CN106451220A - Bypass equipment and method for live replacement of equipment on same-tower multi-loop pole tower - Google Patents

Bypass equipment and method for live replacement of equipment on same-tower multi-loop pole tower Download PDF

Info

Publication number
CN106451220A
CN106451220A CN201611088882.7A CN201611088882A CN106451220A CN 106451220 A CN106451220 A CN 106451220A CN 201611088882 A CN201611088882 A CN 201611088882A CN 106451220 A CN106451220 A CN 106451220A
Authority
CN
China
Prior art keywords
cable
equipment
flexible cable
side flexible
bypass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611088882.7A
Other languages
Chinese (zh)
Inventor
郝旭东
梁东
余志森
张校武
肖立
王康
张建
顾超
龚先权
王显全
李慧杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
Electric Power Research Institute of State Grid Jibei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
Electric Power Research Institute of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, North China Electric Power Research Institute Co Ltd, Electric Power Research Institute of State Grid Jibei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611088882.7A priority Critical patent/CN106451220A/en
Publication of CN106451220A publication Critical patent/CN106451220A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/061Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for DC powered loads
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems

Landscapes

  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses bypass equipment and method for live replacement of equipment on a same-tower multi-loop pole tower. The bypass equipment comprises a power-source-side flexible cable, a load-side flexible cable and a through connection cable, a first end of the power-source-side flexible cable is connected to a power source side of a power distribution line through a cable connector, a first end of the load-side flexible cable is connected to a load side of the power distribution line through a cable connector, and a switch is serially connected on each of the power-source-side flexible cable and the load-side flexible cable; two ends of the through connection cable are connected with second ends of the power-source-side flexible cable and the load-side flexible cable respectively, and the power-source-side flexible cable, the load-side flexible cable and the through connection cable form a short-circuit bypass in parallel connection with the power distribution line. According to the method, the bypass equipment is utilized to form the short-circuit bypass on the power distribution line needing maintenance or equipment replacement, and maintenance, fault quick repair and equipment replacement of the power distribution line are completed while power supply is continuous, so that power failure range is narrowed.

Description

Charged for replacement is with the bypass equipment of equipment on bar multi-circuit tower and method
Technical field
The present invention relates to electric power overhaul apparatus field, more particularly, to a kind of charged for replacement is with equipment on bar multi-circuit tower Bypass equipment and method.
Background technology
Due to the anxiety in soil, by the way of a large amount of erection high-tension distributing line using same bar multiloop of power system, one The complex device of multi circuit transmission lines is had on the circuit of at least more than three times, and same bar on electric pole, thus reducing power circuit Occupation of land usable floor area.
But this circuit concentrating erection is due to equipment installation closely, narrow space, and hotline maintenance and more exchange device are just very Difficulty is carried out, it is necessary to several circuits have a power failure simultaneously when having equipment need maintenance, change, then faulty equipment is examined Repair or change.So that power failure range is expanded, bring loss to national economy.
Thus, the present inventor relies on experience and the practice being engaged in relevant industries for many years, proposes a kind of charged for replacement many with bar The bypass equipment of equipment and method in circuit pole tower, to overcome the defect of prior art.
Content of the invention
It is an object of the invention to provide a kind of charged for replacement is with the bypass equipment of equipment on bar multi-circuit tower and method, Under power supply state incessantly, the maintenance, breakdown repair and the equipment that complete distribution line, with more changing jobs, reduce power failure model Enclose.
The object of the present invention is achieved like this, a kind of charged for replacement with the bypass equipment of equipment on bar multi-circuit tower, Described bypass equipment includes mains side flexible cable, load side flexible cable and transit cable;Described mains side flexible cable First end is connected to the mains side of distribution line by cable connector, and the first end of described load side flexible cable is connect by cable Head is connected to the load side of described distribution line;All it is serially connected with described mains side flexible cable and described load side flexible cable Derailing switch;The second end of cable connection box and described mains side flexible cable and described is passed through at the two ends of described transit cable respectively Second end of load side flexible cable connects;Described mains side flexible cable, described load side flexible cable and described switching electricity Cable forms the short circuit bypass in parallel with described distribution line.
In a better embodiment of the present invention, described cable connection box includes the casing of enclosed construction, described casing Side be provided with entrance hole;It is fixed with copper bar, insulation between described copper bar and described casing is connected in described casing;Described copper bar It is provided with binding post.
In a better embodiment of the present invention, in described casing, it is connected with fix bar, the company of fixation in described fix bar It is connected to insulator;Described copper bar includes three U-shaped copper sheets, and three U-shaped copper sheets are arranged in order along described fix bar, each U-shaped Copper sheet is fixedly connected with described insulator;The two ends of described U-shaped copper sheet form described binding post respectively.
In a better embodiment of the present invention, described casing is provided with the chamber door that can switch.
In a better embodiment of the present invention, the first end of described transit cable and described mains side flexible cable Second end is extend in described cable connection box by described entrance hole respectively, described transit cable and described mains side flexible electrical Cable is connected with the described binding post at the two ends of described U-shaped copper sheet respectively.
In a better embodiment of the present invention, the second end of described transit cable and described load side flexible cable Second end is extend in described cable connection box by described entrance hole respectively, described transit cable and described load side flexible electrical Cable is connected with the described binding post at the two ends of described U-shaped copper sheet respectively.
In a better embodiment of the present invention, in the protecting crust that described transit cable laying is arranged on the ground.
The purpose of the present invention can also be achieved in that, a kind of charged for replacement is with the method for equipment on bar multi-circuit tower, institute State charged for replacement and adopt described bypass equipment with the method for equipment on bar multi-circuit tower, comprise the steps:
S1, lay described mains side flexible cable, described load side flexible cable and described transit cable and form described side Pipeline equipment, makes described derailing switch be in open position;
S2, by described mains side flexible cable and described load side flexible cable be connected respectively to needs construction described in join The mains side of electric line and load side, form the described short circuit bypass in parallel with described distribution line;
S3, the described derailing switch of connection, make described short circuit bypass be in running status, and described by current detecting instrument detection The electric current of short circuit bypass, confirms working properly;
S4, will need construction described distribution line power-off, power-off construction is carried out to described distribution line;
S5, construction connect described distribution line after finishing, and detect the electric current of described distribution line by current detecting instrument, Confirm working properly;
The described derailing switch of S6, successively disconnection load side and mains side, removes described load side flexible cable and described electricity Source flexible cable, then connect each described derailing switch, described bypass equipment is substantially discharged.
In a better embodiment of the present invention, in step s3, first switch on power the described derailing switch of side, in load After side checks that the phase place connection of described mains side flexible cable, described load side flexible cable and described transit cable is errorless, then Connect the described derailing switch of load side.
In a better embodiment of the present invention, in step s 4, first disconnect the load side of described distribution line, and set Put insulated shielding cover, then disconnect the mains side of described distribution line, and insulated shielding cover is set;Detect institute with current detecting instrument again State the electric current of short circuit bypass, confirm that described short circuit bypass is normal.
From the above mentioned, the charged for replacement of the present invention utilizes bypass with the bypass equipment of equipment on bar multi-circuit tower and method Equipment it would be desirable to maintenance electric pole on all circuits carry out powered installation bypass equipment, original distribution line part is carried out side Short out connect, after bypass equipment is run with original distribution line part in parallel, will be partly out of service for original distribution line, user Load be transferred completely into bypass equipment.At this moment, operating personnel can be by power failure working method, to the original distribution line portion exiting Point carry out overhauling, more exchange device, after the completion of, then will move out the part distribution line of operation and access, when bypass equipment is joined with original After electric line part in parallel runs, powered exit bypass equipment, recover distribution line and equipment normally run, reach the dimension that do not have a power failure Repair the purpose changing equipment on multiloop complexity bar.Derailing switch is provided separately by this bypass equipment with cable connection box, Ke Yigen Different situations according to the construction of line flexibly arrange this bypass equipment, and operation is convenient.
Brief description
The following drawings is only intended to, in doing schematic illustration and explanation to the present invention, not delimit the scope of the invention.Wherein:
Fig. 1:Annexation schematic diagram for bypass equipment of the present invention.
Fig. 2:Structural representation for cable connection box in bypass equipment of the present invention.
Specific embodiment
In order to be more clearly understood to the technical characteristic of the present invention, purpose and effect, now comparison brief description this Bright specific embodiment.
Embodiment one
As shown in figure 1, the invention provides a kind of charged for replacement with equipment on bar multi-circuit tower bypass equipment 10, institute State bypass equipment 10 and include mains side flexible cable 1, load side flexible cable 2 and transit cable 3.Added with bar multi-circuit tower If distribution line 4 be usually three-phase distribution circuit, there is the power transmission cable of three outs of phase, according to the conveying direction of electric current It is divided into mains side a and load side b.When livewire work being carried out to a certain section of distribution line 4 using this bypass equipment 10, described electricity The first end of source flexible cable 1 is connected to the mains side a of this section of distribution line 4 by cable connector 5, that is, in this section of distribution wire Three flexible cables are connected on the power transmission cable of three outs of phase the mains side a on road 4, and three flexible cables are to ground Hang down in face.On mains side flexible cable 1, concatenation is used for the derailing switch 6 of three flexible cables of off and on, and derailing switch 6 is existing There is technology, by quick plug-in cable connector 5, three flexible cables can be plugged on derailing switch 6 respectively when being embodied as In corresponding interface.The first end of described load side flexible cable 2 is connected to the negative of this section of distribution line 4 by cable connector 5 Lotus side b;I.e. three flexible cables are connected to the power transmission line of three outs of phase by load side b in this section of distribution line 4 On cable, three flexible cables earthward hang down.Same concatenation on load side flexible cable 2 is used for three flexibilities of off and on Three flexible cables can be plugged on open respectively when being embodied as by the derailing switch 6 of cable by quick plug-in cable connector 5 Close in corresponding interface on device 6.Because the cost of flexible cable is higher, if necessary to this section of distribution wire of maintenance or more exchange device Road 4, all can be very high using flexible cable cost apart from longer, therefore can be only in mains side a and load side b and distribution line One section of 4 connections adopts flexible cable, and remaining part adopts transit cable 3, and transit cable 3 can be using cost than relatively low Common cable;One end that mains side flexible cable 1 and load side flexible cable 2 earthward hang down is the second end, described switching electricity The two ends of cable 3 are respectively by the second end and the described load side flexible cable of cable connection box 7 and described mains side flexible cable 1 2 the second end connects;Wherein, the flexible cable of same phase is corresponding with transit cable 3 connects, and transit cable 3 can be laid on On ground, ground is provided with protecting crust, and transit cable 3 is located in protecting crust.Thus it is described mains side flexible cable 1, described Load side flexible cable 2 and described transit cable 3 form the short circuit bypass in parallel with this section of distribution line 4;Conveying electric current from Flow through in the bypass of this short circuit, power-off maintenance or more exchange device can be carried out to this section of distribution line 4, not result in and stop on a large scale Electricity;And, derailing switch 6 is provided separately with cable connection box 7, can be somebody's turn to do according to the flexible arrangement of the different situations of the construction of line Bypass equipment 10, operation is convenient.
Further, as shown in Fig. 2 described cable connection box 7 includes the rectangular box 71 of an enclosed construction, this cuboid Side be provided with a chamber door that can switch 72, chamber door 72 is provided with box door lock, opens chamber door 72 and conveniently carries out box house Operation.The bottom surface of rectangular box 71 is provided with entrance hole 73, and entrance hole 73 is provided with 6, in 3 × 2 array type arrangement, is used for Wear the termination of flexible cable and common cable.It is fixed with copper bar 74, described copper bar 74 and described casing inside described casing 71 Between 71, insulation connects;Described copper bar 74 is provided with binding post 76, the effect of copper bar 74 be by the flexible cable of same phase and Transit cable 3 connects conducting.Specifically, it is fixedly connected with the fix bar 75 of a horizontally set in described casing 71, described solid Both sides in fixed pole 75 are fixedly connected with insulator 77, and three insulators 77 are fixed in every side, positioned at two of both sides correspondence position Insulator 77 is formed a pair, is fixed with six insulators 77 altogether;Insulator 77 is the fixture of ceramic making, for by copper bar 74 It is dielectrically separated from and is played the effect of fixing copper bar 74 and fix bar 75 between.Described copper bar 74 includes three U-shaped copper sheets 741, three U-shaped copper sheets 741 are arranged in parallel successively along described fix bar 75, and each U-shaped copper sheet 741 is fixedly connected with described On insulator 77, U-shaped copper sheet 741 is crossed on the both sides of fix bar 75, the both sides of U-shaped copper sheet 741 be separately fixed at corresponding absolutely On edge 77.The two ends of described U-shaped copper sheet 741 form binding post 76 respectively.Three U-shaped copper sheets 741 correspond to three not respectively Same phase, the flexible cable of same phase and transit cable 3 are connected to two binding posts of same U-shaped copper sheet 741 On 76.When being embodied as, institute is passed through at the second end of the first end of described transit cable 3 and described mains side flexible cable 1 respectively State entrance hole 73 to extend in described cable connection box 7, described transit cable 3 and described mains side flexible cable 1 respectively with institute The described binding post 76 stating the two ends of U-shaped copper sheet 741 connects.Second end of described transit cable 3 and described load side are flexible Second end of cable 2 is extend in described cable connection box 7 by described entrance hole 73 respectively, described transit cable 3 and described Load side flexible cable 2 is connected with the described binding post 76 at the two ends of described U-shaped copper sheet 741 respectively.In this cable connection box 7 Binding post 76 and copper bar 74 bus meet the load current requirements of 600A.This cable connection box 7 can be arranged on ground, will Flexible cable under drawing from shaft tower is quickly connected with the common cable being laid on ground, and common cable can be changed at any time, fits Use various rugged environments, reduce cost.
Embodiment two
Present invention also offers a kind of charged for replacement is with the method for equipment on bar multi-circuit tower, the same bar of described charged for replacement On multi-circuit tower, the method for equipment adopts the bypass equipment 10 described in embodiment one, specifically includes following steps:
S1, lay described mains side flexible cable 1, described load side flexible cable 2 and described transit cable 3 formed described Bypass equipment 10, makes described derailing switch 6 be in open position.Operating personnel lays ground protecting crust according to arrangement and method for construction, according to Flexible cable 1, derailing switch 6, flexible cable 1, cable connection box 7, common cable 3, cable connection box 7, flexible cable 2, switch Device 6, the order of flexible cable 2 are laid successively.Wherein, need between flexible cable docking or common cable between need right Connect so that during extension length, connected using self-locking quick plug-in transition joint, self-locking quick plug-in transition joint is Prior art.If need to cross over road in short circuit bypass is laid, it is possible to use cable overhead crossing support is by by short circuit Road is maked somebody a mere figurehead and is laid and reliable fixing.
S2, by described mains side flexible cable 1 and described load side flexible cable 2 be connected respectively to needs construction described in The mains side a of distribution line 4 and load side b, form the described short circuit bypass in parallel with described distribution line 4;
S3, the described derailing switch 6 of connection, make described short circuit bypass be in running status, and detect institute by current detecting instrument State the electric current of short circuit bypass, confirm working properly.First switch on power the described derailing switch 6 of side a, checks described electricity in load side b After the phase place connection of source flexible cable 1, described load side flexible cable 2 and described transit cable 3 is errorless, then connect load side The described derailing switch 6 of b.
S4, will need construction described distribution line 4 power-off, power-off construction is carried out to described distribution line 4.First disconnect institute State load side b of distribution line 4, and insulated shielding cover is set, then disconnect the mains side a of described distribution line 4, and insulation is set Mask;Again with the electric current of current detecting instrument detection described short circuit bypass, confirm that described short circuit bypass is normal.
S5, distribution line 4 overhaul in the power-off state or change after equipment construction finishes, and in turn switch on mains side a and negative The described distribution line 4 of lotus side b, and the electric current of described distribution line 4 is detected by current detecting instrument, confirm working properly;
The described derailing switch 6 of S6, successively disconnection load side b and mains side a, removes described load side flexible cable 2 and institute State mains side flexible cable 1, then connect each described derailing switch 6, described bypass equipment 10 is substantially discharged;Dismounting is laid Bypass equipment 10.
The charged for replacement of the present invention utilizes bypass equipment 10 with the bypass equipment 10 of equipment on bar multi-circuit tower and method, All circuits on the electric pole of maintenance will be needed to carry out powered installation bypass equipment 10, original distribution line 4 part is bypassed Short circuit, after bypass equipment 10 is run with original distribution line 4 part in parallel, will be partly out of service for original distribution line 4, use The load at family is transferred completely into bypass equipment 10.At this moment, operating personnel can be by power failure working method, to the original distribution wire exiting Road 4 part carries out overhauling, more exchange device, after the completion of, then will move out the part distribution line 4 of operation and access, when bypass equipment 10 After running with original distribution line 4 part in parallel, powered exit bypass equipment 10, recover distribution line 4 and equipment normally run, Reach the purpose that equipment on multiloop complexity bar is changed in the maintenance that do not have a power failure.This bypass equipment 10 is by derailing switch 6 and cable connection box 7 It is provided separately, can flexibly arrange this bypass equipment 10 according to the different situations of the construction of line, operation is convenient.
The foregoing is only the schematic specific embodiment of the present invention, be not limited to the scope of the present invention.Specifically In embodiment, all combinations of illustrated feature are not necessarily solution that the present invention is limited it is possible to understand that these are additional Structural features and operations improvement can be used alone or be combined with each other.It will therefore be appreciated that the invention is not restricted to Any specific feature or the combination of element, and any desired combinations of features described here can be carried out without departing from Protection scope of the present invention, any those skilled in the art, is made on the premise of the design without departing from the present invention and principle The equivalent variations going out and modification, all should belong to the scope of protection of the invention.

Claims (10)

1. a kind of charged for replacement with the bypass equipment of equipment on bar multi-circuit tower it is characterised in that described bypass equipment includes Mains side flexible cable, load side flexible cable and transit cable;The first end of described mains side flexible cable is connect by cable Head is connected to the mains side of distribution line, and the first end of described load side flexible cable is connected to described distribution by cable connector The load side of circuit;All it is serially connected with derailing switch on described mains side flexible cable and described load side flexible cable;Described switching The two ends of cable are respectively by the second end and the described load side flexible cable of cable connection box and described mains side flexible cable Second end connect;Described mains side flexible cable, described load side flexible cable and described transit cable are formed is joined with described Electric line short circuit bypass in parallel.
2. charged for replacement as claimed in claim 1 with the bypass equipment of equipment on bar multi-circuit tower it is characterised in that described Cable connection box includes the casing of enclosed construction, and the side of described casing is provided with entrance hole;It is fixed with copper bar, institute in described casing State insulation between copper bar and described casing to be connected;Described copper bar is provided with binding post.
3. charged for replacement as claimed in claim 2 with the bypass equipment of equipment on bar multi-circuit tower it is characterised in that described It is connected with fix bar in casing, described fix bar is fixedly connected with insulator;Described copper bar includes three U-shaped copper sheets, three U Shape copper sheet is arranged in order along described fix bar, and each U-shaped copper sheet is fixedly connected with described insulator;Described U-shaped copper sheet Two ends form described binding post respectively.
4. charged for replacement as claimed in claim 2 with the bypass equipment of equipment on bar multi-circuit tower it is characterised in that described Casing is provided with the chamber door that can switch.
5. charged for replacement as claimed in claim 3 with the bypass equipment of equipment on bar multi-circuit tower it is characterised in that described Second end of the first end of transit cable and described mains side flexible cable extend into described cable by described entrance hole respectively In transfer box, described transit cable and the described mains side flexible cable described terminals with the two ends of described U-shaped copper sheet respectively Son connects.
6. charged for replacement as claimed in claim 3 with the bypass equipment of equipment on bar multi-circuit tower it is characterised in that described Second end of the second end of transit cable and described load side flexible cable extend into described cable by described entrance hole respectively In transfer box, described transit cable and the described load side flexible cable described terminals with the two ends of described U-shaped copper sheet respectively Son connects.
7. charged for replacement as claimed in claim 1 with the bypass equipment of equipment on bar multi-circuit tower it is characterised in that described In the protecting crust that transit cable laying is arranged on the ground.
8. a kind of charged for replacement with the method for equipment on bar multi-circuit tower it is characterised in that described charged for replacement is with many times of bar On line pole tower, the method for equipment adopts the bypass equipment any one of claim 1 to 7, comprises the steps:
S1, lay described mains side flexible cable, described load side flexible cable and described transit cable and form described bypass and set Standby, make described derailing switch be in open position;
S2, by described mains side flexible cable and described load side flexible cable be connected respectively to need construction described distribution wire The mains side on road and load side, form the described short circuit bypass in parallel with described distribution line;
S3, the described derailing switch of connection, make described short circuit bypass be in running status, and detect described short circuit by current detecting instrument The electric current of bypass, confirms working properly;
S4, will need construction described distribution line power-off, power-off construction is carried out to described distribution line;
S5, construction connect described distribution line after finishing, and detect the electric current of described distribution line by current detecting instrument, confirmation Working properly;
The described derailing switch of S6, successively disconnection load side and mains side, removes described load side flexible cable and described mains side Flexible cable, then connect each described derailing switch, described bypass equipment is substantially discharged.
9. charged for replacement as claimed in claim 8 with the method for equipment on bar multi-circuit tower it is characterised in that in step S3 In, the described derailing switch of the side that first switches on power, check described mains side flexible cable, described load side flexible cable in load side After errorless with the connection of the phase place of described transit cable, the more described derailing switch connecting load side.
10. charged for replacement as claimed in claim 8 with the method for equipment on bar multi-circuit tower it is characterised in that in step In S4, first disconnect the load side of described distribution line, and insulated shielding cover be set, then disconnect the mains side of described distribution line, And insulated shielding cover is set;Again with the electric current of current detecting instrument detection described short circuit bypass, just confirming described short circuit bypass Often.
CN201611088882.7A 2016-12-01 2016-12-01 Bypass equipment and method for live replacement of equipment on same-tower multi-loop pole tower Pending CN106451220A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611088882.7A CN106451220A (en) 2016-12-01 2016-12-01 Bypass equipment and method for live replacement of equipment on same-tower multi-loop pole tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611088882.7A CN106451220A (en) 2016-12-01 2016-12-01 Bypass equipment and method for live replacement of equipment on same-tower multi-loop pole tower

Publications (1)

Publication Number Publication Date
CN106451220A true CN106451220A (en) 2017-02-22

Family

ID=58223412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611088882.7A Pending CN106451220A (en) 2016-12-01 2016-12-01 Bypass equipment and method for live replacement of equipment on same-tower multi-loop pole tower

Country Status (1)

Country Link
CN (1) CN106451220A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108736466A (en) * 2018-04-03 2018-11-02 国网浙江省电力有限公司杭州供电公司 A kind of method of distribution temporary subsection
CN110120643A (en) * 2019-04-19 2019-08-13 国网浙江淳安县供电有限公司 A kind of ground potential distribution power circuit uninterrupted operation method
CN112736789A (en) * 2020-12-23 2021-04-30 广东电网有限责任公司茂名供电局 Bypass drainage device for low-voltage line of distribution network
CN113922176A (en) * 2021-10-12 2022-01-11 贵州电网有限责任公司 Station terminal RS485 port wiring adapter and use method thereof
CN114301003A (en) * 2021-11-24 2022-04-08 国网浙江省电力有限公司舟山供电公司 Load switching method for flexible cable between adjacent strain towers

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006243995A (en) * 2005-03-02 2006-09-14 Fujikura Ltd Management method for on-electric pole power distribution equipment
CN102684087A (en) * 2012-05-30 2012-09-19 广州供电局有限公司 Bypass operation vehicle capable of enabling users to change distribution transformer without power cutting
CN103078268A (en) * 2012-12-28 2013-05-01 上海市电力公司 Uninterrupted power overhauling method of 10kV cables between two annular net cabinets
CN103840422A (en) * 2014-02-27 2014-06-04 云南电网公司带电作业分公司 400 A load current switching device for 10 kV power distribution network and application method thereof
CN203722189U (en) * 2014-02-27 2014-07-16 云南电网公司带电作业分公司 400A-load-current switching device used for 10kV power distribution network
CN203734209U (en) * 2014-02-17 2014-07-23 广东电网公司佛山供电局 Live working device for cable bypass
CN204835464U (en) * 2015-08-13 2015-12-02 江苏省电力公司常州供电公司 Quick plug cable branch case
CN206195248U (en) * 2016-12-01 2017-05-24 华北电力科学研究院有限责任公司 Electrified bypass equipment who changes with equipment on pole multiloop shaft tower

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006243995A (en) * 2005-03-02 2006-09-14 Fujikura Ltd Management method for on-electric pole power distribution equipment
CN102684087A (en) * 2012-05-30 2012-09-19 广州供电局有限公司 Bypass operation vehicle capable of enabling users to change distribution transformer without power cutting
CN103078268A (en) * 2012-12-28 2013-05-01 上海市电力公司 Uninterrupted power overhauling method of 10kV cables between two annular net cabinets
CN203734209U (en) * 2014-02-17 2014-07-23 广东电网公司佛山供电局 Live working device for cable bypass
CN103840422A (en) * 2014-02-27 2014-06-04 云南电网公司带电作业分公司 400 A load current switching device for 10 kV power distribution network and application method thereof
CN203722189U (en) * 2014-02-27 2014-07-16 云南电网公司带电作业分公司 400A-load-current switching device used for 10kV power distribution network
CN204835464U (en) * 2015-08-13 2015-12-02 江苏省电力公司常州供电公司 Quick plug cable branch case
CN206195248U (en) * 2016-12-01 2017-05-24 华北电力科学研究院有限责任公司 Electrified bypass equipment who changes with equipment on pole multiloop shaft tower

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108736466A (en) * 2018-04-03 2018-11-02 国网浙江省电力有限公司杭州供电公司 A kind of method of distribution temporary subsection
CN108736466B (en) * 2018-04-03 2020-10-27 国网浙江省电力有限公司杭州供电公司 Method for temporarily segmenting distribution network
CN110120643A (en) * 2019-04-19 2019-08-13 国网浙江淳安县供电有限公司 A kind of ground potential distribution power circuit uninterrupted operation method
CN110120643B (en) * 2019-04-19 2020-10-27 国网浙江淳安县供电有限公司 Uninterrupted power operation method for power line of ground potential distribution network
CN112736789A (en) * 2020-12-23 2021-04-30 广东电网有限责任公司茂名供电局 Bypass drainage device for low-voltage line of distribution network
CN113922176A (en) * 2021-10-12 2022-01-11 贵州电网有限责任公司 Station terminal RS485 port wiring adapter and use method thereof
CN113922176B (en) * 2021-10-12 2024-04-02 贵州电网有限责任公司 Station terminal RS485 port wiring adapter and application method thereof
CN114301003A (en) * 2021-11-24 2022-04-08 国网浙江省电力有限公司舟山供电公司 Load switching method for flexible cable between adjacent strain towers

Similar Documents

Publication Publication Date Title
CN106451220A (en) Bypass equipment and method for live replacement of equipment on same-tower multi-loop pole tower
US20090316446A1 (en) Transmission system
WO2017024931A1 (en) Quick connect and disconnect cable branch box
CN104979894A (en) RMU uninterrupted power supply load transfer method
CN112636694A (en) Photovoltaic power generation system and method
CN105445567B (en) The nuclear-phase method of totally enclosed type generalized information system
CN109347134A (en) Bipolar flexible direct-current power grid polar line electric main wiring system and online maintenance method
CN206195248U (en) Electrified bypass equipment who changes with equipment on pole multiloop shaft tower
CN208257232U (en) A kind of low-tension distribution box uninterrupted operation system
CN107809069B (en) Mobile emergency power supply cabinet for bypass of low-voltage equipment of power grid
CN108152779A (en) Electronic current mutual inductor check system and method
CN106885959B (en) Test method for replacing short-circuit copper bar by grounding knife switch in power plant electric main start test
CN109361197A (en) A kind of overcurrent protective device and method
CN108089144A (en) Electronic current mutual inductor field calibration system and method
CN109245291B (en) Maintenance safety measure arrangement method for double-bus double-subsection power supply system of transformer substation
CN105305108A (en) Cluster bus plugging device
CN101366156B (en) Power distribution system with individually isolatable functional zones
HRP20210941T1 (en) Electric vehicle charging station for connecting to high or extra high voltage transmission line and operation method thereof
CN206195321U (en) A cable transfer case for among live working bypass equipment
CN209748180U (en) Electric power system backup power supply bus protection transformation system
CN104062502B (en) A kind of cross interconnected system phase inspection method of high-tension cable
CN208045949U (en) A kind of high voltage distribution installation main electrical scheme system
KR101873005B1 (en) 3 Phase 4 Wires Zero Current Transformer for Detecting Insulation Resistance
CN207098399U (en) AC load switching device in transformer station
CN103972872A (en) Fault handling method of main lines and branch lines in 10KV distribution automation line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170222