CN209292857U - Energy-saving arch rib Hanger Anchor case - Google Patents

Energy-saving arch rib Hanger Anchor case Download PDF

Info

Publication number
CN209292857U
CN209292857U CN201821737730.XU CN201821737730U CN209292857U CN 209292857 U CN209292857 U CN 209292857U CN 201821737730 U CN201821737730 U CN 201821737730U CN 209292857 U CN209292857 U CN 209292857U
Authority
CN
China
Prior art keywords
arch rib
bottom tube
anchor plate
push pipe
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821737730.XU
Other languages
Chinese (zh)
Inventor
邬妙年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI CHENGXI MUNICIPAL CONSTRUCTION ENGINEERING SURVEY AND DESIGN INSTITUTE Co Ltd
Original Assignee
SHANGHAI CHENGXI MUNICIPAL CONSTRUCTION ENGINEERING SURVEY AND DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI CHENGXI MUNICIPAL CONSTRUCTION ENGINEERING SURVEY AND DESIGN INSTITUTE Co Ltd filed Critical SHANGHAI CHENGXI MUNICIPAL CONSTRUCTION ENGINEERING SURVEY AND DESIGN INSTITUTE Co Ltd
Priority to CN201821737730.XU priority Critical patent/CN209292857U/en
Application granted granted Critical
Publication of CN209292857U publication Critical patent/CN209292857U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Energy-saving arch rib Hanger Anchor case, bottom tube (3) upper end is fixed anchor plate (1), on the upside of anchor plate (1) fixed push pipe (2), symmetrical fixed a pair of of partition (5) is erect in bottom tube (3) outer wall, hole is opened in the middle part of anchor plate (1), anchor plate (1) edge stretches out outside push pipe (2) bottom end, push pipe (2) outer diameter is greater than bottom tube (3) outer diameter, and bottom tube (3), anchor plate (1) and push pipe (2) are coaxial.Arch rib sunpender passes through arch rib and is directly anchored in arch rib steel anchor box, can reduce influence of the highway bridge load to bridge floor, and sunpender directly bears mobile load, and bridge floor sunpender stress amplitude is effectively reduced, and is conducive to fast construct and pontic safety and stability.

Description

Energy-saving arch rib Hanger Anchor case
Technical field
The utility model relates to the structure improved technology of the anchor case apparatus in arch bridge facility, especially energy-saving arch rib Hanger Anchor case.
Background technique
Arch bridge is that structure type changes a kind of the most abundant bridge type in bridge structure, and the positional relationship of beam and arch is held under having Formula, half-through and 3 kinds of deck type, and there are many structure types of girder and arch rib.Arch rib plane is arranged perpendicular to bridge plane It is the structure type applied earliest, settable stull is between arch rib to improve overall stability outside its face.With calculation method and apply There is the intilted CFST X-type arch of arch rib, mutually provides support between the arch rib of this form in the raising of work technical level It acts on, overall stability outside the face to improve arch rib.In order to change the traditional structure forms of arch rib, there is arch rib and be inclined outwardly External inclined type arch bridge (butterfly-type arch bridge).External inclined type arch bridge is come across earliest in the little structure of the stress such as Landscape Bridge, foot bridge, and The bridge type has begun to be applied in Longspan Bridge.
Arch rib is the skeleton of arch bridge main arch ring.Arch rib bears dead weight, lateral ties component and corresponding construction loads.Arch The design of rib should also meet section each rank in anabolic process except that should be able to meet in addition to the intensity and stable requirement in lifting stage The requirement of intensity under section load action.
Utility model content
The purpose of the utility model is to provide energy-saving arch rib Hanger Anchor casees, unbalanced existing to reduce bridge floor load As keeping bridge floor power transmission under live loading clear independent.
The purpose of this utility model will be realized by following technical measures: including anchor plate, push pipe, bottom tube and partition; Anchor plate is fixed in bottom tube upper end, and push pipe is fixed on the upside of anchor plate, erects symmetrical fixed a pair of of partition, anchor plate in bottom tube outer wall Hole is opened at middle part, and anchor plate edge stretches out outside push pipe bottom end, and push pipe outer diameter is greater than bottom tube outer diameter, and bottom tube, anchor plate and push pipe are same Axis.
Especially, anchor plate middle through-hole internal diameter is less than bottom tube internal diameter.
Especially, angle steel is horizontally mounted outside bottom tube.
Especially, partition is fixed along arch rib steel pipe extending direction.
Especially, there is open-work on partition.
Especially, tie hoop is coiled outside bottom tube.
Especially, push pipe top ports are coincide along inclination with upper wall along arch rib steel pipe consistent, bottom tube bottom nozzle along under partition It coincide unanimously along inclination and arch rib steel pipe bottom inner wall.
The advantages of the utility model and effect: arch rib sunpender passes through arch rib and is directly anchored in arch rib steel anchor box, can reduce Influence of the highway bridge load to bridge floor, sunpender directly bear mobile load, and bridge floor sunpender stress amplitude is effectively reduced, is conducive to Quick construction and pontic safety and stability.
Detailed description of the invention
Fig. 1 is 1 overlooking structure diagram of the utility model embodiment.
Fig. 2 is A-A profile structure diagram in Fig. 1.
Fig. 3 is B-B cross-section structure diagram in Fig. 1.
Fig. 4 is diaphragm structure schematic diagram in Fig. 1.
Appended drawing reference includes:
Anchor plate 1, push pipe 2, bottom tube 3, angle steel 4, partition 5, tie hoop 6, arch rib steel pipe 7, open-work 501.
Specific embodiment
The utility model includes: anchor plate 1, push pipe 2, bottom tube 3 and partition 5.
The utility model is described in further detail with reference to the accompanying drawings and examples.
Embodiment 1: as shown in attached drawing 1,2,3,4, the fixed anchor plate 1 in 3 upper end of bottom tube fixes push pipe on the upside of anchor plate 1 2, symmetrical fixed a pair of of partition 5 is erect in 3 outer wall of bottom tube, opens hole in the middle part of anchor plate 1,1 edge of anchor plate stretches out 2 bottom of push pipe End is outer, and 2 outer diameter of push pipe is greater than 3 outer diameter of bottom tube, and bottom tube 3, anchor plate 1 and push pipe 2 are coaxial.
In aforementioned, 1 middle through-hole internal diameter of anchor plate is less than 3 internal diameter of bottom tube.
In aforementioned, angle steel 4 is horizontally mounted outside bottom tube 3.
In aforementioned, partition 5 is fixed along 7 extending direction of arch rib steel pipe.
In aforementioned, there is open-work 501 on partition 5.
In aforementioned, tie hoop 6 is coiled outside bottom tube 3.
In aforementioned, the edge inclination of 2 top ports of push pipe coincide unanimously with upper wall along arch rib steel pipe 7,3 bottom nozzle of bottom tube edge and partition The inclination of 5 lower edges coincide consistent with 7 bottom interior wall of arch rib steel pipe.
In the utility model embodiment, bottom tube 3, anchor plate 1 and push pipe 2 are embedded in 7 concrete of arch rib steel pipe.2 outer diameter of push pipe 420mm.3 outer diameter 250mm of bottom tube.Partition 5 width 600mm, 501 aperture 80mm of open-work.6 screw diameter 375mm of tie hoop, spiral High 8 × 80mm, bar diameter 20mm.
In the utility model embodiment, arch rib steel pipe 7 arches upward above bridge floor, and arch rib sunpender upper end, which is connected to, is installed on arch In anchor case in fin steel tube 7, in the application, arch rib sunpender upper end passes through damping block across bottom tube 3 from bottom to top, and by anchor pad Plate 1 is fixed in push pipe 2 in anchor cup, and anchor cup bottom housing connected nut simultaneously crimps spherical hinge rear support in 1 upside of anchor plate, theory Anchor point is located at 1 center of anchor plate, and the coiling installation tie hoop 6 of partition 5 is passed through outside bottom tube 3, horizontal solid in arch rib steel pipe 7 Angle steel 4 is determined with enhancing structure intensity, and protective cover is set with outside anchor cup, anti-corrosion grease is injected separately into bottom tube 3 and protective cover.

Claims (7)

1. energy-saving arch rib Hanger Anchor case, including anchor plate (1), push pipe (2), bottom tube (3) and partition (5);Its feature exists In bottom tube (3) upper end is fixed anchor plate (1), on the upside of anchor plate (1) fixed push pipe (2), erects in bottom tube (3) outer wall symmetrical Hole is opened at fixed a pair of partition (5), anchor plate (1) middle part, and anchor plate (1) edge stretches out outside push pipe (2) bottom end, and push pipe (2) is outside Diameter is greater than bottom tube (3) outer diameter, and bottom tube (3), anchor plate (1) and push pipe (2) are coaxial.
2. energy-saving arch rib Hanger Anchor case as described in claim 1, which is characterized in that in anchor plate (1) middle through-hole Diameter is less than bottom tube (3) internal diameter.
3. energy-saving arch rib Hanger Anchor case as described in claim 1, which is characterized in that be horizontally mounted outside bottom tube (3) Angle steel (4).
4. energy-saving arch rib Hanger Anchor case as described in claim 1, which is characterized in that partition (5) is along arch rib steel pipe (7) Extending direction is fixed.
5. energy-saving arch rib Hanger Anchor case as described in claim 1, which is characterized in that partition has open-work on (5) (501)。
6. energy-saving arch rib Hanger Anchor case as described in claim 1, which is characterized in that bottom tube (3) coils spiral hoop outside Muscle (6).
7. energy-saving arch rib Hanger Anchor case as described in claim 1, which is characterized in that push pipe (2) top ports are along inclination It coincide with arch rib steel pipe (7) interior upper wall consistent, bottom tube (3) bottom nozzle tilts and arch rib steel pipe (7) bottom along with partition (5) lower edge Inner wall coincide consistent.
CN201821737730.XU 2018-10-25 2018-10-25 Energy-saving arch rib Hanger Anchor case Expired - Fee Related CN209292857U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821737730.XU CN209292857U (en) 2018-10-25 2018-10-25 Energy-saving arch rib Hanger Anchor case

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821737730.XU CN209292857U (en) 2018-10-25 2018-10-25 Energy-saving arch rib Hanger Anchor case

Publications (1)

Publication Number Publication Date
CN209292857U true CN209292857U (en) 2019-08-23

Family

ID=67646785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821737730.XU Expired - Fee Related CN209292857U (en) 2018-10-25 2018-10-25 Energy-saving arch rib Hanger Anchor case

Country Status (1)

Country Link
CN (1) CN209292857U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528380A (en) * 2019-09-05 2019-12-03 长江勘测规划设计研究有限责任公司 A kind of anchor case of adaptive sunpender angle
CN112252154A (en) * 2020-11-05 2021-01-22 重庆交通大学 Novel anchor structure of short jib of half-through arch bridge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528380A (en) * 2019-09-05 2019-12-03 长江勘测规划设计研究有限责任公司 A kind of anchor case of adaptive sunpender angle
CN110528380B (en) * 2019-09-05 2024-04-12 长江勘测规划设计研究有限责任公司 Anchor box capable of self-adapting to angle of suspender
CN112252154A (en) * 2020-11-05 2021-01-22 重庆交通大学 Novel anchor structure of short jib of half-through arch bridge

Similar Documents

Publication Publication Date Title
CN105604185B (en) A kind of earthquake-resistant structure support connection structure and attaching method thereof
CN209292857U (en) Energy-saving arch rib Hanger Anchor case
CN205501791U (en) Two recessed arch integrated configurations of steel binder - entity jib -
CN206844302U (en) A kind of Light-weight Steel Structures
CN103469735B (en) The mounting method of curve ultrahigh hollow column plate type pier top solid section template
CN207228146U (en) Bridge tower cushion cap overhanging type tower crane
CN207620108U (en) PC fabricated construction dry type column foot connecting structures
CN105220792A (en) A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof
CN205934703U (en) A high damping shock insulation rubber bearing mounting structure for cast -in -place bridge
CN201809873U (en) Reinforcing aseismatic beam for house
CN208899928U (en) Stage building structure
CN207228330U (en) A kind of prefabricated assembled frame combined using steel core concrete column and girder steel
CN208563658U (en) A kind of prefabricated lattice compound shear wall assembly monomer
CN110359596A (en) A kind of Prefabricated composite assembling steel plate shear wall
CN206467577U (en) Cast-in-place box beam bracket
CN209482822U (en) Assembling type fence in concrete
CN206844303U (en) A kind of house frame of light section steel structure and light floor assembly system
CN206607706U (en) A kind of drawing shore for shear wall construction
CN208604470U (en) A kind of half-through arch bridge
CN106400629A (en) Round-tunnel double-layer lane frame structure system and full-prefabricated construction method thereof
CN208455486U (en) Cast-in-situ concrete beam construction bracket
CN107939135B (en) Beam-slab structure form with post-earthquake restorability
CN204898701U (en) Prefabricated post of elliptic type
CN207863462U (en) A kind of reinforcing aluminum alloy mould plate disc type adjustable steel support
CN212561173U (en) Mounting bracket and mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190823

CF01 Termination of patent right due to non-payment of annual fee