CN208964473U - Elevator - Google Patents
Elevator Download PDFInfo
- Publication number
- CN208964473U CN208964473U CN201821512890.4U CN201821512890U CN208964473U CN 208964473 U CN208964473 U CN 208964473U CN 201821512890 U CN201821512890 U CN 201821512890U CN 208964473 U CN208964473 U CN 208964473U
- Authority
- CN
- China
- Prior art keywords
- fixed
- main body
- wirerope
- body frame
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model relates to technical field of building construction, disclose a kind of elevator, comprising: main body frame, sliding frame, bracket and dynamic fixed pulley group mechanism;Bracket is arranged on sliding frame;Sliding frame is connected in main body frame;Dynamic fixed pulley group mechanism includes: movable pulley, the first fixed pulley, the second fixed pulley, the first wirerope and the second wirerope;Movable pulley is fixed on the bottom of sliding frame;First fixed pulley is fixed on the top of main body frame;First wirerope sequentially passes through the first fixed pulley and movable pulley is fixed on main body frame;Second fixed pulley is fixed on the top of sliding frame, and is serially connected on second wirerope;The both ends of second wirerope are successively connect with the bottom of bracket and main body frame.The elevator can be pre-splicing in ground completion, and power consumption is greatly decreased by dynamic fixed pulley group mechanism, pipeline to be installed is directly promoted to installation position from ground, realizes whole segmented installation, improves construction efficiency while reducing cost.
Description
Technical field
The utility model relates to technical field of building construction, in particular to a kind of elevator.
Background technique
With China's economic development and the requirement of social function, more and more large public buildings and large-scale civil buildings
Investment construction is using, these buildings are people's work and movable important place, such as airport, Waiting Lounge, waits the ship Room, storehouse
The building such as library and workshop.
However, more fire-fighting can be arranged in building since the area of large public building and large-scale civil buildings is larger
Pipeline, and the outer diameter of these fire protection pipelines is generally installed since layer height is higher using conventional construction method in DN150mm or more
Large diameter fire protection pipeline and air hose will affect construction efficiency, or even influence the total quality of building.According to hydraulic lifting
The equipment such as machine carry these pipelines, and maintenance and nonrecurring cost be again higher.Therefore, for this kind of building, high-rise pipe
Material carrying be at this stage urgent need to resolve the problem of.
Utility model content
(1) technical problems to be solved
The utility model provides a kind of elevator, to realize whole segmented installation, improves construction efficiency.
(2) technical solution
To solve the above problems, the utility model provides a kind of elevator, comprising: main body frame, sliding frame, bracket and
Dynamic fixed pulley group mechanism;The bracket is arranged on the sliding frame;The sliding frame is connected in the main body frame;
Wherein, the dynamic fixed pulley group mechanism includes: movable pulley, the first fixed pulley, the second fixed pulley, the first wirerope and the second steel wire
Rope;The movable pulley is fixed on the bottom of the sliding frame;First fixed pulley is fixed on the top of the main body frame;
First wirerope sequentially passes through first fixed pulley and the movable pulley is fixed on the main body frame;Described second
Fixed pulley is fixed on the top of the sliding frame, and is serially connected on second wirerope;The both ends of second wirerope
Successively it is connect with the bottom of the bracket and the main body frame.
Further, the sliding frame is equipped at least one sliding bearing, and the main body frame is equipped with corresponding institute
The groove of sliding bearing is stated, the sliding frame is connected in the main body frame by the sliding bearing and the groove.
Further, the sliding bearing includes: wheel body, bearing and bracket;The wheel body is fixed on the two of the bearing
End;One end of the bracket is connect with the bearing, and the other end of the bracket is connect with the sliding frame.
Further, further includes: fixed bottom plate;The fixed bottom plate is arranged on ground, connect with the main body frame.
Further, one end of the fixed bottom plate and ground face contact is connected with multiple wheels with self-locking device.
Further, one end of the fixed bottom plate and ground face contact is connected with multiple by motor-driven wheel.
Further, the fixed bottom plate is equipped at least one counterweight, for preventing the elevator from tilting.
Further, the bracket includes: first support and second support interconnected;The first support passes through institute
The second steel wire hang is stated, is connected on the sliding frame;Wherein, the second support includes: support rod and web member;It is described
One end of support rod is connected in the first support;The web member is fixed between the support rod and the first support.
Further, the quantity at least two of second fixed pulley, second fixed pulley and second steel wire
The quantity of rope corresponds to each other.
Further, further includes: hoist engine;The hoist engine is arranged on the main body frame, on the hoist engine
Reel is connect with first wirerope.
(3) beneficial effect
The utility model provides a kind of elevator, is different from the prior art, which can be pre-splicing in ground completion,
It is easy to operate, and power consumption can be greatly decreased by the dynamic fixed pulley group mechanism, directly pipeline to be installed is promoted to from ground
Installation position realizes whole segmented installation, effectively increases construction efficiency while reducing cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the elevator provided in the preferred embodiment in the utility model;
Fig. 2 is the structural schematic diagram of the pulley structure provided in the preferred embodiment in the utility model;
Fig. 3 is the sliding bearing provided in the preferred embodiment in the utility model and the structural schematic diagram of groove;
Wherein, 1: main body frame;2: sliding frame;3: bracket;4: dynamic fixed pulley group mechanism;5: hoist engine;6: fixed bottom
Plate;7: wheel;11: groove;21: sliding bearing;31: first support;32: second support;41: movable pulley;42: the first is fixed sliding
Wheel;43: the second fixed pulleys;44: the first wirerope;45: the second wirerope;46: bearing;47: bearing retainer;48: connecting rod;
211: wheel body;212: bearing;213: bracket;321: support rod;322: web member.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer
Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched
The embodiment stated is a part of the embodiment of the utility model, instead of all the embodiments.Based on the reality in the utility model
Apply example, those of ordinary skill in the art's every other embodiment obtained without making creative work, all
Belong to the range of the utility model protection.
The utility model embodiment provides a kind of elevator, as shown in Figure 1, the elevator includes: main body frame 1, sliding
Frame 2, bracket 3 and dynamic fixed pulley group mechanism 4.Bracket 3 is arranged on sliding frame 2, and sliding frame 2 is connected to main body frame 1
It is interior.Wherein, moving fixed pulley group mechanism 4 includes: movable pulley 41, the first fixed pulley 42, the second fixed pulley 43,44 and of the first wirerope
Second wirerope 45.Movable pulley 41 is fixed on the bottom of sliding frame 2;First fixed pulley 42 is fixed on the top of main body frame 1;
First wirerope 44 sequentially passes through the first fixed pulley 42 and movable pulley 41 is fixed on main body frame 1, so that the elevator can lead to
The relative position of the first wirerope of overstretching 44 adjustment sliding frame 2 and main body frame 1.Second fixed pulley 43 is fixed on slider box
The top of frame 2, the second fixed pulley 43 are serially connected on the second wirerope 45, the both ends of the second wirerope 45 successively with bracket 3 and main
The bottom of body frame 1 connects, so that bracket 3 can adjust and sliding frame 2 and main body according to the pulled out condition of the second wirerope 45
Relative position between frame 1.
In the present embodiment, identical pulley structure is can be used in movable pulley 41, the first fixed pulley 42 and the second fixed pulley 43, such as
Shown in Fig. 2, which specifically includes that bearing 46, bearing retainer 47 and connecting rod 48.Wherein, bearing 46 passes through bearing
Fixing piece 47 is fixed, and the both ends of bearing retainer 47 connect bearing 46, and connecting rod 48 is connect with bearing retainer 47, for that will slide
Wheel construction is fixed on main body frame 1 or sliding frame 2.
To enable bracket 3 to be smoothly arranged on sliding frame 2, the quantity at least two of the second fixed pulley 43, and
Since the quantity of the second fixed pulley 43 and the second wirerope 45 corresponds to each other, the quantity of the second wirerope 45 also at least two.
Further, as shown in Figure 1, the elevator further include: hoist engine 5.Hoist engine 5 is arranged on main body frame 1, volume
The reel raised on machine 5 is connect with the first wirerope 44.The elevator is before use, need first to fix the position of the elevator, pine
The first wirerope 44 is opened, bracket 3 is adjusted into lower position, pipeline to be installed or air hose are arranged on bracket 3 using boom.If
Want Pipeline lift to be installed to installation position, tense the first wirerope 44 using hoist engine 5, due to the first wirerope 44 according to
It is secondary to pass through the first fixed pulley 42 and movable pulley 41 and be fixed on main body frame 1, when shrinking the first wirerope 44, the first steel wire
The pulling force effect being subject to is passed through first by main body frame 1 on movable pulley 41, while also by the first fixed pulley 42 by rope 44
The pulling force that wirerope 44 acts on, is connect due to movable pulley 41 with sliding frame 2 at this time, and movable pulley 41 is also applied by sliding frame
Pressure.During shrinking the first wirerope 44, the beginning of sliding frame 2 moves straight up.Movable pulley 41 is by two section first
Wirerope 44 plays, and every section of first wirerope 44 only holds the half of 41 pressure of movable pulley, i.e., only needs one half-power of script
Hoist engine 5 can be such that sliding frame 2 moves straight up.In the motion process of sliding frame 2 straight up, due to the second fixed cunning
The tops that wheel 43 is fixed on sliding frame 2, and the second wirerope 45 passes through the second fixed pulley 43, the both ends of the second wirerope 45
It is successively connect with the bottom of bracket 3 and main body frame 1, the second wirerope 45 is by the second fixed pulley 43 by pulling force effect in bracket
On 3, so that bracket 3 follows the location of second wirerope 45, also starts to move straight up, that is, realize single hoist engine
The adjustment of 5 pairs of multistrand rope positions.Similarly, when if desired putting down pipeline to be installed, the first wirerope 44 can be unclamped, is being unclamped
During first wirerope 44, the beginning of sliding frame 2 moves straight down, and bracket 3 follows position locating for the second wirerope 45
It sets, also starts to move straight down.
The embodiments of the present invention provide a kind of elevator, are different from the prior art, which can be complete on ground
It is easy to operate at pre-splicing, and power consumption can be greatly decreased by the dynamic fixed pulley group mechanism 4, directly by pipeline to be installed from ground
Face is promoted to installation position, realizes whole segmented installation, effectively increases construction efficiency while reducing cost.
Based on the above embodiment, as a preferred embodiment, as shown in figure 3, sliding frame 2 is equipped at least one
Sliding bearing 21, main body frame 1 are equipped with the groove 11 of corresponding sliding bearing 21, and sliding frame 2 passes through sliding bearing 21 and recessed
Slot 11 is connected in main body frame 1.Wherein, sliding bearing 21 includes: wheel body 211, bearing 212 and bracket 213.Wheel body 211 is solid
It is scheduled on the both ends of bearing 212;One end of bracket 213 is connect with bearing 212, and the other end of bracket 213 is connect with sliding frame 2.
The present embodiment slide sliding bearing 21 can on main body frame 1, effectively improved by the sliding bearing 21 equipped with wheel body 211
Construction efficiency.
Based on the above embodiment, as a preferred embodiment, as shown in Figure 1, the elevator further include: fixed bottom plate
6.Fixed bottom plate 6 is arranged on ground, connect with main body frame 1, be used to support main body frame 1 and with main body frame 1 it is direct or
The structure connect in succession, such as sliding frame 2, bracket 3 and dynamic fixed pulley group mechanism 4 etc..In addition, the present embodiment is to make to go up and down function
It is enough to be moved according to job location, can fixed bottom plate 6 with face contact one end connect it is multiple by motor-driven vehicle
Wheel 7.The weight and size of the pipeline to be installed that the quantity of wheel 7 can be gone up and down as needed determines.Preferably, the number of wheel 7
Amount is 4.
Further, the also settable multiple wheels 7 with self-locking device in one end of fixed bottom plate 6 and ground face contact, so that
While the elevator can be moved according to different job locations, moreover it is possible to which fixed point is constructed.In addition, on fixed bottom plate 6
Equipped at least one counterweight, it can suitably increase counterweight according to the pipeline to be installed on bracket 3, for preventing the elevator from inclining
Tiltedly.
Based on the above embodiment, as a preferred embodiment, as shown in Figure 1, bracket 3 includes: interconnected
One bracket 31 and second support 32.First support 31 is hung by the second wirerope 45, is connected on sliding frame 2.Wherein,
Two brackets 32 include: support rod 321 and web member 322.One end of support rod 321 is connected in first support 31.Web member 322 is fixed
It is stated between first support 31 in support rod 321, so that pipeline to be installed can be firmly fixed on elevator by the bracket 3.
It is understood that the application scenarios of elevator provided by the embodiment of the utility model are not limited to carrying pipe, also
Other weights can be delivered and complete vertical transport, it is not limited here.
Finally, it should be noted that above embodiments are only to illustrate the technical solution of the utility model, rather than its limitations;
Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that:
It is still possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is carried out etc.
With replacement;And these are modified or replaceed, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution
The spirit and scope of scheme.
Claims (10)
1. a kind of elevator characterized by comprising
Main body frame, sliding frame, bracket and dynamic fixed pulley group mechanism;
The bracket is arranged on the sliding frame;The sliding frame is connected in the main body frame;
Wherein, the dynamic fixed pulley group mechanism includes: movable pulley, the first fixed pulley, the second fixed pulley, the first wirerope and second
Wirerope;The movable pulley is fixed on the bottom of the sliding frame;First fixed pulley is fixed on the main body frame
Top;First wirerope sequentially passes through first fixed pulley and the movable pulley is fixed on the main body frame;Institute
The top that the second fixed pulley is fixed on the sliding frame is stated, and is serially connected on second wirerope;Second wirerope
Both ends successively connect with the bottom of the bracket and the main body frame.
2. elevator according to claim 1, which is characterized in that the sliding frame is equipped at least one sliding axle
It holds, the main body frame is equipped with the groove of the corresponding sliding bearing, and the sliding frame passes through the sliding bearing and institute
Groove is stated to be connected in the main body frame.
3. elevator according to claim 2, which is characterized in that the sliding bearing includes: wheel body, bearing and bracket;
The wheel body is fixed on the both ends of the bearing;One end of the bracket is connect with the bearing, the other end of the bracket with
The sliding frame connection.
4. elevator according to claim 1, which is characterized in that further include: fixed bottom plate;The fixed bottom plate setting exists
Ground is connect with the main body frame.
5. elevator according to claim 4, which is characterized in that the fixed bottom plate and one end of ground face contact are connected with
Multiple wheels with self-locking device.
6. elevator according to claim 4, which is characterized in that the fixed bottom plate and one end of ground face contact are connected with
It is multiple to pass through motor-driven wheel.
7. elevator according to claim 4, which is characterized in that the fixed bottom plate is equipped at least one counterweight, uses
In preventing the elevator from tilting.
8. elevator according to claim 1, which is characterized in that the bracket include: first support interconnected and
Second support;The first support is connected on the sliding frame by second steel wire hang;Wherein, described
Two brackets include: support rod and web member;One end of the support rod is connected in the first support;The web member is fixed on institute
It states between support rod and the first support.
9. elevator according to claim 1, which is characterized in that the quantity at least two of second fixed pulley, institute
The quantity for stating the second fixed pulley and second wirerope corresponds to each other.
10. elevator according to claim 1, which is characterized in that further include: hoist engine;The hoist engine is arranged in institute
It states on main body frame, the reel on the hoist engine is connect with first wirerope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821512890.4U CN208964473U (en) | 2018-09-14 | 2018-09-14 | Elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821512890.4U CN208964473U (en) | 2018-09-14 | 2018-09-14 | Elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208964473U true CN208964473U (en) | 2019-06-11 |
Family
ID=66755446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821512890.4U Active CN208964473U (en) | 2018-09-14 | 2018-09-14 | Elevator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208964473U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110424543A (en) * | 2019-07-24 | 2019-11-08 | 中冶天工集团有限公司 | A kind of motor driven building module structure and construction method |
CN110497104A (en) * | 2019-09-23 | 2019-11-26 | 山东镭鸣数控激光装备有限公司 | A kind of fully-automatic laser pipe cutting machine automatic charging device |
CN112062031A (en) * | 2020-07-27 | 2020-12-11 | 中建科技集团有限公司 | Auxiliary mounting tool for air pipe |
CN113395790A (en) * | 2021-04-29 | 2021-09-14 | 董子杰 | Steel skeleton type multi-frequency-band mobile communication base station |
CN114592697A (en) * | 2022-03-19 | 2022-06-07 | 马婕妮 | Method for constructing waterless hot spring exercise health-preserving environment |
-
2018
- 2018-09-14 CN CN201821512890.4U patent/CN208964473U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110424543A (en) * | 2019-07-24 | 2019-11-08 | 中冶天工集团有限公司 | A kind of motor driven building module structure and construction method |
CN110497104A (en) * | 2019-09-23 | 2019-11-26 | 山东镭鸣数控激光装备有限公司 | A kind of fully-automatic laser pipe cutting machine automatic charging device |
CN112062031A (en) * | 2020-07-27 | 2020-12-11 | 中建科技集团有限公司 | Auxiliary mounting tool for air pipe |
CN112062031B (en) * | 2020-07-27 | 2023-11-10 | 中建科技集团有限公司 | Auxiliary installation tool for air pipe |
CN113395790A (en) * | 2021-04-29 | 2021-09-14 | 董子杰 | Steel skeleton type multi-frequency-band mobile communication base station |
CN114592697A (en) * | 2022-03-19 | 2022-06-07 | 马婕妮 | Method for constructing waterless hot spring exercise health-preserving environment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208964473U (en) | Elevator | |
CN107458973A (en) | A kind of hanging lifting device of surface structures steel pipe | |
CN203855328U (en) | Novel hoisting machine | |
CN111042540A (en) | Construction method for aerial butt joint of ground suspension cables of super-large-span prestressed pipe truss | |
CN106698208A (en) | Hoisting equipment and hoisting method for external transportation of super high-rise building | |
CN110670879A (en) | High-rise hoisting method for large equipment | |
CN204237493U (en) | A kind of substation equipment maintenance Simple hanger | |
CN118637084A (en) | Rocket booster binding and rocket docking device and method | |
CN203794533U (en) | Light portable mobile lifting equipment | |
CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
CN203128099U (en) | Slipping type pipeline lifting device | |
CN204702437U (en) | A kind of build-up type power pontoon combination mast crane device | |
CN117547751A (en) | Wind-resistant structure and system of personnel safety transfer rescue cabin | |
CN206336964U (en) | A kind of support top formula lifting pipeline apparatus and system | |
CN210480530U (en) | Elevator shaft traction overhead two-to-one suspension ratio construction elevator | |
CN110436335A (en) | A kind of deck unit erection gantry installing mechanism and its application method | |
CN216971814U (en) | Rack roof boarding loading attachment | |
CN116374866A (en) | Building carrier plate hoisting mechanism for steel-structured factory building construction | |
CN206188286U (en) | Sucker type lifting device | |
CN202078661U (en) | High-altitude slow descent device | |
CN110127459B (en) | High-altitude anti-falling device for spraying detection equipment | |
CN206665977U (en) | A kind of derrick crane | |
CN207004055U (en) | A kind of civil engineering pipeline movable stand | |
CN114753657B (en) | Automatic glider and construction method thereof | |
CN110304569A (en) | The movable small-sized platform sound barrier hanging apparatus of one kind and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |