CN208965337U - A kind of Anti-settling device of highway subgrade - Google Patents

A kind of Anti-settling device of highway subgrade Download PDF

Info

Publication number
CN208965337U
CN208965337U CN201821439601.2U CN201821439601U CN208965337U CN 208965337 U CN208965337 U CN 208965337U CN 201821439601 U CN201821439601 U CN 201821439601U CN 208965337 U CN208965337 U CN 208965337U
Authority
CN
China
Prior art keywords
layer
top surface
settling device
fixed
highway subgrade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821439601.2U
Other languages
Chinese (zh)
Inventor
王文学
马建雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communication North Road and Bridge Co Ltd
Original Assignee
China Communication North Road and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Communication North Road and Bridge Co Ltd filed Critical China Communication North Road and Bridge Co Ltd
Priority to CN201821439601.2U priority Critical patent/CN208965337U/en
Application granted granted Critical
Publication of CN208965337U publication Critical patent/CN208965337U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a kind of Anti-settling device of highway subgrade, including ground, support stake is equidistantly fixed at the top of the ground, the support stake top portion is fixed with crossbeam, the cross rail top surface is equipped with reinforced concrete floor, the reinforced concrete floor top surface has poured arcuation reinforcing layer, the arcuation reinforcing layer top surface tiling has dregs layer, the damping performance of support stake can be improved by the first spring stack of setting and second spring column, it prevents by geology, rainfall, when the invasion and destruction of the natures such as weather and vibration or human factor, lose the support due robustness of stake, stability and durability, the integrated carrying load of ground can be increased by the way that arcuation reinforcing layer is arranged, prevent settlement of foundation, bitumen layer is set as arced configuration, facilitate draining, the soil of surrounding can be enclosed by the way that slope protection is arranged, anti- fluid stopping It loses, by the way that kind of a careless brick is arranged on slope protection, green plant, environment purification can be planted.

Description

A kind of Anti-settling device of highway subgrade
Technical field
The utility model relates to a kind of Anti-settling device of highway subgrade, are related to roadbed anti-sedimentation technical field.
Background technique
As the rapid development of sociaty and economy, highway has obtained great development at home, gradually forms and interweaved in length and breadth Network of highways radiate the whole nation, the phenomenon that subgrade settlement is a kind of harm traffic safety common in highway use process, highway by Higher load effect is born in long-time, roadbed integral sinking is caused, road surface is made to be uneven, vehicle is in such road surface uplink When sailing, there are problems that, compared with high safety, application No. is 201721653300.5 utility models to disclose a kind of highway subgrade anti-settling Facility is laid with the material layers of multilayer unlike material and density, so that significantly more efficient protection interior support posts are not inside it Burst, followed by total can the soil inside multiple-protection do not broken up and the concrete layer on top is not made by external force At sinking, but when invasion and destruction of this structure by the natures such as geology, rainfall, weather and vibration or human factor, can lose The due robustness of roadbed, stability and durability are removed, causes roadbed to need regular maintenance and reconstruction, takes time and effort, make At the waste of human resources, the fund expenditure of roadbed maintenance is increased, hinders communications and transportation, therefore, it is necessary to be further improved.
Utility model content
The technical problems to be solved in the utility model overcomes existing defect, provides a kind of Anti-settling device of highway subgrade, It can effectively prevent the generation of settlement of foundation phenomenon, improve travel safety, extend Road Service Life, by the way that the first spring is arranged The damping performance of support stake can be improved in column and second spring column, prevents by the natures such as geology, rainfall, weather and vibration or people For factor invasion and destruction when, lose the due robustness of support stake, stability and durability, can be with by setting limiting slot Support stake double swerve is prevented, its stability is improved, the contact area of support stake and ground can be improved by the way that undersetting is arranged, Settlement of foundation can be effectively prevented, the forced area of support stake and crossbeam can be increased by the way that supporting steel plate is arranged, improve structure Intensity can increase the integrated carrying load of ground by the way that arcuation reinforcing layer is arranged, prevent settlement of foundation, bitumen layer is set as arcuation Structure facilitates draining, can be enclosed to the soil of surrounding by the way that slope protection is arranged, prevent from being lost, by being arranged on slope protection The careless brick of kind, can plant green plant, environment purification can effectively solve the problems in background technique.
In order to solve the above-mentioned technical problem, the utility model provides the following technical solution:
A kind of Anti-settling device of highway subgrade, including ground, the ground top are equidistantly fixed with support stake, the branch Support stake top portion is fixed with crossbeam, and the cross rail top surface is equipped with reinforced concrete floor, table at the top of the reinforced concrete floor Face has poured arcuation reinforcing layer, and the arcuation reinforcing layer top surface tiling has dregs layer, and the dregs layer top surface is equipped with Water barrier, the water barrier top are equipped with geogrids layer, and the geogrids layer top surface is equipped with bitumen layer, the support Stake includes supporting steel plate, and the supporting steel plate bottom is fixed with upper bracket, and the upper bracket bottom has dug limiting slot, described Limiting slot inner cavity top is fixed with the first spring stack, and first spring column bottom is fixedly connected with support column, the support Column bottom is fixed with undersetting, is fixed with second spring column at the top of the undersetting, and the second spring column is socketed in On the outside of support column.
Furthermore, symmetrically fixation has poured Cement guard bar, the Cement guard bar bottom for two sides at the top of the bitumen layer Discharge outlet is equidistantly dug.
Furthermore, the crossbeam two sides are symmetrically arranged with slope protection, and the slope protection top surface is evenly laid out kind of a careless brick.
Furthermore, one side surface of Cement guard bar is fixedly installed with acoustical panel.
Furthermore, the arcuation reinforcing layer is flyash concrete, silica-on-silicon optical waveguides, slag concrete, fiber mix One of which in solidifying soil pours.
Furthermore, the bitumen layer is set as arced configuration, and its radian is 3-5 degree.
The utility model can effectively be prevented the utility model has the advantages that a kind of Anti-settling device of highway subgrade involved in the utility model The only generation of settlement of foundation phenomenon improves travel safety, extends Road Service Life, by the way that the first spring stack and second is arranged The damping performance of support stake can be improved in spring stack, prevents by the natures such as geology, rainfall, weather and vibration or human factor When invasion and destruction, the due robustness of support stake, stability and durability are lost, can prevent from supporting by the way that limiting slot is arranged Stake double swerve, improves its stability, and the contact area of support stake and ground can be improved by the way that undersetting is arranged, can be effective Settlement of foundation is prevented, the forced area of support stake and crossbeam can be increased by the way that supporting steel plate is arranged, structural strength is improved, pass through Arcuation reinforcing layer, which is arranged, can increase the integrated carrying load of ground, prevent settlement of foundation, and bitumen layer is set as arced configuration, convenient Draining can enclose the soil of surrounding by the way that slope protection is arranged, prevent from being lost, can by the way that kind of a careless brick is arranged on slope protection To plant green plant, environment purification.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.
Fig. 1 is a kind of Anti-settling device of highway subgrade structural schematic diagram of the utility model.
Fig. 2 is a kind of support pilework schematic diagram of Anti-settling device of highway subgrade of the utility model.
Fig. 3 is a kind of slope protection side view of Anti-settling device of highway subgrade of the utility model.
Figure label: 1, ground;2, stake is supported;3, crossbeam;4, reinforced concrete floor;5, arcuation reinforcing layer;6, dregs layer; 7, water barrier;8, geogrids layer;9, bitumen layer;10, supporting steel plate;11, upper bracket;12, limiting slot;13, the first spring stack; 14, support column;15, undersetting;16, second spring column;17, Cement guard bar;18, discharge outlet;19, slope protection;20, careless brick is planted;21, Acoustical panel.
Specific embodiment
It is illustrated below in conjunction with preferred embodiment of the attached drawing to the utility model, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
As shown in Figure 1-Figure 3, a kind of Anti-settling device of highway subgrade, including ground 1,1 top of ground are equidistant fixed Equipped with support stake 2, crossbeam 3 is fixed at the top of the support stake 2,3 top surface of crossbeam is equipped with reinforced concrete floor 4, 4 top surface of reinforced concrete floor has poured arcuation reinforcing layer 5, can increase ground 1 by the way that arcuation reinforcing layer 5 is arranged Integrated carrying load prevents ground 1 from settling, and 5 top surface of the arcuation reinforcing layer tiling has dregs layer 6, and the dregs layer 6 pushes up Portion surface is equipped with water barrier 7, can prevent rain penetration from settle roadbed to foundation of road bed bottom by the way that water barrier 7 is arranged With collapsing phenomenon, geogrids layer 8 is equipped at the top of the water barrier 7,8 top surface of geogrids layer is equipped with bitumen layer 9, The support stake 2 includes supporting steel plate 10, and 10 bottom of supporting steel plate is fixed with upper bracket 11,11 bottom of upper bracket Limiting slot 12 is dug, setting limiting slot 12 can prevent support 2 double swerve of stake, improve its stability, the limiting slot 12 Inner cavity top is fixed with the first spring stack 13, and 13 bottom of the first spring stack is fixedly connected with support column 14, the support 14 bottom of column is fixed with undersetting 15, and second spring column 16, and the second spring are fixed at the top of the undersetting 15 Column 16 is socketed in 14 outside of support column, and subtracting for support stake 2 can be improved by the first spring stack 13 of setting and second spring column 16 Shock stability when preventing invasion and the destruction by the natures such as geology, rainfall, weather and vibration or human factor, loses support stake 2 Due robustness, stability and durability.
Symmetrically fixation has poured Cement guard bar 17 for the 9 top two sides of bitumen layer, and 17 bottom of Cement guard bar is equidistantly dug Equipped with discharge outlet 18, facilitate draining, 3 two sides of crossbeam are symmetrically arranged with slope protection 19, and 19 top surface of slope protection is evenly laid out There is kind of a careless brick 20, the soil of surrounding can be enclosed by the way that slope protection 19 is arranged, prevent from being lost, by being arranged on slope protection 19 Kind of careless brick 20, can plant green plant, environment purification, and 17 1 side surface of Cement guard bar is fixedly installed with acoustical panel 21, can be with The noise that vehicle generates is absorbed, the arcuation reinforcing layer 5 is flyash concrete, silica-on-silicon optical waveguides, slag concrete, fiber are mixed One of which in solidifying soil pours, and the bitumen layer 9 is set as arced configuration, and its radian is 3-5 degree, facilitates draining.
Utility model works principle: support stake 2 can be improved by the first spring stack of setting 13 and second spring column 16 Damping performance lose branch when preventing invasion and the destruction by the natures such as geology, rainfall, weather and vibration or human factor The due robustness of stake 2, stability and durability are supportted, support 2 double swerve of stake can be prevented by the way that limiting slot 12 is arranged, improved Its stability can be improved the contact area of support stake 2 and ground 1 by the way that undersetting 15 is arranged, it is heavy that ground 1 can be effectively prevented Drop can increase the forced area of support stake 2 and crossbeam 3 by the way that supporting steel plate 10 is arranged, improve structural strength, be encircleed by setting Shape reinforcing layer 5 can increase the integrated carrying load of ground 1, prevent ground 1 from settling, and bitumen layer 9 is set as arced configuration, facilitates row Water can enclose the soil of surrounding by the way that slope protection 19 is arranged, prevent from being lost, by the way that kind of a careless brick is arranged on slope protection 19 20, green plant, environment purification can be planted.
The above are the preferable embodiment of the utility model, the utility model those skilled in the art can also be to upper It states embodiment to change and modify, therefore, the utility model is not limited to above-mentioned specific embodiment, all abilities Field technique personnel made any conspicuous improvement, replacement or modification on the basis of the utility model belong to practical Novel protection scope.

Claims (6)

1. a kind of Anti-settling device of highway subgrade, including ground (1), it is characterised in that: equidistant fixation is set at the top of the ground (1) Have support stake (2), be fixed with crossbeam (3) at the top of the support stake (2), crossbeam (3) top surface is equipped with reinforced concrete Soil layer (4), reinforced concrete floor (4) top surface have poured arcuation reinforcing layer (5), at the top of the arcuation reinforcing layer (5) Surface tiling has dregs layer (6), and dregs layer (6) top surface is equipped with water barrier (7), is equipped at the top of the water barrier (7) Geogrids layer (8), geogrids layer (8) top surface are equipped with bitumen layer (9), and the support stake (2) includes supporting steel Plate (10), supporting steel plate (10) bottom are fixed with upper bracket (11), and upper bracket (11) bottom has dug limiting slot (12), limiting slot (12) inner cavity top is fixed with the first spring stack (13), and the first spring stack (13) bottom is fixed It is connected with support column (14), support column (14) bottom is fixed with undersetting (15), fixed at the top of the undersetting (15) Equipped with second spring column (16), and the second spring column (16) is socketed on the outside of support column (14).
2. a kind of Anti-settling device of highway subgrade according to claim 1, it is characterised in that: at the top of the bitumen layer (9) Symmetrically fixation has poured Cement guard bar (17) for two sides, and Cement guard bar (17) bottom has equidistantly dug discharge outlet (18).
3. a kind of Anti-settling device of highway subgrade according to claim 1, it is characterised in that: crossbeam (3) two sides pair Claim to be equipped with slope protection (19), slope protection (19) top surface is evenly laid out kind of a careless brick (20).
4. a kind of Anti-settling device of highway subgrade according to claim 2, it is characterised in that: the Cement guard bar (17) one Side surface is fixedly installed with acoustical panel (21).
5. a kind of Anti-settling device of highway subgrade according to claim 1, it is characterised in that: the arcuation reinforcing layer (5) It is poured for the one of which in flyash concrete, silica-on-silicon optical waveguides, slag concrete, fiber concrete.
6. a kind of Anti-settling device of highway subgrade according to claim 1, it is characterised in that: the bitumen layer (9) is set as Arced configuration, and its radian is 3-5 degree.
CN201821439601.2U 2018-09-04 2018-09-04 A kind of Anti-settling device of highway subgrade Active CN208965337U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821439601.2U CN208965337U (en) 2018-09-04 2018-09-04 A kind of Anti-settling device of highway subgrade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821439601.2U CN208965337U (en) 2018-09-04 2018-09-04 A kind of Anti-settling device of highway subgrade

Publications (1)

Publication Number Publication Date
CN208965337U true CN208965337U (en) 2019-06-11

Family

ID=66754440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821439601.2U Active CN208965337U (en) 2018-09-04 2018-09-04 A kind of Anti-settling device of highway subgrade

Country Status (1)

Country Link
CN (1) CN208965337U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350107A (en) * 2020-03-19 2020-06-30 内蒙古自治区交通建设工程质量监督局 Highway subgrade settlement-preventing structure for high and cold frozen soil area
CN111485472A (en) * 2020-04-24 2020-08-04 张颖 Highway pavement construction method based on compression-resistant device
CN112030641A (en) * 2020-09-02 2020-12-04 刘�英 Bridgehead highway subgrade structure
CN112144561A (en) * 2020-09-30 2020-12-29 河北昊锐基础工程有限公司 Foundation anti-settlement structure and construction method
CN112482116A (en) * 2020-11-28 2021-03-12 徐敏旺 Compromise roadbed structure intensity's road bed and prevent subsiding device
CN112962576A (en) * 2021-02-07 2021-06-15 浙江富成建设集团有限公司 Deep foundation treatment method
CN114673040A (en) * 2022-03-18 2022-06-28 中铁二院成都勘察设计研究院有限责任公司 Roadbed supporting structure

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350107A (en) * 2020-03-19 2020-06-30 内蒙古自治区交通建设工程质量监督局 Highway subgrade settlement-preventing structure for high and cold frozen soil area
CN111485472A (en) * 2020-04-24 2020-08-04 张颖 Highway pavement construction method based on compression-resistant device
CN112030641A (en) * 2020-09-02 2020-12-04 刘�英 Bridgehead highway subgrade structure
CN112030641B (en) * 2020-09-02 2021-09-17 刘�英 Bridgehead highway subgrade structure
CN112144561A (en) * 2020-09-30 2020-12-29 河北昊锐基础工程有限公司 Foundation anti-settlement structure and construction method
CN112482116A (en) * 2020-11-28 2021-03-12 徐敏旺 Compromise roadbed structure intensity's road bed and prevent subsiding device
CN112962576A (en) * 2021-02-07 2021-06-15 浙江富成建设集团有限公司 Deep foundation treatment method
CN112962576B (en) * 2021-02-07 2022-04-01 浙江富成建设集团有限公司 Deep foundation treatment method
CN114673040A (en) * 2022-03-18 2022-06-28 中铁二院成都勘察设计研究院有限责任公司 Roadbed supporting structure

Similar Documents

Publication Publication Date Title
CN208965337U (en) A kind of Anti-settling device of highway subgrade
CN209958164U (en) Foam light soil high-fill roadbed widening structure
CN209722631U (en) A kind of Pavement Drainage of Cities structure
CN210766223U (en) Roadbed structure capable of preventing settlement during drainage
CN217579587U (en) Reinforced solidified soil road additionally provided with wear-resistant thin layer and adhesive layer
CN210262555U (en) Light soil road structure
CN211848788U (en) Traffic highway subsides and deals with mechanism
CN210341519U (en) Soft soil roadbed reinforcing device
CN110924251A (en) Road structure with pipe gallery arranged at bottom
CN209759925U (en) Assembled roadbed construction system suitable for deep and thick soft foundation
CN208884292U (en) Soft soil roadbed and normal roadbed intersection anti-settling structure
CN214005282U (en) Waterproof anti-settlement highway subgrade structure
CN110172885A (en) Highway Construction in Desert method
CN213740396U (en) Natural permeable quarrying paving structure for sponge city
CN209924091U (en) Rectangular side ditch structure for reducing roadbed water level and discharging road surface
CN208136650U (en) A kind of highway subgrade safeguard structure
CN206625144U (en) A kind of new drain off floodwaters contains structure
CN112575805A (en) Road structure and construction method
CN219825183U (en) Protection device for wetland soft foundation and roadbed slope
CN206127790U (en) Expressway subgrade reinforced structure
CN218989766U (en) Pavement anti-sedimentation structure
CN213951801U (en) Prevent highway subgrade that subsides
CN220167090U (en) Rainwater drainage system for industrial factory
CN215518200U (en) Soft basic highway section protective structure of highway subgrade
CN217870193U (en) Central anti-collision guardrail structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant