CN109138499A - A kind of precast stair regularization construction protecting rack - Google Patents

A kind of precast stair regularization construction protecting rack Download PDF

Info

Publication number
CN109138499A
CN109138499A CN201811257099.8A CN201811257099A CN109138499A CN 109138499 A CN109138499 A CN 109138499A CN 201811257099 A CN201811257099 A CN 201811257099A CN 109138499 A CN109138499 A CN 109138499A
Authority
CN
China
Prior art keywords
upright bar
operating platform
upright
bars
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811257099.8A
Other languages
Chinese (zh)
Inventor
高健亚
易超
杨小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadong Building Co Ltd of China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
Huadong Building Co Ltd of China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadong Building Co Ltd of China Construction Fifth Engineering Bureau Co Ltd filed Critical Huadong Building Co Ltd of China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201811257099.8A priority Critical patent/CN109138499A/en
Publication of CN109138499A publication Critical patent/CN109138499A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G27/00Temporary arrangements for giving access from one level to another for men or vehicles, e.g. steps, ramps

Abstract

A kind of precast stair regularization construction protecting rack, including protection frame body, operating platform and climbing stair.Protecting frame body includes multiple upright bars and multiple cross bars, multiple upright bars include the first upright bar that top is located at same level height, second upright bar, third upright bar and the 4th upright bar, the bottom end of first upright bar and the 4th upright bar is set to staircase half space, the bottom end of second upright bar and third upright bar is respectively arranged on upper layer stair landing and lower layer's stair landing, multiple cross bars include in horizontally disposed four collar cross bars and four foundation ring cross bars, four collar cross bars are connected to the top of two adjacent upright bars, four foundation ring cross bars are connected at the different height of the bottom end of two adjacent upright bars.Operating platform is set in the accommodation space that protection frame body surrounds, and side is connected in two adjacent upright bars.Climbing stair is set in accommodation space, and one end is connected to one of four collar cross bars, and the other end is connected to one of four foundation ring cross bars.

Description

A kind of precast stair regularization construction protecting rack
Technical field
The present invention relates to architectural engineering construction technique fields, construct in particular to a kind of precast stair regularization anti- Retaining frame.
Background technique
With the rapid development of modern architecture industry and the rapid proliferation of Green Architecture Conception, construction party is to green construction Very high requirement is proposed, specific aspect is implemented to, exactly saves land, saves proposed in " green building assessment standard " It can, save the requirement of material, water-saving and environmental protection and comfortable space.
In building construction process, construction speed is improved frequently with precast stair.Since precast stair lifting must be Bridging piece beam concrete can be lifted after reaching bearing capacity intensity, the time takes around 7 days or so, and staircase periphery is cut Power wall reinforcement installation can be carried out installing after 1 day, and reinforcement installation check and accept well after need at once carry out template installation, mould Plate, which installs consolidation time, to be completed within 3 days, and therefore, layer 2-3 is often delayed in the installation of precast stair, was caused pre- in no lifting In the case where stair processed, the security protection hidden danger of staircase is more, and the operating platform that can not allow worker to stand.
Currently, construction site is generally constructed and protected by the way of setting up steel pipe frame, 1. biographies are suffered from the drawback that The protection method overall stability of system is poor, and safety does not ensure, accident easily occurs, and construction efficiency is not high;2. traditional Operating platform needs every layer to set up primary, is removed again after the completion of use, dismounts very cumbersome, and it is lower to set up efficiency, waste Manpower and financial resources influences construction speed;3. traditional mode of setting up is needed using steel tube fastener, and steel tube fastener can be to prefabricated building Ladder causes more serious damage.
It would therefore be highly desirable to propose a kind of precast stair regularization construction protecting rack, to solve the above problem.
Summary of the invention
The purpose of the present invention is to provide a kind of precast stair regularization construction protecting rack, can by protection, construct and climb It rises three kinds of functions to be integrated in one, meets that protective frame safety and firmness, worker operating space be big, easy access comfortably requires.
The embodiment of the present invention is achieved in that
The embodiment of the present invention provides a kind of precast stair regularization construction protecting rack, and it is neighbouring to ride upon double race stair Between two layers of stair landing and staircase half space.The precast stair regularization construction protecting rack includes protective frame Body, operating platform and climbing stair.The protection frame body includes multiple upright bars and multiple cross bars, and the multiple upright bar includes top Positioned at the first upright bar of same level height, the second upright bar, third upright bar and the 4th upright bar, first upright bar and the described 4th The bottom end of upright bar is set to the staircase half space, and the bottom end of second upright bar and the third upright bar is respectively arranged on upper layer Stair landing and lower layer's stair landing, the multiple cross bar include in horizontally disposed four collar cross bars and four Foundation ring cross bar, four collar cross bars are respectively fixedly connected in the top of two adjacent upright bars, four foundation rings Cross bar is respectively fixedly connected at the different height of the bottom end of two adjacent upright bars.The operating platform is set to described In the accommodation space that protection frame body surrounds, and side is fixedly connected in two adjacent upright bars.The climbing stair is set It is placed in the accommodation space, and one end is fixedly connected on one of described four collar cross bars, the other end is fixedly connected on described One of four foundation ring cross bars.
Optionally, in preferred embodiments of the present invention, first upright bar and the 4th upright bar height are equal.
Optionally, in preferred embodiments of the present invention, second upright bar, the first upright bar and the third upright bar height It spends incremented by successively.
Optionally, in preferred embodiments of the present invention, the edge of the operating platform is equipped with fence.
Optionally, in preferred embodiments of the present invention, the operating platform is additionally provided with multiple to be set along short transverse interval The auxiliary cross bar set.
Optionally, in preferred embodiments of the present invention, the quantity of the auxiliary cross bar is two.
Optionally, in preferred embodiments of the present invention, the protection frame body further includes multiple diagonal braces, the multiple diagonal brace One end be fixedly connected in four upright bars, the other end is fixedly connected on the bottom surface of the operating platform.
Optionally, in preferred embodiments of the present invention, the quantity of the operating platform is four.
Optionally, in preferred embodiments of the present invention, four operating platforms are respectively the first operating platform, second Operating platform, third operating platform and the 4th operating platform, first operating platform and second operating platform are set to institute The middle part of protection frame body is stated, the third operating platform and the 4th operating platform are set to the top of the protection frame body.
Optionally, in preferred embodiments of the present invention, the one of first operating platform and the third operating platform Side is fixedly connected in first upright bar and second upright bar, second operating platform and the 4th operating platform Side is fixedly connected in the third upright bar and the 4th upright bar.
The beneficial effect of the embodiment of the present invention includes:
This precast stair regularization construction protecting rack passes through the upright bar that is not completely equivalent using multiple height and multiple in water The cross bar of flat setting, sufficiently combines the environmental quality of construction site, rests in two layers adjacent of stair landing and staircase Set up out between platform one be in rectangular parallelepiped structure protection frame body, and setting operation is flat in the accommodation space that surrounds of protection frame body Platform and climbing stair by protection, are constructed and three kinds of functions of climbing are integrated in one, and it is empty to meet protective frame safety and firmness, worker operation Between big, easy access comfortably require.This precast stair regularization construction protecting rack structure is simple, has and is easy to set up, be convenient for It using, reusable advantage, solves tradition in the prior art and sets up mode and dismount cumbersome, be easy to cause precast stair Badly damaged problem.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the structural schematic diagram of precast stair regularization construction protecting rack provided in an embodiment of the present invention.
Icon: 100- precast stair regularization construction protecting rack;1- protects frame body;11- upright bar;The first upright bar of 111-; The second upright bar of 112-;113- third upright bar;The 4th upright bar of 114-;12- cross bar;121,121A- collar cross bar;122,122A, The foundation ring 122B, 122C, 122D- cross bar;13- diagonal brace;2- operating platform;The first operating platform of 21-;The second operating platform of 22-; 23- third operating platform;The 4th operating platform of 24-;25- fence;26- assists cross bar;3- climbing stair.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without creative efforts belongs to the model that the present invention protects It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, or be somebody's turn to do Invention product using when the orientation or positional relationship usually put, be merely for convenience of description of the present invention and simplification of the description, without It is that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore not It can be interpreted as limitation of the present invention.In addition, term " first ", " second ", " third " etc. are only used for distinguishing description, and cannot manage Solution is indication or suggestion relative importance.
In addition, the terms such as term "horizontal", "vertical" are not offered as requiring component abswolute level or pendency, but can be slightly Low dip.It is not to indicate that the structure has been had to if "horizontal" only refers to that its direction is more horizontal with respect to for "vertical" It is complete horizontal, but can be slightly tilted.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one Connect to body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be indirect by intermediary It is connected, can be being connected inside two elements.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
Embodiment
Fig. 1 is please referred to, the present embodiment provides a kind of precast stair regularization construction protecting rack 100, rides upon double race stair Between neighbouring two layers of stair landing and staircase half space.Precast stair regularization construction protecting rack 100 wraps Include protection frame body 1, operating platform 2 and climbing stair 3.Precast stair regularization construction protecting rack 100, can be by protection, construction Three kinds of functions are integrated in one with climbing, and meet that protective frame safety and firmness, worker operating space be big, easy access comfortably requires.
It should be noted that double run between two layers neighbouring of stair landing of stair has staircase rest flat Platform, therefore, the height of lower layer's stair landing, staircase half space and upper layer stair landing are incremented by successively, in turn Construction site forms difference in height fixed between half space.Precast stair regularization construction protecting rack 100 is exactly fully Using and combine the environmental quality of construction site, taken between adjacent two layers of stair landing and staircase half space Set out one be in rectangular parallelepiped structure protection frame body 1.
Specifically, protection frame body 1 includes multiple upright bars 11 and multiple cross bars 12, and multiple upright bars 11 include top positioned at same The first upright bar 111, the second upright bar 112, third upright bar 113 and the 4th upright bar 114 of level height, the first upright bar 111 and the 4th The bottom end of upright bar 114 is set to staircase half space, and the bottom end of the second upright bar 112 and third upright bar 113 is respectively arranged on upper floor Terraced half space and lower layer's stair landing, multiple cross bars 12 include in horizontally disposed four collar cross bars 121 and four Foundation ring cross bar 122, four collar cross bars 121 are respectively fixedly connected in the top of two adjacent upright bars 11, four foundation ring cross bars 122 are respectively fixedly connected at the different height of the bottom end of two adjacent upright bars 11.
It should be noted that due to having fixed difference in height between half space, it sets up protection frame body 1 and uses The height of upright bar 11 set on different half spaces differ, 11 height of upright bar set on identical half space is equal.I.e. first is vertical Bar 111 and 114 height of the 4th upright bar are equal, and the height of the first upright bar 111, the second upright bar 112 and third upright bar 113 differs. Specifically, since the second upright bar 112 is set to minimum lower layer's stair landing, the second upright bar 112 is set to intermediate building Half space between ladder, third upright bar 113 are set to highest upper layer half space, therefore, the second upright bar 112, the first upright bar 111 It is incremented by successively with the height of third upright bar 113.The upright bar 11 of the different height used in conjunction with construction site environmental quality designs, Material cost has been saved to a certain extent.
It should also be noted that, in the present embodiment, since the top of each upright bar 11 is located at same level height, and bottom The level height at end is not exactly the same, so the collar cross bar 121 being fixedly connected between two adjacent upright bars 11 is in same Level height, i.e. four collar cross bars 121 can be enclosed a square top beam, between two adjacent upright bars 11 The level height that the foundation ring cross bar 122 being fixedly connected is in is not exactly the same, i.e. four foundation ring cross bars 122 be respectively fixedly connected in It is (please high with specific reference to the level of foundation ring cross bar shown in Fig. 1 122A, 122B, 122C, 122D at the different height of the bottom end of upright bar 11 Degree).It, can be with although the level height of 113 bottom end of third upright bar is highest one in the level height of each 11 bottom end of upright bar Four foundation ring cross bars 122 are fixedly connected in the bottom end of third upright bar 113, but the fixed company at this time in other upright bars 11 The level height for connecing position is higher, entire that frame body 1 is protected to will appear not firm enough the situation in bottom.In conjunction with construction site environment spy Point and use differentiated levels foundation ring cross bar 122 design, strengthen instead protection frame body 1 bottom stability, four Foundation ring cross bar 122 at different levels for protection frame body 1 support is provided, while also solve due to pad concentrate and The problem of strength reduction that may cause.
Operating platform 2 is set in the accommodation space that protection frame body 1 surrounds, and side is fixedly connected on adjacent two and stands On bar 11.
In the present embodiment, the quantity of operating platform 2 is four.Four operating platforms 2 respectively the first operating platform 21, Second operating platform 22, third operating platform 23 and the 4th operating platform 24, the first operating platform 21 and the second operating platform 22 Set on the middle part of protection frame body 1, third operating platform 23 and the 4th operating platform 24 are set to the top for protecting frame body 1, to adapt to The construction demand of differentiated levels.In the present embodiment, it is contemplated that the reason of lower layer's stair landing, the second operating platform 22 level height is slightly below the level height of the first operating platform 21, and the level height of third operating platform 23 is equal to the 4th behaviour Make the level height of platform 24.Certainly, in other embodiments, the quantity of operating platform 2 and specific level height can be with It is adjusted flexibly.
Specifically, the side of the first operating platform 21 and third operating platform 23 is fixedly connected in 111 He of the first upright bar The side of second upright bar 112, the second operating platform 22 and the 4th operating platform 24 is fixedly connected in third upright bar 113 and the 4th Upright bar 114.
In the present embodiment, in order to reinforce the stability of operating platform 2, protection frame body 1 further includes multiple diagonal braces 13, multiple One end of diagonal brace 13 is fixedly connected in four upright bars 11, and the other end is fixedly connected on the bottom surface of operating platform 2.
In the present embodiment, in order to ensure worker operating platform 2 construct when personal safety, the edge of operating platform 2 Equipped with fence 25.Operating platform 2 is additionally provided with two along the spaced auxiliary cross bar 26 of short transverse, to further increase operation The safety of platform 2.
Climbing stair 3 is set in accommodation space, and one end is fixedly connected on one of four collar cross bars 121 (in this reality Apply in example, i.e. collar cross bar 121A shown in Fig. 1), the other end is fixedly connected on one of four foundation ring cross bars 122 (in the present embodiment In, i.e. foundation ring cross bar 122D shown in Fig. 1), to be set at the spatial position reserved among four operating platforms 2.
As described above, upright bar of the precast stair regularization construction protecting rack 100 by being not completely equivalent using multiple height 11 and it is multiple be in horizontally disposed cross bar 12, sufficiently combine the environmental quality of construction site, it is flat in adjacent two layers of stair rest Set up out between platform and staircase half space one be in rectangular parallelepiped structure protection frame body 1, and in the receiving that surrounds of protection frame body 1 Operating platform 2 and climbing stair 3 are set in space, by protection, constructs and three kinds of functions of climbing are integrated in one, meets protective frame peace It consolidates entirely, worker operating space is big, easy access comfortably requires.Precast stair regularization 100 structures of construction protecting rack are simple, Have the advantages that be easy to set up, be easy to use, be reusable, solve tradition in the prior art set up mode dismount it is cumbersome, It is easy to cause precast stair badly damaged problem.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of precast stair regularization construction protecting rack, ride upon two layers neighbouring of stair landing of double race stair and Between staircase half space, which is characterized in that the precast stair regularization construction protecting rack includes:
Protect frame body, including multiple upright bars and multiple cross bars, the multiple upright bar includes that top is located at same level height The bottom end of one upright bar, the second upright bar, third upright bar and the 4th upright bar, first upright bar and the 4th upright bar is set to the building The bottom end of half space between ladder, second upright bar and the third upright bar is respectively arranged on upper layer stair landing and lower floor Terraced half space, the multiple cross bar include in horizontally disposed four collar cross bars and four foundation ring cross bars, four tops Circle cross bar is respectively fixedly connected in the top of two adjacent upright bars, and four foundation ring cross bars are respectively fixedly connected in institute At the different height for stating the bottom end of two adjacent upright bars;
Operating platform is set in the accommodation space that surrounds of protection frame body, and side is fixedly connected on described adjacent two In a upright bar;And
Climbing stair is set in the accommodation space, and one end is fixedly connected on one of described four collar cross bars, the other end It is fixedly connected on one of described four foundation ring cross bars.
2. precast stair regularization construction protecting rack according to claim 1, which is characterized in that first upright bar and institute It is equal to state the 4th upright bar height.
3. precast stair regularization construction protecting rack according to claim 2, which is characterized in that second upright bar, The height of one upright bar and the third upright bar is incremented by successively.
4. precast stair regularization construction protecting rack according to claim 1, which is characterized in that the side of the operating platform Edge is equipped with fence.
5. precast stair regularization construction protecting rack according to claim 4, which is characterized in that the operating platform is also set Have multiple along the spaced auxiliary cross bar of short transverse.
6. precast stair regularization construction protecting rack according to claim 5, which is characterized in that the number of the auxiliary cross bar Amount is two.
7. precast stair regularization construction protecting rack according to claim 1, which is characterized in that the protection frame body also wraps Multiple diagonal braces are included, one end of the multiple diagonal brace is fixedly connected in four upright bars, and the other end is fixedly connected in institute It states on the bottom surface of operating platform.
8. precast stair regularization construction protecting rack according to claim 1, which is characterized in that the number of the operating platform Amount is four.
9. precast stair regularization construction protecting rack according to claim 8, which is characterized in that four operating platforms Respectively the first operating platform, the second operating platform, third operating platform and the 4th operating platform, first operating platform and Second operating platform is set to the middle part of the protection frame body, and the third operating platform and the 4th operating platform are set to The top of the protection frame body.
10. precast stair regularization construction protecting rack according to claim 9, which is characterized in that first operation is flat The side of platform and the third operating platform is fixedly connected in first upright bar and second upright bar, second operation The side of platform and the 4th operating platform is fixedly connected in the third upright bar and the 4th upright bar.
CN201811257099.8A 2018-10-26 2018-10-26 A kind of precast stair regularization construction protecting rack Pending CN109138499A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811257099.8A CN109138499A (en) 2018-10-26 2018-10-26 A kind of precast stair regularization construction protecting rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811257099.8A CN109138499A (en) 2018-10-26 2018-10-26 A kind of precast stair regularization construction protecting rack

Publications (1)

Publication Number Publication Date
CN109138499A true CN109138499A (en) 2019-01-04

Family

ID=64810200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811257099.8A Pending CN109138499A (en) 2018-10-26 2018-10-26 A kind of precast stair regularization construction protecting rack

Country Status (1)

Country Link
CN (1) CN109138499A (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0713942A1 (en) * 1994-11-25 1996-05-29 JAPAN STEELS INTERNATIONAL Inc. Temporary stairway with landing and method for arrangement thereof
KR20070009061A (en) * 2005-07-15 2007-01-18 이앤디몰건축사사무소 주식회사 Simultaneous working type installation method for stair hall equipped prefabricated stair using pc form
US20080017448A1 (en) * 2004-05-27 2008-01-24 Hayes Richard Sr Stairtower and method for erecting the same
EP2692964A2 (en) * 2012-08-01 2014-02-05 Wilhelm Layher Verwaltungs-GmbH Modular stair scaffold tower and stair scaffold module
CN204781872U (en) * 2015-06-11 2015-11-18 中建一局集团第六建筑有限公司 Regularization post reinforcement operation platform
CN205296892U (en) * 2015-11-27 2016-06-08 武汉市汉阳市政建设集团公司 A merogenesis stair and up -downgoing passageway for deep foundation pit construction is current from top to bottom
CN106088636A (en) * 2016-06-08 2016-11-09 中国十七冶集团有限公司 A kind of canalization detachable stair safety protection frame
CN106401210A (en) * 2016-11-21 2017-02-15 成都建筑工程集团总公司 Tool type vertical traffic stair for assembled building elevator shaft
CN206053393U (en) * 2016-09-20 2017-03-29 中铁建设集团有限公司 One kind can have enough to meet the need steel stair operating platform
CN106760451A (en) * 2016-11-21 2017-05-31 成都建筑工程集团总公司 The combination constructing method thereof that the collapsible operation of assembled architecture construction and discharging platform are lifted with tool type stairs
CN206267026U (en) * 2016-11-30 2017-06-20 马卫明 A kind of bridge construction elevating safety ladder
WO2017191391A1 (en) * 2016-05-02 2017-11-09 Entrepose Echafaudages Module for creating a spiral staircase for a building site, assembly comprising at least one such module and staircase for a building site comprising at least one such assembly
CN208966075U (en) * 2018-10-26 2019-06-11 中建五局华东建设有限公司 A kind of precast stair regularization construction protecting rack

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0713942A1 (en) * 1994-11-25 1996-05-29 JAPAN STEELS INTERNATIONAL Inc. Temporary stairway with landing and method for arrangement thereof
US20080017448A1 (en) * 2004-05-27 2008-01-24 Hayes Richard Sr Stairtower and method for erecting the same
KR20070009061A (en) * 2005-07-15 2007-01-18 이앤디몰건축사사무소 주식회사 Simultaneous working type installation method for stair hall equipped prefabricated stair using pc form
EP2692964A2 (en) * 2012-08-01 2014-02-05 Wilhelm Layher Verwaltungs-GmbH Modular stair scaffold tower and stair scaffold module
CN204781872U (en) * 2015-06-11 2015-11-18 中建一局集团第六建筑有限公司 Regularization post reinforcement operation platform
CN205296892U (en) * 2015-11-27 2016-06-08 武汉市汉阳市政建设集团公司 A merogenesis stair and up -downgoing passageway for deep foundation pit construction is current from top to bottom
WO2017191391A1 (en) * 2016-05-02 2017-11-09 Entrepose Echafaudages Module for creating a spiral staircase for a building site, assembly comprising at least one such module and staircase for a building site comprising at least one such assembly
CN106088636A (en) * 2016-06-08 2016-11-09 中国十七冶集团有限公司 A kind of canalization detachable stair safety protection frame
CN206053393U (en) * 2016-09-20 2017-03-29 中铁建设集团有限公司 One kind can have enough to meet the need steel stair operating platform
CN106760451A (en) * 2016-11-21 2017-05-31 成都建筑工程集团总公司 The combination constructing method thereof that the collapsible operation of assembled architecture construction and discharging platform are lifted with tool type stairs
CN106401210A (en) * 2016-11-21 2017-02-15 成都建筑工程集团总公司 Tool type vertical traffic stair for assembled building elevator shaft
CN206267026U (en) * 2016-11-30 2017-06-20 马卫明 A kind of bridge construction elevating safety ladder
CN208966075U (en) * 2018-10-26 2019-06-11 中建五局华东建设有限公司 A kind of precast stair regularization construction protecting rack

Similar Documents

Publication Publication Date Title
CN101435276B (en) Cabin top steel beam hydraulic hoisting and positioning apparatus of cylinder cabin structure building and construction method thereof
CN101328746A (en) Steel structure high altitude mounting method
CN203441073U (en) Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN208966075U (en) A kind of precast stair regularization construction protecting rack
CN108425503A (en) A kind of large-span steel girder mounting slip with promote coupling apparatus and its construction method
CN201665992U (en) Whole lifting platform of large steel net frame
CN107386690A (en) A kind of Combined type safety ladder cage
CN109138499A (en) A kind of precast stair regularization construction protecting rack
US20220010576A1 (en) Valve tower reinforcing structure and reinforcing method
CN104131706A (en) Vertical steel bar two-layer connecting structure of concrete framework structure and construction method of vertical steel bar two-layer connecting structure
CN208884294U (en) A kind of modularization subgrade case and steel plank road platform structure
CN104264781B (en) Latticed cylinder Steel Shell and construction method thereof
CN212478487U (en) Construction platform for building construction
CN205822454U (en) A kind of welding lattice column device
CN201457694U (en) Shipping multifunctional supporting frame used in building berth carrying construction
CN204530492U (en) A kind of hydraulic climbing mould construction platform
CN207568206U (en) A kind of temporary support system for annular building periphery steel construction
CN207553635U (en) Elevator shaft safety protection device and elevator
CN114057089A (en) Combined hoisting method for large air compressor in limited space
CN208201662U (en) High pier bridge pier shaft reinforcing bar binding operation protective frame
CN208347279U (en) A kind of building faces side structural column construction protecting rack
CN206544855U (en) Supporting apparatus for large spatial structure construction elevator wall-attached frame
CN115142428B (en) Advanced construction method for deep foundation pit storage yard
CN105003074A (en) Commercial building construction system and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination