
6. slurry tool is got rid of in portable plastering brooming according to claim 1, it is characterised in that: the length of the handle operating space
Degree is 14cm ~ 16cm.
7. slurry tool is got rid of in portable plastering brooming according to claim 1, it is characterised in that: the fixed plate is rectangle
Steel plate, with a thickness of 2 mm ~ 3mm, width is equal with steel wire width, is highly 15cm ~ 17cm.
8. slurry tool is got rid of in portable plastering brooming according to claim 1, it is characterised in that: be provided in the fixed plate
Through-hole is connected, binding is in fixed plate after the steel wire passes through connection through-hole and mesh by galvanized wire.
9. slurry tool is got rid of in portable plastering brooming according to claim 1, it is characterised in that: the steel wire is by galvanized steel
Silk netting is made after folding 8 ~ 10 layers, and the fixed plate is located among multilayer zinc-coated wire mesh sheet.
10. slurry tool is got rid of in portable plastering brooming according to claim 1, it is characterised in that: the steel wire is detachable
It is connected to the 1/3 of of length no more than steel wire length at the position in fixed plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821658385.0U CN208996405U (en) | 2018-10-12 | 2018-10-12 | Slurry tool is got rid of in a kind of plastering brooming of portable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821658385.0U CN208996405U (en) | 2018-10-12 | 2018-10-12 | Slurry tool is got rid of in a kind of plastering brooming of portable |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208996405U true CN208996405U (en) | 2019-06-18 |
Family
ID=66803770
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821658385.0U Active CN208996405U (en) | 2018-10-12 | 2018-10-12 | Slurry tool is got rid of in a kind of plastering brooming of portable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208996405U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593534A (en) * | 2019-09-12 | 2019-12-20 | 中国五冶集团有限公司 | Masonry plastering slurry throwing tool and plastering slurry throwing method |
-
2018
- 2018-10-12 CN CN201821658385.0U patent/CN208996405U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593534A (en) * | 2019-09-12 | 2019-12-20 | 中国五冶集团有限公司 | Masonry plastering slurry throwing tool and plastering slurry throwing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103114728B (en) | Grid construction method of large area cement wear-resisting floor | |
CN103321442A (en) | Self-compensating repair structure and process for internal stress cracking of inner wall heat insulating wall surface | |
CN106801517A (en) | A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method | |
CN202202552U (en) | Telescopic slurry flinging bat for wall plastering construction | |
CN208996405U (en) | Slurry tool is got rid of in a kind of plastering brooming of portable | |
CN207194343U (en) | The tapestry brick paving structure of autoclave aerated concrete building block exterior wall | |
CN204456790U (en) | The twine that a kind of metope gets rid of slurry plucking is clapped | |
CN108360782A (en) | A kind of method of wall tile | |
CN205025000U (en) | Wet structure of hanging of stone material of gypsum air entrainment brick wall face | |
CN206487122U (en) | A kind of mortar joint pointer of small-sized hollow building block wall | |
CN107299731A (en) | A kind of anti-hollowing of mountain sand cement mortar plastering and cracking construction method | |
CN109537822A (en) | Gutter construction technology | |
CN205444825U (en) | Plaster and get rid of thick liquid device | |
CN106193462A (en) | Roofing Splitting Tile construction method modelled after an antique | |
CN204626735U (en) | Pitched roof adjustable tile system | |
CN217840732U (en) | Special tool for throwing pulp | |
CN207332262U (en) | Brick-setting shuttering | |
CN207260515U (en) | A kind of plucking brush for building | |
CN202275071U (en) | Telescopic multifunctional stainless steel detection ball | |
CN219451396U (en) | Masonry wall napping device | |
CN205444484U (en) | Wall lacing wire subassembly | |
CN207063377U (en) | Autoclave aerated concrete building block exterior wall base layer structure | |
CN105421688B (en) | The splicing plucking construction and its plucking construction method of a kind of wall | |
CN205522764U (en) | Mould stone molding back up coat | |
CN106351411B (en) | The construction method and mortar of the mortar protection structure of steel plate shear force wall protect structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |