CN208707246U - Control cable support and control cable laying device - Google Patents
Control cable support and control cable laying device Download PDFInfo
- Publication number
- CN208707246U CN208707246U CN201821451320.9U CN201821451320U CN208707246U CN 208707246 U CN208707246 U CN 208707246U CN 201821451320 U CN201821451320 U CN 201821451320U CN 208707246 U CN208707246 U CN 208707246U
- Authority
- CN
- China
- Prior art keywords
- cable
- testing bridge
- control cable
- side plate
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012360 testing method Methods 0.000 claims abstract description 63
- 230000004888 barrier function Effects 0.000 claims abstract description 43
- 230000027455 binding Effects 0.000 claims description 20
- 238000009739 binding Methods 0.000 claims description 20
- 238000009413 insulation Methods 0.000 claims description 19
- 238000009434 installation Methods 0.000 claims description 7
- 238000006748 scratching Methods 0.000 claims 1
- 230000002393 scratching effect Effects 0.000 claims 1
- 239000007787 solid Substances 0.000 claims 1
- 238000005192 partition Methods 0.000 abstract description 4
- 238000000034 method Methods 0.000 abstract description 3
- 239000010410 layer Substances 0.000 description 26
- 230000009286 beneficial effect Effects 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 108091092195 Intron Proteins 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000008521 reorganization Effects 0.000 description 1
- 230000002123 temporal effect Effects 0.000 description 1
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model belongs to the technical field of lay cable engineering device technique and specifically relates to a control cable support and control cable laying device is related to. The control cable support includes: the cable bridge frame comprises a cable bridge frame body and an insulating partition plate; be provided with a plurality of first location portions on the cable testing bridge body, a plurality of first location portions are along cable testing bridge body's extending direction interval distribution in proper order, insulating barrier's both ends all are provided with and are used for with the first connecting portion of first location portion complex, and the direction of height along the cable testing bridge body is provided with at least one insulating barrier, the bolt passes first connecting portion and is connected with first location portion, so that two adjacent insulating barriers form a plurality of cable layer and lay the district along cable testing bridge body direction of height, and/or form a plurality of cable layer and lay the district between a plurality of insulating barriers and the cable testing bridge body of the one end of being close to the cable testing bridge body. The technical problem that cables at different starting points are mostly laid alternately in the prior art and cannot be detached once laid is solved.
Description
Technical field
The utility model relates to lay cable engineering device arts, more particularly, to a kind of control cable bearer and control
Cable-laying gear processed.
Background technique
Protection screen, the observing and controlling of the mechanism case, central console, spacing terminal case and secondary device of electric system primary equipment
Screen is required to realize connection by cable, optical cable or cable between failure wave-recording screen, power supply panel etc., to realize above-mentioned connection, according to
The difference in building and space, design has different cable passages, including cable duct, cable shaft, cable interlayer etc., at these
Design has the various brackets of current supply cable laying in space.
Since existing cable layer portal structure is simple, the sequence of unit in charge of construction's cable laying work is first to proceed through electricity
The long cable laying of cable layer carries out stub cable laying again, and long cable is usually the terminal box, convergence control cabinet or mechanism by primary equipment
Cable floor below case to protection communication room enters corresponding screen cabinet, and stub cable is usually between primary equipment or secondary device screen cabinet
Pass through the connecting cable of cable floor.When carrying out long cable laying, temporal influence is brought in order to reduce replacement cable model,
The primary equipment intervening sequences that a kind of long cable of model is related to by current period engineering have usually first laid in unit in charge of construction, then
The long cable of another model is laid, and so on.
Present indoor substation is more and more, and the connecting cable between indoor each layer equipment passes through each layer cable duct laying
To corresponding position, therefore cable duct is designed in each floor plate.These cable ducts can be made due to the limitation of floor construction
It is smaller with area, and any bracket is used without design in this kind of cable duct at present, cause control cable can not be by starting
Point carries out subregion laying, and the cable of different starting points is alternating application mostly, and is layering, accumulates seriously, and cable is once apply
Setting can not just remove, and the usable space of cable duct is deactivated cable and largely occupies, to the reorganization and expansion band of indoor substation
Carry out great difficulty.
Utility model content
The purpose of this utility model is to provide control cable beareves, to alleviate different starting points existing in the prior art
Cable be alternating application mostly, and be layering, accumulate serious, cable once laying is gone down ask by the technology that can not just remove
Topic.
A kind of control cable bearer provided by the utility model, comprising: cable testing bridge ontology and insulating barrier;
Multiple first positioning regions are provided on the cable testing bridge ontology, multiple first positioning regions are along the cable bridge
The extending direction of frame ontology is successively spaced apart, and the both ends of the insulating barrier are provided with for matching with first positioning region
The first connecting portion of conjunction, and the short transverse of the cable testing bridge ontology is provided at least one described insulating barrier, bolt
It is connect across the first connecting portion with first positioning region, so that adjacent along cable testing bridge body height direction
Two insulating barriers form multiple cable floor layings area, and/or close to the multiple described exhausted of one end of cable testing bridge ontology
Multiple cable floor layings area is formed between edge partition and the cable testing bridge ontology.
Further, it is divided into described in adjacent two between the first connecting portion at both ends on each insulating barrier
The integral multiple of first positioning region interval.
Further, multiple second positioning regions, multiple second positioning regions are additionally provided on the cable testing bridge ontology
Extending direction along the cable testing bridge ontology is successively spaced apart, and second positioning region and first positioning region are one by one
It is correspondingly arranged.
Further, the insulating barrier includes mainboard body, upper layer insulation board and lower layer's insulation board;
The both ends of the mainboard body are provided with the first connecting portion, further include having fixation hole on the mainboard body, institute
The both ends that the mainboard body is arranged in fixation hole are stated, the fixation hole is for installing nameplate;The first connecting portion includes three
A first mounting hole and three the second mounting holes, three first mounting holes and three the second mounting holes are along the mainboard body
Width direction be spaced apart, the first mounting hole and the second mounting hole of pairs of linea angulata setting be respectively the first threaded mounting hole and
Second threaded mounting hole, the first threaded mounting hole and the second threaded mounting hole are used to be bolted with first, are arranged in centre
The first mounting hole and the second mounting hole be used for and second be bolted.
Further, the insulating barrier further includes the first elastic insulated plate and the second elastic insulated plate;
The two sides up and down of mainboard body, and described is arranged in the first elastic insulated plate and the second elastic insulated plate
One elastic insulated plate and the second elastic insulated plate are symmetrical arranged, the first elastic insulated plate and described second elastic insulated
Plate scratches control cable for preventing.
Further, the cable testing bridge ontology includes the first side plate, the second side plate and top plate, first side plate and institute
The two sides that the second side plate is symmetricly set on the top plate are stated, first positioning region and second positioning region are in the top plate
On, multiple first positioning regions and multiple second positioning regions are successively spaced setting along the extending direction of the top plate.
Further, first positioning region is identical with second positioning region structure;
First positioning region includes three first positioning holes, the line of the center line of three first positioning holes and institute
The side for stating mainboard body is vertical.
Further, there is multiple first bindings hole on first side plate, be provided with multiple second on second side plate
Bind hole;
Multiple first binding holes are successively spaced apart along the extending direction of first side plate, and multiple described second tie up
It pricks hole to be successively spaced apart along the extending direction of second side plate, and multiple first binding holes and multiple described second are tied up
Hole is pricked to be arranged in a one-to-one correspondence.
It further, further include multiple first link blocks and multiple second link blocks on the cable testing bridge ontology;
First through hole is provided on first link block, multiple first link blocks are uniformly arranged on first side
The one end of plate far from the top plate, and first link block is perpendicular to first side plate;
The second through-hole is provided on second link block, multiple second link blocks are uniformly arranged on described second side
The one end of plate far from the top plate, and second link block is perpendicular to second side plate.
A kind of control cable-laying gear has multiple control cable beareves as described above;
The distribution that multiple control cable beareves are successively spaced, multiple cable laying areas controlled on cable beareves
Form the laying track for laying control cable.
A kind of control cable bearer provided by the utility model, comprising: cable testing bridge ontology and insulating barrier;The cable
Multiple first positioning regions, extending direction of multiple first positioning regions along the cable testing bridge ontology are provided on gantry ontology
Successively it is spaced apart, the both ends of the insulating barrier are provided with the first connecting portion for cooperating with first positioning region,
And the short transverse of the cable testing bridge ontology is provided at least one described insulating barrier, bolt passes through first connection
Portion is connect with first positioning region, so that two insulating barriers adjacent along cable testing bridge body height direction
Form multiple cable floor layings area, and/or multiple insulating barriers and the cable close to one end of cable testing bridge ontology
Multiple cable floor layings area is formed between gantry ontology.Using above-mentioned scheme, insulation is provided with above cable testing bridge ontology
Partition, insulating barrier is connect by bolt with cable testing bridge ontology, and insulating barrier can be along the height above cable testing bridge ontology
Direction is spent at least provided at least one, can also there is at least one cable floor in the short transverse of cable testing bridge ontology in this way
Area is laid, control cable can be set in cable floor laying area, to alleviate the electricity of different starting points existing in the prior art
Cable is alternating application mostly, and is layering, accumulates serious, cable the technical issues of can not just removing once laying is gone down.
A kind of control cable-laying gear provided by the utility model has multiple control cable beareves as described above;
The distribution that multiple control cable beareves are successively spaced, multiple cable laying areas controlled on cable beareves, which are formed, to be used for
The laying track of laying control cable.Its beneficial effect generated is identical as the control beneficial effect of cable bearer, repeats no more.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art
Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below
In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art
Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the cable testing bridge ontology top view of control cable bearer provided by the embodiment of the utility model;
Fig. 2 is this body-side view of the cable testing bridge of control cable bearer provided by the embodiment of the utility model;
Fig. 3 is the cable testing bridge ontology main view of control cable bearer provided by the embodiment of the utility model;
Fig. 4 is the main view of the first embodiment of the insulating barrier of control cable bearer provided by the embodiment of the utility model
Figure;
Fig. 5 is the main view of second of embodiment of insulating barrier of control cable bearer provided by the embodiment of the utility model
Figure;
Fig. 6 is the main view that cable bearer room is arranged in of control cable bearer provided by the embodiment of the utility model.
Icon: 100- cable testing bridge ontology;200- insulating barrier;110- top plate;The first side plate of 120-;130- second side
Plate;The first link block of 140-;The second link block of 150-;210- mainboard body;The upper layer 220- insulation board;230- lower layer insulation board;
The elastic insulated plate of 240- first;The elastic insulated plate of 250- second;The first positioning region 111-;The second positioning region 112-;121- first
Bind hole;211- first connecting portion.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described
Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally
Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical
Novel protected range.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular
Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only
For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific
Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the
One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary,
It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition
The concrete meaning of language in the present invention.
As shown in Figs 1-4, a kind of control cable bearer provided by the utility model, comprising: cable testing bridge ontology 100 and absolutely
Edge partition 200;
Multiple first positioning regions 111, multiple first positioning region, 111 edges are provided on the cable testing bridge ontology 100
The extending direction of the cable testing bridge ontology 100 is successively spaced apart, the both ends of the insulating barrier 200 be provided with for
The first connecting portion 211 that first positioning region 111 cooperates, and be provided with along the short transverse of the cable testing bridge ontology 100
At least one described insulating barrier 200, bolt pass through the first connecting portion 211 and connect with first positioning region 111, so that
Two adjacent insulating barriers 200 form multiple cable floor layings area in 100 short transverse of cable testing bridge ontology,
And/or the shape between multiple insulating barriers 200 and the cable testing bridge ontology 100 of one end of cable testing bridge ontology 100
Area is laid at multiple cable floors.
Wherein, the interval between two adjacent insulating barriers 200 of the extending direction of cable testing bridge ontology 100 can basis
Specific requirement is adjusted.
Wherein, when 200 quantity of insulating barrier of the short transverse setting along cable testing bridge ontology 100 is two or more,
The length of used bolt is different when installation bolt and the insulation board quantity used is one.
A kind of control cable bearer provided by the utility model, the top of cable testing bridge ontology 100 be provided with insulation every
Plate 200, insulating barrier 200 is connect by bolt with cable testing bridge ontology 100, and insulating barrier 200 can be along cable testing bridge sheet
The short transverse of 100 top of body also can in the short transverse of cable testing bridge ontology 100 in this way at least provided at least one
There is at least one cable floor to lay area, control cable can be set in cable floor laying area, exist in the prior art to alleviate
The cables of different starting points be alternating application mostly, and be layering, accumulate serious, cable is once laying is gone down can not just tear open
Except the technical issues of.
On the basis of the above embodiments, further, on each insulating barrier 200 both ends it is described first connection
The integral multiple that first positioning region 111 of adjacent two is spaced is divided between portion 211.
In the present embodiment, between the first connecting portion 211 at 200 both ends of insulating barrier between be divided into two the first positioning regions
111 integral multiple can be provided with the insulating barrier 200 of different length size on cable testing bridge ontology 100 in this way, so that
Cable floor laying area on cable testing bridge ontology 100 can install the control cable of different radicals.
On the basis of the above embodiments, further, it is fixed that multiple second are additionally provided on the cable testing bridge ontology 100
Position portion 112, multiple second positioning regions 112 are successively spaced apart along the extending direction of the cable testing bridge ontology 100, and institute
The second positioning region 112 and first positioning region 111 is stated to be arranged in a one-to-one correspondence.
Further, first positioning region 111 is identical with 112 structure of the second positioning region;
First positioning region 111 includes three first positioning holes, the line of the center line of three first positioning holes
It is vertical with the side of the mainboard body 210.
Wherein, setting is there are three second location hole on the second positioning region 112, where three adjacent second location holes
Straight line where straight line and three first positioning holes is same straight line, and first positioning hole and second location hole are threaded hole.
In the present embodiment, be arranged in a one-to-one correspondence with the first positioning region 111 is additionally provided on cable testing bridge ontology 100
Two positioning regions 112, and the first positioning region 111 is identical with the structure of the second positioning region 112, it is fixed in the first positioning region 111 and second
It may be provided with insulating barrier 200 in position portion 112, may be provided with two in this way on the direction of 100 width of cable testing bridge ontology
Group cable floor disposed in parallel lays area, with the stability of this upper control cable installation that can be improved cable testing bridge ontology 100.
Fig. 5 is the main view of second of embodiment of insulating barrier of control cable bearer provided by the embodiment of the utility model
Figure;Fig. 6 is the main view that cable bearer room is arranged in of control cable bearer provided by the embodiment of the utility model.Such as Figures 5 and 6
Shown, on the basis of the above embodiments, further, the insulating barrier 200 includes mainboard body 210, upper layer insulation board 220
With lower layer insulation board 230;
The both ends of the mainboard body 210 are provided with the first connecting portion 211, further include having on the mainboard body 210
The both ends of the mainboard body 210 are arranged in fixation hole, the fixation hole, and the fixation hole is for installing nameplate;
The first connecting portion 211 includes three the first mounting holes and three the second mounting holes, three first installations
The width direction of hole and three the second mounting holes along the mainboard body is spaced apart, the first mounting hole of pairs of linea angulata setting and
Second mounting hole is respectively the first threaded mounting hole and the second threaded mounting hole, the first threaded mounting hole and the second threaded mounting hole
It is used to be bolted with first, intermediate the first mounting hole and the second mounting hole is set and are used to be bolted with second.
Upper layer insulation board 220 and lower layer's insulation board 230 are elastic insulated plate.
Wherein, every one end of mainboard body 210 is respectively arranged with two fixation holes, and fixation hole is arranged in first connecting portion
Between 211 and the edge of mainboard body 210, the edge of mainboard body 210 is fillet, to improve the safety in use process;
In addition, the first bolt passes through the first mounting hole and first being oppositely arranged when installing the control cable of first layer
Positioning region or the connection of the second positioning region, in the control cable of the short transverse installation second layer along first layer, second layer mainboard
The first threaded mounting hole and the second threaded mounting hole on body and the first threaded mounting hole on the mainboard body of first layer top and the
Two threaded mounting holes are staggered, and the first bolt passes through the first mounting hole being diagonally arranged and the second peace on second layer mainboard body
The first threaded mounting hole and the second threaded mounting hole filled on hole and first layer mainboard body cooperates, by the control cable of the second layer
It is compacted, the second bolt, which passes through, to be arranged in the first mounting hole intermediate on first layer mainboard body and be arranged in second layer mainboard body
Between the first mounting hole, with ensure control cable can be compacted during installation.
In the present embodiment, upper layer insulation board 220 and lower layer's insulation board 230 are used to and control cable abutting, and in mainboard body
Fixation hole is provided on 210, fixation hole is used to install nameplate, in this way can be in order to subsequent maintenance.
On the basis of the above embodiments, further, the insulating barrier 200 further includes the first elastic insulated plate 240
With the second elastic insulated plate 250;
Up and down the two of mainboard body 210 are arranged in the first elastic insulated plate 240 and the second elastic insulated plate 250
Side, and the first elastic insulated plate 240 and the second elastic insulated plate 250 are symmetrical arranged, the first elastic insulated plate
240 and the second elastic insulated plate 250 for prevent scratch control cable.
Wherein, the first elastic insulated plate 240 is identical with the structure of the second elastic insulated plate 250.
In the present embodiment, the first elastic insulated plate 240 and the second elastic insulated plate 250 are symmetricly set on mainboard body 210
Two sides, and the first elastic insulated plate 240 and the second elastic insulated plate 250 are vertical with mainboard body 210, in this way, the first elasticity is absolutely
Listrium 240 and the second elastic insulated plate 250 can separate upper layer insulation board 220 and lower layer's insulation board 230, meanwhile, it is installing
When controlling cable, the setting of the first elastic insulated plate 240 and the second elastic insulated plate 250 can also make relatively restricted control cable
It is traversing, improve control cable installation after stability.
On the basis of the above embodiments, further, the cable testing bridge ontology 100 includes the first side plate 120, second
Side plate 130 and top plate 110, first side plate 120 and second side plate 130 are symmetricly set on the two sides of the top plate 110,
First positioning region 111 and second positioning region 112 are on the top plate 110, multiple first positioning regions 111 and more
Second positioning region 112 is successively spaced setting along the extending direction of the top plate 110.
On the basis of the above embodiments, further, there are multiple first bindings hole 121, institute on first side plate 120
It states and is provided with multiple second bindings hole on the second side plate 130;
Multiple first binding holes 121 are successively spaced apart along the extending direction of first side plate 120, multiple described
Second binding hole is successively spaced apart along the extending direction of second side plate 130, and multiple first binding holes 121 and more
A second binding hole is arranged in a one-to-one correspondence.
In the present embodiment, it is fixedly connected between the first side plate 120, the second side plate 130 and top plate 110, the first positioning region 111
It is arranged on top plate 110 with the second positioning region 112, is respectively arranged with multiple first on the first side plate 120 and the second side plate 130
Hole 121 and multiple second bindings hole are bound, multiple first binding holes 121 and multiple second bindings hole are correspondingly arranged, are controlling in this way
When cable floor lays area, the first binding hole 121 and the second binding hole are capable of fixing control cable for cable setting processed.
It on the basis of the above embodiments, further, further include multiple first connections on the cable testing bridge ontology 100
Block 140 and multiple second link blocks 150;
First through hole is provided on first link block 140, multiple first link blocks 140 are uniformly arranged on described
The one end of first side plate 120 far from the top plate 110, and first link block 140 is perpendicular to first side plate 120;
The second through-hole is provided on second link block 150, multiple second link blocks 150 are uniformly arranged on described
The one end of second side plate 130 far from the top plate 110, and second link block 150 is perpendicular to second side plate 130.
In the present embodiment, multiple first link blocks 140 and multiple second link blocks 150 are symmetricly set on the first side plate 120
With the two sides of the second side plate 130, and first through hole and second are respectively provided on the first link block 140 and the second link block 150
Through-hole, expansion bolt pass through first through hole and fix with external connection object, and expansion bolt passes through the second bolt hole and external connection object
It is fixed, it will be fixed on external connection object on cable testing bridge ontology 100 with the symmetrical one end of top plate 110.
A kind of control cable-laying gear provided by the utility model has multiple control cable beareves as described above;
The distribution that multiple control cable beareves are successively spaced, multiple cable laying areas controlled on cable beareves, which are formed, to be used for
The laying track of laying control cable.Its beneficial effect generated is identical as the control beneficial effect of cable bearer, repeats no more.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited
System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should
Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of
Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new
The range of each embodiment technical solution of type.
Claims (10)
1. a kind of control cable bearer characterized by comprising cable testing bridge ontology and insulating barrier;
Multiple first positioning regions are provided on the cable testing bridge ontology, multiple first positioning regions are along the cable testing bridge sheet
The extending direction of body is successively spaced apart, and the both ends of the insulating barrier are provided with for cooperating with first positioning region
First connecting portion, and the short transverse of the cable testing bridge ontology is provided at least one described insulating barrier, bolt passes through
The first connecting portion is connect with first positioning region, so that two adjacent along cable testing bridge body height direction
The insulating barrier forms multiple cable floors laying area, and/or close to one end of cable testing bridge ontology multiple insulation every
Multiple cable floor layings area is formed between plate and the cable testing bridge ontology.
2. control cable bearer according to claim 1, which is characterized in that both ends is described on each insulating barrier
The integral multiple at adjacent two first positioning regions interval is divided between first connecting portion.
3. control cable bearer according to claim 2, which is characterized in that be additionally provided on the cable testing bridge ontology more
A second positioning region, multiple second positioning regions are successively spaced apart along the extending direction of the cable testing bridge ontology, and institute
The second positioning region and first positioning region is stated to be arranged in a one-to-one correspondence.
4. control cable bearer according to claim 3, which is characterized in that the insulating barrier includes mainboard body, upper layer
Insulation board and lower layer's insulation board;
The both ends of the mainboard body are provided with the first connecting portion, further include having fixation hole on the mainboard body, described solid
Determine the both ends that the mainboard body is arranged in hole, the fixation hole is for installing nameplate;
The first connecting portion includes three the first mounting holes and three the second mounting holes, three first mounting holes and three
Width direction of second mounting hole along the mainboard body is spaced apart, the first mounting hole of pairs of linea angulata setting and the second installation
Hole is respectively the first threaded mounting hole and the second threaded mounting hole, the first threaded mounting hole and the second threaded mounting hole be used to and
First is bolted, and the first mounting hole and the second mounting hole among mainboard body is arranged in and is used to be bolted with second.
5. control cable bearer according to claim 4, which is characterized in that the insulating barrier further includes that the first elasticity is exhausted
Listrium and the second elastic insulated plate;
The two sides up and down of mainboard body, and first bullet is arranged in the first elastic insulated plate and the second elastic insulated plate
Property insulation board and the second elastic insulated plate be symmetrical arranged, the first elastic insulated plate and the second elastic insulated plate are used
Cable is controlled in preventing from scratching.
6. control cable bearer according to claim 5, which is characterized in that the cable testing bridge ontology includes the first side
Plate, the second side plate and top plate, first side plate and second side plate are symmetricly set on the two sides of the top plate, and described first
Positioning region and second positioning region are on the top plate, and multiple first positioning regions and multiple second positioning regions are along institute
The extending direction for stating top plate is successively spaced setting.
7. control cable bearer according to claim 6, which is characterized in that first positioning region and second positioning
Portion's structure is identical;
First positioning region includes three first positioning holes, the line of the center line of three first positioning holes and the master
The side of plate body is vertical.
8. control cable bearer according to claim 7, which is characterized in that there is multiple first bindings on first side plate
Hole is provided with multiple second bindings hole on second side plate;
Multiple first binding holes are successively spaced apart along the extending direction of first side plate, multiple second binding holes
Extending direction along second side plate is successively spaced apart, and multiple first binding holes and multiple second binding holes
It is arranged in a one-to-one correspondence.
9. controlling cable bearer according to claim 8, which is characterized in that further include multiple on the cable testing bridge ontology
One link block and multiple second link blocks;
First through hole is provided on first link block, it is remote that multiple first link blocks are uniformly arranged on first side plate
One end from the top plate, and first link block is perpendicular to first side plate;
The second through-hole is provided on second link block, it is remote that multiple second link blocks are uniformly arranged on second side plate
One end from the top plate, and second link block is perpendicular to second side plate.
10. a kind of control cable-laying gear, which is characterized in that have multiple such as the described in any item controls of claim 1-9
Cable bearer;
The distribution that multiple control cable beareves are successively spaced, multiple cable laying areas controlled on cable beareves are formed
For laying the laying track of control cable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821451320.9U CN208707246U (en) | 2018-09-04 | 2018-09-04 | Control cable support and control cable laying device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821451320.9U CN208707246U (en) | 2018-09-04 | 2018-09-04 | Control cable support and control cable laying device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208707246U true CN208707246U (en) | 2019-04-05 |
Family
ID=65946578
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821451320.9U Active CN208707246U (en) | 2018-09-04 | 2018-09-04 | Control cable support and control cable laying device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208707246U (en) |
-
2018
- 2018-09-04 CN CN201821451320.9U patent/CN208707246U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107171189A (en) | A kind of cable tunnel integrated with substation equipment basis | |
CN109066511A (en) | Cable support and cable laying device | |
CN208508432U (en) | Cable support and cable laying device | |
CN208707246U (en) | Control cable support and control cable laying device | |
CN208508433U (en) | Control cable support and control cable laying device | |
CN207988628U (en) | A kind of Great span landform is convenient for the 10kV broad-base tower equipment of cable or more tower | |
CN208835610U (en) | Control cable support and control cable laying system | |
CN208508429U (en) | Installation type cable support | |
CN208508431U (en) | Installation type cable support | |
CN107634464B (en) | Movable transformer pack | |
CN108767777A (en) | Control cable support and control cable laying device | |
CN206195248U (en) | Electrified bypass equipment who changes with equipment on pole multiloop shaft tower | |
CN209200948U (en) | Valve hall and converter station | |
CN108767749A (en) | Control cable support and control cable laying system | |
CN208767803U (en) | Converter valve and dc circuit breaker for flexible direct current engineering are total to valve hall structure | |
CN208158042U (en) | A kind of layer-by-layer isolated insulation compound cable support of drawer type | |
CN208508430U (en) | Pre-buried cable support | |
CN108767776A (en) | Control cable support and control cable laying device | |
CN208508428U (en) | Cable bridge rack device | |
CN208299375U (en) | A kind of house cable gantry | |
CN208508483U (en) | Pre-buried cable support | |
CN203632243U (en) | A series compensation system | |
CN108767778A (en) | Cable bridge rack device | |
CN206611094U (en) | A kind of outdoor GIS cable terminations fixing device | |
CN106898973A (en) | Many antiwind outlet panels of cable |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |