CN105421688B - The splicing plucking construction and its plucking construction method of a kind of wall - Google Patents

The splicing plucking construction and its plucking construction method of a kind of wall Download PDF

Info

Publication number
CN105421688B
CN105421688B CN201510904493.6A CN201510904493A CN105421688B CN 105421688 B CN105421688 B CN 105421688B CN 201510904493 A CN201510904493 A CN 201510904493A CN 105421688 B CN105421688 B CN 105421688B
Authority
CN
China
Prior art keywords
plucking
particle
mesh sheet
reinforced concrete
sharp cone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510904493.6A
Other languages
Chinese (zh)
Other versions
CN105421688A (en
Inventor
耿英维
贾学军
刘正欣
陈浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN201510904493.6A priority Critical patent/CN105421688B/en
Publication of CN105421688A publication Critical patent/CN105421688A/en
Application granted granted Critical
Publication of CN105421688B publication Critical patent/CN105421688B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • E04F13/047Plaster carrying meshes

Abstract

The splicing plucking construction and its plucking construction method of a kind of wall, including blockwork, reinforced concrete wall, screed-coat and exterior finish coat, the outer surface of the reinforced concrete wall is evenly equipped with the sharp cone distal plucking particle of shape, size all same, anticracking steel fabric sheet is hung with outside the outer surface of the blockwork and the outer surface of reinforced concrete wall, anticracking steel fabric sheet covering sharp cone distal plucking particle.Plucking construction method includes fully soaking, boiling the step of plucking sizing material, cooling plucking sizing material, modulation plucking mud, making concrete base layer surface roughening tool, metope get rid of hair and plucking maintenance for wall.Sharp cone distal plucking particle limitation mortar dry and wet of the present invention is shunk, and is avoided metope hollowing from cracking, is avoided the secondary repairing of metope, is reduced follow-up claim incident and is occurred, there is larger quality income and social benefit.The present invention boils plucking sizing material and has abandoned the existing interfacial agents for having pollution to environment, employs polyvinyl alcohol, and formaldehydeless or preservative belongs to green material.

Description

The splicing plucking construction and its plucking construction method of a kind of wall
Technical field
The invention belongs to the splicing plucking construction of concrete construction field, particularly a kind of wall and its construction party of plucking Method.
Background technology
Existing concrete construction field, the particularly wall of the non-same material of blockwork and reinforced concrete wall it Between, if construction wrong early period, when outside air is drier, non-same material it is non-homogeneous caused by modulus of elasticity is inconsistent Shrink, the screed-coat in later stage and delamination, cracking and the hollowing of exterior finish coat can be made, there are larger construction quality hidden danger.
Particularly on reinforced concrete wall, between the non-material of the same race such as the screed-coat of mortar or exterior finish coat, in order to Ensure bond strength between the two, it will usually plucking construction is carried out on reinforced concrete wall.Traditional metope wharf's pavement quality Mode, what is be usually used mixes interfacial agents on metope in direct roller coating(Usually 108 glue)Plain-water slurry, or using draw The ejecting gun of hair machine spray furnace point directly on metope.The plain cement of interfacial agents is mixed in both the above processing mode, in roller coating During slurry, the interfacial agents in mixed serum(108 glue)In include formaldehyde or preservative, environmental protection is highly detrimental to after roller coating, and spray Mortar point is then limited larger by worker's technical merit, and the formalness of mortar point in itself is without obvious bumps, its own intensity is also Less than due guarantee, mortar finish layer and the unconspicuous shortcoming of mortar bond stress can be produced in the later stage.Particularly extraneous empty When gas is drier, the non-uniform shrinkage caused by modulus of elasticity is inconsistent of non-same material, cause later stage plastering metope delamination, Cracking and hollowing, there are larger hidden danger of quality.
The content of the invention
The object of the present invention is to provide the splicing plucking construction and its plucking construction method of a kind of wall, to solve existing Interfacial agents contain formaldehyde or preservative, the technical problem easily polluted to environment, also solve existing wall stitching portion Construction wrong, the mortar point of napper injection cause the non-of the same race of concrete base layer and mortar finish layer without obvious bumps jointly The technical problem of the mass defects such as screed surface layer hollowing, the cracking of not firm generation is bonded between material.
To achieve the above object, the present invention adopts the following technical scheme that:
A kind of splicing plucking construction of wall, including blockwork to be spliced, reinforced concrete wall and in two kinds of walls Outer surface integrated construction screed-coat and exterior finish coat, the outer surface of the reinforced concrete wall be evenly equipped with shape, The piece of the sharp cone distal plucking particle of size all same, the outer surface of the blockwork and the outer surface of reinforced concrete wall Outer between place and screed-coat to hang with anticracking steel fabric sheet, which is hung on one end covering point of reinforced concrete wall Taper plucking particle.
The sharp cone distal plucking particle is not less than 1cm with respect to the height of the outer surface of reinforced concrete wall, and sharp cone distal is drawn The bottom maximum outside diameter of hair particle is not less than 1cm,
The mounting width that the anticracking steel fabric sheet is located at the outer surface of reinforced concrete wall is not less than 150mm, mounting Height is identical with the height of reinforced concrete wall, and the anticracking steel fabric sheet is located at the mounting width of the outer surface of blockwork not Less than 150mm, mounting height is identical with the height of blockwork, and the anticracking steel fabric sheet passes through the first steel for being arranged by blossom type Nail is fixedly connected with the outer surface of reinforced concrete wall, and the anticracking steel fabric sheet passes through the second steel nail for being arranged by blossom type It is fixedly connected with the outer surface of blockwork.
A kind of plucking construction method of the splicing plucking construction of wall, plucking construction procedure are as follows:
Step 1, the reinforced concrete wall to needing to treat plucking carry out abundant wetting of watering in advance;
Step 2, prepares to make plucking sizing material:Prepare container and raw material, raw material are mixing situ configuration in proportion Polyvinyl alcohol and clear water;
Step 3, boils plucking sizing material:Polyvinyl alcohol is poured into the container for fill cold water and is sufficiently dissolved and divided Dissipate and form hydrate, then container is heated, is heated to sufficiently stir mixture after temperature close to boiling, And this temperature is kept until stirring to hydrate without obvious particle;
Step 4, cools down plucking sizing material:Container is placed in Gan Liangchu, cooling hydrate is cooled to room temperature and checks plucking glue The quality of material, the plucking sizing material boiled should be without obvious color changes, and one layer of glued membrane class of coagulating of upper surface is glued after placing for a long time Thick thing, reaches spare after this is required;
