CN208966075U - A kind of precast stair regularization construction protecting rack - Google Patents

A kind of precast stair regularization construction protecting rack Download PDF

Info

Publication number
CN208966075U
CN208966075U CN201821752033.1U CN201821752033U CN208966075U CN 208966075 U CN208966075 U CN 208966075U CN 201821752033 U CN201821752033 U CN 201821752033U CN 208966075 U CN208966075 U CN 208966075U
Authority
CN
China
Prior art keywords
upright bar
operating platform
upright
bars
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821752033.1U
Other languages
Chinese (zh)
Inventor
高健亚
易超
杨小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadong Building Co Ltd of China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
Huadong Building Co Ltd of China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadong Building Co Ltd of China Construction Fifth Engineering Bureau Co Ltd filed Critical Huadong Building Co Ltd of China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201821752033.1U priority Critical patent/CN208966075U/en
Application granted granted Critical
Publication of CN208966075U publication Critical patent/CN208966075U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

A kind of precast stair regularization construction protecting rack, including protection frame body, operating platform and climbing stair.Protecting frame body includes multiple upright bars and multiple cross bars, multiple upright bars include the first upright bar that top is located at same level height, second upright bar, third upright bar and the 4th upright bar, the bottom end of first upright bar and the 4th upright bar is set to staircase half space, the bottom end of second upright bar and third upright bar is respectively arranged on upper layer stair landing and lower layer's stair landing, multiple cross bars include in horizontally disposed four collar cross bars and four foundation ring cross bars, four collar cross bars are connected to the top of two adjacent upright bars, four foundation ring cross bars are connected at the different height of the bottom end of two adjacent upright bars.Operating platform is set in the accommodation space that protection frame body surrounds, and side is connected in two adjacent upright bars.Climbing stair is set in accommodation space, and one end is connected to one of four collar cross bars, and the other end is connected to one of four foundation ring cross bars.

Description

A kind of precast stair regularization construction protecting rack
Technical field
The utility model relates to architectural engineering construction technique fields, apply in particular to a kind of precast stair regularization Work protective frame.
Background technique
With the rapid development of modern architecture industry and the rapid proliferation of Green Architecture Conception, construction party is to green construction Very high requirement is proposed, specific aspect is implemented to, exactly saves land, saves proposed in " green building assessment standard " It can, save the requirement of material, water-saving and environmental protection and comfortable space.
In building construction process, construction speed is improved frequently with precast stair.Since precast stair lifting must be Bridging piece beam concrete can be lifted after reaching bearing capacity intensity, the time takes around 7 days or so, and staircase periphery is cut Power wall reinforcement installation can be carried out installing after 1 day, and reinforcement installation check and accept well after need at once carry out template installation, mould Plate, which installs consolidation time, to be completed within 3 days, and therefore, layer 2-3 is often delayed in the installation of precast stair, was caused pre- in no lifting In the case where stair processed, the security protection hidden danger of staircase is more, and the operating platform that can not allow worker to stand.
Currently, construction site is generally constructed and protected by the way of setting up steel pipe frame, 1. biographies are suffered from the drawback that The protection method overall stability of system is poor, and safety does not ensure, accident easily occurs, and construction efficiency is not high;2. traditional Operating platform needs every layer to set up primary, is removed again after the completion of use, dismounts very cumbersome, and it is lower to set up efficiency, waste Manpower and financial resources influences construction speed;3. traditional mode of setting up is needed using steel tube fastener, and steel tube fastener can be to prefabricated building Ladder causes more serious damage.
It would therefore be highly desirable to propose a kind of precast stair regularization construction protecting rack, to solve the above problem.
Utility model content
The purpose of this utility model is to provide a kind of precast stair regularization construction protecting racks, can be by protection, construction Three kinds of functions are integrated in one with climbing, and meet that protective frame safety and firmness, worker operating space be big, easy access comfortably requires.
The embodiments of the present invention are achieved in that
The utility model embodiment provides a kind of precast stair regularization construction protecting rack, rides upon double race stair phase up and down Between adjacent two layers of stair landing and staircase half space.The precast stair regularization construction protecting rack includes protection Frame body, operating platform and climbing stair.The protection frame body includes multiple upright bars and multiple cross bars, and the multiple upright bar includes top End is located at the first upright bar, the second upright bar, third upright bar and the 4th upright bar of same level height, first upright bar and described the The bottom end of four upright bars is set to the staircase half space, and the bottom end of second upright bar and the third upright bar is respectively arranged on Layer stair landing and lower layer's stair landing, the multiple cross bar include in horizontally disposed four collar cross bars and four A foundation ring cross bar, four collar cross bars are respectively fixedly connected in the top of two adjacent upright bars, four bottoms Circle cross bar is respectively fixedly connected at the different height of the bottom end of two adjacent upright bars.The operating platform is set to institute It states in the accommodation space that protection frame body surrounds, and side is fixedly connected in two adjacent upright bars.The climbing stair It is set in the accommodation space, and one end is fixedly connected on one of described four collar cross bars, the other end is fixedly connected on institute State one of four foundation ring cross bars.
Optionally, in the utility model preferred embodiment, first upright bar and the 4th upright bar height are equal.
Optionally, in the utility model preferred embodiment, second upright bar, the first upright bar and the third upright bar Height it is incremented by successively.
Optionally, in the utility model preferred embodiment, the edge of the operating platform is equipped with fence.
Optionally, in the utility model preferred embodiment, the operating platform is additionally provided with multiple between short transverse Every the auxiliary cross bar of setting.
Optionally, in the utility model preferred embodiment, the quantity of the auxiliary cross bar is two.
Optionally, in the utility model preferred embodiment, the protection frame body further includes multiple diagonal braces, the multiple One end of diagonal brace is fixedly connected in four upright bars, and the other end is fixedly connected on the bottom surface of the operating platform.
Optionally, in the utility model preferred embodiment, the quantity of the operating platform is four.
Optionally, in the utility model preferred embodiment, four operating platforms be respectively the first operating platform, Second operating platform, third operating platform and the 4th operating platform, first operating platform and second operating platform are set In the middle part of the protection frame body, the third operating platform and the 4th operating platform are set to the top for protecting frame body Portion.
Optionally, in the utility model preferred embodiment, first operating platform and the third operating platform Side be fixedly connected in first upright bar and second upright bar, second operating platform and the 4th operation are flat The side of platform is fixedly connected in the third upright bar and the 4th upright bar.
The beneficial effect of the utility model embodiment includes:
This precast stair regularization construction protecting rack passes through the upright bar that is not completely equivalent using multiple height and multiple in water The cross bar of flat setting, sufficiently combines the environmental quality of construction site, rests in two layers adjacent of stair landing and staircase Set up out between platform one be in rectangular parallelepiped structure protection frame body, and setting operation is flat in the accommodation space that surrounds of protection frame body Platform and climbing stair by protection, are constructed and three kinds of functions of climbing are integrated in one, and it is empty to meet protective frame safety and firmness, worker operation Between big, easy access comfortably require.This precast stair regularization construction protecting rack structure is simple, has and is easy to set up, be convenient for It using, reusable advantage, solves tradition in the prior art and sets up mode and dismount cumbersome, be easy to cause precast stair Badly damaged problem.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment Attached drawing be briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore should not be by Regard the restriction to range as, for those of ordinary skill in the art, without creative efforts, may be used also To obtain other relevant attached drawings according to these attached drawings.
Fig. 1 is the structural schematic diagram of precast stair regularization construction protecting rack provided by the embodiment of the utility model.
Icon: 100- precast stair regularization construction protecting rack;1- protects frame body;11- upright bar;The first upright bar of 111-; The second upright bar of 112-;113- third upright bar;The 4th upright bar of 114-;12- cross bar;121,121A- collar cross bar;122,122A, The foundation ring 122B, 122C, 122D- cross bar;13- diagonal brace;2- operating platform;The first operating platform of 21-;The second operating platform of 22-; 23- third operating platform;The 4th operating platform of 24-;25- fence;26- assists cross bar;3- climbing stair.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Usually here in attached drawing description and The component of the utility model embodiment shown can be arranged and be designed with a variety of different configurations.
Therefore, requirement is not intended to limit to the detailed description of the embodiments of the present invention provided in the accompanying drawings below The scope of the utility model of protection, but it is merely representative of the selected embodiment of the utility model.Based in the utility model Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the range of the utility model protection.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, or The utility model product using when the orientation or positional relationship usually put, be merely for convenience of description the utility model and letter Change description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation construct and Operation, therefore should not be understood as limiting the present invention.In addition, term " first ", " second ", " third " etc. are only used for area Divide description, is not understood to indicate or imply relative importance.
In addition, the terms such as term "horizontal", "vertical" are not offered as requiring component abswolute level or pendency, but can be slightly Low dip.It is not to indicate that the structure has been had to if "horizontal" only refers to that its direction is more horizontal with respect to for "vertical" It is complete horizontal, but can be slightly tilted.
In the description of the present invention, it should also be noted that, unless otherwise clearly defined and limited, term " is set Set ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, Or it is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, intermediary can also be passed through It is indirectly connected, can be being connected inside two elements.For the ordinary skill in the art, it can be managed with concrete condition Solve the concrete meaning of above-mentioned term in the present invention.
Embodiment
Fig. 1 is please referred to, the present embodiment provides a kind of precast stair regularization construction protecting rack 100, rides upon double race stair Between neighbouring two layers of stair landing and staircase half space.Precast stair regularization construction protecting rack 100 wraps Include protection frame body 1, operating platform 2 and climbing stair 3.Precast stair regularization construction protecting rack 100, can be by protection, construction Three kinds of functions are integrated in one with climbing, and meet that protective frame safety and firmness, worker operating space be big, easy access comfortably requires.
It should be noted that double run between two layers neighbouring of stair landing of stair has staircase rest flat Platform, therefore, the height of lower layer's stair landing, staircase half space and upper layer stair landing are incremented by successively, in turn Construction site forms difference in height fixed between half space.Precast stair regularization construction protecting rack 100 is exactly fully Using and combine the environmental quality of construction site, taken between adjacent two layers of stair landing and staircase half space Set out one be in rectangular parallelepiped structure protection frame body 1.
Specifically, protection frame body 1 includes multiple upright bars 11 and multiple cross bars 12, and multiple upright bars 11 include top positioned at same The first upright bar 111, the second upright bar 112, third upright bar 113 and the 4th upright bar 114 of level height, the first upright bar 111 and the 4th The bottom end of upright bar 114 is set to staircase half space, and the bottom end of the second upright bar 112 and third upright bar 113 is respectively arranged on upper floor Terraced half space and lower layer's stair landing, multiple cross bars 12 include in horizontally disposed four collar cross bars 121 and four Foundation ring cross bar 122, four collar cross bars 121 are respectively fixedly connected in the top of two adjacent upright bars 11, four foundation ring cross bars 122 are respectively fixedly connected at the different height of the bottom end of two adjacent upright bars 11.
It should be noted that due to having fixed difference in height between half space, it sets up protection frame body 1 and uses The height of upright bar 11 set on different half spaces differ, 11 height of upright bar set on identical half space is equal.I.e. first is vertical Bar 111 and 114 height of the 4th upright bar are equal, and the height of the first upright bar 111, the second upright bar 112 and third upright bar 113 differs. Specifically, since the second upright bar 112 is set to minimum lower layer's stair landing, the second upright bar 112 is set to intermediate building Half space between ladder, third upright bar 113 are set to highest upper layer half space, therefore, the second upright bar 112, the first upright bar 111 It is incremented by successively with the height of third upright bar 113.The upright bar 11 of the different height used in conjunction with construction site environmental quality designs, Material cost has been saved to a certain extent.
It should also be noted that, in the present embodiment, since the top of each upright bar 11 is located at same level height, and bottom The level height at end is not exactly the same, so the collar cross bar 121 being fixedly connected between two adjacent upright bars 11 is in same Level height, i.e. four collar cross bars 121 can be enclosed a square top beam, between two adjacent upright bars 11 The level height that the foundation ring cross bar 122 being fixedly connected is in is not exactly the same, i.e. four foundation ring cross bars 122 be respectively fixedly connected in It is (please high with specific reference to the level of foundation ring cross bar shown in Fig. 1 122A, 122B, 122C, 122D at the different height of the bottom end of upright bar 11 Degree).It, can be with although the level height of 113 bottom end of third upright bar is highest one in the level height of each 11 bottom end of upright bar Four foundation ring cross bars 122 are fixedly connected in the bottom end of third upright bar 113, but the fixed company at this time in other upright bars 11 The level height for connecing position is higher, entire that frame body 1 is protected to will appear not firm enough the situation in bottom.In conjunction with construction site environment spy Point and use differentiated levels foundation ring cross bar 122 design, strengthen instead protection frame body 1 bottom stability, four Foundation ring cross bar 122 at different levels for protection frame body 1 support is provided, while also solve due to pad concentrate and The problem of strength reduction that may cause.
Operating platform 2 is set in the accommodation space that protection frame body 1 surrounds, and side is fixedly connected on adjacent two and stands On bar 11.
In the present embodiment, the quantity of operating platform 2 is four.Four operating platforms 2 respectively the first operating platform 21, Second operating platform 22, third operating platform 23 and the 4th operating platform 24, the first operating platform 21 and the second operating platform 22 Set on the middle part of protection frame body 1, third operating platform 23 and the 4th operating platform 24 are set to the top for protecting frame body 1, to adapt to The construction demand of differentiated levels.In the present embodiment, it is contemplated that the reason of lower layer's stair landing, the second operating platform 22 level height is slightly below the level height of the first operating platform 21, and the level height of third operating platform 23 is equal to the 4th behaviour Make the level height of platform 24.Certainly, in other embodiments, the quantity of operating platform 2 and specific level height can be with It is adjusted flexibly.
Specifically, the side of the first operating platform 21 and third operating platform 23 is fixedly connected in 111 He of the first upright bar The side of second upright bar 112, the second operating platform 22 and the 4th operating platform 24 is fixedly connected in third upright bar 113 and the 4th Upright bar 114.
In the present embodiment, in order to reinforce the stability of operating platform 2, protection frame body 1 further includes multiple diagonal braces 13, multiple One end of diagonal brace 13 is fixedly connected in four upright bars 11, and the other end is fixedly connected on the bottom surface of operating platform 2.
In the present embodiment, in order to ensure worker operating platform 2 construct when personal safety, the edge of operating platform 2 Equipped with fence 25.Operating platform 2 is additionally provided with two along the spaced auxiliary cross bar 26 of short transverse, to further increase operation The safety of platform 2.
Climbing stair 3 is set in accommodation space, and one end is fixedly connected on one of four collar cross bars 121 (in this reality Apply in example, i.e. collar cross bar 121A shown in Fig. 1), the other end is fixedly connected on one of four foundation ring cross bars 122 (in the present embodiment In, i.e. foundation ring cross bar 122D shown in Fig. 1), to be set at the spatial position reserved among four operating platforms 2.
As described above, upright bar of the precast stair regularization construction protecting rack 100 by being not completely equivalent using multiple height 11 and it is multiple be in horizontally disposed cross bar 12, sufficiently combine the environmental quality of construction site, it is flat in adjacent two layers of stair rest Set up out between platform and staircase half space one be in rectangular parallelepiped structure protection frame body 1, and in the receiving that surrounds of protection frame body 1 Operating platform 2 and climbing stair 3 are set in space, by protection, constructs and three kinds of functions of climbing are integrated in one, meets protective frame peace It consolidates entirely, worker operating space is big, easy access comfortably requires.Precast stair regularization 100 structures of construction protecting rack are simple, Have the advantages that be easy to set up, be easy to use, be reusable, solve tradition in the prior art set up mode dismount it is cumbersome, It is easy to cause precast stair badly damaged problem.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (10)

1. a kind of precast stair regularization construction protecting rack, ride upon two layers neighbouring of stair landing of double race stair and Between staircase half space, which is characterized in that the precast stair regularization construction protecting rack includes:
Protect frame body, including multiple upright bars and multiple cross bars, the multiple upright bar includes that top is located at same level height The bottom end of one upright bar, the second upright bar, third upright bar and the 4th upright bar, first upright bar and the 4th upright bar is set to the building The bottom end of half space between ladder, second upright bar and the third upright bar is respectively arranged on upper layer stair landing and lower floor Terraced half space, the multiple cross bar include in horizontally disposed four collar cross bars and four foundation ring cross bars, four tops Circle cross bar is respectively fixedly connected in the top of two adjacent upright bars, and four foundation ring cross bars are respectively fixedly connected in institute At the different height for stating the bottom end of two adjacent upright bars;
Operating platform is set in the accommodation space that surrounds of protection frame body, and side is fixedly connected on described adjacent two In a upright bar;And
Climbing stair is set in the accommodation space, and one end is fixedly connected on one of described four collar cross bars, the other end It is fixedly connected on one of described four foundation ring cross bars.
2. precast stair regularization construction protecting rack according to claim 1, which is characterized in that first upright bar and institute It is equal to state the 4th upright bar height.
3. precast stair regularization construction protecting rack according to claim 2, which is characterized in that second upright bar, The height of one upright bar and the third upright bar is incremented by successively.
4. precast stair regularization construction protecting rack according to claim 1, which is characterized in that the side of the operating platform Edge is equipped with fence.
5. precast stair regularization construction protecting rack according to claim 4, which is characterized in that the operating platform is also set Have multiple along the spaced auxiliary cross bar of short transverse.
6. precast stair regularization construction protecting rack according to claim 5, which is characterized in that the number of the auxiliary cross bar Amount is two.
7. precast stair regularization construction protecting rack according to claim 1, which is characterized in that the protection frame body also wraps Multiple diagonal braces are included, one end of the multiple diagonal brace is fixedly connected in four upright bars, and the other end is fixedly connected in institute It states on the bottom surface of operating platform.
8. precast stair regularization construction protecting rack according to claim 1, which is characterized in that the number of the operating platform Amount is four.
9. precast stair regularization construction protecting rack according to claim 8, which is characterized in that four operating platforms Respectively the first operating platform, the second operating platform, third operating platform and the 4th operating platform, first operating platform and Second operating platform is set to the middle part of the protection frame body, and the third operating platform and the 4th operating platform are set to The top of the protection frame body.
10. precast stair regularization construction protecting rack according to claim 9, which is characterized in that first operation is flat The side of platform and the third operating platform is fixedly connected in first upright bar and second upright bar, second operation The side of platform and the 4th operating platform is fixedly connected in the third upright bar and the 4th upright bar.
CN201821752033.1U 2018-10-26 2018-10-26 A kind of precast stair regularization construction protecting rack Expired - Fee Related CN208966075U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821752033.1U CN208966075U (en) 2018-10-26 2018-10-26 A kind of precast stair regularization construction protecting rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821752033.1U CN208966075U (en) 2018-10-26 2018-10-26 A kind of precast stair regularization construction protecting rack

Publications (1)

Publication Number Publication Date
CN208966075U true CN208966075U (en) 2019-06-11

Family

ID=66760667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821752033.1U Expired - Fee Related CN208966075U (en) 2018-10-26 2018-10-26 A kind of precast stair regularization construction protecting rack

Country Status (1)

Country Link
CN (1) CN208966075U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138499A (en) * 2018-10-26 2019-01-04 中建五局华东建设有限公司 A kind of precast stair regularization construction protecting rack

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138499A (en) * 2018-10-26 2019-01-04 中建五局华东建设有限公司 A kind of precast stair regularization construction protecting rack

Similar Documents

Publication Publication Date Title
CN101435276B (en) Cabin top steel beam hydraulic hoisting and positioning apparatus of cylinder cabin structure building and construction method thereof
CN203441073U (en) Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN103366844B (en) Nuclear power station upper-part in-reactor component installation method
CN208966075U (en) A kind of precast stair regularization construction protecting rack
CN205775852U (en) A kind of active force conversion support for steel structure support moulding bed top
CN108049666B (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN104131706B (en) The construction method of the two-layer connection structure of vertical reinforcement of concrete frame structure
CN109113306A (en) A kind of modularization elevator shaft and its construction method
CN109138499A (en) A kind of precast stair regularization construction protecting rack
CN204850469U (en) Commercial mansion system that builds
CN201457694U (en) Shipping multifunctional supporting frame used in building berth carrying construction
CN206969947U (en) Stagnant empty formula construction elevator
CN206034271U (en) Novel shelter bridge concrete foundation structure
CN105019657A (en) Building construction system
CN210289068U (en) Elevator shaft lifting platform
CN109505234B (en) Bridge vase pier connecting frame structure and construction method thereof
CN209556320U (en) A kind of steel construction job platform for super high-rise building core tube construction
CN106968432A (en) Super large cantilever balcony structure form bracing system and its construction method
CN207553635U (en) Elevator shaft safety protection device and elevator
CN207988457U (en) It is protected outside skyscraper staggered floor balcony and operating platform sets up structure
CN208201662U (en) High pier bridge pier shaft reinforcing bar binding operation protective frame
CN207568206U (en) A kind of temporary support system for annular building periphery steel construction
CN209080444U (en) Prefabricated components transfer carriage
CN115142428B (en) Advanced construction method for deep foundation pit storage yard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190611