CN208843115U - A kind of steel pipe bundle lifting turnover conveying equipment - Google Patents

A kind of steel pipe bundle lifting turnover conveying equipment Download PDF

Info

Publication number
CN208843115U
CN208843115U CN201821174408.0U CN201821174408U CN208843115U CN 208843115 U CN208843115 U CN 208843115U CN 201821174408 U CN201821174408 U CN 201821174408U CN 208843115 U CN208843115 U CN 208843115U
Authority
CN
China
Prior art keywords
output
chain
lifting
motor
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821174408.0U
Other languages
Chinese (zh)
Inventor
练杰明
罗立新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhida Precision Pipe Manufacturing Co ltd
Original Assignee
GUANGDONG ZHIDA PRECISION TUBE MANUFACTURE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG ZHIDA PRECISION TUBE MANUFACTURE Co Ltd filed Critical GUANGDONG ZHIDA PRECISION TUBE MANUFACTURE Co Ltd
Priority to CN201821174408.0U priority Critical patent/CN208843115U/en
Application granted granted Critical
Publication of CN208843115U publication Critical patent/CN208843115U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of steel pipes to tie lifting turnover conveying equipment comprising input chain bed and output chain bed;Exporting chain bed includes two output chains, output motor and output rack;Output chain is mounted in output rack, and the rotary output of output motor is fixedly installed output connecting rod, and output connecting rod is connect with two output chains respectively, is provided with gap between two output chains;The output end for inputting chain bed is connect with the input terminal of output chain bed, and the conveying direction for inputting chain bed is vertical with the output conveying direction of chain bed.When the utility model bundlees steel pipe bundle by row hoist, have biggish operating space, is tied convenient for rationally slinging steel pipe using row hoist;Steel pipe automatically can be tied defeated be transported to from input chain bed to export on chain bed, it is safer, laborsaving;There are gaps between each input roller, convenient for the gap setting lifting unit between input roller, saving space.

Description

A kind of steel pipe bundle lifting turnover conveying equipment
Technical field
A kind of this practical steel pipe turnover conveying technology field being related to after being packaged, and in particular to steel pipe bundle lifting turnover conveying Equipment.
Background technique
With the development of industry, manufacturing industry is all towards more human-saving, automatic flow, pipelining, reasonable logistics week Turn the trend development of constant pitch cost-saving, improvement effect.In steel pipe's production, the steel pipe packed for entire bundle, in same workshop It is usually all to transport turnover with row hoist, when production task is more in workshop, and many places require row crane operation, it is necessary to The comparison multirow hoist equipment of configuration, but the crane in same workshop be usually all using same track, and laterally Position can only a vehicling operation, so fully rely on row hoist come handling turnover will wait, pause production, influence to give birth to Produce efficiency.How turnover conveying efficiently to be carried out to steel pipe, rationally slinging steel pipe bundle using row hoist is always steel pipe system Make the technical problem that industry is faced.
Utility model content
To solve the above problems, the purpose of this utility model is to provide a kind of steel pipes to tie lifting turnover conveying equipment, lead to When space hoist bundlees steel pipe bundle, have biggish operating space, is tied convenient for rationally slinging steel pipe using row hoist.
A kind of detailed technology scheme that the utility model is taken are as follows: steel pipe bundle lifting turnover conveying equipment comprising input Chain bed and output chain bed;Exporting chain bed includes two output chains, output motor and output rack;Output chain is mounted on It exports in rack, the rotary output of output motor is fixedly installed output connecting rod, and output connecting rod is exported with two respectively Chain connects, and is provided with gap between two output chains;The output end for inputting chain bed is connect with the input terminal of output chain bed, and The conveying direction for inputting chain bed is vertical with the output conveying direction of chain bed.
Preferably, the width that gap is provided between two output chains is one to four meters.
Preferably, input chain bed includes input chassis, hinged input roller and is fixed at defeated with input chassis Enter the input motor in rack, each roller that inputs is connect with input motor.
There are gaps between each input roller, convenient for the gap setting lifting unit between input roller, saving space.
It further, further include the lifting unit that the output end of input chain bed is set, lifting unit includes transition trailing arm, transition Motor, transition chain and lifters, the quantity of transition trailing arm are two or more, it is hinged on transition trailing arm there are two Transition sprocket wheel, transition chain cover in two transition sprocket wheels, and the rotary output of a transition sprocket wheel and transition motor is fixed to be connected It connects;The setting direction of transition trailing arm and the axis parallel of input roller, the fixing end of lifters are fixedly connected with input chassis, The lift side of lifters is fixedly connected one by one with transition trailing arm.
Steel pipe automatically can be tied defeated be transported to from input chain bed to export on chain bed, without manually tying steel pipe from input Chain bed is shifted on output chain bed, safer, laborsaving.
Preferably, lifters include lifting motor, lifting connecting rod and lifting frame;Go up and down in frame it is hinged there are two Two lifting sprockets of lifting sprocket, a lifting frame are cased with elevating chain, a lifting sprocket of each lifting sprocket with liter Drop connecting rod is fixedly connected, and lifting connecting rod is fixedly connected with the rotary output of lifting motor, transition trailing arm and elevating chain It is fixedly connected.
It can guarantee each transition trailing arm synchronously up and down, when thereby may be ensured that steel pipe bundle is transported to output chain bed, The axle center of the steel pipe of steel pipe bundle is vertical with output chain, convenient for being sling steel pipe bundle with row hoist.
It further, further include electric control gear, electric control gear includes PLC controller, inputs motor, lifting motor, output Motor, transition motor are connect with PLC controller electrical property.
To realize the automation of the control to a kind of steel pipe bundle lifting turnover conveying equipment of the utility model.
Preferably, output chain bed further includes output motor, export it is hinged there are two output chain gear in rack, output motor Rotary output is fixedly installed output connecting rod, and output connecting rod is fixed with the output chain gear of two output chains respectively to be connected It connects, output chain bypasses output chain gear respectively.
To guarantee the operation of two output chain syn-chro-steps, it thereby may be ensured that steel pipe is bundled in and export when being moved on chain bed, steel pipe The axle center of the steel pipe of bundle is vertical with output chain, convenient for being sling steel pipe bundle with row hoist.
Compared with prior art, the utility model has the following beneficial effects: 1, by row hoist bundle steel pipe bundle When, have biggish operating space, is tied convenient for rationally slinging steel pipe using row hoist;2, automatically steel pipe can be tied defeated It is transported to and is exported on chain bed from input chain bed, shifted on output chain bed without manually tying steel pipe from input chain bed, relatively safer, It is laborsaving;3, respectively there are gaps between input roller, convenient for the gap setting lifting unit between input roller, saving space.
Detailed description of the invention
Fig. 1 is the stereoscopic schematic diagram of one of the utility model steel pipe bundle lifting turnover conveying equipment.
Fig. 2 is the stereoscopic schematic diagram at another visual angle of one of the utility model steel pipe bundle lifting turnover conveying equipment.
Fig. 3 is the schematic top plan view of one of the utility model steel pipe bundle lifting turnover conveying equipment.It is solid in Fig. 3 Line arrow indicates that the moving direction of the steel pipe bundle of input, thick dashed line arrow indicate the moving direction of the steel pipe bundle of output.
Fig. 4 is the schematic diagram of I-I section of Fig. 3.
Fig. 5 is the wiring diagram of one of the utility model steel pipe bundle lifting turnover conveying equipment.
Fig. 6 is the schematic diagram of electric control gear 4.
Input chain bed 1;Input roller 11;Input motor 12;Input chassis 13;Lifting unit 2;Transition trailing arm 21;Transition chain Item 211;Transition motor 212;Limit bar 213;Transition sprocket wheel 214;Lifters 22;Lifting motor 221;Go up and down connecting rod 222; Elevating chain 223;Lifting sprocket 224;Go up and down frame 225;Export chain bed 3;Export chain 31;Output chain gear 311;Output motor 32;Export connecting rod 321;Export rack 33;Electric control gear 4;PLC controller 41;Lifting motor rotates forward KM0;Lifting motor is anti- Turn KM1;Output motor runs KM2;Input motor operation KM3;Transition motor operation KM4.
Specific embodiment
Below in conjunction with the attached drawing of the utility model, the technical solution of the utility model is illustrated.
A kind of steel pipe bundle lifting turnover conveying equipment of the utility model comprising input chain bed 1 and output chain bed 3. Input chain bed 1 and power conveying device, such as power belt, power idler wheel, power chain etc. for routine.
Exporting chain bed 3 includes two output chains 31, output motor 32 and output rack 33;Output chain 31 is mounted on [for example, output chain bed 3 further includes output motor 32, hinged in output rack 33 there are two output chain gears in output rack 33 311, the rotary output of output motor 32 is fixedly installed output connecting rod 321, and output connecting rod 321 is exported with two respectively The output chain gear 311 of chain 31 is fixedly connected, and output chain 31 bypasses output chain gear 311 respectively, to guarantee two output chains 31 synchronous operations thereby may be ensured that steel pipe is bundled on output chain bed 3 when moving, the axle center of the steel pipe of steel pipe bundle and output chain 31 is vertical, convenient for being sling steel pipe bundle with row hoist], the rotary output of output motor 32 is fixedly installed output connection Bar 321, output connecting rod 321 are connect with two output chains 31 respectively, are provided with gap between two output chains 31.It is logical Often, the width that gap is provided between two output chains 31 is one to four meters.
The output end for inputting chain bed 1 is connect with the input terminal of output chain bed 3, and inputs conveying direction and the output of chain bed 1 The conveying direction of chain bed 3 is vertical.
As preferably embodiment, inputting chain bed 1 includes input chassis 13 and the hinged input roller of input chassis 13 11 and the input motor 12 that is fixed in input chassis 13, it is each input roller 11 connect with input motor 12 [for example, One end of input roller 11 is fixedly installed sprocket wheel, and the rotary output of input motor 12 is fixedly installed sprocket wheel, input roller The sprocket wheel of wheel 11 is connect by chain with the sprocket wheel for inputting motor 12, and chain is not drawn into].Between existing between each input roller 11 Gap, convenient for the gap setting lifting unit 2 between input roller 11, saving space.
As preferably embodiment, a kind of steel pipe bundle lifting turnover conveying equipment of the utility model, further includes setting Input chain bed 1 output end lifting unit 2, lifting unit 2 include transition trailing arm 21, transition motor 212, transition chain 211 with And lifters 22, the quantity of transition trailing arm 21 are two or more, it is hinged on transition trailing arm 21 that there are two transition sprocket wheels 214,211 sets of transition chain in two transition sprocket wheels 214, the rotary output of a transition sprocket wheel 214 and transition motor 212 It is fixedly connected;The axis parallel of the setting direction of transition trailing arm 21 and input roller 11, the fixing end of lifters 22 with input Rack 13 is fixedly connected, and the lift side of lifters 22 is fixedly connected one by one with transition trailing arm 21.Lifters 22 are that can be moved with straight line Dynamic force piece, such as cylinder, hydraulic cylinder etc..Steel pipe automatically can be tied into defeated be transported to from input chain bed 1 and export chain bed 3 On, it is shifted on output chain bed 3 without manually tying steel pipe from input chain bed 1, it is safer, laborsaving.In general, transition trailing arm 21 End is fixedly installed limit bar 213, to limit the movement that steel pipe is bundled in transition trailing arm 21.
As preferably embodiment, lifters 22 include lifting motor 221, lifting connecting rod 222 and lifting frame 225;It goes up and down hingedly there are two lifting sprocket 224 in frame 225, two lifting sprockets 224 of a lifting frame 225 are cased with lifting Chain 223, a lifting sprocket 224 of each lifting sprocket 224 are fixedly connected with lifting connecting rod 222, go up and down connecting rod 222 It is fixedly connected with the rotary output of lifting motor 221, transition trailing arm 21 is fixedly connected with elevating chain 223.It can guarantee each The synchronously up and down of transition trailing arm 21, when thereby may be ensured that steel pipe bundle is transported to output chain bed 3, the steel pipe of steel pipe bundle Axle center is vertical with output chain 31, convenient for being sling steel pipe bundle with row hoist.
Further, a kind of steel pipe bundle lifting turnover conveying equipment of the utility model, further includes electric control gear 4, automatically controlled Device 4 includes PLC controller 41, and input motor 12, lifting motor 221, output motor 32, transition motor 212 are controlled with PLC The connection of 41 electrical property of device;To realize the automation of the control to a kind of steel pipe bundle lifting turnover conveying equipment of the utility model.
The working principle of a kind of steel pipe bundle lifting turnover conveying equipment of the utility model are as follows: in use, steel pipe is tied [attached Figure is not drawn into] [i.e. the axle center of the steel pipe of steel pipe bundle is parallel with the input conveying direction of chain bed 1] is placed vertically in input chain bed 1 On, control [usually realizing control by electric control gear 4] input chain bed 1 starts, and steel pipe bundle is delivered to input chain by input chain bed 1 The output end of bed 1, steel pipe bundle is located at the top of transition trailing arm 21 at this time, and the control rotating forward of lifting motor 221 makes on transition trailing arm 21 It rises, steel pipe bundle is lifted by transition trailing arm 21 up to the concordant or transition with the output top of chain 31 of the top of transition trailing arm 21 The top of trailing arm 21 is higher than output chain 31, and then steel pipe bundle is delivered to by control starting transition motor 212, transition chain 211 It exports on chain 31, then controlling the reversion of lifting motor 221 declines transition trailing arm 21, then controls output motor 32 and runs directly Being delivered to suitable position to steel pipe bundle, [the usually underface of the suspending head of row hoist can usually pass through point operation control Realize the fine tuning for the position tied to steel pipe], steel pipe bundle is sling by row hoist [attached drawing is not drawn into].Process in repetition, It can only several steel pipes bundle be sling by row hoist.
From the above, it is seen that passing through row hoist due to being provided with biggish gap between two output chains 31 When bundling steel pipe bundle, have biggish operating space, is tied convenient for rationally slinging steel pipe using row hoist.
It is to be appreciated that term " center ", " longitudinal direction ", " transverse direction ", "front", "rear", "left", "right", "vertical", " water It is flat ", "top", "bottom", "inner", the instructions such as "outside" orientation or positional relationship be to be based on the orientation or positional relationship shown in the drawings, It is only the present invention and simplified description for ease of description, rather than indicating or imply signified device or element must have specifically Orientation is constructed and is operated for specific orientation, thus should not be understood as the limitation to present invention protection content.
Above specific embodiment is only the preferred embodiment of this creation, all in this wound not to limit this creation Any modification, equivalent substitution, improvement and etc. done within the spirit and principle of work, should be included in this creation protection scope it It is interior.

Claims (7)

1. a kind of steel pipe bundle lifting turnover conveying equipment, it is characterised in that: including input chain bed (1) and output chain bed (3);It is defeated Chain bed (3) includes two output chains (31), output motor (32) and output rack (33) out;Output chain (31) is mounted on It exports on rack (33), the rotary output of output motor (32) is fixedly installed output connecting rod (321), exports connecting rod (321) it is connect respectively with two output chains (31), is provided with gap between two output chains (31);Input chain bed (1) Output end is connect with the input terminal of output chain bed (3), and inputs the conveying direction of chain bed (1) and the conveying side of output chain bed (3) To vertical.
2. a kind of steel pipe bundle lifting turnover conveying equipment as described in claim 1, it is characterised in that: two output chains (31) Between be provided with gap width be one to four meters.
3. a kind of steel pipe bundle lifting turnover conveying equipment as described in claim 1, it is characterised in that: inputting chain bed (1) includes It input chassis (13), the input roller (11) hinged with input chassis (13) and is fixed at defeated on input chassis (13) Enter motor (12), respectively inputs roller (11) and connect with input motor (12).
4. a kind of steel pipe bundle lifting turnover conveying equipment as claimed in claim 3, it is characterised in that: further include that setting is inputting The lifting unit (2) of the output end of chain bed (1), lifting unit (2) include transition trailing arm (21), transition motor (212), transition chain (211) and lifters (22), the quantity of transition trailing arm (21) is two or more, and transition trailing arm is hinged on (21) Two transition sprocket wheels (214), transition chain (211) cover on two transition sprocket wheels (214), a transition sprocket wheel (214) and mistake The rotary output for crossing motor (212) is fixedly connected;The setting direction of transition trailing arm (21) and the axle center of input roller (11) are flat Row, the fixing end of lifters (22) are fixedly connected with input chassis (13), the lift side and transition trailing arm of lifters (22) (21) it is fixedly connected one by one.
5. a kind of steel pipe bundle lifting turnover conveying equipment as claimed in claim 4, it is characterised in that: lifters (22) include rising Motor (221), lifting connecting rod (222) and lifting frame (225) are dropped;It is hinged in lifting frame (225) that there are two lifting sprockets (224), two lifting sprockets (224) of lifting frame (225) are cased with elevating chain (223), and the one of each lifting sprocket (224) A lifting sprocket (224) is fixedly connected with lifting connecting rod (222), goes up and down the rotation of connecting rod (222) and lifting motor (221) It transfers outlet to be fixedly connected, transition trailing arm (21) is fixedly connected with elevating chain (223).
6. a kind of steel pipe bundle lifting turnover conveying equipment as claimed in claim 5, it is characterised in that: further include electric control gear (4), electric control gear (4) includes PLC controller (41), inputs motor (12), lifting motor (221), output motor (32), transition Motor (212) is connect with PLC controller (41) electrical property.
7. a kind of steel pipe bundle lifting turnover conveying equipment as described in claim 1-6 is any, it is characterised in that: output chain bed It (3) further include output motor (32), hinged in output rack (33) there are two output chain gear (311), the rotations of output motor (32) It transfers outlet and is fixedly installed output connecting rod (321), export connecting rod (321) output with two output chains (31) respectively Sprocket wheel (311) is fixedly connected, and output chain (31) bypasses output chain gear (311) respectively.
CN201821174408.0U 2018-07-24 2018-07-24 A kind of steel pipe bundle lifting turnover conveying equipment Active CN208843115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821174408.0U CN208843115U (en) 2018-07-24 2018-07-24 A kind of steel pipe bundle lifting turnover conveying equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821174408.0U CN208843115U (en) 2018-07-24 2018-07-24 A kind of steel pipe bundle lifting turnover conveying equipment

Publications (1)

Publication Number Publication Date
CN208843115U true CN208843115U (en) 2019-05-10

Family

ID=66353966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821174408.0U Active CN208843115U (en) 2018-07-24 2018-07-24 A kind of steel pipe bundle lifting turnover conveying equipment

Country Status (1)

Country Link
CN (1) CN208843115U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112158560A (en) * 2020-09-29 2021-01-01 贵州中科维视智能科技有限公司 AI chain bed intelligent process control system and control method
CN113305111A (en) * 2021-06-30 2021-08-27 金华微湃科技有限公司 Pneumatic transposition cleaning machine for inner wall and outer wall of steel pipe
CN114604567A (en) * 2022-03-16 2022-06-10 福州弘泰冶金技术开发有限公司 Profiled steel servo stacking equipment and working method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112158560A (en) * 2020-09-29 2021-01-01 贵州中科维视智能科技有限公司 AI chain bed intelligent process control system and control method
CN112158560B (en) * 2020-09-29 2021-12-28 贵州中科维视智能科技有限公司 AI chain bed intelligent process control system and control method
CN113305111A (en) * 2021-06-30 2021-08-27 金华微湃科技有限公司 Pneumatic transposition cleaning machine for inner wall and outer wall of steel pipe
CN113305111B (en) * 2021-06-30 2023-12-15 金华微湃科技有限公司 Pneumatic transposition cleaning machine for inner and outer walls of steel pipe
CN114604567A (en) * 2022-03-16 2022-06-10 福州弘泰冶金技术开发有限公司 Profiled steel servo stacking equipment and working method thereof

Similar Documents

Publication Publication Date Title
CN208843115U (en) A kind of steel pipe bundle lifting turnover conveying equipment
CN104722610B (en) Panel bending automatic production line
CN203294345U (en) Magnetic force packing system of steel tube production line and oil sleeve production line
CN108639965A (en) A kind of row handling transfer device
CN105337218B (en) A kind of transmission line of electricity lowering or hoisting gear
CN203638111U (en) Automatic weighing and subpackaging equipment for hardware parts
CN203451150U (en) Hoisting device for replacing belt roller
CN204848079U (en) Cable reel device
CN207275925U (en) Wire retracting device
CN206580246U (en) Vehicle frame transmits upset system
CN106410734B (en) A kind of portable iron bag uncovery equipment electric power system
CN205527364U (en) A movable conveyor for single -rail transportation
CN209352169U (en) Material transferring device and the material transmission line body equipment with it between a kind of wire body
CN209177598U (en) A kind of quick high-order formula handgrip stacking machine
CN109926769A (en) A kind of stirrup automatic conveying device for steel reinforcement cage welding
CN208932541U (en) A kind of stacking material frame automatic conveying device
CN208882995U (en) A kind of pond feeding device and pond reclaimer system
CN204078214U (en) A kind of welding rod vanning control system
CN203845498U (en) Rolling buffer mechanism
CN206366993U (en) A kind of automatic clamping and placing material manipulator
CN109292338A (en) A kind of automatic access movement system of industry production process
CN206427087U (en) A kind of express mail carries small handcart
CN109384033A (en) Material transferring device, material transmission line body equipment and control method between a kind of wire body
CN201473111U (en) Automatic traverse unit for large-diameter cable
CN209306515U (en) Material automatic pick-and-place apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 528300 West Zone e08-2, Beihua Road, Daba Industrial Park, Longjiang Town, Shunde District, Foshan City, Guangdong Province

Patentee after: Guangdong Zhida precision pipe manufacturing Co.,Ltd.

Address before: 528300 West Zone e08-2, Beihua Road, Daba Industrial Park, Longjiang Town, Shunde District, Foshan City, Guangdong Province

Patentee before: GUANGDONG ZHIDA PRECISION TUBE MANUFACTURE Co.,Ltd.