Step 5, modulates plucking mud:By the sizing material cooled down in step 4 in proportion with portland cement in proportion into Row stirring forms plucking mud, and stirring is in thick up to plucking mud, reaches the state flowed without falling and falling without falling;
Step 6, makes surface roughening tool:The identical hard steel plate mesh sheet of mesh and mild steel silk netting are cut into area one by one Rectangle mesh sheet in the same size, by all rectangle mesh sheet according to hard steel plate mesh sheet bottom, mild steel silk netting top requirement according to It is secondary to be built up rectangular laminations mesh sheet group, rectangular laminations mesh sheet group is then fixed into binding to the top side of axis handle, and Ensure that the mesh of all rectangle mesh sheet aligns one by one, form surface roughening tool;
Step 7, metope get rid of hair:By plucking mud full coat in rectangular laminations mesh sheet group and scraping flat surface, plucking mud must Institute's hole must be filled up, construction personnel holds axis handle, keeps rectangular laminations mesh sheet group parallel in metope direction, holding Behind axis handle and human body Oblique 45 Degree direction, towards carrying out bat firmly perpendicular to the direction of metope, pull into a plucking;Draw Hair mud is thrown away from the mesh of rectangular laminations mesh sheet group is bonded in metope surface, forms appearance uniform sharp cone distal of the same size Plucking particle, when beating, are sequentially patted by shooting on metope, and guarantee is treated uniformly to be abound with the reinforced concrete wall of plucking big Small consistent sharp cone distal plucking particle;
Step 8, plucking maintenance:Must not be later than after getting rid of hair 6~8 it is small when it is interior in time carry out wet curing, curing time is not When must be small less than 72, and carry out the quality examination of sharp cone distal plucking particle.
In the step 2, between the mass ratio of polyvinyl alcohol and water is 1/40~1/30.
In the step 3, the mode of heating to container is electrical heating or combustion heating.
In the step 3, the temperature of cold water is 15~30 DEG C, and optimal is 20 DEG C, the temperature close to boiling for 90~ 100 DEG C, when the mixing time for keeping this temperature is 2~3 small.
In the step 5, between the mass ratio of plucking sizing material and portland cement is 1.3/1~1.5/1
In the step 4, the method for checking plucking sizing material quality is that sizing material is first twined sense after being cooled to room temperature with finger Feel that similar grease is smooth, be twined reach within 2~3 minutes glued membrane shape and viscous wrist-watch show it is up-to-standard.
In the step 8, whether the quality examination content of sharp cone distal plucking particle uniformly closes including sharp cone distal plucking particle Lattice, whether the intensity level of sharp cone distal plucking particle in itself reaches requirement and the adhesive strength of sharp cone distal plucking particle and metope is It is no to reach requirement.
Surface roughening tool in the step 6 includes getting rid of fleece bat, it is described get rid of fleece and clap be by axis handle and be connected to The rectangular laminations mesh sheet group composition of the top side of axis handle, the lamination mesh sheet group is identical including area and overlapping connects up and down At least two layers of mesh sheet, the mesh size of all mesh sheet is identical while mesh alignment is set, and the lamination mesh sheet group is included at least One layer of hard steel plate mesh sheet and at least one layer of mild steel silk netting, the hard steel plate mesh sheet are connected with axis handle, and mild steel silk netting is folded If it is connected to the upside of hard steel plate mesh sheet.
Compared with prior art the invention has the characteristics that and beneficial effect:
The splicing structure of the wall of the present invention, it is uniformly distributed in the metope of concrete wall in variety classes wall stitching portion The sharp cone distal plucking particle of shape, size all same, the form of sharp cone distal plucking particle compare existing non-uniform injection sand Starch point, the tapered equal distribution of point, its sharp cone distal plucking particle intensity in itself and sharp cone distal plucking particle and metope Adhesive strength has greatly improved, and advantageously accounts for screed and forms uniform bond stress with plucking pointing object, improves plucking point Shape thing self-strength and the adhesive strength with concrete topping, solve the mortar point of napper injection without obvious bumps, make The matter such as screed surface layer hollowing, the cracking of not firm generation are bonded between into the non-material of the same race of concrete base layer and mortar finish layer The technical problem of defect is measured, sharp cone distal plucking particle limitation mortar dry and wet is shunk, and avoids metope hollowing from cracking, and then avoid metope Secondary repairing, reduces follow-up claim incident and occurs, and the stitching portion of wall is also provided with anticracking steel fabric sheet, anticracking steel fabric sheet with The plucking particle of sharp cone distal acts at the same time, further enhancing the bond strength between different materials.
The construction method of the present invention has abandoned the existing interfacial agents for having pollution to environment, employs polyvinyl alcohol, no first Aldehyde or preservative belong to green material, and the creative configuration process for improving plucking sizing material and plucking mud, has larger Quality income and social benefit.
Brief description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is the structure diagram of the splicing plucking construction of the present invention.
Fig. 2 is the structure diagram of the surface roughening tool of the present invention.
Fig. 3 is the side structure schematic view of Fig. 2.
Fig. 4 is the process flow chart of the present invention.
Reference numeral:1- blockworks, 2- reinforced concrete walls, 3- screed-coats, 4- exteriors finish coat, 5- sharp cone distals Plucking particle, 6- anticrackings steel fabric sheet, the first steel nails of 7-, the second steel nails of 8-, 9- axis handle, 10- rectangular laminations mesh sheet Group, 10.1- hard steel plates mesh sheet, 10.2- mild steel silk nettings.
Embodiment
Embodiment is shown in Figure 1, a kind of splicing plucking construction of wall, including blockwork 1 to be spliced, reinforced concrete The screed-coat 3 and exterior finish coat 4 of cob wall 2 and outer surface integrated construction in two kinds of walls, the reinforced concrete wall 2 Outer surface be evenly equipped with the sharp cone distal plucking particle 5 of shape, size all same, outer surface and the reinforcing bar of the blockwork mix Outer between the edge joint position and screed-coat 3 of the outer surface of solidifying cob wall to hang with anticracking steel fabric sheet 6, which is hung on One end covering sharp cone distal plucking particle 5 of reinforced concrete wall.
The sharp cone distal plucking particle 5 is not less than 1cm with respect to the height of the outer surface of reinforced concrete wall, and sharp cone distal is drawn The bottom maximum outside diameter of hair particle is not less than 1cm,
The mounting width that the anticracking steel fabric sheet 6 is located at the outer surface of reinforced concrete wall 2 is not less than 150mm, hangs Connect height it is identical with the height of reinforced concrete wall 2, the anticracking steel fabric sheet 6 is located at the mounting of the outer surface of blockwork 1 Width is not less than 150mm, and mounting height is identical with the height of blockwork 1, and the anticracking steel fabric sheet 6 by blossom type by being arranged The first steel nail 7 be fixedly connected with the outer surface of reinforced concrete wall 2, the anticracking steel fabric sheet 6 passes through by blossom type cloth The second steel nail 8 put is fixedly connected with the outer surface of blockwork 1.
Need to carry out equipment preparation before construction and material prepares.
Equipment prepares mainly to include boiling the container needed for plucking sizing material, such as steel drum or plastic barrel, prepares coagulation soil matrix Layer surface roughening tool, measures the thermometer needed for slurry, the plasterer's trowel for entering slurries in mesh is smoothed out when metope is got rid of mao, transport material Small handcart, maintenance when the sprayer that uses, also have the heating unit of container.According to electrical heating, which is electrically heated rod, According to combustion heating, then waste and old template and flitch can be used as fuel.
Material prepares mainly to include polyvinyl alcohol, 42.5 Portland cement of portland cement and clear water.
Specific construction step is as follows:
Step 1, abundant wetting of watering is carried out to needing to treat that the metope of armored concrete of plucking shifts to an earlier date 1~2 day.
Step 2, prepares to make plucking sizing material:Prepare container and raw material, raw material are mixing situ configuration in proportion Polyvinyl alcohol and clear water;The mass ratio of polyvinyl alcohol and water is 1/40 in the present embodiment.During practical operation can according to self-condition, Selection can utilize container, such as:The paint kettle that cleans up, heat safe plastic barrel etc..
Step 3, boils plucking sizing material:Polyvinyl alcohol is poured into the container for fill cold water and is sufficiently dissolved and divided Dissipate and form hydrate, then container is heated, is heated to sufficiently stir mixture after temperature close to boiling, And this temperature is kept until stirring to hydrate without obvious particle;The temperature of cold water is 15~30 DEG C, and optimal is 20 DEG C, described to connect The temperature closely seethed with excitement is 90~100 DEG C, and optimal is 95 DEG C, when the mixing time for keeping this temperature is 2~3 small.To hydrate into The heating unit of row heating considers that energy saving and environmental protection is proposed with electrical bar heating, reduces environmental pollution.
Step 4, cools down plucking sizing material:Container is placed in Gan Liangchu, cooling hydrate is cooled to room temperature and checks plucking glue The quality of material, the plucking sizing material boiled should be without obvious color changes, and one layer of glued membrane class of coagulating of upper surface is glued after placing for a long time Thick thing, the method for checking plucking sizing material quality be, sizing material is first twined that to feel like grease smooth with finger after being cooled to room temperature, It is twined and reaches within 2~3 minutes glued membrane shape and viscous wrist-watch shows up-to-standard, reaches spare after this requirement.Standby time is unrestricted, but palpus Carry out rain-proof measure.
