CN208294041U - One kind being used for side slope construction Integral foldable scaffold - Google Patents
One kind being used for side slope construction Integral foldable scaffold Download PDFInfo
- Publication number
- CN208294041U CN208294041U CN201820387427.5U CN201820387427U CN208294041U CN 208294041 U CN208294041 U CN 208294041U CN 201820387427 U CN201820387427 U CN 201820387427U CN 208294041 U CN208294041 U CN 208294041U
- Authority
- CN
- China
- Prior art keywords
- upright bar
- cross bar
- bar
- slideway
- door type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 238000010586 diagram Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses one kind to be used for side slope construction Integral foldable scaffold, including fixed transverse rod, upright bar, removable cross bar, oblique pull bracket, job platform and concrete embedded component;Wherein: door type structure is formed between upright bar and fixed transverse rod;The scaffold includes multiple door type structures;Upright bar is internally provided with slideway, and removable cross bar both ends are connected with the upper end of the slideway of two adjacent door type structures respectively, and removable cross bar both ends can be slided up and down along upright bar and locking;Oblique pull bracket both ends are connected with the lower end of the slideway of two adjacent door type structures respectively, and the both ends of oblique pull bracket can be slided up and down along upright bar and locking;Concrete embedded component is arranged on the different height position of high slope, and upright bar is fixed on the different height position of high slope by concrete embedded component respectively;After door type structure is fixed, job platform is fixedly mounted on removable cross bar.The utility model overall performance is good, and stability is strong, durable using reliable.
Description
Technical field
The utility model relates to side slope construction scaffolding work field, more particularly to one kind are whole for side slope construction
Folding scaffold.
Background technique
Existing side slope construction is staggeredly set up using design of coupler scaffold according to cross bar and upright bar, fastener connection, by
Grade of side slope influences, and complicated for operation, fastener is easily lost, and sets up that difficulty is big, and at high cost, danger coefficient is larger, causes to construction
Certain difficulty.
Utility model content
It is a kind of for high slope the technical problem to be solved by the present invention is to for the defects in the prior art, provide
Construction Integral foldable scaffold.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
The utility model provide it is a kind of for side slope construction Integral foldable scaffold, including fixed transverse rod, upright bar,
Removable cross bar, oblique pull bracket, job platform and concrete embedded component;Wherein:
Two upright bars are arranged in parallel, and are fixedly connected by multiple fixed transverse rods being arranged in parallel between upright bar,
Door type structure is formed between upright bar and fixed transverse rod;The scaffold includes multiple door type structures, is separately positioned on high slope not
With height;Upright bar is internally provided with slideway, moves the cross bar both ends upper end with the slideway of two adjacent door type structures respectively
It is connected, removable cross bar both ends can be slided up and down along upright bar and locking;Oblique pull bracket both ends respectively with two adjacent gate-types
The lower end of the slideway of structure is connected, and the both ends of oblique pull bracket can be slided up and down along upright bar and locking;Concrete embedded component is set
It sets on the different height position of high slope, upright bar is fixed on the different height position of high slope by concrete embedded component respectively
It sets;After door type structure is fixed, job platform is fixedly mounted on removable cross bar.
Further, the removable cross bar both ends of the utility model are provided with slide bolt, and slide bolt is matched with slideway
Connection is closed, cross bar is moved and realizes sliding and locking in upright bar by slide bolt.
Further, the oblique pull bracket both ends of the utility model are provided with slide bolt, and slide bolt and slideway cooperate
Connection, oblique pull bracket realize sliding and locking in upright bar by slide bolt.
Further, bottom slide track is provided on the concrete embedded part of the utility model.
Further, the bottom of upright rod of the utility model is provided with bottom fixing bolt, and bottom fixing bolt and bottom are sliding
Road is cooperatively connected, and sliding and locking on concrete embedded part are realized in upright bar by bottom fixing bolt.
Further, no less than 3 fixations are provided between two upright bars in each door type structure of the utility model
Cross bar.
The beneficial effect that the utility model generates is: the utility model is used for side slope construction Integral foldable foot hand
Frame, is used for high slope rockmass scaffolding work, and Integral foldable scaffold has the characteristics that installing and dismounting is efficient and convenient;Oblique pull
Bracket and the adjustable height of packaged type cross bar and angle, adapt to the construction environment of high slope rockmass engineering complexity, meet construction
Every demand, strong applicability;The utility model overall performance is good, and stability is strong, durable using reliable.
Detailed description of the invention
Below in conjunction with accompanying drawings and embodiments, the utility model is described in further detail, in attached drawing:
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is the side structure schematic view of the utility model embodiment;
Fig. 3 is the upright bar structural schematic diagram of the utility model embodiment;
Fig. 4 is the concrete embedded part structural schematic diagram of the utility model embodiment;
In figure: 1- fixed transverse rod, 2- upright bar, 3- move cross bar, 4- oblique pull bracket, 5- job platform, and 6- concrete is pre-
Embedded part, 7- slideway, 8- slide bolt, 9- bottom slide track, the unrivalled fixing bolt of 10-.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only to explain this
Utility model is not used to limit the utility model.
As shown in Figure 1, the utility model embodiment is used for side slope construction Integral foldable scaffold, including fixation
Cross bar 1, upright bar 2, removable cross bar 3, oblique pull bracket 4, job platform 5 and concrete embedded component 6;Wherein:
Two upright bars 2 are arranged in parallel, and pass through multiple 1 companies of being fixed of fixed transverse rod being arranged in parallel between upright bar 2
It connects, forms door type structure between upright bar 2 and fixed transverse rod 1;The scaffold includes multiple door type structures, is separately positioned on high slope
Different height;Upright bar 2 is internally provided with slideway 7, moves 3 both ends of the cross bar slideway with two adjacent door type structures respectively
7 upper end is connected, and removable 3 both ends of cross bar can be slided up and down along upright bar 2 and locking;4 both ends of oblique pull bracket respectively with it is adjacent
The lower ends of slideway 7 of two door type structures be connected, the both ends of oblique pull bracket 4 can slide up and down and locking along upright bar 2;Coagulation
Native preburied component 6 is arranged on the different height position of high slope, and upright bar 2 is fixed on height by concrete embedded component 6 respectively
The different height position of side slope;After door type structure is fixed, job platform 5 is fixedly mounted on removable cross bar 3.
As shown in Fig. 2, removable 3 both ends of cross bar are provided with slide bolt 8, slide bolt 8 and slideway 7 are cooperatively connected,
Removable cross bar 3 realizes sliding and locking in upright bar 2 by slide bolt 8.
As shown in figure 3,4 both ends of oblique pull bracket are provided with slide bolt 8, slide bolt 8 and slideway 7 are cooperatively connected, tiltedly
Bracket 4 is drawn to realize sliding and locking in upright bar 2 by slide bolt 8.
As shown in figure 4, being provided with bottom slide track 9 on concrete embedded part 6.2 bottom of upright bar is provided with bottom fixing bolt
10, bottom fixing bolt 10 and bottom slide track 9 are cooperatively connected, and upright bar 2 is realized by bottom fixing bolt 10 concrete embedded
Sliding and locking on part 6.No less than 3 fixed transverse rods 1 are provided between two upright bars 2 in each door type structure.
In another specific embodiment of the utility model: using a kind of foldable integral type scaffold, pass through oblique pull
Bracket and packaged type cross bar adjust the spacing between upright bar so that job platform can up and down adjustment, then fixing bolt, shape
At firm job platform, convenient disassembly is set up, meets the needs of complicated construction environment.
A kind of primary structure for side slope construction Integral foldable scaffold is upright bar, mobile horizontal cross bar,
Fixed transverse rod, oblique pull bracket, concrete embedded component composition.
Solve the above problems used scheme are as follows: is connected between upright bar and upright bar using fixed transverse rod, forms gate-type knot
Structure, top uses packaged type cross bar between door type structure and door type structure, and mobile cross bar is fixed by bolts with upright bar,
Cross bar top can shelve job platform, and job platform can adjust height, middle part by packaged type cross bar according to geographical environment
It is connected using oblique pull bracket, oblique pull bracket one end is articulated with upright bar, and one end slidably, adapts to the geographical conditions of side slope complexity, whole
Body is height-adjustable, and lower part is connected using built-in connection, forms stable side slope scaffolding structure.
Workflow:
Door type structure, top between door type structure and door type structure are formed by three fixed transverse rods between upright bar and upright bar
It is connected using mobile cross bar, both ends are connect by slide bolt with upright bar, and middle part is connected using oblique pull bracket, oblique pull bracket one
End is hingedly fixed with upright bar, the other end by using slide bolt, and when reaching certain slope, upright bar is vertical, fixed sliding spiral shell
Platform is shelved on bolt, mobile cross bar top, so that it may form a firm platform structure.
Bottom of upright rod is connected using concrete embedded component, and slideway is arranged in preburied component top, and the setting of upright bar lower part is fixed
Bolt, in use, upright bar can be slided up and down according to geographical environment by preburied component slideway, and adjustment height works as upright bar
Vertically, fixing bolt can make it stable when reaching slope requirement.
Oblique pull bracket slide bolt need to be only loosened when disassembly, remove top packaged type cross bar, so that it may folding door type structure,
Then fixed bottom when next time uses just can be used according to the fixed packaged type cross bar of construction requirement and oblique pull bracket.
The utility model has the beneficial effects that
1, the present invention is used for high slope rockmass scaffolding work, and Integral foldable scaffold has installing and dismounting fast side
Just the characteristics of.
2, oblique pull bracket and the adjustable height of packaged type cross bar and angle, adapt to the construction of high slope rockmass engineering complexity
Environment meets every demand of construction, strong applicability.
3, the utility model overall performance is good, and stability is strong, durable using reliable.
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description,
And all these modifications and variations all should belong to the protection scope of the appended claims for the utility model.
Claims (6)
1. one kind is used for side slope construction Integral foldable scaffold, which is characterized in that including fixed transverse rod (1), upright bar
(2), cross bar (3), oblique pull bracket (4), job platform (5) and concrete embedded part (6) are moved;Wherein:
Two upright bars (2) are arranged in parallel, and are fixed by multiple fixed transverse rods (1) being arranged in parallel between upright bar (2)
Connection, forms door type structure between upright bar (2) and fixed transverse rod (1);The scaffold includes multiple door type structures, is separately positioned on
The different height of high slope;Upright bar (2) is internally provided with slideway (7), move cross bar (3) both ends respectively with two adjacent doors
The upper end of the slideway (7) of formula structure is connected, and removable cross bar (3) both ends can be slided up and down along upright bar (2) and locking;Oblique pull branch
Frame (4) both ends are connected with the lower end of the slideway (7) of two adjacent door type structures respectively, and the both ends of oblique pull bracket (4) can edge
Upright bar (2) slides up and down and locking;Concrete embedded part (6) is arranged on the different height position of high slope, and upright bar (2) is respectively
The different height position of high slope is fixed on by concrete embedded part (6);After door type structure is fixed, job platform (5) is fixed
It is mounted on removable cross bar (3).
2. according to claim 1 be used for side slope construction Integral foldable scaffold, which is characterized in that removable cross
Bar (3) both ends are provided with slide bolt (8), and slide bolt (8) and slideway (7) are cooperatively connected, and removable cross bar (3) pass through cunning
Dynamic bolt (8) realize sliding and locking on upright bar (2).
3. according to claim 1 be used for side slope construction Integral foldable scaffold, which is characterized in that oblique pull bracket
(4) both ends are provided with slide bolt (8), and slide bolt (8) and slideway (7) are cooperatively connected, and oblique pull bracket (4) passes through sliding spiral shell
Bolt (8) realizes sliding and locking on upright bar (2).
4. according to claim 1 be used for side slope construction Integral foldable scaffold, which is characterized in that concrete is pre-
Bottom slide track (9) are provided on embedded part (6).
5. according to claim 4 be used for side slope construction Integral foldable scaffold, which is characterized in that upright bar (2)
Bottom is provided with bottom fixing bolt (10), and bottom fixing bolt (10) and bottom slide track (9) are cooperatively connected, and upright bar (2) passes through
Bottom fixing bolt (10) realizes sliding and locking on concrete embedded part (6).
6. according to claim 1 be used for side slope construction Integral foldable scaffold, which is characterized in that each gate-type
No less than 3 fixed transverse rods (1) are provided between two upright bars (2) in structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820387427.5U CN208294041U (en) | 2018-03-21 | 2018-03-21 | One kind being used for side slope construction Integral foldable scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820387427.5U CN208294041U (en) | 2018-03-21 | 2018-03-21 | One kind being used for side slope construction Integral foldable scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208294041U true CN208294041U (en) | 2018-12-28 |
Family
ID=64694578
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820387427.5U Expired - Fee Related CN208294041U (en) | 2018-03-21 | 2018-03-21 | One kind being used for side slope construction Integral foldable scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208294041U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109653479A (en) * | 2019-01-09 | 2019-04-19 | 中国冶集团有限公司 | The whole adjustable scaffold of side slope construction |
CN111005543A (en) * | 2019-11-21 | 2020-04-14 | 中欧国际建工集团有限公司 | Adjustable door type formwork system and construction method thereof |
-
2018
- 2018-03-21 CN CN201820387427.5U patent/CN208294041U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109653479A (en) * | 2019-01-09 | 2019-04-19 | 中国冶集团有限公司 | The whole adjustable scaffold of side slope construction |
CN111005543A (en) * | 2019-11-21 | 2020-04-14 | 中欧国际建工集团有限公司 | Adjustable door type formwork system and construction method thereof |
CN111005543B (en) * | 2019-11-21 | 2021-08-06 | 中欧国际建工集团有限公司 | Construction method of adjustable door type formwork system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208294041U (en) | One kind being used for side slope construction Integral foldable scaffold | |
CN209011579U (en) | A kind of adjustable vertical pump line support frame | |
CN205590174U (en) | Handling support frame for building | |
CN201129027Y (en) | Two-hinge-turning-plate guard rail for widening scaffold | |
CN103104186B (en) | Outdoor operation ladder | |
CN105479412B (en) | A kind of rudder blade mounting tool | |
CN201671315U (en) | Adjustable scaffold | |
CN203640127U (en) | Sunshade for operation platform | |
CN210918316U (en) | Elevator shaft opening safety protection device | |
CN208310154U (en) | A kind of construction scaffold | |
CN110104205A (en) | A kind of aviation working stand | |
CN203890758U (en) | Floor type folding clothes hanger | |
CN205822584U (en) | Adjustable high strength I-beam structure | |
CN201649607U (en) | Overhung-type outer wall scaffold | |
CN209024965U (en) | A kind of adjustable anticollision wall form | |
CN205135390U (en) | Fitment is with ladder | |
CN209428070U (en) | A kind of overhead job platform of bridge construction | |
CN209277575U (en) | A kind of protection canopy with buffer unit | |
CN207144430U (en) | A kind of scalable operating platform | |
CN208571420U (en) | Cable channel cover plate lifts lift tool | |
CN207110415U (en) | A kind of building construction scaffold being easily installed | |
CN205562179U (en) | Convenient to carry's test stand | |
CN204357085U (en) | Pin-connected panel operating platform | |
CN205422745U (en) | Tunnel lining trolley | |
CN213061709U (en) | Hanging basket for road and bridge construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181228 |
|
CF01 | Termination of patent right due to non-payment of annual fee |