CN104979894A - RMU uninterrupted power supply load transfer method - Google Patents

RMU uninterrupted power supply load transfer method Download PDF

Info

Publication number
CN104979894A
CN104979894A CN201510425798.9A CN201510425798A CN104979894A CN 104979894 A CN104979894 A CN 104979894A CN 201510425798 A CN201510425798 A CN 201510425798A CN 104979894 A CN104979894 A CN 104979894A
Authority
CN
China
Prior art keywords
phase
switch
nuclear phase
interconnection switch
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510425798.9A
Other languages
Chinese (zh)
Inventor
丁俊
车红卫
关晓菲
柳徐
赵子鋆
周波
张曦
唐炅
邓敏
戴兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Hunan Electric Power Co Ltd
Changsha Power Supply Co of State Grid Hunan Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Hunan Electric Power Co Ltd
Changsha Power Supply Co of State Grid Hunan Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Hunan Electric Power Co Ltd, Changsha Power Supply Co of State Grid Hunan Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Hunan Electric Power Co Ltd
Priority to CN201510425798.9A priority Critical patent/CN104979894A/en
Publication of CN104979894A publication Critical patent/CN104979894A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种环网柜不停电负荷转供方法,该方法包括如下步骤:1)将环网柜外二次侧接线孔作为环网柜内相应于进线控制开关和常开联络开关的用于测定相序的核相孔;2)对相应于进线控制开关的各相核相孔及相应于常开联络开关的各相核相孔进行两两核相;3)对相应于进线控制开关的核相孔及相应于常开联络开关的核相孔进行同电源核相;然后进行异电源核相:4)当上述判断均正确后,认定进线控制开关与常开联络开关的二次接线正确、常开联络开关两侧线路的相序对应正确,此时合上常开联络开关,再断开相应一侧电站开关,实现环网柜互联线路不停电(合环)转供负荷。本发明实施容易、操作简单安全,极大地提升了城市配电网的供电可靠性。

The invention discloses a load transfer method for a ring network cabinet without power failure. The method includes the following steps: 1) Using the secondary side wiring hole outside the ring network cabinet as a control switch corresponding to the incoming line and a normally open contact switch in the ring network cabinet The nuclear phase hole for determining the phase sequence; 2) Perform two-two nuclear phase for each phase nuclear hole corresponding to the incoming line control switch and each phase nuclear phase hole corresponding to the normally open contact switch; 3) For the corresponding The check phase hole of the incoming line control switch and the check phase hole corresponding to the normally open connection switch are checked for the same power source; The secondary wiring of the switch is correct, and the phase sequence of the lines on both sides of the normally open contact switch is correct. At this time, close the normally open contact switch, and then disconnect the power station switch on the corresponding side, so as to realize the non-stop power supply (ring closure) of the interconnection line of the ring main unit. transfer load. The invention is easy to implement, simple and safe to operate, and greatly improves the power supply reliability of the urban distribution network.

Description

环网柜不停电负荷转供方法Ring network cabinet load transfer method without power failure

技术领域 technical field

本发明属于电网自动化运行领域,具体涉及一种环网柜不停电负荷转供方法。 The invention belongs to the field of automatic operation of power grids, and in particular relates to a load transfer method of a ring network cabinet without power failure.

背景技术 Background technique

配电环网是指两条及两条以上的配电线路组成“手拉手”线路,对每条线路进行分段设置控制开关,线路的连接点设置联络开关,实现支干线互联供电,当线路的某一部分出现故障,可以及时隔离故障部位,设法从两侧开关向负荷正常供电,减少停电损失。随着社会经济快速发展,城市配网网架变化非常大,电缆线路逐渐取代架空线路,并占据了主要地位。现有城市配电环网一般采用环网柜进行互联,具体如图1、图2所示。 The power distribution ring network refers to two or more power distribution lines that form a "hand in hand" line. Control switches are set for each line in sections, and contact switches are set at the connection points of the lines to realize the interconnection of branch and trunk lines. When the line If a certain part of the system fails, the faulty part can be isolated in time, and the power supply can be normally supplied to the load from the switches on both sides, so as to reduce the loss of power failure. With the rapid development of social economy, the urban distribution network structure has changed greatly, and cable lines have gradually replaced overhead lines and occupied a major position. The existing urban power distribution ring network generally adopts ring network cabinets for interconnection, as shown in Figure 1 and Figure 2.

环网柜是指一组高压开关设备装在金属或非金属绝缘柜体内或做成拼装间隔式的电气设备,环网柜中设有母线及其进出线设备,完成接受并分配电力,能开、合负荷电流、过载电流及短路电流。环网柜内部的高压母线及进出线间隔由前挡挡板封闭,且前挡挡板与接地刀闸形成了互锁,只有在相关间隔停电并转检修的状况下,运维人员才能将挡板取下,以确保现场运维的人身安全。 The ring network cabinet refers to a set of high-voltage switchgear installed in a metal or non-metal insulated cabinet or made into an assembled compartment type electrical equipment. The ring network cabinet is equipped with a busbar and its incoming and outgoing line equipment to complete receiving and distributing power. , Combined load current, overload current and short circuit current. The high-voltage busbar and the interval between the incoming and outgoing lines inside the ring network cabinet are closed by the front baffle, and the front baffle and the grounding knife switch form an interlock. Remove the board to ensure the personal safety of on-site operation and maintenance.

在配电环网中进行不停电(合环)转供负荷,是指电气操作中先将环网线路、变压器或断路器串构成网络闭合运行,再断开相应一侧电站开关的操作,以图1或图2为例,即为先合上常开联络开关,再断开电站1(或电站2)开关,将电站1(电站2)所出线路的电力负荷转至电站2(电站1)供电。根据三相交流电力系统的运行特性,电力系统在正常运行时,配电线路必须在联络开关两侧核相并对应正确后,才能合环操作,即不停电转供负荷。如果联络开关两侧线路相序不对应正确,贸然合上联络开关,将造成线路短路,造成设备烧坏等严重事故。但是由于环网柜采用的“全绝缘、全密封”结构,其高压带电体封装在柜体内,正常带电运行时无法直接核对联络开关两侧线路相序,一般只能停电进行负荷转供及运行方式调整,即停电调电转供负荷。由此,对电力优质服务、供电企业精益化管理、电力现场操作安全均产生严重影响。 In the power distribution ring network, the non-stop power supply (ring closing) transfer load refers to the operation of first closing the ring network line, transformer or circuit breaker string to form a network in the electrical operation, and then disconnecting the operation of the power station switch on the corresponding side, so as to Take Figure 1 or Figure 2 as an example, that is, close the normally open contact switch first, then turn off the switch of power station 1 (or power station 2), and transfer the power load of the line from power station 1 (power station 2) to power station 2 (power station 1) )powered by. According to the operating characteristics of the three-phase AC power system, when the power system is in normal operation, the distribution line must be checked and correspondingly correct on both sides of the contact switch before the loop can be closed, that is, the load is transferred without power failure. If the phase sequence of the lines on both sides of the contact switch is not correct, and the contact switch is closed rashly, it will cause a short circuit of the line and cause serious accidents such as equipment burnout. However, due to the "fully insulated and fully sealed" structure adopted by the ring network cabinet, its high-voltage live body is encapsulated in the cabinet, and it is impossible to directly check the phase sequence of the lines on both sides of the contact switch during normal live operation. Mode adjustment, that is, power outage and power transfer to load. As a result, it will have a serious impact on high-quality electric power services, lean management of power supply enterprises, and on-site electric power operation safety.

为了应对这一难题,某些地方供电企业开发了“基于旁路带电作业”的环网柜不停电负荷转供技术。所谓旁路转供技术,就是指利用旁路布缆车、旁路配电车等设备,在正常供电线路上构建电缆旁路并接转供用电负荷,由旁路电缆(设备)临时替代正常线路(设备)供电。但是该技术实施协调难度大,综合协作能力要求非常高。每次实施该技术作业前,必需出动大型应急旁路布缆车、带电作业车及其它电力施工车辆,作业点周边带电设备需围起防护网,实施现场需近三十名左右工作人员配合,耗费较多时间、精力。 In order to cope with this problem, some local power supply enterprises have developed the technology of load transfer of ring main unit without power failure based on "bypass live operation". The so-called bypass transfer technology refers to the use of bypass cable cars, bypass distribution vehicles and other equipment to build cable bypass on the normal power supply line and transfer the power supply load, and the bypass cable (equipment) temporarily replaces the normal power supply. Line (device) powered. However, the implementation and coordination of this technology is difficult, and the requirements for comprehensive collaboration capabilities are very high. Every time before implementing this technical operation, it is necessary to dispatch large-scale emergency bypass cable cars, live work vehicles and other electric construction vehicles. The live equipment around the operation point needs to be surrounded by a protective net. The implementation site requires the cooperation of about 30 staff, which consumes a lot of money. More time and energy.

发明内容 Contents of the invention

本发明的目的在于提供一种实施容易、操作简单、安全可靠的环网柜不停电负荷转供方法。 The purpose of the present invention is to provide a method for transferring loads without power failure of the ring main unit which is easy to implement, simple to operate, safe and reliable.

本发明提供的这种环网柜不停电负荷转供方法,包括如下步骤: The load transfer method of the ring main unit without power failure provided by the present invention comprises the following steps:

1)确定待执行合环操作的环网柜,此时环网柜中的常开联络开关处于断开状态; 1) Determine the ring main unit to be closed. At this time, the normally open contact switch in the ring main unit is in the disconnected state;

2)将环网柜外二次侧接线孔作为环网柜内相应于进线控制开关和常开联络开关的用于测定相序的核相孔; 2) The secondary side wiring hole outside the ring network cabinet is used as the nuclear phase hole for measuring the phase sequence corresponding to the incoming line control switch and the normally open contact switch in the ring network cabinet;

3)对相应于进线控制开关的各相核相孔进行两两核相,对相应于常开联络开关的各相核相孔进行两两核相,判定进线控制开关及常开联络开关二次接线是否有错误并接。 3) Carry out two-two phase checks for each phase check hole corresponding to the incoming line control switch, and perform two-two checks for each phase check phase hole corresponding to the normally open contact switch, and determine the incoming line control switch and the normally open contact switch Whether the secondary wiring is wrong and connected.

4)对相应于进线控制开关的核相孔及相应于常开联络开关的核相孔进行同电源核相:常开联络开关一侧接母排,另一侧接联络电缆,对于联络电缆的另一端还连有一个常合联络开关,断开该常合联络开关,然后合上所述常开联络开关,对相应于进线控制开关核相孔和相应于常开联络开关核相孔在各对应相之间进行相互一一核相,判断进线控制开关与常开联络开关二次接线对应电压是否同相位。 4) Carry out the same power supply verification for the nuclear phase hole corresponding to the incoming line control switch and the nuclear phase hole corresponding to the normally open contact switch: one side of the normally open contact switch is connected to the busbar, and the other side is connected to the contact cable. For the contact cable The other end of the connection is also connected with a normally closed contact switch, disconnect the normally closed contact switch, then close the normally open contact switch, and connect the nuclear phase hole corresponding to the incoming line control switch and the nuclear phase hole corresponding to the normally open contact switch. Carry out one-by-one phase verification among the corresponding phases, and judge whether the corresponding voltages of the incoming line control switch and the secondary wiring of the normally open contact switch are in the same phase.

5)对相应于进线控制开关的核相孔及相应于常开联络开关的核相孔进行异电源核相:对已合上的常开联络开关拉闸,使之处于断开状态,对已断开的常合联络开关执行合闸,对相应于进线控制开关核相孔和相应于常开联络开关核相孔在各对应相之间进行相互一一核相,再次判断进线控制开关与常开联络开关二次接线对应电压是否同相位。 5) Perform different power supply verification on the nuclear phase hole corresponding to the incoming line control switch and the nuclear phase hole corresponding to the normally open contact switch: pull the closed normally open contact switch to make it in the disconnected state, and The normally closed contact switch that has been disconnected is closed, and the phase verification hole corresponding to the incoming line control switch and the phase verification hole corresponding to the normally open contact switch are mutually checked one by one among the corresponding phases, and the incoming line control is judged again. Whether the voltage corresponding to the secondary wiring of the switch and the normally open contact switch is in the same phase.

6)当通过步骤3~5均判断正确后,即认定进线控制开关与常开联络开关的二次接线正确、常开联络开关两侧线路的相序对应正确,此时合上常开联络开关,实现环网柜联络线路的合环操作,再断开待停止供电电站的开关,实现将一侧配电线路电力负荷通过环网柜联络开关不停电(合环)转供到另一侧线路供电。 6) After steps 3 to 5 are all judged correctly, it is determined that the secondary wiring between the incoming line control switch and the normally open contact switch is correct, and the phase sequence of the lines on both sides of the normally open contact switch is correct. At this time, close the normally open contact The switch realizes the ring-closing operation of the contact line of the ring network cabinet, and then disconnects the switch of the power supply station to be stopped, so as to transfer the power load of one side of the distribution line to the other side through the contact switch of the ring network cabinet without power failure (ring closure) Line powered.

所述核相以交流电压波形进行判断。 The nuclear phase is judged by the AC voltage waveform.

所述核相采用测量交流电压相位差的仪器进行测量核相。 The nuclear phase is measured by an instrument for measuring the AC voltage phase difference.

    本发明环网柜不停电负荷转供方法是通过先对环网柜两侧联络线路进行核相再进行合环操作来实现不停电转供负荷的。与现有技术相比本发明不需要增加任何设备,也没有任何经费投入,而且操作简单、安全可靠,作业量小,技术难度低,能快速的实现不停电转供负荷,整个操作过程中不需要对欲转供的负荷停电,在不影响欲转供的负荷正常工作的情况下顺利的实现该负荷转供。本发明极大地提升了城市配电网的供电可靠性,提升了电力优质服务水平,简化了运维操作流程和人员操作量,有效避免了负荷的损失。 The method of load transfer without power failure of the ring network cabinet of the present invention is to realize the load transfer without power failure by first checking the phase of the contact lines on both sides of the ring network cabinet and then performing the ring closing operation. Compared with the prior art, the present invention does not need to add any equipment, nor does it require any capital investment, and the operation is simple, safe and reliable, the workload is small, and the technical difficulty is low. It is necessary to cut off the power supply of the load to be transferred, and realize the load transfer smoothly without affecting the normal operation of the load to be transferred. The invention greatly improves the power supply reliability of the urban distribution network, improves the high-quality power service level, simplifies the operation and maintenance operation process and the amount of personnel operations, and effectively avoids the loss of load.

附图说明 Description of drawings

图1为现有技术中配电环网示意图。 Fig. 1 is a schematic diagram of a power distribution ring network in the prior art.

图2为现有技术中配电线路联络开关示意图。 Fig. 2 is a schematic diagram of a distribution line tie switch in the prior art.

图3为本发明的一种具体实施例的配电线路联络开关示意图。 Fig. 3 is a schematic diagram of a distribution line tie switch according to a specific embodiment of the present invention.

图4为本发明的环网柜同间隔间两两核相示意图。 Fig. 4 is a schematic diagram of two core phases in the same compartment of the ring main unit of the present invention.

图5为本发明的环网柜同电源核相示意图。 Fig. 5 is a schematic diagram of the ring main unit and the power core of the present invention.

图6为本发明的环网柜异电源核相示意图。 Fig. 6 is a schematic diagram of different power sources and nuclear phases of the ring main unit of the present invention.

具体实施方式 Detailed ways

如图3所示为本发明的一种具体实施例的配电线路联络开关示意图,为了使图像更能清晰展示,本示意图只画了单相,三相图与单向图同理。本实施方式是一个由甲乙两个电站供电的实施例,在甲电站配电线路和乙电站配电线路之间对应有甲乙两个环网柜,每个环网柜中都有一个进线控制开关(401和404)、一个联络开关(402和403),其中甲环网柜中的联络开关为常开联络开关,乙环网柜中的联络开关为常合联络开关,甲环网柜中的常开联络开关与乙环网柜中常合联络开关之间通过联络电缆连接。每个环网柜外都自带有二次接线孔,该二次接线孔已经获取与一次接线耦合对应的低电压,利用这一点,本发明将二次侧接线孔作为环网柜内相应于进线控制开关和常开联络开关的用于测定相序的核相孔,对常开联络开关两侧线路相序进行核相,当核相确定相序一致时,即可合环。比如乙变电站需要停电维修,原来由乙变电站供电的负荷必须转到由甲变电站供电,用本发明方法不停电转供乙站负荷,需要对甲环网柜中的常开联络开关(402)两侧线路进行核相,相序完全正确后才能合环,进而不停电转供负荷。具体做法如下: As shown in Figure 3, it is a schematic diagram of a distribution line tie switch of a specific embodiment of the present invention. In order to make the image more clearly displayed, this schematic diagram only draws a single phase, and the three-phase diagram is the same as the one-way diagram. This implementation mode is an example where power is supplied by two power stations A and B. There are two ring network cabinets of A and B correspondingly between the distribution line of Power Station A and the distribution line of Power Station B. Each ring network cabinet has an incoming line control Switches (401 and 404), a contact switch (402 and 403), wherein the contact switch in the ring network cabinet is a normally open contact switch, the contact switch in the ring network cabinet is a normally closed contact switch, and the contact switch in the ring network cabinet is a normally closed contact switch. The normally open contact switch in the network cabinet is connected with the normally closed contact switch in the second ring network cabinet through a contact cable. Each ring network cabinet has its own secondary wiring hole outside, and the secondary wiring hole has obtained the low voltage corresponding to the primary wiring coupling. Taking advantage of this, the present invention uses the secondary side wiring hole as the corresponding The check-phase holes of the incoming line control switch and the normally open tie switch are used to measure the phase sequence, and the phase sequence of the lines on both sides of the normally open tie switch is checked. When the check phase confirms that the phase sequence is consistent, the ring can be closed. Such as substation B needs power outage maintenance, the load originally powered by substation B must be transferred to substation A to supply power, and the method of the present invention is used to transfer the load of substation B without power outage, and it is necessary to connect the normally open contact switch (402) in the ring network cabinet twice The phase of the side line is checked, and the phase sequence can be closed only after the phase sequence is completely correct, and then the load is transferred without power failure. The specific method is as follows:

步骤1:甲环网柜同间隔间两两核相,参见图4,具体如下: Step 1: Two core phases in the same compartment of a ring network cabinet, see Figure 4, details are as follows:

保持进线控制开关401的闭合和常开联络开关402的断开,在甲环网柜布置的二次接线孔获得低电压值(30~100V),高低电压的波形、幅值对应成正比,频率保持一致,使用测量交流电压相位差的仪器,在二次接线孔A对同一线路的二次接线孔B、同一线路的二次接线孔C两两各进行一次核相,401为:401A对401B、401A对401C,402为:402A对402B、402A对402C;因“三相交流电力系统A/B/C三相电压相位差依次互差120°,如该间隔二次接线无并接或接线错误,则此两次核相的相位差结果必然是120°与240°;如该间隔二次接线存在并接或接线错误,则此两次核相的相位差结果必然是0°与0°或0°与120°或0°与240°或120°与120°或240°与240°,于是通过该步骤测出同间隔线路的两两核相结果,判断进线控制开关401和常开联络开关402间隔对应的二次接线有无并接错误。具体如下表所示: Keep the incoming line control switch 401 closed and the normally open contact switch 402 disconnected, and obtain a low voltage value (30~100V) in the secondary wiring hole arranged in the ring network cabinet. The waveform and amplitude of the high and low voltage are proportional to each other. Keep the frequency consistent, use the instrument for measuring the phase difference of AC voltage, and perform a phase verification on the secondary wiring hole A of the same line, the secondary wiring hole B of the same line, and the secondary wiring hole C of the same line. 401 is: 401A pair 401B, 401A to 401C, and 402 are: 402A to 402B, 402A to 402C; because "the three-phase AC power system A/B/C three-phase voltage phase difference is 120° in turn, if there is no parallel connection or If the wiring is wrong, the phase difference between the two nuclear phases must be 120° and 240°; if there is a parallel connection or wiring error in the secondary wiring at this interval, the phase difference between the two nuclear phases must be 0° and 0° ° or 0° and 120° or 0° and 240° or 120° and 120° or 240° and 240°, so through this step, the pairwise core phase results of the lines at the same interval are measured, and the incoming line control switch 401 and normal Whether there is a parallel connection error in the secondary wiring corresponding to the interval of opening the contact switch 402. The details are shown in the following table:

表1 Table 1

步骤2:甲环网柜先同电源核相、再异电源核相,具体如图5、图6所示: Step 2: The A ring network cabinet first has the same power core phase, and then different power core phases, as shown in Figure 5 and Figure 6:

可以看到,两个不同间隔在甲环网柜内的相母排连接;相母排同样分为A相、B相和C相;图5和图6中左边间隔由甲变电站供电,供电线路中的一相连接在相母排中的某相上,右边间隔由乙变电站供电,供电线路中的一相同样连接在相母排中的某相上;采用以下方法可判定环网柜二次接线及联络开关两侧相序是否正确: It can be seen that two different intervals are connected to the phase busbars in the A ring network cabinet; the phase busbars are also divided into A phase, B phase and C phase; the left interval in Figure 5 and Figure 6 is powered by A substation, and the power supply line One phase of the power supply line is connected to a certain phase of the phase busbar, and the right interval is powered by substation B, and one phase of the power supply line is also connected to a certain phase of the phase busbar; the following method can be used to determine the secondary Whether the wiring and the phase sequence on both sides of the contact switch are correct:

①同电源核相: 先将联络电缆连接的常合联络开关403断开,再将联络电缆连接的常开联络开关402闭合,此时配电线路如图5所示,此时联络开关402连接的两侧线路均由同一路电源(甲变电站)供电;在此基础上,利用测量交流电压相位差的仪器对甲环网柜连接401、402开关的对应二次核相孔各对应相之间进行一一测量,即401A对402A、401B对402B、401C对402C,如相位差显示均为同相,则继续下步操作,如相位差显示任一对为异相,则判定甲环网柜401、402开关对应二次接线错误,必须对二次接线进行改接直到满足上述相位差为同相的要求; ①Same as power supply nuclear phase: First disconnect the normally closed contact switch 403 connected with the contact cable, and then close the normally open contact switch 402 connected with the contact cable. At this time, the distribution circuit is shown in Figure 5, and the contact switch 402 is connected at this time Both sides of the line are powered by the same power supply (substation A); on this basis, use the instrument for measuring the phase difference of AC voltage to connect the corresponding secondary nuclear phase holes of the switches 401 and 402 to the ring network cabinet between the corresponding phases Measure one by one, that is, 401A to 402A, 401B to 402B, 401C to 402C. If the phase difference shows that they are all in phase, continue to the next step. If the phase difference shows that any pair is out of phase, then determine that the ring network cabinet 401 , The 402 switch corresponds to the secondary wiring error, and the secondary wiring must be reconnected until the above phase difference is met;

② 异电源核相:在①的基础上,将常开联络开关402恢复断开状态,再将常合联络开关403闭合,如图6所示,此时联络开关402连接的两侧线路由不同电源供电;在此基础上,再次利用测量交流电压相位差的仪器对甲环网柜连接401、402开关对应的二次核相孔各对应相之间进行一一测量,即401A对402A、401B对402B、401C对402C,并根据相位差再次判断甲环网柜内两侧线路的二次连接及相序情况,如相位差显示均为同相,则继续下步操作,如相位差显示任一对为异相,则判定环网柜联络开关两侧配电线路相序错误,必须将两侧配电线路进行换相直至正确。 ② Different power source nuclear phase: On the basis of ①, restore the normally open contact switch 402 to the disconnected state, and then close the normally closed contact switch 403, as shown in Figure 6. At this time, the two sides of the contact switch 402 are connected by different routes. Power supply; on this basis, use the instrument for measuring the phase difference of AC voltage to measure the corresponding phases of the secondary nuclear phase holes corresponding to the switches 401 and 402 connected to the ring network cabinet, that is, 401A to 402A, 401B For 402B, 401C, and 402C, judge the secondary connection and phase sequence of the lines on both sides of the ring network cabinet according to the phase difference. If the phase difference shows that they are all in the same phase, continue to the next step. If the phase difference shows that any If it is out of phase, it is determined that the phase sequence of the distribution lines on both sides of the contact switch of the ring main unit is wrong, and the phase sequence of the distribution lines on both sides must be commutated until it is correct.

综合上述步骤1:同相间隔两两核相、步骤2:先同电源核相再异电源核相的判定结果,可正确判定甲环网柜内二次侧接线是否正确、常开联络开关两侧线路相序是否正确,一旦二次接线和核相均正确,则认定常开联络开关402两侧线路的相序对应正确,这种核相方法有效防止了所谓环网柜“一次侧接反、二次侧也接反,同电源核相验证‘负负得正’”的情况的发生。同时,在进行核相时,必须采用测量相角差的仪器,核对三相交流电压相应相角差值,而不能使用测量三相交流电压差值的仪器,即不能通过“同相电压相差为零,异相电压相差100V”来判断,因为环网柜二次接线孔所耦合的电压并非标准值,因耦合电压、二次接线电阻的偏差,根据系统内对环网柜实测,环网柜二次接线孔所耦合的电压从30~100V不等,根本无法得出二次接线孔“同相电压相差为零,异相电压相差100V”的结论。 Combining the judgment results of the above step 1: two core phases separated by the same phase, and step 2: first the same power core phase and then different power core phases, it can be correctly judged whether the secondary side wiring in the A ring network cabinet is correct, and whether the two sides of the normally open contact switch are correct. Whether the phase sequence of the line is correct. Once the secondary wiring and phase verification are correct, it is determined that the phase sequence of the lines on both sides of the normally open contact switch 402 is correct. This verification method effectively prevents the so-called "reverse connection of the primary side, The secondary side is also reversed, and the same power supply core is used to verify the occurrence of the situation of "negative negative becomes positive". At the same time, when performing phase verification, an instrument for measuring the phase angle difference must be used to check the corresponding phase angle difference of the three-phase AC voltage, instead of an instrument for measuring the difference of the three-phase AC voltage, that is, the "phase difference of the same phase voltage is zero". , out-of-phase voltage difference of 100V" to judge, because the voltage coupled to the secondary wiring hole of the ring network cabinet is not a standard value, due to the deviation of the coupling voltage and the secondary wiring resistance, according to the actual measurement of the ring network cabinet in the system, the ring network cabinet two The voltage coupled to the secondary wiring hole ranges from 30 to 100V, and it is impossible to draw the conclusion that "the voltage difference between the same phase is zero and the voltage difference between different phases is 100V" for the secondary wiring hole.

步骤3:环网柜互联线路的不停电(合环)操作转供电力负荷,具体如图6所示: Step 3: The non-stop power-off (ring closing) operation of the interconnection line of the ring main unit is transferred to the power load, as shown in Figure 6:

① 在步骤1、2的基础上,合上甲环网柜402常开联络开关,进行甲电站配电线路与乙电站配电线路合环; ① On the basis of steps 1 and 2, close the normally open contact switch 402 of the ring main unit A to close the distribution line of power station A and power station B;

② 拉开乙电站对应开关,实现乙站配电线路负荷不停电转供至甲站配电线路供电。 ② Turn on the corresponding switch of power station B to realize the power transfer of the distribution line load of station B to the distribution line of station A without interruption.

Claims (3)

1. ring main unit does not have a power failure a load transfer method, comprises the steps:
1) determine the ring main unit of pending Loop Closing Operation, the interconnection switch of often opening now in ring main unit is in off-state;
2) outer for ring main unit secondary side wiring hole is used for corresponding to inlet wire control switch and Chang Kai interconnection switch in ring main unit the nuclear phase hole measuring phase sequence;
3) nuclear phase is between two carried out to each phase nuclear phase hole corresponding to inlet wire control switch, carry out nuclear phase between two to corresponding to each phase nuclear phase hole of often driving interconnection switch, judge inlet wire control switch and often open interconnection switch secondary connection whether wrong and connect;
4) to the nuclear phase hole corresponding to inlet wire control switch and carry out same power supply nuclear phase corresponding to the nuclear phase hole of often driving interconnection switch: often open interconnection switch one side joint busbar, another side joint link cable, the other end for link cable is also connected with one and often closes interconnection switch, disconnect this and often close interconnection switch, then close and describedly often drive interconnection switch, to corresponding to inlet wire control switch nuclear phase hole and corresponding to often open interconnection switch nuclear phase hole each corresponding mutually between carry out mutually nuclear phase one by one, judge inlet wire control switch and often open interconnection switch secondary connection corresponding voltage whether same-phase;
5) to the nuclear phase hole corresponding to inlet wire control switch and carry out different power supply nuclear phase corresponding to the nuclear phase hole of often driving interconnection switch: operate a switch to the interconnection switch of often opening closed, make it to be in off-state, combined floodgate is performed to the normal conjunction interconnection switch disconnected, to corresponding to inlet wire control switch nuclear phase hole and corresponding to often open interconnection switch nuclear phase hole each corresponding mutually between carry out mutually nuclear phase one by one, again judge inlet wire control switch and often open interconnection switch secondary connection corresponding voltage whether same-phase;
6) after passing through the equal correct judgment in step 3 ~ 5, correctly, often to open the phase sequence of interconnection switch both sides circuit corresponding correctly with often opening the secondary connection of interconnection switch to assert inlet wire control switch, now close and often drive interconnection switch, realize the Loop Closing Operation of ring main unit both sides distribution line, disconnect the switch in power station to be stopped power supply again, realize side distribution line electric load to turn and be fed to opposite side distribution line by the cyclization that do not have a power failure of ring main unit interconnection switch and power.
2. a kind of ring main unit according to claim 1 does not have a power failure load transfer method, it is characterized in that described nuclear phase judges with alternating voltage waveform.
3. a kind of ring main unit load transfer method according to claim 1 and 2, is characterized in that described nuclear phase adopts the instrument measuring alternating voltage phase difference to carry out measurement nuclear phase.
CN201510425798.9A 2015-07-20 2015-07-20 RMU uninterrupted power supply load transfer method Pending CN104979894A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510425798.9A CN104979894A (en) 2015-07-20 2015-07-20 RMU uninterrupted power supply load transfer method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510425798.9A CN104979894A (en) 2015-07-20 2015-07-20 RMU uninterrupted power supply load transfer method

Publications (1)

Publication Number Publication Date
CN104979894A true CN104979894A (en) 2015-10-14

Family

ID=54276119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510425798.9A Pending CN104979894A (en) 2015-07-20 2015-07-20 RMU uninterrupted power supply load transfer method

Country Status (1)

Country Link
CN (1) CN104979894A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108183476A (en) * 2017-12-29 2018-06-19 国网北京市电力公司 The remodeling method and power distribution network of power distribution network
CN109001533A (en) * 2018-07-11 2018-12-14 国网湖南省电力有限公司 Switchgear is to phase method
CN109546577A (en) * 2019-01-23 2019-03-29 浙江华仪电器科技有限公司 A kind of uninterrupted operation maintenance auxiliary switch assembly and power grid service without power-off method
CN109546578A (en) * 2019-01-23 2019-03-29 浙江华仪电器科技有限公司 A kind of uninterrupted operation maintenance auxiliary switch assembly and power grid service without power-off method
CN112510573A (en) * 2020-09-29 2021-03-16 浙江大有实业有限公司带电作业分公司 Outgoing cable overhauling method based on temporary mobile power supply application
CN112952809A (en) * 2021-02-20 2021-06-11 云南电网有限责任公司电力科学研究院 Series loop-closing power regulating device and method for multi-loop network cabinet of power distribution network
CN112946513A (en) * 2021-02-03 2021-06-11 山东钢铁股份有限公司 Phase checking method for power supply of transformer substation
CN113363968A (en) * 2021-05-26 2021-09-07 广东韶钢松山股份有限公司 Method for transferring load of power distribution system of new and old transformer substation without power outage
CN113872194A (en) * 2021-09-28 2021-12-31 国网江苏省电力有限公司电力科学研究院 Mobile distribution line loop closing hot reversing operation device and method
CN119471080A (en) * 2024-11-11 2025-02-18 广东电网有限责任公司广州供电局 Portable non-sensing power transfer device and power transfer method thereof
CN119804981A (en) * 2024-12-31 2025-04-11 国网北京市电力公司 On-site detection method of voltage phase difference based on phase hole of ring main unit

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020052742A (en) * 2000-12-26 2002-07-04 신현준 Method of bypass without phase-difference for UPS with phase-difference
CN202182918U (en) * 2011-09-07 2012-04-04 王芳 Remote wireless nuclear phase device for cable lines
CN203455416U (en) * 2013-09-16 2014-02-26 国家电网公司 Ring main unit phase checking loop closing device
CN104156797A (en) * 2014-06-24 2014-11-19 国网浙江海盐县供电公司 Skipping execution method for electric power scheduling instruction ticket

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020052742A (en) * 2000-12-26 2002-07-04 신현준 Method of bypass without phase-difference for UPS with phase-difference
CN202182918U (en) * 2011-09-07 2012-04-04 王芳 Remote wireless nuclear phase device for cable lines
CN203455416U (en) * 2013-09-16 2014-02-26 国家电网公司 Ring main unit phase checking loop closing device
CN104156797A (en) * 2014-06-24 2014-11-19 国网浙江海盐县供电公司 Skipping execution method for electric power scheduling instruction ticket

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陆志欣: "浅析供电企业提高10KV配网合环转供电率的措施", 《电子测试》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108183476A (en) * 2017-12-29 2018-06-19 国网北京市电力公司 The remodeling method and power distribution network of power distribution network
CN109001533A (en) * 2018-07-11 2018-12-14 国网湖南省电力有限公司 Switchgear is to phase method
CN109546577A (en) * 2019-01-23 2019-03-29 浙江华仪电器科技有限公司 A kind of uninterrupted operation maintenance auxiliary switch assembly and power grid service without power-off method
CN109546578A (en) * 2019-01-23 2019-03-29 浙江华仪电器科技有限公司 A kind of uninterrupted operation maintenance auxiliary switch assembly and power grid service without power-off method
CN112510573A (en) * 2020-09-29 2021-03-16 浙江大有实业有限公司带电作业分公司 Outgoing cable overhauling method based on temporary mobile power supply application
CN112946513A (en) * 2021-02-03 2021-06-11 山东钢铁股份有限公司 Phase checking method for power supply of transformer substation
CN112952809A (en) * 2021-02-20 2021-06-11 云南电网有限责任公司电力科学研究院 Series loop-closing power regulating device and method for multi-loop network cabinet of power distribution network
CN112952809B (en) * 2021-02-20 2022-09-27 云南电网有限责任公司电力科学研究院 Series loop-closing power regulating device and method for multi-loop network cabinet of power distribution network
CN113363968A (en) * 2021-05-26 2021-09-07 广东韶钢松山股份有限公司 Method for transferring load of power distribution system of new and old transformer substation without power outage
CN113872194A (en) * 2021-09-28 2021-12-31 国网江苏省电力有限公司电力科学研究院 Mobile distribution line loop closing hot reversing operation device and method
CN119471080A (en) * 2024-11-11 2025-02-18 广东电网有限责任公司广州供电局 Portable non-sensing power transfer device and power transfer method thereof
CN119804981A (en) * 2024-12-31 2025-04-11 国网北京市电力公司 On-site detection method of voltage phase difference based on phase hole of ring main unit

Similar Documents

Publication Publication Date Title
US7830679B2 (en) Transmission system
CN105576660B (en) Local distribution network in-circuit emulation analytical equipment and system
CN101917064B (en) Back-up protection processing method of digital substation transformer based on GOOSE mode
CN105655879B (en) The voltage arrangement of 110 kilovolts of system busbar combining unit duplicate system retrofits of intelligent substation double bus scheme mode
CN103138171B (en) A kind of power electronic transformer substation
US8014178B2 (en) Converter station
CN104898018B (en) One-phase earthing failure in electric distribution network tries to draw Detection & Controling device automatically
CN109450080A (en) A kind of automatic redundancy zero propagation switching system of two dc power supply and method
CN105375465A (en) City center area power distribution network and load transfer method
CN201134619Y (en) 10KV distribution network closing ring power exchange device
CN202600048U (en) Automatic PT (potential transformer) secondary voltage paralleling/switching system
CN104505863A (en) A method for determining and adjusting wireless phase detection
CN114407734B (en) Flexible traction power supply system and protection method
CN108736480A (en) A kind of multichannel AC looped network type energy router
CN105809576A (en) Power distribution network oriented power supply safety load hierarchical evaluation method
CN205231838U (en) Boats and ships bank electricity automatic switching device
CN202009236U (en) Single-bus segmental running control device of substation
US20090201702A1 (en) Converter Station
CN207853185U (en) The female simultaneous other system structure of substation
CN204334126U (en) Measurement and control device for 10kV switching station
CN113507072B (en) Method for replacing 10kV relay protection device in live mode
CN105429176A (en) Cophase supply power mutual feedback experiment system for electrified railways
CN110460044A (en) 10 KV medium-voltage distribution network closed-loop operation system and use method thereof
CN204696667U (en) Be applicable to the railway substation protection for feed line measure and control device of Line for Passenger Transportation
CN201918728U (en) Circuit with phase automatic error correction function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151014