Step 5, modulates plucking mud:By the sizing material cooled down in step 4 in proportion with portland cement in proportion into Row stirring forms plucking mud, and stirring is in thick up to plucking mud, reaches the state flowed without falling and falling without falling;Afterwards Batch mixing plucking mud is carried out further according to live plucking floor expense.Plucking sizing material and portland cement in the present embodiment Mass ratio is 1.3/1, and ratio can suitably be adjusted according to the thick situation in scene.
Step 6, makes concrete base layer surface roughening tool:
The effectively implementation that concrete base layer surface roughening tool and production method are constructed for plucking is critically important, and instrument and method are not When the mass effect difference of formation process is very big, or even technological requirement is not implemented completely, does not reach quality standard.
Surface roughening tool include get rid of fleece bat, it is described get rid of fleece clap be by axis handle 9 and the top for being connected to axis handle The rectangular laminations mesh sheet group 10 of side forms, and the lamination mesh sheet group is identical including area and overlaps up and down at least two layers of connection Mesh sheet, the mesh size of all mesh sheet is identical while mesh alignment is set.The lamination mesh sheet group includes at least one layer of hard steel plate Mesh sheet 10.1 and at least one layer of mild steel silk netting 10.2, the hard steel plate mesh sheet 10.1 is connected with axis handle 9, mild steel silk netting 10.2 fold the upside for setting and being connected to hard steel plate mesh sheet 10.1.
The hard steel plate mesh sheet 10.1 at least can continuously set 2 layers, and the mild steel silk netting 10.2 can set 3~6 layers.Institute It is pvc pipe to state axis handle, and axis handle is connected with the binding of rectangular laminations mesh sheet group.The axis handle is steel pipe, and axis is clapped Handle is connected or welds with rectangular laminations mesh sheet group.
The concrete special basic unit surface roughening tool made in the present embodiment, similar to flyswatter.It is usually that mesh is identical Hard steel plate mesh sheet and mild steel silk netting cut into the consistent rectangle mesh sheet of size one by one, by all rectangle mesh sheet according to hard steel plate In bottom, mild steel silk netting, the requirement on top is built up rectangular laminations mesh sheet group to mesh sheet successively, then by rectangular laminations net Piece group fixes binding to the top side of axis handle, and ensures that the mesh of all rectangle mesh sheet aligns one by one, forms concrete Basic unit's surface roughening tool.
The galvanized steel wire netting of 1.0mm × 10mm × 10mm can be used in the present embodiment, galvanized steel wire netting has certain rigidity And intensity, 300mm × 300mm square is cut into, 6~7 layers of galvanized steel wire netting are superimposed together with iron wire, and ensure that hole is basic Alignment, then diameter 30mm, the hard plastic tube of long 1.5m or waddy incite somebody to action both lashings together as axis handle.
Actual overlapping is appropriate to the occasion to place two layers of hard steel plate mesh sheet, 4~5 layers of top placement mild steel silk netting, while net in bottom The aperture in hole can suitably stagger aperture to reduce pore size according to live actual plucking quality condition.
Step 7, metope get rid of hair:By plucking mud full coat in rectangular laminations mesh sheet group and scraping flat surface, plucking mud must Institute's hole must be filled up, construction personnel holds axis handle, keeps rectangular laminations mesh sheet group parallel in metope direction, holding Behind axis handle and human body Oblique 45 Degree direction, towards carrying out bat firmly perpendicular to the direction of metope, pull into a plucking;Draw Hair mud is thrown away from the mesh of rectangular laminations mesh sheet group is bonded in metope surface, forms appearance uniform sharp cone distal of the same size Plucking particle, when beating, are sequentially patted by shooting on metope, and guarantee is treated uniformly to be abound with the metope of plucking of the same size Sharp cone distal plucking particle 3.
Step 8, plucking maintenance:Must not be later than after getting rid of hair 6~8 it is small when it is interior in time carry out wet curing, maintenance preferably use Watering can etc instrument is conserved, and maintenance should be timely, moisture state is remained, when curing time must not be small less than 72.Three days Check afterwards sharp cone distal plucking particle whether uniformly qualified, sharp cone distal plucking particle intensity in itself and sharp cone distal plucking particle with The adhesive strength of metope, and appropriate adjustment is made to allocation ratio and method according to effect is reached.
It is shown in Figure 1, after the completion of plucking construction, sharp cone distal plucking particle has been evenly arranged on the metope for treat plucking, The construction of follow-up screed-coat and architectural surface is carried out on sharp cone distal plucking particle.

Claims (4)

1. the plucking construction method of the splicing plucking construction of a kind of wall, it is characterised in that plucking construction procedure is as follows:The wall The splicing plucking construction of body, including blockwork to be spliced(1), reinforced concrete wall(2)And the outside table in two kinds of walls The screed-coat of face integrated construction(3)With exterior finish coat(4), it is characterised in that:The reinforced concrete wall(2)Outer surface It is evenly equipped with the sharp cone distal plucking particle of shape, size all same(5), the outer surface of the blockwork and reinforced concrete wall The edge joint position and screed-coat of outer surface(3)Between outer hang with anticracking steel fabric sheet(6), the anticracking steel fabric sheet(6)It is hung on steel One end covering sharp cone distal plucking particle of reinforced concrete wall(5),
The sharp cone distal plucking particle(5)Height with respect to the outer surface of reinforced concrete wall is not less than 1cm, sharp cone distal plucking The bottom maximum outside diameter of particle is not less than 1cm,
The anticracking steel fabric sheet(6)Positioned at reinforced concrete wall(2)The mounting width of outer surface be not less than 150mm, hang Connect height and reinforced concrete wall(2)Height it is identical, the anticracking steel fabric sheet(6)Positioned at blockwork(1)Outer surface Mounting width be not less than 150mm, mounting height and blockwork(1)Height it is identical, the anticracking steel fabric sheet(6)By by First steel nail of blossom type arrangement(7)With reinforced concrete wall(2)Outer surface be fixedly connected, the anticracking steel fabric sheet (6)Pass through the second steel nail arranged by blossom type(8)With blockwork(1)Outer surface be fixedly connected,
Step 1, the reinforced concrete wall to needing to treat plucking(2)Abundant wetting of watering is carried out in advance;
Step 2, prepares to make plucking sizing material:Prepare container and raw material, raw material are the poly- second for mixing situ configuration in proportion Enol and clear water;
Step 3, boils plucking sizing material:Polyvinyl alcohol is poured into the container for fill cold water and is sufficiently dissolved and scattered shape Into hydrate, then container is heated, is heated to sufficiently stir mixture after temperature close to boiling, and protect This temperature is held until stirring to hydrate without obvious particle;
Step 4, cools down plucking sizing material:Container is placed in Gan Liangchu, cooling hydrate is cooled to room temperature and checks plucking sizing material Quality, the plucking sizing material boiled should be without obvious color changes, one layer of glued membrane class dope of coagulating of upper surface after placing for a long time, Reach spare after this is required;
Step 5, modulates plucking mud:The sizing material cooled down in step 4 is stirred in proportion with portland cement in proportion Mix to form plucking mud, stirring is in thick up to plucking mud, reaches the state flowed without falling and falling without falling;
Step 6, makes surface roughening tool:The identical hard steel plate mesh sheet of mesh and mild steel silk netting are cut into size one by one Consistent rectangle mesh sheet, by all rectangle mesh sheet, according to hard steel plate mesh sheet, in bottom, mild steel silk netting, the requirement on top is folded successively Conjunction forms rectangular laminations mesh sheet group, rectangular laminations mesh sheet group then is fixed binding to the top side of axis handle, and ensure The mesh of all rectangle mesh sheet aligns one by one, forms surface roughening tool;
Step 7, metope get rid of hair:By plucking mud full coat in rectangular laminations mesh sheet group and scraping flat surface, plucking mud must will Institute's hole fills up, and construction personnel holds axis handle, keeps rectangular laminations mesh sheet group parallel to metope direction, keeps axis to clap Behind handle and human body Oblique 45 Degree direction, towards carrying out bat firmly perpendicular to the direction of metope, pull into a plucking;Plucking mud Slurry is thrown away from the mesh of rectangular laminations mesh sheet group is bonded in metope surface, forms appearance uniform sharp cone distal plucking of the same size Particle, when beating, are sequentially patted by shooting on metope, and guarantee is treated uniformly to be abound with size one on the reinforced concrete wall of plucking The sharp cone distal plucking particle of cause;
Step 8, plucking maintenance:Must not be later than after getting rid of hair 6~8 it is small when it is interior carry out wet curing in time, curing time must not lack When 72 is small, and the quality examination of sharp cone distal plucking particle is carried out,
In the step 2, between the mass ratio of polyvinyl alcohol and water is 1/40~1/30,
In the step 3, the temperature of cold water is 15~30 DEG C, and the temperature close to boiling is 90~100 DEG C, keeps this temperature When the mixing time of degree is 2~3 small,
In the step 5, between the mass ratio of plucking sizing material and portland cement is 1.3/1~1.5/1,
Surface roughening tool in the step 6 includes getting rid of fleece bat, and described to get rid of fleece and clap be by axis handle(9)In being connected to The rectangular laminations mesh sheet group of the top side of axis handle(10)Composition, the lamination mesh sheet group is identical including area and overlaps up and down At least two layers of mesh sheet of connection, the mesh size of all mesh sheet is identical while mesh alignment is set, and the lamination mesh sheet group includes In two layers of hard steel plate mesh sheet that bottom is placed(10.1)The 4-5 layer mild steel silk nettings placed with top(10.2), mild steel silk netting (10.2)Folded set is connected to hard steel plate mesh sheet(10.1)Upside, the hard steel plate mesh sheet(10.1)With axis handle(9)Connection.
2. plucking construction method according to claim 1, it is characterised in that:In the step 3, to the heating side of container Formula is electrical heating or combustion heating.
3. plucking construction method according to claim 1, it is characterised in that:In the step 4, plucking sizing material matter is checked The method of amount is, sizing material is first twined that to feel like grease smooth with finger after being cooled to room temperature, be twined 2~3 minutes and reach glue Membranaceous and viscous wrist-watch shows up-to-standard.
4. plucking construction method according to claim 1, it is characterised in that:In the step 8, sharp cone distal plucking particle Quality examination content include sharp cone distal plucking particle uniformly whether the qualified, intensity level of sharp cone distal plucking particle in itself reach To requiring and whether the adhesive strength of sharp cone distal plucking particle and metope reaches requirement.
CN201510904493.6A 2015-12-09 2015-12-09 The splicing plucking construction and its plucking construction method of a kind of wall Active CN105421688B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510904493.6A CN105421688B (en) 2015-12-09 2015-12-09 The splicing plucking construction and its plucking construction method of a kind of wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510904493.6A CN105421688B (en) 2015-12-09 2015-12-09 The splicing plucking construction and its plucking construction method of a kind of wall

Publications (2)

Publication Number Publication Date
CN105421688A CN105421688A (en) 2016-03-23
CN105421688B true CN105421688B (en) 2018-04-20

Family

ID=55500193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510904493.6A Active CN105421688B (en) 2015-12-09 2015-12-09 The splicing plucking construction and its plucking construction method of a kind of wall

Country Status (1)

Country Link
CN (1) CN105421688B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109695346A (en) * 2017-10-20 2019-04-30 五冶集团上海有限公司 A kind of inner-outer wall plastering bat slurry construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI820674L (en) * 1981-03-03 1982-09-04 Groetz Franz Gmbh FAESTSTOED FOER DAEMPUTS OCH MED HJAELP DAERAV FRAMSTAELLD FASAD
CN103588435A (en) * 2013-11-15 2014-02-19 江苏蓝圈新材料有限公司 Adhesive agent
CN103790386A (en) * 2014-01-17 2014-05-14 洛阳广鑫建设集团有限公司 Method for controlling cracks in process of plastering aerated concrete block wall
CN203905414U (en) * 2014-06-03 2014-10-29 浙江省一建建设集团有限公司 Binder throwing and burr-forming adhesion bat for wall plastering
CN104178061B (en) * 2014-08-08 2016-09-07 韩志龙 A kind of environmental protection wall surface sealing glue preparation method for building
CN205348451U (en) * 2015-12-09 2016-06-29 中建二局第三建筑工程有限公司 Concatenation structure of wall body

Also Published As

Publication number Publication date
CN105421688A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN106759975B (en) A kind of construction method of EPS wall thermal insulation structure
CN103015717B (en) Rear superelevation steel pipe column outsourcing Construction technology of fair-faced concrete closed by a kind of floor
CN205688599U (en) A kind of Novel rock wool composite insulation boards
CN102259377B (en) Production method and production equipment for reinforced heat insulation template
CN103643754B (en) The waterproof treatment structure of building wall body interface seam crossing and processing method
CN108915107B (en) Construction method of EPS inorganic infiltration insulation board
CN108412093A (en) A kind of Modern Landscape decoration loam wall and its construction method
CN105421688B (en) The splicing plucking construction and its plucking construction method of a kind of wall
CN104032972A (en) Method for repairing cracks of thermal mortar of outer wall
CN111608280A (en) External wall heat insulation construction method
CN108130992A (en) Rubble plate, styrofoam and porous brick compound thermal-insulating decorative external wall construction engineering method
CN108301320A (en) The method for paving of water-protected enclosure layer based on C40 microlith fiber concretes
CN107761968A (en) Exterior wall internal insulation mortar joins position construction method
CN107574936B (en) A kind of heat preserving exterior wall construction technology
Goel et al. A Comparative Study on the Effect of Curing on the Strength of Concrete
CN101545235A (en) Complex fiber roadbed thin felt
CN109853889A (en) A kind of construction method of kervit microbead insulated sand slurry
CN108951904A (en) A kind of steel core concrete column outsourcing pea gravel concreten fireprotection layer construction
CN108083740A (en) Mortar and the two-in-one compound material of putty and preparation method thereof
CN101476385A (en) Conveniently stripped concrete template
CN107724546A (en) Gypsum based inorganic thermal insulation mortar system construction method
CN106049871B (en) A kind of anti-cracking concrete construction method and its aggregate blow cold
CN208996405U (en) Slurry tool is got rid of in a kind of plastering brooming of portable
CN205874913U (en) A multi -functional double -deck prestressing force ironing press board for pavement spreading operation
WO2016095755A1 (en) Structure of building floor backfill spacer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant