CN211466812U - Concrete prefabricated part mould - Google Patents

Concrete prefabricated part mould Download PDF

Info

Publication number
CN211466812U
CN211466812U CN201922428890.7U CN201922428890U CN211466812U CN 211466812 U CN211466812 U CN 211466812U CN 201922428890 U CN201922428890 U CN 201922428890U CN 211466812 U CN211466812 U CN 211466812U
Authority
CN
China
Prior art keywords
device main
main part
shell upper
atress board
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922428890.7U
Other languages
Chinese (zh)
Inventor
印学军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huai'an Zhongxing Green Building Technology Co ltd
Original Assignee
Huai'an Zhongxing Green Building Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huai'an Zhongxing Green Building Technology Co ltd filed Critical Huai'an Zhongxing Green Building Technology Co ltd
Priority to CN201922428890.7U priority Critical patent/CN211466812U/en
Application granted granted Critical
Publication of CN211466812U publication Critical patent/CN211466812U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The present case relates to precast concrete equipment technical field, and a precast concrete component mould is disclosed, including the device main part, the shell upper part is installed to the upper end of device main part, moulding between has all been seted up to the upper end of device main part and the lower extreme of shell upper part, the equal welded connection in both ends of device main part and shell upper part has the gusset plate, first atress board is installed to the upper end of shell upper part, the both sides of device main part and shell upper part have all been settled down and have the second atress board, the equal welded connection in one end of first atress board and second atress board has the shutoff piece, the equal plug-in connection in inside of first atress board and second atress board has set screw, the internal thread hole has all been seted up to the week side of device main part and shell upper part, the feed inlet has been seted up to shell upper part one end, the bleeder vent has all been seted up to the week side. The present case makes the device pour the time of taking shape to the precast concrete spare and can great shortening through a series of designs to great promotion the efficiency of construction.

Description

Concrete prefabricated part mould
Technical Field
The utility model relates to a precast concrete equipment technical field especially relates to a precast concrete component mould.
Background
The concrete prefabricated part is a building part which is manufactured in a factory in advance by taking concrete as a basic material, and refers to an assembled concrete part which is manufactured before installation is implemented on a construction site, and generally, a prefabricated concrete floor slab, a concrete box beam for a bridge, a prefabricated concrete roof beam for an industrial factory building, a culvert frame structure, a prefabricated concrete pile for foundation treatment and the like are common, but the existing device has longer prefabrication time when the concrete pile is prefabricated, and the construction efficiency is greatly reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete prefabricated component mould to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a precast concrete component mould, includes the device main part, the shell upper part body is installed to the upper end of device main part, moulding room has all been seted up to the upper end of device main part and the lower extreme of shell upper part body, the equal welded connection in both ends of device main part and shell upper part body has the gusset plate, first atress board is installed to the upper end of shell upper part body, the both sides of device main part and shell upper part body are all settled down and are had the second atress board, the equal welded connection in one end of first atress board and second atress board has the shutoff piece, the equal plug-in connection in inside of first atress board and second atress board has set screw, the internal screw hole has all been seted up to the week side of device main part and shell upper part body, the feed inlet has been seted up to shell upper part body one end, the bleeder vent has all been seted up to the week side of.
Preferably, the inner diameter of the air hole is the same as the outer diameter of the plugging block, and the air hole is in clearance fit with the plugging block.
Preferably, an internal thread is arranged inside the internal thread hole, an external thread is arranged on the outer side of the lower end of the fixing screw, and the fixing screw is in threaded connection with the internal thread hole.
Preferably, the inner thread of the feed inlet is connected with a threaded plug.
Preferably, a circular hole is formed in the middle of the reinforcing plate, and a fastening bolt is connected to the inside of the circular hole in an inserting mode.
Preferably, one end of the shaping chamber is in a quadrangular pyramid shape.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses pour the raw materials into moulding inside within a definite time through the feed inlet when using, then install the inside of going into the feed inlet with the screw stopper, rotatory set screw after moulding completion of inside raw materials between moulding, make set screw and device main part and shell upper part of the body separation, then use great power to separate first atress board and second atress board from the week side of device main part and shell upper part of the body, the outside air after the separation is accomplished can enter into moulding inside within a definite time through the bleeder vent, rotatory fastening bolt after concrete closely solidifies, make gusset plate and fastening bolt effectively separate, then use great power to separate shell upper part of the body and interior screw hole, take out concrete after the shaping from moulding inside within a definite time again, make the device pour the time that takes shape to the concrete prefab shorter, thereby great promotion the efficiency of construction.
Drawings
FIG. 1 is a schematic view of the overall structure of one end of the present invention;
FIG. 2 is a schematic view of the overall structure of the other end of the present invention;
fig. 3 is a drawing of the disassembled accessories of the present invention.
In the figure: 1. a device main body; 2. a housing upper body; 3. a first force-bearing plate; 4. a second force-bearing plate; 5. a reinforcing plate; 6. fastening a bolt; 7. a set screw; 8. a shaping chamber; 9. air holes are formed; 10. an internal threaded bore; 11. a threaded plug; 12. a feed inlet; 13. and (6) a plugging block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-3, a concrete prefabricated part mold comprises a device main body 1, a shell upper body 2 is installed at the upper end of the device main body 1, shaping rooms 8 are respectively formed at the upper end of the device main body 1 and the lower end of the shell upper body 2, one end of each shaping room 8 is in a quadrangular pyramid shape, so that a molded concrete stress pile can better penetrate into a foundation, reinforcing plates 5 are respectively welded and connected to the two ends of the device main body 1 and the two ends of the shell upper body 2, a circular hole is formed in the middle of each reinforcing plate 5, and a fastening bolt 6 is connected to the inside of each circular hole in an inserted manner, so that the reinforcing plates 5 can be better fixed by the fastening bolt 6;
the upper end of the upper shell body 2 is provided with a first stress plate 3, the two sides of the upper shell body 2 and the main body 1 are respectively provided with a second stress plate 4, one ends of the first stress plate 3 and the second stress plate 4 are respectively connected with a plugging block 13 in a welding manner, the interiors of the first stress plate 3 and the second stress plate 4 are respectively connected with a fixing screw 7 in an inserting manner, the peripheral sides of the main body 1 and the upper shell body 2 are respectively provided with an internal thread hole 10, an internal thread is arranged in the internal thread hole 10, an external thread is arranged on the outer side of the lower end of the fixing screw 7, and the fixing screw 7 is connected with the internal thread hole 10 through a thread, so that the fixing screw 7 is more convenient to install;
feed inlet 12 has been seted up to the one end of the 2 upper ends of the shell upper part of the body, and the inside threaded connection of feed inlet 12 has screw plug 11 for screw plug 11 can be sealed with feed inlet 12, and bleeder vent 9 has all been seted up with the week side of the shell upper part of the body 2 to device main part 1, and the internal diameter of bleeder vent 9 is the same with the external diameter size of plugging block 13, and bleeder vent 9 and 13 clearance fit of plugging block make the inside of getting into bleeder vent 9 that plugging block 13 can be better.
The working principle is as follows:
in the utility model, when a user uses the device, the raw material is poured into the shaping chamber 8 through the feed inlet 12, then the threaded plug 11 is installed in the feed inlet 12, the fixing screw 7 is rotated after the shaping of the raw material in the shaping chamber 8 is completed, so that the fixing screw 7 is separated from the device main body 1 and the shell upper body 2, then the first stress plate 3 and the second stress plate 4 are separated from the peripheral sides of the device main body 1 and the shell upper body 2 by using larger force, the external air can enter the shaping chamber 8 through the vent hole 9 after the separation is completed, the fastening bolt 6 is rotated after the concrete is densely solidified, so that the reinforcing plate 5 is effectively separated from the fastening bolt 6, then the shell upper body 2 is separated from the internal threaded hole 10 by using larger force, the formed concrete is taken out from the shaping chamber 8, so that the device has shorter pouring and forming time for the concrete prefabricated part, thereby greatly improving the construction efficiency.
Above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the design of the present invention, equivalent replacement or change should be covered within the protection scope of the present invention.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.

Claims (6)

1. The utility model provides a concrete prefabricated part mould, includes device main part (1), its characterized in that, the shell upper part (2) is installed to the upper end of device main part (1), moulding room (8) have all been seted up to the upper end of device main part (1) and the lower extreme of shell upper part (2), the both ends of device main part (1) and shell upper part (2) all welded connection have gusset plate (5), first atress board (3) is installed to the upper end of shell upper part (2), the both sides of device main part (1) and shell upper part (2) all have been settled second atress board (4), the one end of first atress board (3) and second atress board (4) all welded connection has block (13), the inside of first atress board (3) and second atress board (4) all is inserted connection and has set screw (7), the device main part (1) all sets up female screw hole (10) with shell upper part (2), a feed inlet (12) is formed in one end of the upper shell body (2), and air holes (9) are formed in the periphery of the main body (1) and the upper shell body (2).
2. The precast concrete member mold according to claim 1, wherein the inner diameter of the ventilation hole (9) is the same as the outer diameter of the block piece (13), and the ventilation hole (9) is in clearance fit with the block piece (13).
3. The precast concrete member mold according to claim 1, wherein the internally threaded hole (10) is internally provided with an internal thread, the outside of the lower end of the fixing screw (7) is provided with an external thread, and the fixing screw (7) is threadedly coupled with the internally threaded hole (10).
4. A precast concrete member mould according to claim 1, wherein a screw stopper (11) is screw-coupled to the inside of the feed port (12).
5. The precast concrete member mould according to claim 1, characterized in that a circular hole is formed in the middle of the reinforcing plate (5), and a fastening bolt (6) is inserted into the circular hole.
6. A precast concrete member mold according to claim 1, wherein one end of the shaping room (8) is in a quadrangular pyramid shape.
CN201922428890.7U 2019-12-30 2019-12-30 Concrete prefabricated part mould Expired - Fee Related CN211466812U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922428890.7U CN211466812U (en) 2019-12-30 2019-12-30 Concrete prefabricated part mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922428890.7U CN211466812U (en) 2019-12-30 2019-12-30 Concrete prefabricated part mould

Publications (1)

Publication Number Publication Date
CN211466812U true CN211466812U (en) 2020-09-11

Family

ID=72365936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922428890.7U Expired - Fee Related CN211466812U (en) 2019-12-30 2019-12-30 Concrete prefabricated part mould

Country Status (1)

Country Link
CN (1) CN211466812U (en)

Similar Documents

Publication Publication Date Title
CN107217790B (en) Prefabricated reinforced concrete frame hollow column and construction method thereof
CN208981527U (en) Assembly concrete connection structure
CN204001721U (en) The mould of architectural reserved spool mounting groove
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN206953254U (en) Shaped steel combination floor makes mould
CN211466812U (en) Concrete prefabricated part mould
CN207419778U (en) A kind of free removal wall body casting template device
CN201649636U (en) Mold plate device for door and window openings
CN209670153U (en) A kind of formwork of superstructure cast-in-place concrete
CN209699427U (en) A kind of easily demoulding prefabricated balcony mold
CN210758333U (en) Concrete annular interlocking formula stand combination basis prefabricated component pouring mould
CN110861190A (en) Component for placing air conditioner external unit and construction method
CN208529368U (en) A kind of production mould for the prefabricated girder of armored concrete
CN216139121U (en) Mould fixing device is used in prefabricated component superimposed sheet production
CN207003720U (en) A kind of assembled integral concrete shear force wall attachment structure
CN111677286A (en) Concrete pouring and vibrating device assembly for closed space and vibrating method
CN203622619U (en) Manufacturing die for integral cable channel
CN216067977U (en) Dislocation-preventing concrete prefabricated part mold for green building construction
CN211714580U (en) Embedded strong and weak circuit box integration construction mould
CN214462921U (en) Integral preset steel mould concrete pouring building
CN210148367U (en) Cross prefabricated component forming die
CN214026255U (en) Shaping aluminum alloy die of multifunctional precast concrete block
CN219505071U (en) Concrete mould builds structure
CN205224269U (en) Can assemble roof beam and post module into building frame
CN216553050U (en) Cast strip prefabricated tire template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200911