CN208995924U - A kind of box girder construction hanger - Google Patents
A kind of box girder construction hanger Download PDFInfo
- Publication number
- CN208995924U CN208995924U CN201821347254.0U CN201821347254U CN208995924U CN 208995924 U CN208995924 U CN 208995924U CN 201821347254 U CN201821347254 U CN 201821347254U CN 208995924 U CN208995924 U CN 208995924U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- fixation kit
- box beam
- main body
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of box girder construction hangers, including platform hanging basket and fixation kit, the both ends of the platform hanging basket pass through the lower section that fixation kit is hooked on box beam main body to be closed up both ends respectively, the fixation kit includes upper locking piece, screw rod and fixed block, the screw rod upper end edge vertical movable passes through box beam main body, and locked by upper locking piece, the screw rod lower end passes through platform hanging basket and locks platform hanging basket by fixed block.This box girder construction hanger is provided with platform hanging basket, platform hanging basket is fixedly connected by fixation kit across box beam, due to being hooked in box beam using multiple spot, it is cooperated by closing piece, screw rod and fixed block, closing piece cooperation screw rod is wherein utilized to carry out adjustment height due to using, so that make entire platform and box beam bottom when installation is bonded that situation is more firm, and stress condition is good, reduce unstability.Due to being attached using fixation kit, so that entire hanger is convenient for disassembly and assembly.
Description
Technical field
The utility model relates to Construction Technique of Box field more particularly to a kind of construction hangers.
Background technique
Inverted trapezoidal PC box beam is formed by connecting by concrete roof and floor both sides case by diaphragm plate.In recent years, inverted trapezoidal box beam
Start to apply to large-span continuous girder bridges and cable-stayed bridge, frequently with Hanging basket on front support cantilever construction.Closure section construction is as Hanging Basket
Last procedure of cantilever construction and a procedure of most critical, are directly related to that girder is linear and bridge entirety stress
State.Therefore, it is necessary under the precondition for guaranteeing safety, shortcoming, provides a kind of inverted trapezoidal PC according to prior art
Box girder stayed-cable bridge midspan closing construct hanger, achieve the purpose that quickly, economically realize midspan closing.
Utility model content
In order to overcome the above-mentioned deficiencies of the prior art, the utility model provides a kind of easy to connect, whole stress condition
Good construction hanger.
The utility model solves technical solution used by its technical problem are as follows:
A kind of box girder construction hanger, including platform hanging basket and fixation kit, the both ends of the platform hanging basket pass through solid respectively
Determine the lower section that component is hooked on box beam main body to be closed up both ends, the fixation kit includes upper locking piece, screw rod and fixed block, described
Screw rod upper end edge vertical movable passes through box beam main body, and is locked by upper locking piece, and the screw rod lower end passes through platform hanging basket
And platform hanging basket is locked by fixed block.
As an improvement of the above technical solution, the fixation kit is equipped with several groups, and every group of fixation kit is along platform hanging basket
Direction is successively connect with box beam main body.
As an improvement of the above technical solution, every group of fixation kit is equipped at least one set of screw rod, and the screw rod can pass through
Upper locking piece adjusts platform hanging basket at a distance from box beam bottom part body.
As an improvement of the above technical solution, the platform hanging basket includes walking stringer and is slidably walking on stringer
Hanging Basket, the both ends of the walking stringer pass through fixation kit respectively and connect with the both ends of box beam main body to be closed up.
As an improvement of the above technical solution, the walking stringer is equipped with several groups, and two adjacent groups walking stringer passes through cross
Beam connects and forms support platform.
As an improvement of the above technical solution, it is convex to be equipped with the support abutted with box beam bottom part body for the support platform
It rises.
As an improvement of the above technical solution, the both ends of the walking stringer pass through at least two groups fixation kit and case respectively
Beam body connection, length direction interval setting of all fixation kits along walking stringer.
As an improvement of the above technical solution, the two sides that the support platform is located at box beam main body are equipped with protection department, described
Protection department upwardly extends, and the height of upper end is higher than the height of box beam body upper surface.
The beneficial effects of the utility model have:
This box girder construction hanger is provided with platform hanging basket, and platform hanging basket passes through box beam by fixation kit and company is fixed
It connects, due to being hooked in box beam using multiple spot, is cooperated by closing piece, screw rod and fixed block, due to using it
It is middle to carry out adjustment height using closing piece cooperation screw rod, so that make entire platform and box beam bottom when installation is bonded situation more
Firm, stress condition is good, reduces unstability.Due to being attached using fixation kit, so that entire hanger is convenient for disassembly and assembly.
Detailed description of the invention
With reference to the accompanying drawing and specific embodiment the utility model is described in further detail, in which:
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is the main view of the utility model embodiment;
Fig. 3 is cross-sectional view of the Fig. 2 along the direction A-A.
Specific embodiment
Referring to Fig. 1 to Fig. 3, a kind of box girder construction hanger of the utility model, including platform hanging basket 1 and fixation kit 2, institute
The both ends for stating platform hanging basket 1 pass through the lower section that fixation kit 2 is hooked on 3 both ends of box beam main body to be closed up respectively, and described fixed group
Part 2 includes upper locking piece 21, screw rod 22 and fixed block 23, and the 22 upper end edge vertical movable of screw rod passes through box beam main body 3, and passes through
Upper locking piece 21 is locked, and 22 lower end of screw rod passes through platform hanging basket 1 and locks platform hanging basket 1 by fixed block 23.
Wherein, the fixation kit 2 be equipped with several groups, every group of fixation kit 2 along 1 direction of platform hanging basket successively with box beam master
Body 3 connects, and for stable connection, is respectively provided at least two groups fixation kit 2 in every side box beam in the application, this two groups fixed groups
Part 2 is configured along the length direction of box beam, additionally due to entire 1 area of platform hanging basket and weight are relatively large, therefore this Shen
Please in multiple fixation kits 2 are set in the transverse direction of box beam, improve the stability of connection, wherein multiple groups fixation kit 2
Screw rod 22 can be cooperated to be attached by closing piece 21, for adjusting the stationarity of entire platform, improve the safety of operation.
Referring to figs. 2 and 3, every group of fixation kit 2 is equipped at least one set of screw rod 22, in order to increase stationarity, the application
In two groups of screw rods 22 are equipped on each fixation kit 2, the screw rod 22 can pass through upper locking piece 21 and adjust platform hanging basket 1 and box beam
The distance of 3 bottom of main body.
In addition, the platform hanging basket 1 include walking stringer 11 and slidably walk stringer 11 on Hanging Basket so that it is convenient to
Carry out different operation.The both ends of the walking stringer 11 pass through fixation kit 2 respectively and the both ends of box beam main body 3 to be closed up connect
It connects.Entire hanger platform is connected in the box beam main body 3 to be closed up of both ends so that it is convenient to carry out constructing operation.It is entire in order to enhance
The intensity of platform hanging basket 1, the walking stringer 11 are equipped with several groups, and two adjacent groups walking stringer 11 is connected and formed by crossbeam
Support platform.In addition, the support platform is equipped with the support protrusion 12 abutted with 3 bottom of box beam main body, support protrusion 12 is real
Existing small area is abutted with 3 bottom of box beam main body, more convenient compared to entire support platform to be bonded.The walking stringer 11
Both ends pass through at least two groups fixation kit 2 respectively and connect with box beam main body 3, length of all fixation kits 2 along walking stringer 11
Spend the setting of direction interval.The two sides that the support platform is located at box beam main body 3 are equipped with protection department, and the protection department upwardly extends,
And the height of upper end is higher than the height of 3 upper surface of box beam main body.
This box girder construction hanger is provided with platform hanging basket 1, and platform hanging basket 1 is fixed by fixation kit 2 across box beam
Connection, due to being hooked in box beam using multiple spot, is cooperated by closing piece, screw rod 22 and fixed block 23, due to
Using wherein adjustment height is carried out using closing piece cooperation screw rod 22, so that making the patch of entire platform Yu box beam bottom when installation
Conjunction situation is more firm, and stress condition is good, reduces unstability.Due to being attached using fixation kit 2, so that entire hanger
It is convenient for disassembly and assembly.
The above, the only better embodiment of the utility model, but the utility model is not limited to above-mentioned reality
Example is applied, as long as its technical effect for reaching the utility model with any same or similar means, all should belong to the utility model
Protection scope.
Claims (8)
1. a kind of box girder construction hanger, it is characterised in that: including platform hanging basket (1) and fixation kit (2), the platform hanging basket
(1) both ends pass through the lower section that fixation kit (2) is hooked on box beam main body (3) both ends to be closed up, the fixation kit (2) respectively
Including upper locking piece (21), screw rod (22) and fixed block (23), screw rod (22) the upper end edge vertical movable passes through box beam main body
(3), it and by upper locking piece (21) is locked, screw rod (22) lower end passes through platform hanging basket (1) and passes through fixed block (23)
It locks platform hanging basket (1).
2. a kind of box girder construction hanger according to claim 1, it is characterised in that: the fixation kit (2) is equipped with several
Group, every group of fixation kit (2) successively connect with box beam main body (3) along platform hanging basket (1) direction.
3. a kind of box girder construction hanger according to claim 2, it is characterised in that: every group of fixation kit (2) be equipped with to
Few one group of screw rod (22), the screw rod (22) can adjust platform hanging basket (1) and box beam main body (3) bottom by upper locking piece (21)
Distance.
4. a kind of box girder construction hanger according to claim 1, it is characterised in that: the platform hanging basket (1) includes walking
The both ends of stringer (11) and the slidably Hanging Basket in walking stringer (11), walking stringer (11) pass through fixation kit respectively
(2) it is connect with the both ends of box beam main body (3) to be closed up.
5. a kind of box girder construction hanger according to claim 4, it is characterised in that: the walking stringer (11) is equipped with several
Group, two adjacent groups walking stringer (11) are connected by crossbeam and form support platform.
6. a kind of box girder construction hanger according to claim 5, it is characterised in that: the support platform is equipped with and box beam
The support protrusion (12) that main body (3) bottom abuts.
7. a kind of box girder construction hanger according to claim 4, it is characterised in that: the both ends point of walking stringer (11)
Not Tong Guo at least two groups fixation kit (2) connect with box beam main body (3), the length of all fixation kits (2) along walking stringer (11)
Spend the setting of direction interval.
8. a kind of box girder construction hanger according to claim 5, it is characterised in that: the support platform is located at box beam main body
(3) two sides are equipped with protection department, and the protection department upwardly extends, and the height of upper end is higher than the height of box beam main body (3) upper surface
Degree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821347254.0U CN208995924U (en) | 2018-08-20 | 2018-08-20 | A kind of box girder construction hanger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821347254.0U CN208995924U (en) | 2018-08-20 | 2018-08-20 | A kind of box girder construction hanger |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208995924U true CN208995924U (en) | 2019-06-18 |
Family
ID=66798645
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821347254.0U Active CN208995924U (en) | 2018-08-20 | 2018-08-20 | A kind of box girder construction hanger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208995924U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111472274A (en) * | 2020-03-18 | 2020-07-31 | 王文洋 | Device for adjusting folding line shape of segmental prefabricated assembled bridge |
-
2018
- 2018-08-20 CN CN201821347254.0U patent/CN208995924U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111472274A (en) * | 2020-03-18 | 2020-07-31 | 王文洋 | Device for adjusting folding line shape of segmental prefabricated assembled bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103711201B (en) | A kind of large-span prestressed concrete beam slab frame structure system | |
CN206529701U (en) | Traversing deviation correcting device during steel truss girder pushing tow | |
CN208995924U (en) | A kind of box girder construction hanger | |
CN102704405B (en) | Method utilizing buckle cable and anchor cable for balancing extra horizontal force | |
CN105110156B (en) | A kind of intermediate strutting device of moving staircase girders | |
CN209686443U (en) | One kind can formwork composed bogie in early demoulding gallery | |
CN104452568A (en) | Steel plate girder pedestrian overbridge | |
CN205822584U (en) | Adjustable high strength I-beam structure | |
CN208294041U (en) | One kind being used for side slope construction Integral foldable scaffold | |
CN106149542A (en) | Combined cable bridge | |
CN205855702U (en) | A kind of Elevator weight sensor block assembly | |
CN209024940U (en) | A kind of large span combination folding abdomen steel box-girder that horizontal support structure is set | |
CN209482165U (en) | A kind of novel rhombus Hanging Basket | |
CN208777188U (en) | A kind of Hanging Basket for box arch bridge cantilever pouring | |
CN209539398U (en) | A kind of evacuation platform of Fast Installation | |
CN103061262A (en) | Cable-crossing crane and application method thereof | |
CN204370286U (en) | The self-anchored suspension bridge of fish spine structure | |
CN104310184A (en) | Awning integrated escalator | |
CN206956998U (en) | A kind of grid system in curtain wall system | |
CN206591419U (en) | A kind of large span stayed-cable bridge | |
CN205857368U (en) | A kind of aluminum alloy support base is connected aluminium section bar with side | |
CN205875711U (en) | Steel wood stencil assembly | |
EA201800603A2 (en) | INSTALLATION FOR THE MANUFACTURE OF VOLUME BLOCKS | |
CN109137713A (en) | A kind of large span combination folding abdomen steel box-girder and construction method that horizontal support structure is set | |
CN209162633U (en) | Municipal bridge bridge expanded joint structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |