CN101614018B - Construction method of bottom foundation architecture of large desulfurization anti-corrosion case and tank - Google Patents

Construction method of bottom foundation architecture of large desulfurization anti-corrosion case and tank Download PDF

Info

Publication number
CN101614018B
CN101614018B CN2009100484992A CN200910048499A CN101614018B CN 101614018 B CN101614018 B CN 101614018B CN 2009100484992 A CN2009100484992 A CN 2009100484992A CN 200910048499 A CN200910048499 A CN 200910048499A CN 101614018 B CN101614018 B CN 101614018B
Authority
CN
China
Prior art keywords
steel plate
embedded bolt
pre embedded
welding
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009100484992A
Other languages
Chinese (zh)
Other versions
CN101614018A (en
Inventor
刘晓琴
陈海峰
刘京
方辉
陆慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Longking Environmental Protection Co Ltd
Original Assignee
Shanghai Longking Environmental Protection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Longking Environmental Protection Co Ltd filed Critical Shanghai Longking Environmental Protection Co Ltd
Priority to CN2009100484992A priority Critical patent/CN101614018B/en
Publication of CN101614018A publication Critical patent/CN101614018A/en
Application granted granted Critical
Publication of CN101614018B publication Critical patent/CN101614018B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Preventing Corrosion Or Incrustation Of Metals (AREA)
  • Foundations (AREA)

Abstract

The invention relates to a construction method of bottom plate foundation architecture of a large desulfurization anti-corrosion storage tank or storage case. The method includes the steps that: a) screws are uniformly arranged in pair, welded, fixed and embedded according to width requirement of a steel bottom plate to be paved; b) the end part of the exposed part of the embedded screws is provided with upper nuts and lower nuts; wherein an adjusting steel plate is arranged between the upper nuts and the lower nuts, and the lower nuts are sequentially finely adjusted until the height of the upper surface of the adjusting steel plate accords with drawing technical requirements; c) grating strips are fixed on the adjusting steel plate by welding; d) concrete foundation is formed below the grating strips by final grouting, and a storage tank bottom plate is paved on and is fixedly connected with the reticular grating strips by welding. The invention has the beneficial effects that: standard height of the adjusting steel plate can be conveniently adjusted by sequentially finely adjusting the lower nuts at the end part of the embedded screws, further flatness error of the whole grating plate mesh can be controlled, the problem that the flatness of the case and tank bottom plate exceeds standard is effectively overcome, and thread adjustment is convenient and accurate.

Description

The job practices of bottom foundation architecture of large desulfurization anti-corrosion case and tank
Technical field
The invention belongs to desulphurization plant case jar manufacturing technology field, relate to a kind of large-scale storage tank or storage tank mat foundation structure, relate in particular to the job practices of foundation structure of the demanding need of mat foundation quality requirement, particularly planeness being made the Large Box jar of anti-corrosion treatment.
Background technology
Usually, large anticorrosion erosion case pot bottom foundation structure is the vertical, horizontal clathrate to be made with i iron or channel-section steel in whole bottom surface separate, as vertically with the long i iron of whole piece as floor beams, side laterally is welded to connect fixing with short channel-section steel and vertical long i iron segmentation, fixedly connected with the civil engineering concrete casting cast layer of storage tank pot bottom below by pre embedded bolt in the lower edge of floor beams i iron.Base plate is laid on the floor beams and welding is fixed, and makes the anticorrosion rubber lining in case jar inside at last, or coated glass scale clay.The out-of-flatness of case pot bottom will influence the quality of subsequent handling Corrosion resistant linings.
Conventional case pot bottom foundation construction component are various, and the long i iron of several meters long whole piece is unified in the construction adjusts not only labour intensity height of flatness, and the flatness error of installing is difficult to control.
Summary of the invention
The objective of the invention is in order to overcome the disadvantage of prior art, provide a kind of embedded part structure succinct, regulate light accurately, can effectively control the job practices of base foundation structure of the case jar of the flatness error that base plate installs.
For achieving the above object, the technical scheme of employing is: the job practices of bottom foundation architecture of large desulfurization anti-corrosion case and tank is characterized in that: step is:
A) by the width requirement of steel sole plate to be laid, the uniform pre embedded bolt that is provided with directly is welded on the reinforcement foundation in pairs, checks that the errorless back pouring of angle absolute altitude concrete basis makes described pre embedded bolt fixed-site;
B) the exposed part end of pre embedded bolt is equipped with top nut and lower nut, be equipped with the adjustment steel plate between described top nut and the lower nut, finely tune each lower nut successively, meet the drawing technical requirements until described adjustment steel plate upper level, described lower nut and described pre embedded bolt spot welding are fixed, and tighten the top nut location;
C) on described adjustment steel plate, arrange the grid lath, prescind described pre embedded bolt and exceed grid lath upper surface portion, the grid lath is fixing with the welding of adjustment steel plate, be connected into netted integral body by welding manner between the grid lath, thereby reach the flatness error of controlling whole grid expanded metals effectively;
D) final grouting concrete basis, described grid lath below, netted described grid lath upper berth is established the case tank bottom and is welded to each other and is connected and fixed.
Described pre embedded bolt is the L sigmoid.
The invention has the beneficial effects as follows: L type pre embedded bolt and to adjust the steel plate combined member uniform and symmetrical, can adjust the absolute altitude of steel plate easily and contain the drawing technical requirements by finely tuning lower nut successively to according with.Threaded adjusting is light accurately and since the design arrangement of grid lath be horizontal, indulge mode, be netted, so and then can control the flatness error of whole grid expanded metals, effectively overcome problems such as case tank bottom flatness exceeds standard.
Description of drawings
Fig. 1 is a Large Box tank bottom structure chart;
Fig. 2 is the B-B cross-sectional view of Fig. 1.
Among the figure, 1, pre embedded bolt; 2, lower nut; 3, adjust steel plate; 4, top nut; 5, grid lath; 6, base plate.
The specific embodiment
The invention will be further described below in conjunction with Fig. 1 and Fig. 2.
The job practices of large anticorrosion erosion case pot bottom foundation structure, it is characterized in that: step is:
A) by the width requirement of steel sole plate to be laid 6, pre embedded bolt 1 is set in pairs, directly is welded on the reinforcement foundation, check that the errorless back pouring of angle absolute altitude concrete basis makes described pre embedded bolt 1 fixed-site;
B) the exposed part end of pre embedded bolt 1 is equipped with top nut 4 and lower nut 2, be equipped with between described top nut 4 and the lower nut 2 and adjust steel plate 3, finely tune lower nut 2 successively and regulate height, meet the drawing technical requirements until described adjustment steel plate 3 upper level, lower nut 2 is fixed with pre embedded bolt 1 spot welding, tightens top nut 4 location;
C) on described adjustment steel plate 3, arrange grid lath 5, prescind described pre embedded bolt 1 and exceed described grid lath 5 upper surface portion, grid lath 5 is fixing with 3 welding of adjustment steel plate, be connected into netted integral body by welding manner between the grid lath 5, thereby reach the flatness error of controlling whole grid expanded metals effectively;
D) final grouting concrete basis, described grid lath 5 below, treat that case jar body installs after, last install bin tank bottom 6.For the flatness of finally guaranteeing case tank bottom 6 reaches technical requirements, lay and be welded to connect fixed base plate 6 on the netted described grid lath 5, strict order according to past both sides from the center, base plate 6 and flase floor bar 5 are fused.
For convenient pre-buried in having the concrete civil engineering layer of reinforcing bar, described pre embedded bolt 1 is the L sigmoid.

Claims (2)

1. the job practices of bottom foundation architecture of large desulfurization anti-corrosion case and tank, it is characterized in that: step is:
A) by the width requirement of steel sole plate to be laid (6), pre embedded bolt (1) is set in pairs, directly be welded on the reinforcement foundation, check that the errorless back pouring of angle absolute altitude concrete basis makes described pre embedded bolt (1) fixed-site;
B) the exposed part end of pre embedded bolt (1) is equipped with top nut (4) and lower nut (2), be equipped with between described top nut (4) and the lower nut (2) and adjust steel plate (3), finely tune lower nut (2) successively and regulate height, meet the drawing technical requirements until described adjustment steel plate (3) upper level, described lower nut (2) is fixed with pre embedded bolt (1) spot welding, tightens top nut (4) location;
C) on described adjustment steel plate (3), arrange grid lath (5), prescind described pre embedded bolt (1) and exceed described grid lath (5) upper surface portion, grid lath (5) is fixing with adjustment steel plate (3) welding, the grid lath is connected into netted integral body by welding manner between (5), thereby controls the flatness error of whole grid expanded metals;
D) described grid lath (5) below final grouting concrete basis, treat that case jar body installs after, base plate (6) is installed at last, base plate (6) and flase floor bar (5) are welded and fused.
2. according to the job practices of the described bottom foundation architecture of large desulfurization anti-corrosion case and tank of claim 1, it is characterized in that: described pre embedded bolt (1) is the L sigmoid.
CN2009100484992A 2009-03-30 2009-03-30 Construction method of bottom foundation architecture of large desulfurization anti-corrosion case and tank Expired - Fee Related CN101614018B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100484992A CN101614018B (en) 2009-03-30 2009-03-30 Construction method of bottom foundation architecture of large desulfurization anti-corrosion case and tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100484992A CN101614018B (en) 2009-03-30 2009-03-30 Construction method of bottom foundation architecture of large desulfurization anti-corrosion case and tank

Publications (2)

Publication Number Publication Date
CN101614018A CN101614018A (en) 2009-12-30
CN101614018B true CN101614018B (en) 2011-03-16

Family

ID=41493889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100484992A Expired - Fee Related CN101614018B (en) 2009-03-30 2009-03-30 Construction method of bottom foundation architecture of large desulfurization anti-corrosion case and tank

Country Status (1)

Country Link
CN (1) CN101614018B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2490941A (en) * 2011-05-19 2012-11-21 Nicholas James Marshall Frame support
CN102322072B (en) * 2011-06-29 2013-09-04 中国葛洲坝集团股份有限公司 Mounting method for accurately embedding large-sized screw group and base sections
CN105292828B (en) * 2015-10-21 2018-08-21 中国石油化工股份有限公司 A kind of installation method of tank bottom harden structure on large-scale storage tank
CN106702907B (en) * 2016-12-19 2018-05-01 中交路桥建设有限公司 A kind of Bridge guardrail base adjustable flange disk construction method
CN111576475A (en) * 2020-04-24 2020-08-25 中冶天工集团有限公司 Method for mounting pump equipment with anticorrosion requirement on foundation
CN113338324A (en) * 2021-06-23 2021-09-03 国能龙源环保有限公司 Tank bottom plate fixing structure and construction method thereof
CN113531034B (en) * 2021-07-14 2022-08-16 哈尔滨电机厂有限责任公司 Elastic device for upper frame of generator motor

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3927497A (en) * 1972-11-15 1975-12-23 Hitachi Ltd Supporting structure of pressure vessel
CN101250881A (en) * 2008-01-21 2008-08-27 武汉冶建安装工程有限责任公司 Method for installation of seat slurry method construction packing plate
JP4231517B2 (en) * 2006-09-12 2009-03-04 日精樹脂工業株式会社 Measuring method for injection molding machine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3927497A (en) * 1972-11-15 1975-12-23 Hitachi Ltd Supporting structure of pressure vessel
JP4231517B2 (en) * 2006-09-12 2009-03-04 日精樹脂工業株式会社 Measuring method for injection molding machine
CN101250881A (en) * 2008-01-21 2008-08-27 武汉冶建安装工程有限责任公司 Method for installation of seat slurry method construction packing plate

Also Published As

Publication number Publication date
CN101614018A (en) 2009-12-30

Similar Documents

Publication Publication Date Title
CN101614018B (en) Construction method of bottom foundation architecture of large desulfurization anti-corrosion case and tank
CN103397701B (en) Adjustable positioning structure for pre-buried bolt double-layered positioning plate and construction method
CN2799743Y (en) Cast-in-place concrete precise regulator and controller
CN102758445A (en) Foundation leveling device, foundation assembly and foundation forming method for wind driven generator tower
CN102936962A (en) Construction method of slanting cantilever steel structure supported by temporary steel frame
CN204298825U (en) Foundation ditch builds elephant trunk supporting and regulating device
CN104234385A (en) Mounting and construction method for terrace large-size steel plate embedded part
CN103726450B (en) Supported Slab Bridge rises method and adjustable height combination mat stone structure thereof
CN105401958A (en) Prefabricating construction method with movable prefabricating trolley for tunnel cable trench cover plate
CN102433996A (en) Method for constructing wafer board with SMC (Sheet Molding Compound) hole forming mould
CN108643428A (en) A kind of height-adjustable prefabricated reinforced concrete slab
CN102286988A (en) Grouting shim plate construction method
CN104032969A (en) Precise positioning and process regulation and control device for vibration isolation support embedded plate
CN105386517A (en) Prefabricated floating window board and mounting method thereof
CN201386283Y (en) Base structure of bottom part of large-scale desulfurization and corrosion protection tank
CN110725324A (en) Shear wall high-limb guide wall conversion supporting structure and construction method thereof
CN204780972U (en) Bayonet column base mounting adjustment device of steel column rim of a cup
CN203383332U (en) Adjustable positioning structure with two positioning plates for embedded bolts
CN207004065U (en) A kind of piping shaft reserves thimble assembly
CN202627494U (en) Device for locating and supporting prefabricated concrete structure laminated slab
CN208815557U (en) A kind of signal tower pedestal installation system
CN207405882U (en) A kind of steel bar positioning frame
CN210451571U (en) Novel steel box girder bridge floor mould
KR200397566Y1 (en) Gang form with horizontal leveling device
CN203160707U (en) Adjustable t-shaped controller

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110316

Termination date: 20170330

CF01 Termination of patent right due to non-payment of annual fee