CN208950302U - One kind making floor and the one-time formed erecting device of concrete flanging - Google Patents
One kind making floor and the one-time formed erecting device of concrete flanging Download PDFInfo
- Publication number
- CN208950302U CN208950302U CN201821448493.5U CN201821448493U CN208950302U CN 208950302 U CN208950302 U CN 208950302U CN 201821448493 U CN201821448493 U CN 201821448493U CN 208950302 U CN208950302 U CN 208950302U
- Authority
- CN
- China
- Prior art keywords
- side form
- floor
- outer side
- interior side
- erecting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a kind of architectural furnitures, more particularly to one kind makes floor and the one-time formed erecting device of concrete flanging, including interior side form, outer side mold, support frame, connecting rod and fixed link, the interior side form and outer side mold are all made of channel steel lateral arrangement and surround concentric rectangles structure, it is connected between interior side form and outer side mold by connecting rod, interior side form inner corner trim is reinforced using fixed link, and the erecting device is supported using support frame.The utility model replaces wooden model in the prior art as side form using steel tank, formwork erecting structure is firm, flange position is not easy sideslip, secondly floor and concrete flanging one-time-concreting form, simple process, and construction quality is high, and it can be by adjusting formwork erecting structure, the floor and flange of different height and thickness are poured as needed, and erecting device can also repeat to recycle, and save cost.
Description
Technical field
The utility model relates to a kind of architectural furnitures more particularly to one kind to make floor and concrete flanging one-pass molding
Erecting device.
Background technique
As the exploitation of the commercial house is more more and more universal, the quality of the life that people pursue is also higher and higher, when toilet, kitchen
The case where often seeping water, the ratio for causing people to complain gradually are got higher, and have seriously affected the stabilization of real-estate market.In order to anti-
The case where only seeping water, toilet, kitchen etc. require setting concrete flanging to the flooring that waterproof requires, due to building
Position is easy sideslip after plate and flange are not easy one-pass molding or molding, causes to seep due to there are construction joint when leading to secondary pour
Water, and the traditional wooden model of most of all uses is supported in the prior art, since wooden model is less accurate and resistance in the presence of positioning
The defects of expenditure is lower, higher cost, and intensity is also not big enough, fixed very inconvenient, causes the position of finished product to be easy sideslip, gently then
It is beautiful to influence finished product, it is heavy then influence building and use function.
For example, one kind disclosed " a kind of flange concrete one-pass molding erecting device " in Chinese patent literature, public
Announcement CN202969925U, including interior side form and outer side mold, interior side form and outer side mold are made using common plank sheathing, side form
Upper and lower opening is reinforced with the lumps of wood;It is connected between side form and the lumps of wood with common round iron wire nail;With internal U-shaped hoop between interior side form and outer side mold
It is fixed with external U-shaped frame, internal U-shaped hoop is bent using reinforcing bar scene, and in succession with spot welding and main structure reinforcing bar, frame body is wide
Degree is flange width;External U-shaped frame is welded by two transverse steels and two vertical angle steel, lower, transverse reinforcing bar to angle steel
Bottom lengths are flange height, and the clear spacing of two side legs is flange width+two sides template thickness+two sides lumps of wood width, inside
Outer side mold is set up after being installed;Internal U-shaped hoop guarantees that every side is no less than 2;Entire support for shuttering interior side form reinforcing bar bottom
Support and the support of outer side mold Steel bar rack, guarantee that flange absolute altitude meets design requirement;Door opening reservation device normal wood template construct,
Width is door opening width with flange width, length, is fixed on Steel bar rack.Interior side form and outer side mold described in the patent are all made of
Common plank sheathing field fabrication, since wooden model intensity is lower, it may appear that the position of position inaccurate, finished product is easy asking for sideslip
Topic, and wooden model durability is lower, and reuse consume is larger, so that its increased costs.
Summary of the invention
The utility model is to be not easy one-pass molding or molding using wooden model when conventional concrete flange being overcome to pour
Position is easy the problem of sideslip afterwards, proposes a kind of defect for using regularization formwork system, can solve when wooden model support, makes
Floor and the one-time formed erecting device of concrete flanging.
To achieve the goals above, the utility model uses following technical scheme:
One kind of the utility model makes floor and the one-time formed erecting device of concrete flanging, including interior side form, outside
Mould, support frame, connecting rod and fixed link, the interior side form and outer side mold are all made of the horizontally disposed side for surrounding concentric rectangles of channel steel
Mode structure is connected between interior side form and outer side mold by connecting rod, and interior side form inner corner trim is reinforced using fixed link, the side form structure
It is supported using support frame.
Its working principle is that interior side form and outer side mold are enclosed using steel tank is horizontally disposed according to the height and width of flange
The side form structure of concentric rectangle, the distance between interior side form and outer side mold are equal to the width of flange, then, by interior side form and
Outer side mold is linked together by connecting rod, so that interior side form and outer side mold spacing are fixed, is then adopted at four inner corner trims of interior side form
It is reinforced with fixed link, so that the concentric rectangles structure that interior side form and outer side mold surround further is consolidated, side form structure is then adopted
Be supported with support frame, support frame can carry out the absolute altitude of adjusting side mould bottom surface according to the thickness of floor to be poured, floor with turn over
While the upper surface of floor is abutted with side form bottom surface, and concrete flanging is cast between interior side form and outer side mold, so that building when pouring
Plate and concrete flanging one-pass molding, do not need it is secondary pour, simplify process flow, and since interior side form and outer side mold are adopted
It is set up with steel tank, so that flange position is not easy sideslip, also improves quality, it is ensured that there is no cold seam between flange and floor.And
It is detachably reused after the erecting device use, saves cost.
Preferably, support frame as described above includes supporting rod and screw rod, the supporting rod is set to side form structure by horizontal
On, the equal opposite end outer side mold in both ends protrudes outward, and is connected by bolt between supporting rod and interior side form and outer side mold
It connects, the screw rod is vertical at ground and is fixedly connected with supporting rod by nut, screw rod bottom end and interior side form or outer side mold
Vertical range between bottom is the thickness of floor to be poured, and interior side form and outer side mold bottom are abutted with floor upper bottom surface to be poured, spiral shell
Bar bottom is fixed with the floor aluminum dipping form for being set to soffit to be poured by nut.
It is bolted between supporting rod and interior side form and outer side mold in support frame, so that support frame and inside
Mould and outer side mold link into an integrated entity, since the width of supporting rod is greater than the outside width of erecting device, and it is vertical in support frame
Screw rod set on ground is fixedly connected with supporting rod by nut, and support frame is propped up entire erecting device, and
The absolute altitude of side form bottom surface can arbitrarily be adjusted by the height of screw rod with floor actual (real) thickness to be poured.Screw rod bottom be set to it is to be poured
The floor aluminum dipping form of soffit is fixed by nut so that entire erecting device is fixed with floor aluminum dipping form, pour at this time build floor with
Flange can make floor and flange one-pass molding, and flange position is not easy sideslip, and half of screw is poured in building when due to pouring build floor
It can will be located at the screw rod on concrete in plate, when dismantling erecting device after concrete curing and carry out high temperature cutting.
Preferably, being arranged with sebific duct below the screw rod and supporting rod junction.
Being arranged with sebific duct below screw rod and supporting rod junction can be used for supporting the load on top, so that screw rod and support
Rod piece connection is stronger.
Preferably, the contact-segment of the screw rod and floor to be poured is equipped with seal ring, seal ring is welded on screw rod.
Upper seal ring is welded in the contact-segment of screw rod and floor to be poured, it is ensured that the gap between floor and screw rod to be poured will not
Infiltration leak.
Preferably, the supporting rod is the angle bar that band iron is welded.
Preferably, the interior side form and outer side mold bottom are equipped with and increase aluminum corner brace, it is described to increase aluminum corner brace upper end and interior side form
It is bolted with the bottom end of outer side mold, the bottom for increasing aluminum corner brace is abutted with floor upper bottom surface to be poured.
When flange height is higher, greater than side form height when, aluminum corner brace can be increased in interior side form and the setting of outer side mold bottom, increased
High aluminum corner brace upper end and the bottom end of interior side form and outer side mold are bolted, and bottom is abutted with floor upper bottom surface to be poured, when pouring from
To the effect for increasing concrete flanging height.
Preferably, the connecting rod and fixed link are angle bar, the connecting rod and interior side form and outer side mold upper surface
It is bolted, fixed link is bolted with interior side form upper surface, so that erecting device is more firm.
Therefore, the utility model has the following beneficial effects: (1) replaces wooden model as side form, formwork erecting structure using steel tank
Firm, flange position is not easy sideslip;(2) floor and concrete flanging one-time-concreting form, simple process, and construction quality is high;(3)
By adjusting formwork erecting structure, the floor and flange of different height and thickness can be poured as needed;(4) erecting device can repeat
It recycles, saves cost.
Detailed description of the invention
Fig. 1 is the utility model overlooking structure diagram.
Fig. 2 is the utility model length direction diagrammatic cross-section.
Fig. 3 is a kind of diagrammatic cross-section of the utility model width direction.
Fig. 4 is that width direction diagrammatic cross-section after aluminum corner brace is increased in the utility model setting.
In figure: interior side form 1, outer side mold 2, support frame 3, connecting rod 4, fixed link 5, supporting rod 6, screw rod 7, sebific duct 8, only
Water ring 9, floor 10 to be poured, floor aluminum dipping form 11 increase aluminum corner brace 12.
Specific embodiment
The utility model is further described with specific embodiment with reference to the accompanying drawing.
Embodiment 1: as shown in Figure 1, 2, 3, one kind making floor and the one-time formed erecting device of concrete flanging, including interior
It is horizontally disposed that side form 1, outer side mold 2, support frame 3, connecting rod 4 and fixed link 5, the interior side form 1 and outer side mold 2 are all made of channel steel
The side form structure of concentric rectangles is surrounded, is connected between interior side form 1 and outer side mold 2 by connecting rod 4, interior 1 inner corner trim of side form is using solid
Fixed pole 5 is reinforced, and the connecting rod 4 and fixed link 5 are angle bar, the connecting rod 4 and 2 upper surface spiral shell of interior side form 1 and outer side mold
It tethers and connects, fixed link 5 is bolted with interior 1 upper surface of side form, so that erecting device is more firm.The erecting device uses three
Root support frame 3 supports, and support frame 3 includes supporting rod 6 and screw rod 7, and the supporting rod 6 is set in side form structure as horizontal,
The equal opposite end outer side mold 2 in its both ends protrudes outward, and supporting rod 6 is the angle bar that band iron is welded, with interior side form 1 and outside
It is bolted between side form 2, the screw rod 7 is vertical at ground and is fixedly connected with supporting rod 6 by nut, spiral shell
It is arranged with sebific duct 8 below bar 7 and 6 junction of supporting rod, it is vertical between 7 bottom end of screw rod and 2 bottom of interior side form 1 or outer side mold
Distance is the thickness of floor 10 to be poured, and interior side form 1 and 2 bottom of outer side mold abut with 10 upper bottom surface of floor to be poured, 7 bottom of screw rod and
Floor aluminum dipping form 11 set on 10 bottom surface of floor to be poured is fixed by nut, and the contact-segment of screw rod 7 and floor 10 to be poured is welded with only
Water ring 9.
When in use, according to the height of flange and width, interior side form 1 and outer side mold 2 are surrounded using steel tank lateral arrangement
Concentric rectangles structure, the distance between interior side form 1 and outer side mold 2 are equal to the width of flange, then, by interior side form 1 and outside
Mould 2 is linked together by connecting rod 4, so that interior side form 1 and 2 spacing of outer side mold are fixed, is then adopted at 1 four inner corner trims of interior side form
It is reinforced with fixed link 5, so that the concentric rectangles structure that interior side form 1 and outer side mold 2 surround further is consolidated, entire formwork dress
It sets, is supported using support frame 3, passes through bolt between the supporting rod 6 and interior side form 1 and outer side mold 2 in support frame 3
Connection, so that support frame 3 links into an integrated entity with interior side form 1 and outer side mold 2, since the width of supporting rod 6 is greater than erecting device
Outside width, and the screw rod 7 that ground is vertical in support frame 3 is fixedly connected with supporting rod 6 by nut, so that support
Frame 3 can prop up entire erecting device, and the absolute altitude of side form bottom surface can be random with floor actual (real) thickness by the height of screw rod
It adjusts.7 bottom of screw rod is fixed with the floor aluminum dipping form 11 for being set to 10 bottom surface of floor to be poured by nut so that entire erecting device with
The fixation of floor aluminum dipping form 11, subsequent progress floor and flange pour, and floor 10 to be poured is cast on floor aluminum dipping form 11, when pouring,
The upper surface of floor is abutted with side form bottom surface, and concrete flanging is cast between interior side form 1 and outer side mold 2, so that floor and mixed
Solidifying soil flange one-pass molding, flange position are not easy sideslip, and half of screw 7 is poured in floor when due to pouring floor 10 to be poured
In, the screw rod 7 on concrete can will be located at when dismantling erecting device after concrete curing and carries out high temperature cutting, the formwork dress of disassembly
Set repeatable recycling.
Embodiment 2: difference from example 1 is that: as shown in figure 4, when flange height is higher, greater than the height of side form
When spending, aluminum corner brace 12 can be increased in interior side form 1 and the setting of 2 bottom of outer side mold, increase 12 upper end of aluminum corner brace and interior side form 1 and outer side mold 2
Bottom end be bolted, bottom is abutted with 10 upper bottom surface of floor to be poured, in casting concrete flange, the height of concrete flanging
The height for increasing aluminum corner brace 12 is added for side form height, so that concrete flanging height can increase adjusting according to actual needs.
Claims (7)
1. one kind makes floor and the one-time formed erecting device of concrete flanging, which is characterized in that including interior side form (1), outside
Mould (2), support frame (3), connecting rod (4) and fixed link (5), the interior side form (1) and outer side mold (2) are all made of the horizontal cloth of channel steel
The side form structure for surrounding concentric rectangles is set, is connected between interior side form (1) and outer side mold (2) by connecting rod (4), interior side form (1)
Inner corner trim is reinforced using fixed link (5), and the side form structure is supported using support frame (3).
2. one kind according to claim 1 makes floor and the one-time formed erecting device of concrete flanging, which is characterized in that
Support frame as described above (3) includes supporting rod (6) and screw rod (7), and the supporting rod (6) is horizontal to be set in side form structure, and its
The equal opposite end outer side mold (2) in both ends protrudes outward, and passes through spiral shell between supporting rod (6) and interior side form (1) and outer side mold (2)
Tether and connect, the screw rod (7) is vertical at ground and is fixedly connected with supporting rod (6) by nut, screw rod (7) bottom end with it is interior
Vertical range between side form (1) or outer side mold (2) bottom is the thickness of floor to be poured (10), interior side form (1) and outer side mold (2)
Bottom is abutted with floor to be poured (10) upper bottom surface, screw rod (7) bottom and the floor aluminum dipping form (11) for being set to floor to be poured (10) bottom surface
It is fixed by nut.
3. one kind according to claim 2 makes floor and the one-time formed erecting device of concrete flanging, which is characterized in that
Sebific duct (8) are arranged with below the screw rod (7) and supporting rod (6) junction.
4. one kind according to claim 2 or 3 makes floor and the one-time formed erecting device of concrete flanging, feature exists
In the contact-segment of the screw rod (7) and floor to be poured (10) is equipped with seal ring (9), in seal ring (9) welding and screw rod (7).
5. one kind according to claim 2 makes floor and the one-time formed erecting device of concrete flanging, which is characterized in that
The supporting rod (6) is the angle bar that band iron is welded.
6. one kind according to claim 2 makes floor and the one-time formed erecting device of concrete flanging, which is characterized in that
The interior side form (1) and outer side mold (2) bottom, which are equipped with, increases aluminum corner brace (12), described to increase aluminum corner brace (12) upper end and interior side form (1)
It is bolted with the bottom end of outer side mold (2), the bottom for increasing aluminum corner brace (12) is abutted with floor to be poured (10) upper bottom surface.
7. one kind according to claim 1 makes floor and the one-time formed erecting device of concrete flanging, which is characterized in that
The connecting rod (4) and fixed link (5) are angle bar, the connecting rod (4) and interior side form (1) and outer side mold (2) upper surface spiral shell
It tethers and connects, fixed link (5) is bolted with interior side form (1) upper surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821448493.5U CN208950302U (en) | 2018-09-05 | 2018-09-05 | One kind making floor and the one-time formed erecting device of concrete flanging |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821448493.5U CN208950302U (en) | 2018-09-05 | 2018-09-05 | One kind making floor and the one-time formed erecting device of concrete flanging |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208950302U true CN208950302U (en) | 2019-06-07 |
Family
ID=66737015
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821448493.5U Active CN208950302U (en) | 2018-09-05 | 2018-09-05 | One kind making floor and the one-time formed erecting device of concrete flanging |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208950302U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112412003A (en) * | 2020-10-27 | 2021-02-26 | 中国建筑第四工程局有限公司 | Anti-bank and cast-in-place wall post integration pouring construction template |
CN112411798A (en) * | 2020-12-02 | 2021-02-26 | 贵州建工集团第六建筑工程有限责任公司 | Synchronous construction method for prefabricated guide wall and main structure of toilet |
CN112554547A (en) * | 2020-11-26 | 2021-03-26 | 肇庆创富新材料科技有限公司 | Full concrete bathroom structure outer wall aluminum mould reinforcing system for building |
-
2018
- 2018-09-05 CN CN201821448493.5U patent/CN208950302U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112412003A (en) * | 2020-10-27 | 2021-02-26 | 中国建筑第四工程局有限公司 | Anti-bank and cast-in-place wall post integration pouring construction template |
CN112554547A (en) * | 2020-11-26 | 2021-03-26 | 肇庆创富新材料科技有限公司 | Full concrete bathroom structure outer wall aluminum mould reinforcing system for building |
CN112411798A (en) * | 2020-12-02 | 2021-02-26 | 贵州建工集团第六建筑工程有限责任公司 | Synchronous construction method for prefabricated guide wall and main structure of toilet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208950302U (en) | One kind making floor and the one-time formed erecting device of concrete flanging | |
CN110700567A (en) | Be used for concrete building one-time to pour fashioned aluminium template mounting structure | |
CN106760493A (en) | A kind of subsided rest room fixative composition aluminum dipping form panel assembly and its mold method | |
CN209384656U (en) | A kind of concrete flanging integration formwork for placing | |
CN106854906A (en) | Connection cast-in-situ steel reinforced concrete assembled wall in a kind of double-template assembled | |
CN203939238U (en) | For a flask board of epirelief concrete member formwork device | |
CN109083456A (en) | Assembled mill construction and its method of construction | |
CN104452601B (en) | Bridge floor tapping pipe bush mould and using method | |
CN207140033U (en) | Assembly concrete exterior wall board mold | |
CN113338614B (en) | Adjustable template structure for column caps of beamless floor | |
CN107060173B (en) | Early demoulding construction method in clear-water concrete wafer board structure hole | |
CN207003735U (en) | Connection cast-in-situ steel reinforced concrete assembled wall in a kind of double-template assembled | |
CN113356882B (en) | Large-section tunnel wall bracket and construction method | |
CN204356658U (en) | Bridge floor tapping pipe bush mould | |
CN203939237U (en) | The one-time formed erecting device of waterproof epirelief concrete component | |
CN209990152U (en) | Opening-closing type pouring opening structure | |
CN109025262B (en) | Construction method for one-time pouring forming of concrete flanging | |
CN106639300A (en) | Assembly type inner connecting concrete heat preservation formwork and concrete formwork for building | |
CN209082681U (en) | A kind of prefabricated assembled bay window constructing structure of residential building | |
CN109930712A (en) | The cast-in-place double mesh sheet of one kind exempt from the plaster dedicated framework of partition wall construction and its construction method | |
CN109403516A (en) | A kind of outer wall of basement construction method | |
CN215759142U (en) | Steel form for cup mouth foundation | |
CN219887547U (en) | Structure board area mould that falls convenient to turnover is used | |
CN109025277A (en) | Secondary frame and its pre-buried structure and method | |
CN216516450U (en) | High-strength concrete prefabricated module |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |