CN208981527U - Assembly concrete connection structure - Google Patents
Assembly concrete connection structure Download PDFInfo
- Publication number
- CN208981527U CN208981527U CN201821624728.1U CN201821624728U CN208981527U CN 208981527 U CN208981527 U CN 208981527U CN 201821624728 U CN201821624728 U CN 201821624728U CN 208981527 U CN208981527 U CN 208981527U
- Authority
- CN
- China
- Prior art keywords
- wall
- sleeve
- opening
- reinforcing bar
- connection structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to industrialized building fields, it is intended to provide assembly concrete connection structure, its key points of the technical solution are that including the first wall and the second wall perpendicular to the first wall, the opening of first wall described in the corresponding position of second wall and first wall opening and the open communication of second wall, opening on first wall and the second wall is through the top of the first wall and the second wall, the first connector is provided in the opening of first wall, second connector mating with the first connector is provided in the opening of second wall.The utility model is suitable for the connection of corner location between neighboring walls.
Description
Technical field
The utility model relates to industrialized building fields, more specifically, it relates to assembly concrete connection structure.
Background technique
It is built made of assemble in site as pre-constructed unit, referred to as assembled architecture, its main feature is that a large amount of building component
It is completed the process by Workshop Production, cast-in-place operation greatly reduces, short time limit;Component standardization, high production efficiency, corresponding component at
The cost performance of this decline, assembled architecture is high.
Currently, the working procedure that the corner location between neighboring walls connects is many and diverse, the time of consuming is longer.
Utility model content
The purpose of the utility model is to provide assembly concrete connection structure, the pre-constructed unit in neighboring walls, so that
The working procedure that corner location connects between neighboring walls is reduced, and shortens the time of installation.
The above-mentioned technical purpose of the utility model has the technical scheme that assembly concrete connects
Structure, including the first wall and perpendicular to the second wall of the first wall, second wall is corresponding with first wall
The opening of first wall described in position opening and the open communication of second wall, the opening on the first wall and the second wall
Through the top of the first wall and the second wall, it is provided with the first connector in the opening of first wall, described second
Second connector mating with the first connector is provided in the opening of wall.
By using above-mentioned technical proposal, using prefabricated in the first wall intracorporal first between orthogonal two wall
Connector and prefabricated second connector intracorporal, mating with the first connector in the second wall are attached, and realize phase
The connection of corner location between adjacent wall, on-site construction processes are few, and the set-up time shortens.
Preferably, first connector includes steel plate, L-shaped first sleeve, the first steel of several rectangular types
Muscle and first sleeve, the sheet steel sections are located in the opening of first wall, and steel plate includes vertical the first steel bar and water
The second flat steel bar, for second steel bar horizontal through the opening of second wall, the of top is arranged in first sleeve
On one steel bar, the resin capsule of wrapped resin glue is provided at the corner location in the first sleeve, first reinforcing bar is solid
It is scheduled on the side of the adjacent steel plate, the first sleeve is fixed on the open bottom of first wall and with described first
Reinforcing bar is mating.
By using above-mentioned technical proposal, the steel plate of rectangular type strengthens the connection connection of corner location between neighboring walls
System is enhanced the rigidity of corner location between neighboring walls, is connected between adjacent steel plate using close the first reinforcing bar for being welded in its side
Connect, strengthen the globality of the first connector, overall structure is more preferable, the first reinforcing bar be fixed on the of the first wall open bottom
Sleeve is mating, so that the connection of the first connector and the first wall is more firm.
Preferably, second connector includes the second casing, the second reinforcing bar and L-shaped second sleeve, adjacent institute
It states and wears same second reinforcing bar on the second steel bar vertically, the second sleeve is located at the top of the second reinforcing bar and with described first
Sleeve is mating, and second casing is fixed on the open bottom of second wall and matches with the second reinforcing bar grafting
It closes.
By using above-mentioned technical proposal, second sleeve is mating with first sleeve, and second sleeve is entering first
When sleeve inner, puncture resin capsule using the head of second sleeve so that its internal resin glue outflow covering second sleeve with
The plug-in position of first sleeve and solidification, the connection of second sleeve and first sleeve is more firm, so strengthen the first wall with
The connection of second wall, the second reinforcing bar is slotting mating with the second casing of the open bottom for being fixed on the second wall, so that the
The connection of two connectors and the second wall is more firm.
Preferably, the position that first wall corresponds to the first sleeve is provided with the first slot box, the connection of the first slot box
The opening of first wall, the first sleeve are threadedly coupled the first slot box.
By using above-mentioned technical proposal, first sleeve is threadedly coupled with setting in the intracorporal first slot box of the first wall, into
And the connection of the first connector and the first wall is more firm.
Preferably, the resin capsule of wrapped resin glue is provided in the first slot box.
By using above-mentioned technical proposal, when first sleeve is screwed into the first slot box, extrusion resin capsule makes the tree in it
Rouge glue overflows, and the threaded connection place of first sleeve and the first slot box is covered by resin glue to be solidified, and then the first connector and first
The connection of wall is more firm.
Preferably, first reinforcing bar is symmetrically fixed on the two sides of the adjacent steel plate, and the quantity of the first sleeve is
Two and be separately fixed at the first wall corresponding two first reinforcing bars of open bottom position.
By using above-mentioned technical proposal, the first reinforcing bar be symmetrically fixed on the side of adjacent steel plate and be fixed on first
The first sleeve of wall open bottom is mating, increases the contact area of the first connector and the first wall, makes the first connection
The connection of part and the first wall is more firm.
Preferably, the second sleeve is arranged with the mating end tip of the first sleeve.
By using above-mentioned technical proposal, when second sleeve and first sleeve are mating, the end of second sleeve is punctured
Resin capsule in first sleeve, internal resin glue overflow, by resin at the plug-in position of first sleeve and second sleeve
Glue covering solidification, and then the connection of first sleeve and second sleeve is more firm
Preferably, the lower horizontal of second wall is embedded with third reinforcing bar, and the third reinforcing bar is horizontal through described
The opening of first wall.
By using above-mentioned technical proposal, third reinforcing bar runs through the turning link position of the first wall and the second wall, into
One step strengthens contacting between the first wall and the second wall.
In conclusion the utility model has the following beneficial effects:
1, the first prefabricated wall is matched with the second prefabricated wall by the second connector and the first connector grafting
Conjunction carries out pouring fixation again, reduces the joint connection in site process of corner location between neighboring walls, and the set-up time shortens;
2, the first connector strengthens the connection connection of corner location between neighboring walls, enhances and turns between neighboring walls
The rigidity of Angle Position, overall structure are more preferable;
3, through the third reinforcing bar of the first wall and the second wall turning link position, the first wall and the second wall are strengthened
Connection between body enhances the rigidity of the first wall and the second wall turning link position.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of assembly concrete connection structure;
Fig. 2 is the explosive view of assembly concrete connection structure;
Fig. 3 is the sectional view of assembly concrete connection structure.
In figure: 1, the first wall;2, the second wall;3, steel plate;31, the first steel bar;32, the second steel bar;4, first sleeve;
5, the first reinforcing bar;6, first sleeve;7, resin capsule;8, the first slot box;9, the second casing;10, the second reinforcing bar;11, second set
Cylinder;12, the second through-hole;13, third reinforcing bar.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Following specific embodiments are only the explanation to the utility model, are not limitations of the present invention, this
Field technical staff can according to need the modification that not creative contribution is made to the present embodiment after reading this specification,
But as long as all by the protection of Patent Law in the scope of the claims of following utility model.
Assembly concrete connection structure, as shown in Figure 1, including the first wall 1 and the second wall perpendicular to the first wall 1
The corresponding position of body 2, the second wall 2 and the first wall 1 is open and the opening of the first wall of open communication 1 of the second wall 2, the
The opening of one wall 1 and the second wall 2 is through the top of the first wall 1 and the second wall 2.
As shown in Figures 2 and 3, it is vertically arranged with the steel plate 3 of several rectangular types in the opening of the first wall 1, steel plate 3
For quartile in the opening of the first wall 1, steel plate 3 includes vertical the first steel bar 31 and the second horizontal steel bar 32, part second
Steel bar 32 horizontal through the second wall 2 opening, between adjacent steel plate 3 on both sides it is symmetrical it is close be welded with the first reinforcing bar 5, with
Reinforce the globality between adjacent steel plate 3, overall structure is more preferable, the position of corresponding first reinforcing bar 5 of the open bottom of the first wall 1
Fixed there are two the first sleeves 6 mating with two first reinforcing bars 5, so that the company of the first reinforcing bar 5 and the first wall 1
It connects more firm.
The first through hole (not shown) along its width direction, first through hole are offered on first steel bar 31 of top
It is inside rotatably connected to L-shaped first sleeve 4, the position that first sleeve 4 is corresponded on the first wall 1 offers notch face
The end tip of first slot box 8 of one sleeve 4, first sleeve 4 is arranged and is threadedly connected in the first slot box 8, and the first slot box 8 is remote
Side from 4 end of first sleeve is provided with the resin capsule 7 of wrapped resin glue, so that first sleeve 4 is threadedly coupled the first slot
While box 8, the end of pointed shape punctures resin capsule 7, and resin glue is made to overflow the spiral shell of covering first sleeve 4 and the first slot box 8
Line link position simultaneously solidifies, and then first sleeve 4 and the connection of the first slot box 8 are more firm.
The second through-hole 12 is offered along its short transverse on the second steel bar 32 in the second wall 2 opening, it is adjacent
Same second reinforcing bar 10 is socketed in second through-hole 12 vertically, to reinforce the globality between adjacent steel plate 3, overall structure is more
It is good, second casing 9 mating with the second reinforcing bar 10 is fixed in the open bottom of the second wall 2, so that the second reinforcing bar 10
It is more firm with the connection of the second wall 2.
The side of the top of second reinforcing bar 10 towards the first wall 1 is rotatably connected to L-shaped second sleeve 11, and second
11 end of sleeve is provided with package tree in the shape and mating with first sleeve 4 of point at the corner location in first sleeve 4
The resin capsule 7 of rouge glue, so that the end of pointed shape punctures resin capsule during 11 grafting first sleeve 4 of second sleeve
7, so that resin glue is overflowed plug-in position and the solidification of covering first sleeve 4 and second sleeve 11, and then first sleeve 4 and second set
The connection of cylinder 11 is more firm.
The lower horizontal of second wall 2 is embedded with the third reinforcing bar 13 horizontal through the first wall 1 opening, to reinforce first
Contacting between wall 1 and the second wall 2 enhances the rigidity of the first wall 1 and 2 turning link position of the second wall.
3, first sleeves 4 of several steel plates, the first reinforcing bar 5 and first sleeve 6 form the first connector.
Second casing 9, the second reinforcing bar 10 and a second sleeve 11 form the second connector.
Specific installation process:
Prefabricated the first wall 1 and the second wall 2 are transported to construction site, the position of the first wall 1 is fixed
Afterwards, make the opening of 1 side of the first wall of opening face of 2 side of the second wall and be bonded with the first wall 1, and then the second steel bar
32 parts are located in the opening of the second wall 2, and 13 part of third reinforcing bar is located in the opening of the first wall 1, make the second reinforcing bar 10
Vertical interspersed second through-hole 12 is simultaneously inserted into the second casing 9 of 2 open bottom of the second wall, while the second casing 9 and first set
Pipe 6 is mating and contact position has resin glue spilling, to resin adhesive curing, by the opening position of the first wall 1 and the second wall 2
Set casting concrete until aperture position be landfilled leveling, wait for a period of time until concrete dry out harden.
Claims (8)
1. assembly concrete connection structure, it is characterized in that: including the first wall (1) and perpendicular to the second of the first wall (1)
The corresponding position opening of wall (2), second wall (2) and first wall (1) and the opening of second wall (2)
Be connected to the opening of first wall (1), the opening on the first wall (1) and the second wall (2) through the first wall (1) and
The top of second wall (2) is provided with the first connector in the opening of first wall (1), and the second wall (2) are opened
Second connector mating with the first connector is provided in mouthful.
2. assembly concrete connection structure according to claim 1, it is characterized in that: first connector includes several
Steel plate (3), L-shaped first sleeve (4), the first reinforcing bar (5) and the first sleeve (6) of rectangular type, steel plate (3) portion
For quartile in the opening of first wall (1), steel plate (3) includes the second steel bar of vertical the first steel bar (31) and level
(32), for second steel bar (32) horizontal through the opening of second wall (2), top is arranged in first sleeve (4)
On first steel bar (31), the resin capsule (7) of wrapped resin glue, institute are provided at the corner location in the first sleeve (4)
It states the first reinforcing bar (5) to be fixed on the side of the adjacent steel plate (3), the first sleeve (6) is fixed on first wall
(1) open bottom and mating with first reinforcing bar (5).
3. assembly concrete connection structure according to claim 2, it is characterized in that: second connector includes second
Casing (9), the second reinforcing bar (10) and L-shaped second sleeve (11) are worn on adjacent second steel bar (32) same vertically
One second reinforcing bar (10), the second sleeve (11) are located at the top of the second reinforcing bar (10) and insert with the first sleeve (4)
Connect cooperation, second casing (9) be fixed on the open bottom of second wall (2) and with the second reinforcing bar (10) grafting
Cooperation.
4. assembly concrete connection structure according to claim 2, it is characterized in that: first wall (1) corresponds to institute
The position for stating first sleeve (4) is provided with the first slot box (8), and the first slot box (8) is connected to the opening of the first wall (1), and described the
One sleeve (4) is threadedly coupled the first slot box (8).
5. assembly concrete connection structure according to claim 4, it is characterized in that: setting in the first slot box (8)
There is the resin capsule (7) of wrapped resin glue.
6. assembly concrete connection structure according to claim 2, it is characterized in that: first reinforcing bar (5) is symmetrically solid
The two sides of the adjacent steel plate (3) are scheduled on, the quantity of the first sleeve (6) is two and is separately fixed at the first wall (1)
Corresponding two first reinforcing bars (5) of open bottom position.
7. assembly concrete connection structure according to claim 3, it is characterized in that: the second sleeve (11) with it is described
The mating end tip setting of first sleeve (4).
8. assembly concrete connection structure according to claim 1, it is characterized in that: the lower part of second wall (2)
Level is embedded with third reinforcing bar (13), opening of the third reinforcing bar (13) horizontal through first wall (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821624728.1U CN208981527U (en) | 2018-09-30 | 2018-09-30 | Assembly concrete connection structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821624728.1U CN208981527U (en) | 2018-09-30 | 2018-09-30 | Assembly concrete connection structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208981527U true CN208981527U (en) | 2019-06-14 |
Family
ID=66786620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821624728.1U Expired - Fee Related CN208981527U (en) | 2018-09-30 | 2018-09-30 | Assembly concrete connection structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208981527U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112647576A (en) * | 2020-12-21 | 2021-04-13 | 福建鑫远建工有限公司 | Prefabricated pipe-jacking inspection well chamber structure and construction method thereof |
CN113833152A (en) * | 2021-09-06 | 2021-12-24 | 百盛联合集团有限公司 | Fabricated reinforced structure of standardized prefabricated member for building |
CN114575466A (en) * | 2022-03-28 | 2022-06-03 | 昌建建设集团有限公司 | Energy-conserving ready-package modularization house |
-
2018
- 2018-09-30 CN CN201821624728.1U patent/CN208981527U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112647576A (en) * | 2020-12-21 | 2021-04-13 | 福建鑫远建工有限公司 | Prefabricated pipe-jacking inspection well chamber structure and construction method thereof |
CN113833152A (en) * | 2021-09-06 | 2021-12-24 | 百盛联合集团有限公司 | Fabricated reinforced structure of standardized prefabricated member for building |
CN114575466A (en) * | 2022-03-28 | 2022-06-03 | 昌建建设集团有限公司 | Energy-conserving ready-package modularization house |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208981527U (en) | Assembly concrete connection structure | |
CN106013531B (en) | The concrete shear wall structure based on 3D printing with concave convex texture | |
CN204826423U (en) | Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member | |
KR101526889B1 (en) | Permanent form and construction method for coping | |
CN207794658U (en) | The connection structure of steel column is connect on a kind of reinforced column | |
CN109016089A (en) | A kind of mold, manufacture craft and the installation method of small-sized gate stack | |
CN207686288U (en) | The manufacture of the horizontal hole to be provided of wall and plugging device | |
CN207660193U (en) | A kind of overlength eaves gutter applied in assembling type steel structure building | |
CN202969248U (en) | Prefabricated diaphragm plate for bridge | |
CN208934188U (en) | A kind of fabricated shear wall energy-dissipating and shock-absorbing horizontal connection structure | |
CN210797894U (en) | Prefabricated built-in concrete structure's connected node | |
CN210369305U (en) | Column-beam connecting node, building frame structure and building body | |
CN107471423A (en) | A kind of construction method of reinforced beam cavity | |
CN209494050U (en) | A kind of connection structure of assembled steel frame exterior wall and structural column | |
KR101219459B1 (en) | The water-storage tank of assembly type and method for constructing thereof | |
CN208310195U (en) | Constraint slurry anchor bar splicing connector prepares mold | |
CN207859091U (en) | For the molding mold of prefabricated components | |
CN208084639U (en) | Sectional die for pouring prefabricated overlapping wall and prefabricated overlapping wall body structure | |
CN211466812U (en) | Concrete prefabricated part mould | |
CN207245172U (en) | A kind of constructional column prefab-form structure | |
CN109944362A (en) | T-steel and threaded sleeve assembly and connection formula steel concrete compound tube T-type node | |
CN106696053B (en) | A kind of installation method of preform lid beam bottom plate | |
CN212405576U (en) | Connection structure of vertical seam of prefabricated shear force wall of prevention of seepage water | |
CN210622092U (en) | High-strength concrete prefabricated wall | |
CN107363985A (en) | A kind of construction method of reinforced concrete wall cavity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190614 Termination date: 20210930 |
|
CF01 | Termination of patent right due to non-payment of annual fee |