CN208933838U - A kind of ladder cage that bridge construction is ascended a height - Google Patents

A kind of ladder cage that bridge construction is ascended a height Download PDF

Info

Publication number
CN208933838U
CN208933838U CN201821514870.0U CN201821514870U CN208933838U CN 208933838 U CN208933838 U CN 208933838U CN 201821514870 U CN201821514870 U CN 201821514870U CN 208933838 U CN208933838 U CN 208933838U
Authority
CN
China
Prior art keywords
unit
ladder cage
steel
ladder
height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821514870.0U
Other languages
Chinese (zh)
Inventor
王阳松
徐建锋
毛利炎
郑子军
缪小鸣
陈可可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Quzhou Communications Construction Group Co Ltd
Original Assignee
Zhejiang Quzhou Communications Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Quzhou Communications Construction Group Co Ltd filed Critical Zhejiang Quzhou Communications Construction Group Co Ltd
Priority to CN201821514870.0U priority Critical patent/CN208933838U/en
Application granted granted Critical
Publication of CN208933838U publication Critical patent/CN208933838U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of ladder cages that bridge construction is ascended a height, and belong to construction equipment field.It is formed by several single-unit ladder cage unit splicings;The main frame of each single-unit ladder cage unit forms cuboid framework by high-strength bolt connection by 12 angle steel;The surrounding of main frame forms closed framework steel mesh surrounding baffle by steel mesh grid;The main frame of each single-unit ladder cage unit is internally provided with inclined ladder;Different single-unit ladder cage unit vertically stackeds is connected and fixed in underlying single-unit ladder cage unit by high-strength bolt between the horizontal corner steel of bottom in the horizontal corner steel at top and the single-unit ladder cage unit being located above;Entrance door opening is offered on the closed framework steel mesh surrounding baffle of the single-unit ladder cage unit of bottom, offers outlet door opening on the closed framework steel mesh surrounding baffle of top one or more single-unit ladder cage unit.The utility model can be installed detachably, the operation of ascending a height suitable for each different parts construction of bridge.

Description

A kind of ladder cage that bridge construction is ascended a height
Technical field
The utility model belongs to construction equipment field, and in particular to a kind of ladder cage that bridge construction is ascended a height.
Background technique
In bridge structure object high altitude operation construction, enters scene for convenience of construction worker's approach construction position and apply Work needs to set up foot hand bracket and ascends a height facility.The ascend a height assembled material of facility use of conventional foot hand bracket is usually steel pipe welding It connects or steel tube fastener connects, there are volume heaviness, stability is poor, component connection is complicated, takes the defects of tearing heavy workload open.
Moreover, for bridge construction, it is often necessary to which, to constructing at different height, existing facility of ascending a height can not Easily adjust construction height.It is therefore desirable to design a set of operation of ascending a height that can be applicable in each different parts construction of bridge Ladder cage.
Summary of the invention
Utility model aims to solve problems of the prior art, and provide a kind of bridge construction and ascend a height use Ladder cage, the operation of ascending a height suitable for bridge each different parts construction.
Specific technical solution used by the utility model is as follows:
A kind of ladder cage that bridge construction is ascended a height, it is formed by several single-unit ladder cage unit splicings;Each single-unit ladder cage The main frame of unit forms cuboid framework by high-strength bolt connection by 12 angle steel, wherein 4 horizontal corner steels form bottom Rectangular frame, other 4 horizontal corner steels composition top rectangular frame, 4 vertical Bolted angle connection bottom rectangular frames with The angle point of top rectangular frame;If the surrounding of main frame is fixed with dry plate steel lattice grid by high-strength bolt, formed closed Frame steel mesh surrounding baffle;The main frame of each single-unit ladder cage unit is internally provided with inclined ladder, and the two sides of inclined ladder are using channel steel as side Crossbeam is respectively arranged on plate, bottom rectangular frame and top rectangular frame, the both ends of the side plate are individually fixed in bottom On the crossbeam in portion and the crossbeam at top, several pedals are welded between the side plate of two sides, inclined ladder faces sky side and is equipped with handrail column Bar;Different single-unit ladder cage unit vertically stackeds, in underlying single-unit ladder cage unit the horizontal corner steel at top with positioned at upper It is connected and fixed between the horizontal corner steel of bottom by high-strength bolt in the single-unit ladder cage unit of side;Upper and lower two single-units ladder cage unit The halfpace of two width inclined ladders of connection is equipped in splicing plane;The closed framework steel mesh surrounding baffle of the single-unit ladder cage unit of bottom On offer entrance door opening, offer outlet portal on the closed framework steel mesh surrounding baffle of top one or more single-unit ladder cage unit Hole.
Preferably, the angle steel is hot rolling equal angle steel.
Preferably, forming entrance by not installing the steel mesh grid on the closed framework steel mesh surrounding baffle Door opening and outlet door opening.
Preferably, the pedal uses checkered steel plate.
Preferably, the hand banisters uses Tu zinc square steel tube.
Preferably, the steel mesh grid surrounds steel mesh frame by angle steel, then steel mesh piece is fixed on steel mesh frame.
Preferably, the halfpace is paved into using deal board.
Preferably, the single-unit ladder cage unit bottom of bottom is fixed in concrete foundation in entire ladder cage.
Preferably, passing through the Reinforced Concrete Pier Column of lateral fixing piece and bridge in the ladder cage at a certain distance On.
Preferably, the lateral fixing piece is fashioned iron or steel pipe.
The utility model in terms of existing technologies, has the advantages that
1) structure is simple: main member skeleton is assemblied to form by fashioned iron, and inclined ladder, handrail, halfpace, outside is arranged inside Closed framework steel mesh surrounding baffle is arranged in surrounding, is connected by high-strength bolt, not only ensure that intensity is reliable, but also can take into account various uses The demand of scene.
2) overall stability is good: every section ladder cage is the absolute construction of a rectangle, and when installation splices section by section from bottom to top, root The joint number of splicing is determined according to podium level.
3) safe and convenient above and below personnel: make crossbeam using 2 channel steels for the inclined ladder above and below personnel, on facing sky side channel steel Handrail is installed, personnel safety is facilitated to walk, guarantees the continuity of inclined ladder between assembled unit by halfpace up and down.
4) easy for assemble or unload: all consolidation services of single-unit ladder cage unit can carry out on ground, reduce labor intensity, Safe operation is comfortable.
5) it is convenient for storage and management: detachably at monolithic piece after ladder cage use, transports, stores small in size, handling are flexible It is convenient, easy-maintaining maintenance.
Detailed description of the invention
Fig. 1 is a kind of overall structure diagram of ladder cage that bridge construction is ascended a height;
Fig. 2 is the side view of single-unit ladder cage unit;
Fig. 3 is the top view of single-unit ladder cage unit;
Fig. 4 is the scheme of installation of steel mesh grid;
Fig. 5 is the scheme of installation of hand banisters and halfpace in ladder cage;
Appended drawing reference in figure: single-unit ladder cage unit I, horizontal corner steel 1, vertical angle steel 2, side plate 3, pedal 4, crossbeam 5, centre Platform 6, steel mesh grid 7, hand banisters 8.
Specific embodiment
The utility model is further elaborated and is illustrated with reference to the accompanying drawings and detailed description.In the utility model The technical characteristic of each embodiment can carry out the corresponding combination under the premise of not conflicting with each other.
As shown in Figure 1, for the ladder cage that the bridge construction in one embodiment of the utility model is ascended a height, by several lists It is assembled to save ladder cage unit I.As shown in Figures 2 and 3, the main frame of each single-unit ladder cage unit I is passed through high-strength by 12 angle steel It is bolted composition cuboid framework, wherein 4 horizontal corner steels 1 form bottom rectangular frames, other 41 group of horizontal corner steel At top rectangular frame, 4 vertical angle steel 2 connect the angle point of bottom rectangular frame and top rectangular frame.In angle point Screw hole is offered on two horizontal corner steels 1 and a vertical angle steel 2 at place, two horizontal corner steels 1 are bolted respectively It is connected on two sides of vertical angle steel 2, stable and firm connection is consequently formed.12 angle steel are all made of 100 × 100 × 8mm Hot rolling equal angle steel, the diameter of high-strength bolt are 16mm, the main frame periphery full-size after assembling be 3.2m × 1.8m × 2.0m (length × width × height).In addition, as shown in figure 4, the surrounding of main frame is fixed with multi-disc steel mesh grid 7 by high-strength bolt, Four side walls of main frame are surrounded, closed framework steel mesh surrounding baffle is formed.Wherein, 3 steel meshes are arranged in the every side of the long side of main frame 2 steel mesh grids 7 are arranged in grid 7, the every side of short side.192 × 80cm steel is made by 40 × 40 × 4mm angle steel in every steel mesh grid 7 Screen frame frame, then 50 × 40 × 4mm steel mesh piece is fixed on steel mesh frame.It is set inside the main frame of each single-unit ladder cage unit I It is equipped with inclined ladder, for using No. 20 as the two sides in the channel above and below construction personnel, inclined ladder, wall thickness 7.6mm channel steel is as side plate 3, one of side plate 3 is close to main frame, and another block of side plate 3 is hanging.Divide on bottom rectangular frame and top rectangular frame Be not provided with base cross members 5 and top cross-bar 5, base cross members 5 and top cross-bar 5 it is parallel with 4 horizontal corner steels 1 of main frame and Keep certain distance.The both ends of two blocks of side plates 3 pass through high-strength bolt respectively and are fixed in base cross members 5 and top cross-bar 5, two sides Side plate 3 between be welded with muti-piece pedal 4 step by step, pedal 4 uses 3mm thickness checkered steel plate.
As shown in figure 5, inclined ladder, which faces sky side, is equipped with hand banisters 8,50 × 30 × 4mm Tu zinc square steel of hand banisters 8 Pipe.Different I vertically stackeds of single-unit ladder cage unit, in underlying single-unit ladder cage unit I horizontal corner steel 1 at top be located at It is connected and fixed between the horizontal corner steel 1 of bottom by high-strength bolt in the single-unit ladder cage unit I of top.Upper and lower two single-unit ladder cages Unit I is equipped with the halfpace 6 of two width inclined ladders of connection in splicing plane, which can be used as half space.Halfpace 6 is whole Body having a size of 175cm × 65cm (long × wide), can be laid between horizontal corner steel 1 and crossbeam 5 using the splicing of 3cm thickness deal board and At every piece of board width 10cm~15cm or so.Offered on the closed framework steel mesh surrounding baffle of the single-unit ladder cage unit I of bottom into Mouthful door opening offers outlet door opening on the closed framework steel mesh surrounding baffle of top one or more single-unit ladder cage unit I, is convenient for people Member's disengaging.Door opening width is the 1/2 of ladder cage width direction, is highly subject to and is embedded in ladder cage main frame.Door opening can be in steel mesh It is opened up on grid 7, but preferred way is directly to save one piece of steel mesh grid 7, to form entrance door opening and outlet door opening.
In order to guarantee the stability of ladder cage, in entire ladder cage, I bottom of single-unit ladder cage unit of bottom need to be fixed on concrete On the basis of.Also, pass through the reinforced concrete knoll of the lateral fixing piece and bridge such as fashioned iron or steel pipe in ladder cage at a certain distance On column.
Above-mentioned ladder cage can process all components in the factory in advance, then spell each component conveying to scene Dress, technical process includes: preparation of construction, material processing and fabricating, base concrete casting, on-site consolidation main frame, inside and outside Component is installed, vertically splices section by section, transverse direction is fixedly connected, pass in and out door opening passageway and protective equipment is installed, inspects for acceptance.
The main construction method of the ladder cage is described below in detail:
1) it preparation of construction: is purchased according to material, specification and the quantity that design drawing requires selection to meet quality.Scene Put storage space in order.Plan the ground base location for placing ladder cage, the processing before constructing to basis.Builder's road is built Personnel's vehicle is facilitated to march into the arena.
2) material processing and fabricating: processing material requested equipment, welds to the higher aperture of part precision requirement Component is processed by specialized factory.The screw hole dimensions of each rod piece connection high-strength bolt are fixed according to the diameter of bolt, are drilled to ellipse Type hole mouth, left and right fine tuning when convenient for high-strength bolt connection.All processing dimensions strictly provide to carry out in accordance with drawing, to guarantee to pacify Fill accurate positioning.
3) concrete foundation is poured: will be carried out at ground before being poured concrete foundation to each ladder cage position bottom Reason, foundation requirement is closely knit, first tamps to loose ground, then place mat 20cm or so rubble pave-load layer on it, then stands Mould is poured 15cm plain concrete flooring base, at least each wide ladder cage 20cm out of concrete foundation surrounding outer width size.Flooring base Surface requirements are smooth, shuttering absolute altitude measured before being poured, casting completion post-tensioning diagonal line repetition measurement, quadrangle does not surpass with central point height difference Cross 3mm.
4) on-site consolidation main frame: the material accessory processed is transported to after scene, main frame assembled first.Respectively will The vertical angle steel 2 of 8 horizontal corner steels 1 and 4 piece connects the main frame to form cuboid with high-strength bolt, and connects shelve simultaneously Between platform 6 and side plate 32 crossbeams 5 up and down.High-strength bolt is tentatively tightened after all connecting, then carries out interior external member Installation.
5) external member is installed in: the progress after the completion of being mounted on main frame of each structural member in inside and outside, first by side plate 3, pedal 4, hand banisters 8, steel mesh grid 7 are installed in place one by one.It is whether symmetrical that its surrounding is measured with angle square again, and is tightened after checking confirmation All bolts form complete single-unit ladder cage unit I (see Fig. 3).
6) vertical splicing section by section: I quantity of single-unit ladder cage unit is determined needed for designing ladder cage according to works height, with 5 tons Truck crane is coupled, and the horizontal corner steel 1 between upper and lower two sections single-unit ladder cage unit I tightens fixation by high-strength bolt.Every peace A section single-unit ladder cage unit I is filled, its verticality is measured, is allowed to vertically laterally be intended to be aligned with next section to be not to misplace.
7) be laterally fixedly connected: generally often installing 2~3 section single-unit ladder cage units I will carry out laterally being fixedly connected, and protect Demonstrate,prove its stability.It is fixed according to live physical condition using distinct methods.Usually with fashioned iron or steel pipe one end and single-unit Ladder cage unit I is fixed, and the other end is anchored on the Reinforced Concrete Pier Column of bridge (see Fig. 4).
8) door opening passageway and protective equipment installation are passed in and out: after whole single-unit ladder cage units I are installed in place, being wanted in import and export It carries out door opening and safety enters and leaves the abutting joint processing of protective equipment.General entrance door opening is mounted on the single-unit ladder cage unit of bottom On I, in side one piece of steel mesh grid 7 is not installed;Exporting door opening need to be depending on construction location, at each construction height It needs to open up a door opening on single-unit ladder cage unit I.The connecting platform between construction location need to be carried out at outlet door opening.
9) it inspects for acceptance: finally carrying out whole examination.It comes into operation after meeting the requirements.Embodiment described above is this A kind of preferable scheme of utility model, so it is not to limit the utility model.Ordinary skill people in relation to technical field Member can also make a variety of changes and modification in the case where not departing from the spirit and scope of the utility model.Therefore all to take The mode of equivalent substitution or equivalent transformation technical solution obtained, all falls in the protection scope of the utility model.

Claims (10)

1. a kind of ladder cage that bridge construction is ascended a height, which is characterized in that assembled by several single-unit ladder cage units (I);Often The main frame of a single-unit ladder cage unit (I) forms cuboid framework by high-strength bolt connection by (12) root angle steel, wherein 4 water Straight angle steel (1) forms bottom rectangular frame, in addition 4 horizontal corner steel (1) composition top rectangular frames, 4 vertical angle steel (2) angle point of bottom rectangular frame and top rectangular frame is connected;If the surrounding of main frame is fixed with by high-strength bolt Dry plate steel mesh grid (7) forms closed framework steel mesh surrounding baffle;The main frame of each single-unit ladder cage unit (I) is internally provided with Inclined ladder, the two sides of inclined ladder as side plate (3), are respectively arranged with using channel steel on bottom rectangular frame and top rectangular frame Crossbeam (5), the both ends of the side plate (3) are individually fixed on the crossbeam (5) of bottom and the crossbeam (5) at top, the side plate of two sides (3) it is welded between several pedals (4), inclined ladder faces sky side and is equipped with hand banisters (8);Different single-unit ladder cage units (I) Vertically stacked, the horizontal corner steel (1) at the middle top of underlying single-unit ladder cage unit (I) and the single-unit ladder cage unit being located above (I) it is connected and fixed between the horizontal corner steel (1) of bottom by high-strength bolt in;Upper and lower two single-unit ladder cages unit (I) is being spliced Plane is equipped with the halfpace (6) of two width inclined ladders of connection;The closed framework steel mesh surrounding baffle of the single-unit ladder cage unit (I) of bottom On offer entrance door opening, offered out on the closed framework steel mesh surrounding baffle of top one or more single-unit ladder cage unit (I) Mouth door opening.
2. the ladder cage that bridge construction as described in claim 1 is ascended a height, which is characterized in that the angle steel is the corners such as hot rolling Steel.
3. the ladder cage that bridge construction as described in claim 1 is ascended a height, which is characterized in that the closed framework steel mesh encloses It blocks, forms entrance door opening and outlet door opening by not installing the steel mesh grid (7).
4. the ladder cage that bridge construction as described in claim 1 is ascended a height, which is characterized in that the pedal (4) uses decorative pattern Steel plate.
5. the ladder cage that bridge construction as described in claim 1 is ascended a height, which is characterized in that the hand banisters (8) uses Tu zinc square steel tube.
6. the ladder cage that bridge construction as described in claim 1 is ascended a height, which is characterized in that the steel mesh grid (7) is by angle Steel surrounds steel mesh frame, then steel mesh piece is fixed on steel mesh frame.
7. the ladder cage that bridge construction as described in claim 1 is ascended a height, which is characterized in that the halfpace (6) uses Deal board is paved into.
8. the ladder cage that bridge construction as described in claim 1 is ascended a height, which is characterized in that in entire ladder cage, the single-unit of bottom Ladder cage unit (I) bottom is fixed in concrete foundation.
9. the ladder cage that bridge construction as described in claim 1 is ascended a height, which is characterized in that every a spacing in the ladder cage From on the Reinforced Concrete Pier Column by lateral fixing piece and bridge.
10. the ladder cage that bridge construction as claimed in claim 9 is ascended a height, which is characterized in that the lateral fixing piece is type Steel or steel pipe.
CN201821514870.0U 2018-09-17 2018-09-17 A kind of ladder cage that bridge construction is ascended a height Active CN208933838U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821514870.0U CN208933838U (en) 2018-09-17 2018-09-17 A kind of ladder cage that bridge construction is ascended a height

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821514870.0U CN208933838U (en) 2018-09-17 2018-09-17 A kind of ladder cage that bridge construction is ascended a height

Publications (1)

Publication Number Publication Date
CN208933838U true CN208933838U (en) 2019-06-04

Family

ID=66721227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821514870.0U Active CN208933838U (en) 2018-09-17 2018-09-17 A kind of ladder cage that bridge construction is ascended a height

Country Status (1)

Country Link
CN (1) CN208933838U (en)

Similar Documents

Publication Publication Date Title
CN106013454B (en) Building and method of construction based on large spatial structure body and free-standing peripheral structure
CN106013455B (en) A kind of manufacture of Prefabricated composite steel reinforcement cage component assembly method, reinforced concrete structure body method of construction
CN101435276B (en) Hydraulic lifting and positioning device for steel beam at top of silo structure and construction method thereof
CN108265885B (en) Construction method of high-large non-orthogonal large-inclination-angle special-shaped concrete inclined column
CN110512719B (en) Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence
US20160076269A1 (en) Concrete deck with lateral force resisting system
CN107882321A (en) Diameter Silo slding form operation engineering method
CN114232805B (en) Construction method of ultrahigh-height large-span steel concrete beam hanging structure
CN107100361B (en) Inner support aluminum dipping form device and its installation method are climbed outside a kind of
CN206052964U (en) Prefabricated composite steel reinforcement cage component and structure
JP3569861B2 (en) Construction method of stairs and staircase, staircase support device, and staircase structure
CN109610834A (en) The high-altitude construction method of Long-span Multi-storey Frame heavy duty concrete structure
CN112663516A (en) Construction method of bridge thin-wall hollow pier column
CN107653900A (en) A kind of preparation method of Prefabricated pipe gallery
CN110259090A (en) A kind of construction method of novel pull-up builder's jack
CN205875520U (en) Precast beam steel reinforcement cage component and reinforced concrete roof beam
CN208933838U (en) A kind of ladder cage that bridge construction is ascended a height
CN110130477B (en) House construction method
EP0048870B1 (en) Apparatus for the construction of prefabricated wall units
US4249870A (en) Climbing framework for erecting concrete forms in the manufacture of straight or curved reinforced concrete walls
CN110821197A (en) Angle-adjustable assembly type horizontal cantilever protection shed and construction method thereof
CN115247498A (en) Fixed bolster of prefabricated wallboard and contain braced system of this support
CN205875402U (en) Building based on big spatial structure body and free -standing outer protective structure
CN206143914U (en) SC fabricated frame bearing structure system
CN110965757A (en) Scaffold applicable to wall with flanging structure and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant