CN208835610U CN201821469614.4U CN201821469614U CN208835610U CN 208835610 U CN208835610 U CN 208835610U CN 201821469614 U CN201821469614 U CN 201821469614U CN 208835610 U CN208835610 U CN 208835610U
Authority
CN
China
Prior art keywords
cable
side plate
testing bridge
hole
control cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821469614.4U
Other languages
Chinese (zh)
Inventor
孙玉彤
陈晓彬
黎高程
杨忠亮
李晓飚
陈洁生
连楷敏
黄华吉
陈钧孚
邓小玉
王雪
朱颖
陈贤彬
黄勇东
卢丹
谢育斌
刘耿彬
陈钦彬
王喜东
王跃新
谢惠藩
王一波
黄锐坤
王琪
王锃
黄明辉
李海涛
邢文忠
孙旭
郭少玲
李暖群
陈泽星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Co ltd
ZHUHAI ELECTRIC POWER DESIGN INSTITUTE CO LTD
Guangdong Power Grid Co Ltd
Jieyang Power Supply Bureau of Guangdong Power Grid Co Ltd
Grid Planning Research Center of Guangdong Power Grid Co Ltd
Original Assignee
Shenzhen Power Supply Co ltd
ZHUHAI ELECTRIC POWER DESIGN INSTITUTE CO LTD
Guangdong Power Grid Co Ltd
Jieyang Power Supply Bureau of Guangdong Power Grid Co Ltd
Grid Planning Research Center of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Co ltd, ZHUHAI ELECTRIC POWER DESIGN INSTITUTE CO LTD, Guangdong Power Grid Co Ltd, Jieyang Power Supply Bureau of Guangdong Power Grid Co Ltd, Grid Planning Research Center of Guangdong Power Grid Co Ltd filed Critical Shenzhen Power Supply Co ltd
Priority to CN201821469614.4U priority Critical patent/CN208835610U/en
Application granted granted Critical
Publication of CN208835610U publication Critical patent/CN208835610U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model belongs to the technical field of lay cable engineering device technique and specifically relates to a control cable support and control cable laying system is related to. A control cable support comprising: the cable bridge comprises a cable bridge body, a first connecting part, a second connecting part and a separator; the cable bridge body is provided with a plurality of plugging parts which are uniformly distributed at intervals along the length direction of the cable bridge body, and a plurality of separators are plugged with the plugging parts so as to form a plurality of cable layer laying areas on the cable bridge body; the first connecting portion with the second connecting portion are a plurality of, and are a plurality of first connecting portion with it is a plurality of the second connecting portion evenly distributed be in the both sides of cable testing bridge, so that the cable testing bridge body can be fixed on the installed part. The technical problems that cables at different starting points are mostly laid alternately, are stacked layer by layer and are seriously stacked, and the cables cannot be detached once laid in the prior art are solved.

Description

Control cable bearer and control cable laying system
Technical field
The utility model relates to lay cable engineering device arts, more particularly, to a kind of control cable bearer and control Cable laying system processed.
Background technique
Protection screen, the observing and controlling of the mechanism case, central console, spacing terminal case and secondary device of electric system primary equipment Screen is required to realize connection by cable, optical cable or cable between failure wave-recording screen, power supply panel etc., to realize above-mentioned connection, according to The difference in building and space, design has different cable passages, including cable duct, cable shaft, cable interlayer etc., at these Design has the various brackets of current supply cable laying in space.
Since existing cable layer portal structure is simple, the sequence of unit in charge of construction's cable laying work is first to proceed through electricity The long cable laying of cable layer carries out stub cable laying again, and long cable is usually the terminal box, convergence control cabinet or mechanism by primary equipment Cable floor below case to protection communication room enters corresponding screen cabinet, and stub cable is usually between primary equipment or secondary device screen cabinet Pass through the connecting cable of cable floor.When carrying out long cable laying, temporal influence is brought in order to reduce replacement cable model, The primary equipment intervening sequences that a kind of long cable of model is related to by current period engineering have usually first laid in unit in charge of construction, then The long cable of another model is laid, and so on.
Present indoor substation is more and more, and the connecting cable between indoor each layer equipment passes through each layer cable duct laying To corresponding position, therefore cable duct is designed in each floor plate.These cable ducts can be made due to the limitation of floor construction It is smaller with area, and any bracket is used without design in this kind of cable duct at present, cause control cable can not be by starting Point carries out subregion laying, and the cable of different starting points is alternating application mostly, and is layering, accumulates seriously, and cable is once apply Setting can not just remove, and the usable space of cable duct is deactivated cable and largely occupies, to the reorganization and expansion band of indoor substation Carry out great difficulty.
Utility model content
The purpose of this utility model is to provide control cable beareves, to alleviate different starting points existing in the prior art Cable be alternating application mostly, and be layering, accumulate serious, cable once laying is gone down ask by the technology that can not just remove Topic.
A kind of control cable bearer provided by the utility model, comprising: cable testing bridge ontology, first connecting portion, second connect Socket part and separator;
Multiple plug divisions are provided on the cable testing bridge ontology, multiple plug divisions are along the cable testing bridge ontology Length direction is evenly spaced on, and multiple separators are with the plug division grafting so as to be formed on the cable testing bridge ontology There is multiple cable floor layings area;
The first connecting portion and the second connecting portion are multiple, multiple first connecting portions and multiple described Two interconnecting pieces are evenly distributed on the two sides of the cable testing bridge, so that the cable testing bridge ontology is capable of fixing on mountings.
Further, the first connecting portion is identical with the structure of the second connecting portion.
Further, the first connecting portion is the first link block, is provided with the first threaded hole on first link block; The second connecting portion is the second link block, is provided with the second threaded hole on second link block.
Further, multiple first connecting portions and multiple second connecting portions are symmetricly set on the cable testing bridge The two sides of ontology.
Further, the plug division includes the first fixation hole, the second fixation hole, the first spliced eye and the second spliced eye;
First fixation hole and second fixation hole are symmetricly set on the two sides of the cable testing bridge ontology, and described One spliced eye and second spliced eye are arranged between first fixation hole and second fixation hole, the separator energy It is enough to cooperate across first spliced eye and second spliced eye and first fixation hole and second fixation hole, it will It is divided into multiple cable floor layings area on the cable testing bridge ontology.
Further, the cable testing bridge ontology includes the first side plate, the second side plate and top plate, first side plate and institute The two sides that the second side plate is symmetricly set on the top plate are stated, are provided with first fixation hole on first side plate, described Second fixation hole is provided on two side plates, first fixation hole and second fixation hole are separately positioned on described first Side plate and the described one end of second side plate far from the top plate, first spliced eye and second spliced eye are arranged described On top plate.
Further, it is provided with the first binding hole on first side plate, is provided with the second binding on second side plate Hole;
It is described first binding hole be it is multiple, it is multiple it is described first binding holes uniformly divides along the extending direction of first side plate First side plate is arranged in close to the side of the top plate in cloth, first binding hole;
It is described second binding hole be it is multiple, it is multiple it is described second binding holes uniformly divides along the extending direction of second side plate Second side plate is arranged in close to the side of the top plate in cloth, second binding hole;
Multiple first binding holes and multiple second binding holes are arranged in a one-to-one correspondence;
Multiple first binding holes are staggered with multiple first fixation holes.
Further, the separator is subregion spring;
The subregion spring includes U-typed spring body and clamping portion;
The open end of the U-typed spring body is arranged in the clamping portion, and the clamping portion is used for and the plug division It is cooperatively connected.
Further, the clamping portion includes first connecting rod and second connecting rod, the first connecting rod and the second connecting rod Be separately positioned on the two sides of the open end of the U-typed spring body, and the first connecting rod and the second connecting rod with it is described U-typed spring body is vertically arranged.
A kind of control cable laying system has multiple control cable beareves as described above;
The distribution that multiple control cable beareves are successively spaced, multiple cable laying areas controlled on cable beareves Form the laying track for laying control cable.
A kind of control cable bearer provided by the utility model, comprising: cable testing bridge ontology, first connecting portion, second connect Socket part and separator;Multiple plug divisions are provided on the cable testing bridge ontology, multiple plug divisions are along the cable testing bridge The length direction of ontology is evenly spaced on, and multiple separators and the plug division grafting are so that the cable testing bridge ontology On be formed with multiple cable floors laying area;The first connecting portion and the second connecting portion be it is multiple, multiple described first Interconnecting piece and multiple second connecting portions are evenly distributed on the two sides of the cable testing bridge, so that described this physical efficiency of cable testing bridge It is enough to fix on mountings.Using above-mentioned scheme, it is provided with multiple plug divisions on cable testing bridge ontology, by separator and inserts The cooperation of socket part lays areas so as to form multiple independent cable floors on cable testing bridge ontology, while in cable testing bridge ontology Two sides are provided with first connecting portion and second connecting portion, and the setting of first connecting portion and second connecting portion can make cable testing bridge sheet The stability that body is connected when being arranged on external installation part is higher, to alleviate different starting points existing in the prior art Cable is alternating application mostly, and is layering, accumulates serious, cable the technical issues of can not just removing once laying is gone down.
A kind of control cable laying system provided by the utility model has multiple control cable beareves as described above; The distribution that multiple control cable beareves are successively spaced, multiple cable laying areas controlled on cable beareves, which are formed, to be used for The laying track of laying control cable.Its beneficial effect generated is identical as the control beneficial effect of cable bearer, repeats no more.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the top view of control cable bearer provided by the embodiment of the utility model;
Fig. 2 is the side view of control cable bearer provided by the embodiment of the utility model;
Fig. 3 is the main view of control cable bearer provided by the embodiment of the utility model;
Fig. 4 is the main view of separator on control cable bearer provided by the embodiment of the utility model;
Fig. 5 is that the cable floor of control cable bearer provided by the embodiment of the utility model lays a piece cable of the every layer of laying in area Main view;
Fig. 6 is that the cable floor of control cable bearer provided by the embodiment of the utility model lays a piece cable of the every layer of laying in area Top view;
Fig. 7 is that the cable floor of control cable bearer provided by the embodiment of the utility model lays two cables of the every layer of laying in area Main view;
Fig. 8 is that the cable floor of control cable bearer provided by the embodiment of the utility model lays every layer of area laying different number The top view of cable;
Fig. 9 is the main view that cable bearer room is arranged in of control cable bearer provided by the embodiment of the utility model.
Icon: 100- cable testing bridge ontology;200- first connecting portion;300- second connecting portion;400- separator;110- Side plate;The second side plate of 120-;130- top plate;The first threaded hole of 210-;The second threaded hole of 310-;410- U-typed spring body; The clamping portion 420-;The first fixation hole of 111-;112- first binds hole;The first spliced eye of 131-;The second spliced eye of 132-.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical Novel protected range.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
Fig. 5 is that the cable floor of control cable bearer provided by the embodiment of the utility model lays a piece cable of the every layer of laying in area Main view;Fig. 6 is that the cable floor of control cable bearer provided by the embodiment of the utility model lays a piece electricity of the every layer of laying in area The top view of cable;Fig. 7 is that the cable floor of control cable bearer provided by the embodiment of the utility model lays the laying two of every layer of area The main view of cable;Fig. 8 is that the cable floor of control cable bearer provided by the embodiment of the utility model lays the laying of every layer of area not With the top view of number of cable;Fig. 9 is the setting of control cable bearer provided by the embodiment of the utility model in cable bearer room Main view.As shown in figures 5-9, a kind of control cable bearer provided by the utility model, comprising: cable testing bridge ontology 100, One interconnecting piece 200, second connecting portion 300 and separator 400;
Multiple plug divisions are provided on the cable testing bridge ontology 100, multiple plug divisions are along the cable testing bridge sheet The length direction of body 100 is evenly spaced on, and multiple separators 400 are with the plug division grafting so that the cable testing bridge Multiple cable floor layings area is formed on ontology 100;
The first connecting portion 200 and the second connecting portion 300 are multiple, multiple 200 Hes of first connecting portion Multiple second connecting portions 300 are evenly distributed on the two sides of the cable testing bridge, so that the cable testing bridge ontology 100 can It fixes on mountings.
Wherein, the interval of two adjacent separators 400 can not be identical, in this way on a cable testing bridge ontology 100 i.e. The cable floor laying area of multiple and different length can be formed, the control of different number is provided in the cable floor laying area of different length Cable, and cable start of installation is provided in each cable floor laying area.
A kind of control cable bearer provided by the utility model, comprising: cable testing bridge ontology 100, first connecting portion 200, Second connecting portion 300 and separator 400;Multiple plug divisions, multiple plug divisions are provided on the cable testing bridge ontology 100 Length direction along the cable testing bridge ontology 100 is evenly spaced on, multiple separators 400 and the plug division grafting So as to be formed with multiple cable floor layings area on the cable testing bridge ontology 100;The first connecting portion 200 and described second connects Socket part 300 be it is multiple, multiple first connecting portions 200 and multiple second connecting portions 300 are evenly distributed on the electricity The two sides of cable gantry, so that the cable testing bridge ontology 100 is capable of fixing on mountings.Using above-mentioned scheme, cable bridge Multiple plug divisions are provided on frame ontology 100, by the cooperation of separator 400 and plug division so that on cable testing bridge ontology 100 Multiple independent cable floor laying areas are formd, while the two sides of cable testing bridge ontology 100 being provided with 200 He of first connecting portion Second connecting portion 300, the setting of first connecting portion 200 and second connecting portion 300 can make cable testing bridge ontology 100 exist in setting The stability connected when on external installation part is higher, is mostly to alleviate the cable of different starting points existing in the prior art Alternating application, and be layering, accumulate serious, cable the technical issues of can not just removing once laying is gone down.
Fig. 1 is the top view of control cable bearer provided by the embodiment of the utility model;Fig. 2 is the utility model embodiment The side view of the control cable bearer of offer;Fig. 3 is the main view of control cable bearer provided by the embodiment of the utility model;Such as Shown in Fig. 1-3, on the basis of the above embodiments, further, the first connecting portion 200 and the second connecting portion 300 Structure it is identical.
Further, the first connecting portion 200 is the first link block, is provided with the first screw thread on first link block Hole 210;The second connecting portion 300 is the second link block, is provided with the second threaded hole 310 on second link block.
Further, multiple first connecting portions 200 and multiple second connecting portions 300 are symmetricly set on the electricity The two sides of cable gantry ontology 100.
Wherein, the two sides of cable testing bridge ontology 100 can be alternately arranged in first connecting portion 200 and second connecting portion 300, As long as can be connect with installation part.
In the present embodiment, multiple first link blocks and multiple second are symmetrically arranged in the two sides of cable testing bridge ontology 100 Link block is provided with the first threaded hole 210 on the first link block, in cable testing bridge ontology 100 and external connection, in external object The second threaded hole 310 is provided on body, expansion bolt passes through the first threaded hole 210 and the second threaded hole 310 cooperates, by cable Gantry ontology 100 and external connection.
On the basis of the above embodiments, further, the plug division include the first fixation hole 111, the second fixation hole, First spliced eye 131 and the second spliced eye 132;
First fixation hole 111 and second fixation hole are symmetricly set on the two sides of the cable testing bridge ontology 100, First spliced eye 131 and second spliced eye 132 setting first fixation hole 111 and second fixation hole it Between, the separator 400 can pass through first spliced eye and second spliced eye and first fixation hole 111 and institute The cooperation of the second fixation hole is stated, multiple cable floor layings area will be divided on the cable testing bridge ontology 100.
Wherein, the first fixation hole 111, the second fixation hole, the first spliced eye 131 and the second spliced eye 132 are an a pair It should be arranged, multiple first fixation holes 111 and multiple second fixation holes uniformly divide along the extending direction of cable testing bridge ontology 100 Cloth, while the first fixation hole 111, the second fixation hole, the first spliced eye 131 and the second spliced eye 132 are in the same plane, and the Plane and cable testing bridge ontology where one fixation hole 111, the second fixation hole, the first spliced eye 131 and the second spliced eye 132 100 is vertical, in order to which separator 400 is connect with plug division.
In the present embodiment, plug division includes that the first fixation hole 111, the second fixation hole, the first spliced eye 131 and second are inserted Connect hole 132, separator 400 pass through after the first spliced eye 131 and the second spliced eye 132 both ends respectively with the first fixation hole 111 and The clamping of second fixation hole, so that separator 400 is fixed on cable testing bridge ontology 100, it is multiple that cable testing bridge ontology 100, which is divided, Cable floor lays area.
On the basis of the above embodiments, further, the cable testing bridge ontology 100 includes the first side plate 110, second Side plate 120 and top plate 130, first side plate 110 and second side plate 120 are symmetricly set on the two sides of the top plate 130, It is provided with first fixation hole 111 on first side plate 110, it is fixed that described second is provided on second side plate 120 Hole, first fixation hole 111 and second fixation hole are separately positioned on first side plate 110 and second side plate 120 one end far from the top plate 130, first spliced eye and second spliced eye are arranged on the top plate 130.
Wherein, the top plate 130 on cable testing bridge ontology, the first side plate 110 and the second side plate 120 are hollow structure, and Multiple groups reinforcing rib is provided in top plate 130, the first side plate 110 and the second side plate 120.
In the present embodiment, it is fixedly connected between the first side plate 110, the second side plate 120 and top plate 130, so that cable testing bridge Ontology 100 is formed as hollow housing open at one end, and 110 He of the first side plate is arranged in first connecting portion 200 and second connecting portion 300 Second one end of side plate 120 far from top plate 130, the first fixation hole 111 and the second fixation hole are symmetricly set on 110 He of the first side plate On second side plate 120, the first spliced eye 131 and the second spliced eye 132 are arranged on top plate 130, multiple first spliced eye, 131 Hes Multiple second spliced eyes 132 are arranged in a one-to-one correspondence, between symmetrically arranged first fixation hole 111 a pair of in this way and the second fixation hole Plug division can be formed with by being provided with first spliced eye 131 and second spliced eye 132, and the mode of this set can Cooperate convenient for separator 400 and plug division.
On the basis of the above embodiments, further, the first binding hole 112, institute are provided on first side plate 110 It states and is provided with the second binding hole on the second side plate 120;
First binding hole 112 is multiple, extension of multiple first binding holes 112 along first side plate 110 Direction is uniformly distributed, and first side plate 110 is arranged in close to the side of the top plate 130 in first binding hole 112;
It is described second binding hole be it is multiple, it is multiple it is described second binding holes it is equal along the extending direction of second side plate 120 Second side plate 120 is arranged in close to the side of the top plate 130 in even distribution, second binding hole;
Multiple first binding holes 112 and multiple second binding holes are arranged in a one-to-one correspondence;
Multiple first binding holes 112 are staggered with multiple first fixation holes 111.
In the present embodiment, the first binding hole 112 and are also respectively provided on the first side plate 110 and the second side plate 120 Two binding holes, the first binding hole 112 and the second binding hole are separately positioned on the first side plate 110 and the second side plate 120 close to top plate 130 one end, while the connecting line in multiple first bindings hole 112 is parallel with the connecting line of the first fixation hole 111, multiple second tie up The connecting line for pricking hole is parallel with the connecting line of multiple second fixation holes, and multiple first bindings hole 112 interlocks with the first fixation hole 111 Setting, multiple second bindings hole are staggered with the second fixation hole, are controlling cable setting when cable floor lays area in this way, the One binding hole 112 and the second binding hole are capable of fixing control cable.
Fig. 4 is the main view of separator on control cable bearer provided by the embodiment of the utility model.As shown in figure 4, On the basis of above-described embodiment, further, the separator 400 is subregion spring;
The subregion spring includes U-typed spring body 410 and clamping portion 420;
The open end of the U-typed spring body 410 is arranged in the clamping portion 420, and the clamping portion 420 is used for and institute State plug division mating connection.
Further, the clamping portion 420 includes first connecting rod and second connecting rod, and the first connecting rod and described second connect Bar is separately positioned on the two sides of the open end of the U-typed spring body 410, and the first connecting rod and the second connecting rod with The U-typed spring body 410 is vertically arranged.
In the present embodiment, separator 400 includes U-typed spring body 410 and clamping portion 420, due to U-typed spring body 410 setting makes upper part and end circular design, prevents Damage Coutrol cable and scratches staff;U-typed spring master Body 410 and the first spliced eye of element and the second spliced eye cooperate, and keep U-typed spring body 410 or so inactive, U-typed spring Main body 410 is after the first spliced eye and the second spliced eye, and first connecting rod and the second connecting rod are i.e. along the first side plate 110 and second The inner sidewall of side plate 120 is moved at the first fixation hole 111 and the second fixation hole, and fixed with the first fixation hole 111 and second Hole connection, to reach the purpose being stably placed on cable testing bridge ontology 100.
A kind of control cable laying system provided by the utility model has multiple control cable beareves as described above; The distribution that multiple control cable beareves are successively spaced, multiple cable laying areas controlled on cable beareves, which are formed, to be used for The laying track of laying control cable.Its beneficial effect generated is identical as the control beneficial effect of cable bearer, repeats no more.
Wherein, the shape for the laying track that multiple control cable beareves are formed can be adjusted according to specific needs.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new The range of each embodiment technical solution of type.

Claims (10)

1. a kind of control cable bearer characterized by comprising cable testing bridge ontology, first connecting portion, second connecting portion and point Spacing body;
Multiple plug divisions, length of multiple plug divisions along the cable testing bridge ontology are provided on the cable testing bridge ontology Direction is evenly spaced on, and multiple separators and the plug division grafting on the cable testing bridge ontology so as to be formed with more A cable floor lays area;
The first connecting portion and the second connecting portion are multiple, multiple first connecting portions and multiple second companies Socket part is evenly distributed on the two sides of the cable testing bridge, so that the cable testing bridge ontology is capable of fixing on mountings.
2. control cable bearer according to claim 1, which is characterized in that the first connecting portion and second connection The structure in portion is identical.
3. control cable bearer according to claim 2, which is characterized in that the first connecting portion is the first link block, The first threaded hole is provided on first link block;The second connecting portion is the second link block, on second link block It is provided with the second threaded hole.
4. control cable bearer according to claim 3, which is characterized in that multiple first connecting portions and multiple described Second connecting portion is symmetricly set on the two sides of the cable testing bridge ontology.
5. control cable bearer according to claim 4, which is characterized in that the plug division includes the first fixation hole, the Two fixation holes, the first spliced eye and the second spliced eye;
First fixation hole and second fixation hole are symmetricly set on the two sides of the cable testing bridge ontology, and described first inserts It connects hole and second spliced eye is arranged between first fixation hole and second fixation hole, the separator can be worn It crosses first spliced eye and second spliced eye and first fixation hole and second fixation hole cooperates, it will be described It is divided into multiple cable floor layings area on cable testing bridge ontology.
6. control cable bearer according to claim 5, which is characterized in that the cable testing bridge ontology includes the first side Plate, the second side plate and top plate, first side plate and second side plate are symmetricly set on the two sides of the top plate, and described first It is provided with first fixation hole on side plate, second fixation hole, first fixation hole are provided on second side plate First side plate and the described one end of second side plate far from the top plate are separately positioned on second fixation hole, described One spliced eye and second spliced eye are arranged on the top plate.
7. control cable bearer according to claim 6, which is characterized in that be provided with the first binding on first side plate Hole is provided with the second binding hole on second side plate;
It is described first binding hole be it is multiple, it is multiple it is described first binding holes is uniformly distributed along the extending direction of first side plate, First side plate is arranged in close to the side of the top plate in first binding hole;
It is described second binding hole be it is multiple, it is multiple it is described second binding holes is uniformly distributed along the extending direction of second side plate, Second side plate is arranged in close to the side of the top plate in second binding hole;
Multiple first binding holes and multiple second binding holes are arranged in a one-to-one correspondence;
Multiple first binding holes are staggered with multiple first fixation holes.
8. control cable bearer according to claim 1, which is characterized in that the separator is subregion spring;
The subregion spring includes U-typed spring body and clamping portion;
The open end of the U-typed spring body is arranged in the clamping portion, and the clamping portion is used to cooperate with the plug division Connection.
9. control cable bearer according to claim 8, which is characterized in that the clamping portion includes first connecting rod and second Connecting rod, the first connecting rod and the second connecting rod are separately positioned on the two sides of the open end of the U-typed spring body, and institute First connecting rod and the second connecting rod is stated to be vertically arranged with the U-typed spring body.
10. a kind of control cable laying system, which is characterized in that have multiple such as the described in any item controls of claim 1-9 Cable bearer;
The distribution that multiple control cable beareves are successively spaced, multiple cable laying areas controlled on cable beareves are formed For laying the laying track of control cable.
CN201821469614.4U 2018-09-04 2018-09-04 Control cable support and control cable laying system Active CN208835610U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821469614.4U CN208835610U (en) 2018-09-04 2018-09-04 Control cable support and control cable laying system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821469614.4U CN208835610U (en) 2018-09-04 2018-09-04 Control cable support and control cable laying system

Publications (1)

Publication Number Publication Date
CN208835610U true CN208835610U (en) 2019-05-07

Family

ID=66312587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821469614.4U Active CN208835610U (en) 2018-09-04 2018-09-04 Control cable support and control cable laying system

Country Status (1)

Country Link
CN (1) CN208835610U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108767749A (en) * 2018-09-04 2018-11-06 广东电网有限责任公司 Control cable support and control cable laying system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108767749A (en) * 2018-09-04 2018-11-06 广东电网有限责任公司 Control cable support and control cable laying system

Similar Documents

Publication Publication Date Title
CN208835610U (en) Control cable support and control cable laying system
CN203761697U (en) Cabinet
CN208136956U (en) A kind of simple cable ditch convenient for building, removing
CN106451220A (en) Bypass equipment and method for live replacement of equipment on same-tower multi-loop pole tower
CN208508433U (en) Control cable support and control cable laying device
CN208508431U (en) Installation type cable support
CN208508432U (en) Cable support and cable laying device
CN206401832U (en) It is a kind of new to lift the monoblock type cable testing bridge easily extended
CN109066511A (en) Cable support and cable laying device
CN108767749A (en) Control cable support and control cable laying system
CN105048324A (en) L-shaped distribution structure of valve hall converter transformer of extra-high-voltage direct-current converter station
CN208508429U (en) Installation type cable support
CN207988628U (en) A kind of Great span landform is convenient for the 10kV broad-base tower equipment of cable or more tower
CN105552730A (en) Intelligent comprehensive power distribution box
CN208508428U (en) Cable bridge rack device
CN208707246U (en) Control cable support and control cable laying device
CN208508483U (en) Pre-buried cable support
CN206195248U (en) Electrified bypass equipment who changes with equipment on pole multiloop shaft tower
CN208508430U (en) Pre-buried cable support
CN108988233A (en) A kind of network engineering wiring adjuster
CN108767778A (en) Cable bridge rack device
CN108767776A (en) Control cable support and control cable laying device
CN208835649U (en) Pre-buried cable support
CN208299263U (en) Micro- station isolating device
CN109066561A (en) Pre-buried cable support and method for laying control cable in cable trench

Legal Events

Date Code Title Description
GR01 Patent grant