CN208965332U - A kind of dam road from draining tailings reservoir preliminary dam - Google Patents
A kind of dam road from draining tailings reservoir preliminary dam Download PDFInfo
- Publication number
- CN208965332U CN208965332U CN201821696259.4U CN201821696259U CN208965332U CN 208965332 U CN208965332 U CN 208965332U CN 201821696259 U CN201821696259 U CN 201821696259U CN 208965332 U CN208965332 U CN 208965332U
- Authority
- CN
- China
- Prior art keywords
- dam
- riding track
- road
- oblique
- draining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a kind of dam roads from draining tailings reservoir preliminary dam, the oblique riding track for being sequentially connected and being arranged by cutting slope into dam body including N sections, N sections of oblique riding tracks form the oblique riding track of "the" shape, wherein, N is the positive integer not less than 2, the road surface Shuan Po is provided between two neighboring oblique riding track, the road surface Shuan Po is connected to dam abutment gutter.The utility model is novel in design, the setting oblique riding track of "the" shape in slope is inwardly cut on the basis of former dam body cross-sectional outer profile, the local directed complete set dam facing gradient, oblique riding track straightway is drained by road surface longitudinal slope, oblique riding track turning junction sets the road surface Shuan Po and completes draining, both can guarantee the safety and stability of dam body, and had reduced difficulty of construction, it can be reduced volume of earthwork again, cut down expenses.
Description
Technical field
The utility model belongs to road drainage technical field in dam on tailings reservoir preliminary dam, and in particular to a kind of from draining tailing
Dam road in the initial dam of library.
Background technique
Before dam roading has two sides side slope, a dam on tailings reservoir preliminary dam at present, behind dam and its several knots such as comprehensive arrangement
Structure, for mountain valley-type tailings reservoir preliminary dam, because the two sides Ba Qu landform is precipitous, execution conditions are poor, and massif excavation project amount is big, therefore
Dam embankment make rational planning for and the arrangement of upper dam road is to ensure that the key technical problem of dam construction, need from landform
Looks, dam feature, stock ground position, dam embankment, construction period, economy etc. are many-sided to be considered.
When the outside upper dam road in original dam is changed to bank slope road and the oblique riding track of dam slope "the" shape outside dam because of landform limitation
When the mode combined, the dam body form on elongated slope can be used, i.e., the overall gradient is constant, and local segmentation adjusts the dam facing gradient, leads to
Frequently with oblique riding track is built in a manner of pasting slope on the basis of former dam profile line is constant and pumping equipment, this design is arranged
Method the problem is that: one, additionally increase huge earthwork volume, cost improves, and destroys ecological environment, economy is not
Rationally;Two, because caused by project amount increase the construction period extend, construction speed is affected.
Utility model content
It is a kind of from row the technical problem to be solved by the utility model is in view of the deficiency of the prior art, provide
Dam road on water tailings reservoir preliminary dam, it is novel in design reasonable, slope setting is inwardly cut on the basis of former dam body cross-sectional outer profile
The oblique riding track of "the" shape, the local directed complete set dam facing gradient, oblique riding track straightway are drained by road surface longitudinal slope, oblique riding track turning junction
If draining is completed on the road surface Shuan Po, the safety and stability of dam body both can guarantee, and reduced difficulty of construction, and can be reduced volume of earthwork, saved
It about pays wages, convenient for promoting the use of.
In order to solve the above technical problems, the technical solution adopted in the utility model is: 1. is a kind of from draining Tailings Dam initial stage
Dam road on dam, it is characterised in that: the oblique riding track for being sequentially connected and being arranged by cutting slope into dam body including N sections, N sections of oblique riding tracks
Forming the oblique riding track of "the" shape, wherein N is the positive integer not less than 2, is provided with the road surface Shuan Po between two neighboring oblique riding track,
The road surface Shuan Po is connected to dam abutment gutter.
Above-mentioned a kind of dam road from draining tailings reservoir preliminary dam, it is characterised in that: the longitudinal slope of the oblique riding track is average
The gradient is 8%, and the horizontal slope mean inclination of the oblique riding track is 2% and single slope introversion.
It is above-mentioned a kind of from draining dam road on tailings reservoir preliminary dam, it is characterised in that: the gradient on the road surface Shuan Po is
2%~3%.
Above-mentioned a kind of dam road from draining tailings reservoir preliminary dam, it is characterised in that: the width of the oblique riding track is not small
In 5m, and oblique riding track is equipped with protective fence far from the side of dam body.
It is above-mentioned a kind of from draining dam road on tailings reservoir preliminary dam, it is characterised in that: the two neighboring oblique riding track it
Between with 1:1.75 slope surface connection.
A kind of above-mentioned dam road from draining tailings reservoir preliminary dam, it is characterised in that: the most narrow width on the road surface Shuan Po
Degree and length are not less than 12m.
A kind of above-mentioned dam road from draining tailings reservoir preliminary dam, it is characterised in that: the oblique riding track include bottom with
Concrete topping positioned at the bottom upper surface.
Compared with the prior art, the utility model has the following advantages:
1, the utility model inwardly cuts the slope setting oblique riding track of "the" shape, part on the basis of former dam body cross-sectional outer profile
The dam facing gradient is adjusted, rolling coefficient inside raising dam body ensures the safety and stability of dam body, convenient for promoting the use of.
2, the oblique riding track straightway of the utility model is drained by road surface longitudinal slope, does not set gutter, oblique riding track turning junction
If draining is completed on the road surface Shuan Po, a slope completes to drain with oblique riding track road surface longitudinal slope, another slope slope aspect dam abutment gutter, to constitute
The drainage system of entire dam facing, reliable and stable, using effect is good.
3, the utility model is novel in design rationally, and solving current mountain valley-type tailings reservoir preliminary dam because with a varied topography leads to bank
Dam road need to carry out earthwork volume sharp increase caused by a large amount of massif explosions and conventional slope sticking type highway layout on slope, the duration prolongs
The problems such as long, convenient for promoting the use of.
In conclusion the utility model is novel in design rationally, slope is inwardly cut on the basis of former dam body cross-sectional outer profile and is set
The oblique riding track of "the" shape, the local directed complete set dam facing gradient are set, oblique riding track straightway is drained by road surface longitudinal slope, oblique riding track turning connection
Place sets the road surface Shuan Po and completes draining, both can guarantee the safety and stability of dam body, reduces difficulty of construction, and can be reduced volume of earthwork,
It cuts down expenses, convenient for promoting the use of.
Below by drawings and examples, the technical solution of the utility model is described in further detail.
Detailed description of the invention
Fig. 1 is the utility model tailings reservoir preliminary dam dam body sectional view.
Fig. 2 is that the utility model tailings reservoir preliminary dam downstream dam slope cuts slope schematic diagram.
Fig. 3 is the installation relation schematic diagram of the utility model protective fence and oblique riding track.
Fig. 4 is the oblique riding track of the utility model and dam facing discharge structure schematic diagram.
Description of symbols:
1-initial dam dam crest;2-former dam body outer contours;3-dam bodys cut slope outer contour;
4-dam bodys paste slope outer contour;5-oblique riding tracks;6-the road surfaces Shuan Po;
8-dam abutment gutters;9-protective fences.
Specific embodiment
As shown in Figures 1 to 4, the utility model includes the N sections of oblique horses for being sequentially connected and being arranged by cutting slope into dam body
Road 5, N sections of oblique riding tracks 5 form the oblique riding tracks of "the" shape, wherein N is the positive integer not less than 2, between two neighboring oblique riding track 5
It is provided with the road surface Shuan Po 6, the road surface Shuan Po 6 is connected to dam abutment gutter 8.
It should be noted that tailings reservoir preliminary dam guarantees that the width of initial dam dam crest 1 is greater than the width and entirety of oblique riding track 5
The gradient is constant, and the width of preferred initial dam dam crest 1 is 6m, will be original on the basis of former dam body outer contour 2 when practical operation
Patch slope mode change and the oblique riding track of "the" shape is set inwardly to cut the mode on slope also serves as initial dam permanently upper dam road, part is adjusted
It is whole that the gradient of original 1:2.0 is adjusted to the gradient of 1:1.75 from oblique riding track 5 to the dam facing gradient of 1 part of initial dam dam crest,
In Fig. 1 dam body patch slope outer contour 4 be to paste the dam body outer contour that oblique riding track is arranged in a manner of slope and is formed, as height rises,
Oblique riding track width is opposite to narrow, and such mode easily largely increases cubic metre of earth and stone dosage;In Fig. 1 dam body cut slope outer contour 3 be with
It inside cuts slope mode and the dam body outer contour that oblique riding track is formed is set, the dosage that such mode increases the cubic metre of earth and stone far smaller than pastes slope side
The increased cubic metre of earth and stone dosage of formula, effectively cuts down expenses.
In the present embodiment, the longitudinal slope mean inclination of the oblique riding track 5 is 8%, and the horizontal slope mean inclination of the oblique riding track 5 is
2% and single slope introversion.
In the present embodiment, the gradient on the road surface Shuan Po 6 is 2%~3%.
It should be noted that inwardly cutting the slope setting oblique riding track of "the" shape, office on the basis of former dam body cross-sectional outer profile
Portion adjusts the dam facing gradient, and coefficient is rolled inside raising dam body ensures the safety and stability of dam body, and oblique 5 straightway of riding track is vertical by road surface
Slope draining does not set gutter, and the oblique turning of riding track 5 junction sets the road surface Shuan Po 6 and completes draining, and a slope is complete with oblique riding track road surface longitudinal slope
At draining, another slope slope aspect dam abutment gutter 8, to constitute the drainage system of entire dam facing, reliable and stable, using effect is good.
In the present embodiment, the width of the oblique riding track 5 is not less than 5m, and tiltedly riding track 5 be equipped with far from the side of dam body it is anti-
Guardrail 9.
In the present embodiment, with the connection of 1:1.75 slope surface between the two neighboring oblique riding track 5.
In the present embodiment, the most narrow width and length on the road surface Shuan Po 6 are not less than 12m.
It should be noted that the purpose one that the most narrow width and length on the road surface Shuan Po 6 are not less than 12m is easy for largely
Draining, second is that for the ease of the meeting of vehicle on dam, securely and reliably.
In the present embodiment, the oblique riding track 5 includes bottom and the concrete topping positioned at the bottom upper surface.
The utility model is suitable for the situation that mountain valley-type Tailings Dam topography complicated construction is limited, wide with former dam body cross-sectional outer
The slope setting oblique riding track of "the" shape, the local directed complete set dam facing gradient are inwardly cut on the basis of line, oblique riding track straightway passes through road surface longitudinal slope
Draining, oblique riding track turning junction set the road surface Shuan Po and complete draining, not only can guarantee the safety and stability of dam body, but also be avoided that dam is outside upper
Dam road reduces difficulty of construction because of construction problems such as landform reason bring massif explosions, reduces the destruction to ecological environment, and
It is huge to overcome earthwork volume caused by conventional slope sticking type road, the shortcomings that claim for eot, effectively save spending.
The above is only the preferred embodiment of the utility model, not imposes any restrictions to the utility model, all
According to any simple modification to the above embodiments of the utility model technical spirit, change and equivalent structural changes, still
Belong in the protection scope of technical solutions of the utility model.
Claims (7)
1. a kind of dam road from draining tailings reservoir preliminary dam, it is characterised in that: be sequentially connected and including N sections by into dam body
The oblique riding track (5) of slope setting is cut, N sections of oblique riding tracks (5) form the oblique riding track of "the" shape, wherein N is the positive integer not less than 2, phase
It is provided with the road surface Shuan Po (6) between adjacent two oblique riding tracks (5), the road surface Shuan Po (6) are connected to dam abutment gutter (8).
2. a kind of dam road from draining tailings reservoir preliminary dam described in accordance with the claim 1, it is characterised in that: the oblique riding track
(5) longitudinal slope mean inclination is 8%, and the horizontal slope mean inclination of the oblique riding track (5) is 2% and single slope introversion.
3. a kind of dam road from draining tailings reservoir preliminary dam according to claim 2, it is characterised in that: the road Shuan Po
The gradient in face (6) is 2%~3%.
4. a kind of dam road from draining tailings reservoir preliminary dam described in accordance with the claim 1, it is characterised in that: the oblique riding track
(5) width is not less than 5m, and tiltedly the side of the separate dam body of riding track (5) is equipped with protective fence (9).
5. a kind of dam road from draining tailings reservoir preliminary dam described in accordance with the claim 1, it is characterised in that: described adjacent two
With the connection of 1:1.75 slope surface between a oblique riding track (5).
6. a kind of dam road from draining tailings reservoir preliminary dam described in accordance with the claim 1, it is characterised in that: the road Shuan Po
The most narrow width and length in face (6) are not less than 12m.
7. a kind of dam road from draining tailings reservoir preliminary dam described in accordance with the claim 1, it is characterised in that: the oblique riding track
It (5) include bottom and the concrete topping positioned at the bottom upper surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821696259.4U CN208965332U (en) | 2018-10-19 | 2018-10-19 | A kind of dam road from draining tailings reservoir preliminary dam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821696259.4U CN208965332U (en) | 2018-10-19 | 2018-10-19 | A kind of dam road from draining tailings reservoir preliminary dam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208965332U true CN208965332U (en) | 2019-06-11 |
Family
ID=66760087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821696259.4U Active CN208965332U (en) | 2018-10-19 | 2018-10-19 | A kind of dam road from draining tailings reservoir preliminary dam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208965332U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110905511A (en) * | 2019-11-22 | 2020-03-24 | 西北矿冶研究院 | Dry tailing stoping method for valley type tailing pond based on underground water drainage |
-
2018
- 2018-10-19 CN CN201821696259.4U patent/CN208965332U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110905511A (en) * | 2019-11-22 | 2020-03-24 | 西北矿冶研究院 | Dry tailing stoping method for valley type tailing pond based on underground water drainage |
CN110905511B (en) * | 2019-11-22 | 2021-04-20 | 西北矿冶研究院 | Dry tailing stoping method for valley type tailing pond based on underground water drainage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209429048U (en) | One kind being suitable for Mountainous Area in North China karez formula underground and catchments water delivery water storage gallery | |
CN102888849B (en) | A kind of large outdoors colliery refuse dump, loess area micro-slope reconstruction method | |
CN208965332U (en) | A kind of dam road from draining tailings reservoir preliminary dam | |
CN103556672A (en) | Rainwater harvesting and water storage system for field road and construction method thereof | |
CN106869239A (en) | A kind of elevated bridge rain water collecting system for being applied to flat slope | |
CN106337342B (en) | A kind of road cross-sectional configuration for mountain highway | |
CN202202227U (en) | Urban road brick curb and road and flower bed rainwater drainage combined system | |
CN206503213U (en) | Scattered collection mating type waterproof and water drainage system for highway median strip | |
CN105603850B (en) | A kind of urban road both sides sunk type Greenland Irrigation system | |
CN205529776U (en) | Infiltration structure of waterproof road in road surface | |
CN204370554U (en) | A kind of greenbelt is from process formula storm detention tank | |
CN210151515U (en) | Excavation side slope super high road section road surface drainage system | |
CN208733763U (en) | The rain sewage collection system of high-pile beam Wharf Platform | |
CN207699962U (en) | A kind of road engineering roadbed | |
CN203411895U (en) | Drainage facility for highway bridge floor | |
CN2589499Y (en) | Concave water collection pavement | |
CN207919284U (en) | A kind of sponge city, which can ooze, can store water-permeable pavement | |
CN209568328U (en) | A kind of water penetration road foundation | |
CN205399127U (en) | Resistance to compression formula road surface drainage structure | |
CN110205950A (en) | A kind of mountainous area highway culvert structure | |
CN216640129U (en) | Curb with drainage function | |
CN213448796U (en) | L-shaped side-form rainwater grate reinforcing block | |
CN212958755U (en) | Underground tunnel drainage structure | |
CN107313324A (en) | A kind of pin-connected panel pavement and system | |
CN220433544U (en) | Hydraulic structure of revetment engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |