CN208815557U - A kind of signal tower pedestal installation system - Google Patents

A kind of signal tower pedestal installation system Download PDF

Info

Publication number
CN208815557U
CN208815557U CN201821478266.7U CN201821478266U CN208815557U CN 208815557 U CN208815557 U CN 208815557U CN 201821478266 U CN201821478266 U CN 201821478266U CN 208815557 U CN208815557 U CN 208815557U
Authority
CN
China
Prior art keywords
steel plate
lower margin
tower
margin steel
reinforced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821478266.7U
Other languages
Chinese (zh)
Inventor
耿欣宗
王坤辉
洪连捷
黄俊平
李广荣
王浩帆
朱向锋
杨振河
黎迪辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Shixin Engineering Construction Co Ltd
Original Assignee
Fujian Shixin Engineering Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Shixin Engineering Construction Co Ltd filed Critical Fujian Shixin Engineering Construction Co Ltd
Priority to CN201821478266.7U priority Critical patent/CN208815557U/en
Application granted granted Critical
Publication of CN208815557U publication Critical patent/CN208815557U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of signal tower pedestal installation systems, including reinforced concrete foundation, the upper end of reinforced concrete foundation is embedded with foundation bolt, foundation bolt top is provided with lower lower margin steel plate, the upper surface of lower lower margin steel plate is provided with reinforced pier, it is provided with lower margin steel plate above reinforced pier, tower body is provided with above upper lower margin steel plate, tower body is connected by high-strength bolt with upper lower margin steel plate.The utility model installs reinforced pier in former concrete foundation, and by foundation bolt adjusting tower basal part, effectively controls flatness control when signal tower installation;Pre-embedded anchoring bolts when construction install reinforced pier and tower body and adjust tower body height after-pouring concrete, improve signal tower basement construction quality;After reinforced pier and tower body can be processed outside the venue, Fast Installation is carried out at the scene, so that basement construction is convenient, fast efficiently, improves signal tower basement construction efficiency.

Description

A kind of signal tower pedestal installation system
Technical field
The utility model relates to construction field, in particular to a kind of signal tower pedestal installation system.
Background technique
Signal tower base member mounting portion point is the primary link of signal tower installation, and the construction of signal tower pedestal directly influences letter The integral installation quality of number tower.
Traditional signal tower pedestal installation system is generally located at steel by the way that signal tower tower body is directly passed through foundation bolt On the basis of reinforced concrete, not only difficulty of construction is larger in this way, but also tower body is directly located in concrete foundation, concrete foundation Flatness also bad control, these all directly constrain the efficiency and quality of signal tower installation.
Therefore, it is badly in need of a kind of bad control of solution classical signal column foot seat installation system concrete foundation flatness, construction The novel signal column foot seat installation system for the problems such as difficulty is big, construction efficiency is low.
Utility model content
It is difficult for the bad control of classical signal column foot seat installation system concrete foundation flatness, construction for the utility model The problems such as degree is big, construction efficiency is low, provides that a kind of signal tower foundation flatness is easy to control, construction quality is good, high-efficient Signal tower pedestal installation system.
Technical problem to be solved in the utility model is achieved through the following technical solutions:
A kind of signal tower pedestal installation system, including reinforced concrete foundation, the upper end of the reinforced concrete foundation are pre- It is embedded with foundation bolt, the foundation bolt top is provided with lower lower margin steel plate, and the upper surface of the lower lower margin steel plate, which is provided with, to be added Strong pier is provided with lower margin steel plate above the reinforced pier, tower body is provided with above the upper lower margin steel plate, and the tower body is logical High-strength bolt is crossed to be connected with the upper lower margin steel plate.
Preferably, in above-mentioned technical proposal, the surrounding of the tower body bottom is welded with reinforcement steel plate.
Preferably, in above-mentioned technical proposal, one end of the foundation bolt is set in reinforced concrete foundation, the other end It wears and is fixed on the lower lower margin steel plate.
Preferably, in above-mentioned technical proposal, one end of the high-strength bolt is set to below the upper lower margin steel plate, another End is fixed on the pedestal of the tower body.
Preferably, in above-mentioned technical proposal, the thickness of the lower lower margin steel plate and the upper lower margin steel plate is 10mm.
Preferably, in above-mentioned technical proposal, the foundation bolt is No. 38 foundation bolts, and the high-strength bolt is No. 28 height Strength bolt.
Preferably, in above-mentioned technical proposal, the reinforced pier with a thickness of 3mm.
Preferably, in above-mentioned technical proposal, between the reinforced pier and the lower lower margin steel plate, the upper lower margin steel plate To be welded to connect.
Utility model above-mentioned technical proposal, has the following beneficial effects:
The signal tower pedestal installation system of the utility model, installs reinforced pier, and pass through ground in former concrete foundation Foot bolt adjusting tower basal part effectively controls flatness control when signal tower installation;Pre-embedded anchoring bolts when construction, installation add Strong pier and tower body simultaneously adjust tower body height after-pouring concrete, improve signal tower basement construction quality;Reinforced pier and tower body can After being processed outside the venue, Fast Installation is carried out at the scene, so that basement construction is convenient, fast efficiently, improves signal column foot Seat construction efficiency.
Detailed description of the invention
Fig. 1 is the main view of the signal tower pedestal installation system of the utility model.
Fig. 2 is the face the A-A cross-sectional view of Fig. 1.
Fig. 3 is the face the B-B cross-sectional view of Fig. 1.
Wherein: 1, reinforced concrete foundation, 2, reinforced pier, 3, tower body, 4, lower lower margin steel plate, 5, foundation bolt, 6, Shangdi Foot steel plate, 7, high-strength bolt, 8, reinforcement steel plate.
Specific embodiment
Specific embodiment of the present utility model is described in detail below, it is practical new in order to further understand this Type.
Fig. 1 is the main view of the signal tower pedestal installation system of the utility model.Fig. 2 is the face the A-A cross-sectional view of Fig. 1.Fig. 3 It is the face the B-B cross-sectional view of Fig. 1.It is as shown in the figure:
A kind of signal tower pedestal installation system successively includes reinforced concrete foundation 1, reinforced pier 2 and tower from the bottom to top Body 3.Specifically:
The upper end of reinforced concrete foundation 1 is embedded with foundation bolt 5, and 5 top of foundation bolt is provided with lower lower margin steel plate 4, The upper surface of lower lower margin steel plate 4 is provided with reinforced pier 2, and the top of reinforced pier 2 is provided with lower margin steel plate 6, on upper lower margin steel plate 6 Side is provided with tower body 3, and tower body 3 is connected by high-strength bolt 7 with upper lower margin steel plate 6.The surrounding of 3 bottom of tower body is welded with reinforcement steel Plate 8.
Specifically, one end of foundation bolt 5 is set in reinforced concrete foundation 1, the other end can be crossed on lower margin steel plate 4 Aperture, be fixed on lower lower margin steel plate 4 after passing through by nut.One end of high-strength bolt 7 is set under lower margin steel plate 6 Side, the other end pass through the pedestal of upper lower margin steel plate 6 and tower body 3, are fixed on the pedestal of tower body 3 eventually by spiral shell.
Preferably, the thickness of lower lower margin steel plate 4 and upper lower margin steel plate 6 is 10mm.Foundation bolt 5 is No. 38 lower margin spiral shells Bolt, high-strength bolt 7 are No. 28 high-strength bolts.Reinforced pier 2 with a thickness of 3mm.Certainly, the utility model is not limited thereto, this Field technical staff can voluntarily select suitably sized as needed.
It preferably, is to be welded to connect between reinforced pier 2 and lower lower margin steel plate 4, upper lower margin steel plate 6.
Production and use process is as follows:
Select 5, No. 28 high-strength bolts 7 of No. 38 foundation bolts, the lower lower margin steel plate 4 of 10mm thickness, 10mm thickness upper lower margin steel The reinforced pier 2 of plate 6,3mm thickness.
Four No. 38 foundation bolts 5 are embedded in reinforced concrete foundation 1, by in concrete foundation 1 with steel bar welding Capable positioning is tapped into, the lower lower margin steel plate 4 of 10mm thickness, the fixed foundation bolt of lower 4 four corners of lower margin steel plate are installed in 5 top of foundation bolt 5, the levelness that foundation bolt 5 adjusts column foot seat is turned at this time, the reinforced pier 2 of 3mm thickness is welded on lower lower margin steel plate 4, is reinforced Pier 2 is welded with the upper lower margin steel plate of 10mm thickness, upper lower margin steel plate 6 and tower body to improve signal tower pedestal intensity on reinforced pier 2 12 No. 28 high-strength bolts 7 are installed, this completes the installation of signal tower pedestal leveling between pedestal.Similar installation later After fixing and leveling other three signal tower pedestals, 3 pedestal of tower body and upper lower margin steel plate 6 are fixed, in 3 bottom surrounding of tower body It is welded and fixed and reinforces steel plate 8, and pouring reinforcement concrete basis 1.
The signal tower pedestal installation system of the utility model, installs reinforced pier, and pass through ground in former concrete foundation Foot bolt adjusting tower basal part effectively controls flatness control when signal tower installation;Pre-embedded anchoring bolts when construction, installation add Strong pier and tower body simultaneously adjust tower body height after-pouring concrete, improve signal tower basement construction quality;Reinforced pier and tower body can After being processed outside the venue, Fast Installation is carried out at the scene, so that basement construction is convenient, fast efficiently, improves signal column foot Seat construction efficiency.
Although the utility model is disclosed as above with embodiment, so it is not intended to limit the utility model, any ability Field technique personnel can make a variety of different selections and modification, therefore this without departing from the spirit and scope of the utility model The protection scope of utility model is limited by claims and its equivalents.

Claims (8)

1. a kind of signal tower pedestal installation system, which is characterized in that including reinforced concrete foundation (1), the armored concrete The upper end of basic (1) is embedded with foundation bolt (5), and foundation bolt (5) top is provided with lower lower margin steel plate (4), under described The upper surface of lower margin steel plate (4) is provided with reinforced pier (2), is provided with lower margin steel plate (6), institute above the reinforced pier (2) It states and is provided with tower body (3) above lower margin steel plate (6), the tower body (3) passes through high-strength bolt (7) and the upper lower margin steel plate (6) it is connected.
2. signal tower pedestal installation system according to claim 1, which is characterized in that the surrounding of tower body (3) bottom It is welded with and reinforces steel plate (8).
3. signal tower pedestal installation system according to claim 1, which is characterized in that one end of the foundation bolt (5) It is set in reinforced concrete foundation (1), the other end wears and is fixed on the lower lower margin steel plate (4).
4. signal tower pedestal installation system according to claim 1, which is characterized in that one end of the high-strength bolt (7) It is set to below the upper lower margin steel plate (6), the other end is fixed on the pedestal of the tower body (3).
5. signal tower pedestal installation system according to claim 1, which is characterized in that the lower lower margin steel plate (4) and institute The thickness for stating lower margin steel plate (6) is 10mm.
6. signal tower pedestal installation system according to claim 1, which is characterized in that the foundation bolt (5) is No. 38 Foundation bolt, the high-strength bolt (7) are No. 28 high-strength bolts.
7. signal tower pedestal installation system according to claim 1, which is characterized in that the reinforced pier (2) with a thickness of 3mm。
8. signal tower pedestal installation system according to claim 1, which is characterized in that the reinforced pier (2) and it is described under It is to be welded to connect between lower margin steel plate (4), the upper lower margin steel plate (6).
CN201821478266.7U 2018-09-10 2018-09-10 A kind of signal tower pedestal installation system Expired - Fee Related CN208815557U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821478266.7U CN208815557U (en) 2018-09-10 2018-09-10 A kind of signal tower pedestal installation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821478266.7U CN208815557U (en) 2018-09-10 2018-09-10 A kind of signal tower pedestal installation system

Publications (1)

Publication Number Publication Date
CN208815557U true CN208815557U (en) 2019-05-03

Family

ID=66276594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821478266.7U Expired - Fee Related CN208815557U (en) 2018-09-10 2018-09-10 A kind of signal tower pedestal installation system

Country Status (1)

Country Link
CN (1) CN208815557U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485556A (en) * 2019-07-26 2019-11-22 北京建筑大学 A kind of assembled cold-rolled forming section plate-column structure compartment-type flanged joint system and its construction method
CN110485555A (en) * 2019-07-26 2019-11-22 北京建筑大学 A kind of assembled slab column system and its construction method with compound shear wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485556A (en) * 2019-07-26 2019-11-22 北京建筑大学 A kind of assembled cold-rolled forming section plate-column structure compartment-type flanged joint system and its construction method
CN110485555A (en) * 2019-07-26 2019-11-22 北京建筑大学 A kind of assembled slab column system and its construction method with compound shear wall

Similar Documents

Publication Publication Date Title
CN208815557U (en) A kind of signal tower pedestal installation system
CN100376454C (en) Method for plane sectional building hull
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN205205667U (en) Bearing bracket device
CN109706956A (en) A kind of rectangular built-in fitting device with circular hole
CN104481166B (en) Additionally assembled type balcony structure for old community and construction method of additionally assembled type balcony structure
CN104499619B (en) A kind of plug-in wall bottom adjusting parts of PC
CN101951191A (en) Adjustable-height bracket base for photovoltaic array bracket
CN205934703U (en) A high damping shock insulation rubber bearing mounting structure for cast -in -place bridge
CN108894320A (en) Simple fixed bracket and its construction method are quickly positioned for foundation bolt
CN204780972U (en) Bayonet column base mounting adjustment device of steel column rim of a cup
CN102425304B (en) Method for replacing or increasing steel reinforced protection layer cushion block
CN105080976B (en) Vertical mill backing plate installation method and its device
CN207714362U (en) A kind of adjustable equipment supporter
CN209292857U (en) Energy-saving arch rib Hanger Anchor case
CN206707266U (en) Plastic formwork early removing system
CN205654125U (en) Reinforcement support column of adjustable elevation
CN201455643U (en) Leveling device for installation of equipment
CN203429556U (en) System for quickly installing and positioning cable saddle
CN208072189U (en) A kind of Quick installation supporting seat
CN205908034U (en) SRC column base plate locating support
CN209603171U (en) A kind of rectangular built-in fitting device with circular hole
CN208702161U (en) A kind of template support that recycling can be adjusted accurately
CN209652761U (en) A kind of antiskid anchor ear device
CN207507107U (en) A kind of filter beam of the balance air cushion layer in filter tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190503

Termination date: 20200910

CF01 Termination of patent right due to non-payment of annual fee