CN208759772U - Canopy and its precast reinforced concrete frame beam are poured after one kind - Google Patents

Canopy and its precast reinforced concrete frame beam are poured after one kind Download PDF

Info

Publication number
CN208759772U
CN208759772U CN201820627860.1U CN201820627860U CN208759772U CN 208759772 U CN208759772 U CN 208759772U CN 201820627860 U CN201820627860 U CN 201820627860U CN 208759772 U CN208759772 U CN 208759772U
Authority
CN
China
Prior art keywords
canopy
frame beam
stress
embedded
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820627860.1U
Other languages
Chinese (zh)
Inventor
刘威
吴锋
张贵文
徐春丽
周杨
杨勇玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201820627860.1U priority Critical patent/CN208759772U/en
Application granted granted Critical
Publication of CN208759772U publication Critical patent/CN208759772U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

Canopy is poured after disclosed by the utility model, including precast reinforced concrete frame beam and canopy steel bar stress, wherein, the precast reinforced concrete frame beam includes frame beam body, embedded bar mechanical sleeves are set in the frame beam body, the embedded bar mechanical sleeves are connect with canopy steel bar stress embedded section, and the end of thread of the canopy steel bar stress, which is inserted into the embedded bar mechanical sleeves, to be connected.Canopy is poured after provided by the utility model can be realized easy for construction, raising working efficiency.The utility model also provides a kind of precast reinforced concrete frame beam.

Description

Canopy and its precast reinforced concrete frame beam are poured after one kind
Technical field
The utility model relates to canopy and its precast reinforced is poured after assembled architecture field of engineering technology more particularly to one kind Concrete frame beam.
Background technique
Process of Housing Industrialization is carried forward vigorously in country and place in recent years.Wherein, Shanghai City requires the outer ring from 2016 Civil buildings are created within line should be all using assembled architecture, and Section of Outer Ring Line is in addition more than 50%;Section of Outer Ring Line is external from 2017 Increase year by year on the basis of 50%.Meanwhile to using concrete structural system build assembled architecture monomer pre-emulsion assembly rate into It has gone and respective specified and has stepped up, since 2016, monomer pre-emulsion rate was not less than 40%.
With assembled architecture development and widely popularize, there is various technical problem, existing assembled rule The reference way that model and atlas provide just seems awkward, the serious development for restricting assembled architecture technology.
Currently, canopy stress indulges muscle and is generally 8@100, distributing bar one when the after-pouring canopy design of cantilever span 1m As be 8@200, canopy stress is indulged there are mainly three types of the connection types of muscle and precast reinforced concrete frame beam:
The first: setting a roof beam in place upper embedded bar mechanical sleeves in prefabricated frame, and then live formwork supporting plate, is mechanically connected stress steel Muscle binds distributed structure reinforcing bar, casting concrete.
This way disadvantage: it is 8 100 that stress, which indulges muscle, more in prefabricated frame interior pre-buried reinforcing steel bar machinery sleeve of setting a roof beam in place, not only It is costly, and prefabricated frame sets a roof beam in place production and later period canopy site operation is inconvenient.
Second: directly reserving canopy steel bar stress in precast frame beam sides, then live formwork supporting plate, binding distribution structure Make reinforcing bar, casting concrete.
This way disadvantage: when prefabricated components are manufactured, mold periphery throws away one meter or so of reinforcing bar, not only causes die station Upper a large amount of reinforcing bar accumulations, influence to produce;And since weight difference is very big inside and outside mold for canopy steel bar stress, necessarily cause by Power reinforcing bar is tilted in die inside, reinforcing bar location difficulty;In addition, prefabricated frame is set a roof beam in place, outside throws away a large amount of canopy steel bar stresses, makes It sets a roof beam in place at prefabricated frame in the inconvenience of transport, lifting and construction casting.
The third: prefabricated frame is set a roof beam in place normally to be produced in factory, after being transported to scene, rigging out, in precast frame beam sides Drilling is implanted into canopy steel bar stress, and then live formwork supporting plate, binds distributed structure reinforcing bar, casting concrete.
This way disadvantage: 1. are connected using later period bar planting, and setting a roof beam in place to former component, that is, prefabricated frame, it is larger to damage;2. bar planting expense Higher, construction quality is difficult to ensure;3. after the smooth side bar planting of prefabricated components, casting concrete, new-old concrete contact surface It is bad to locate globality, stress weakness easy to form;4. atlas " concrete structure reinforcement construction " (13G311-1) page 196 is bright True regulation this bar planting spreading floor way is not suitable for newly-increased cantilevered plate.
Therefore, canopy is poured after how providing one kind, it is easy for construction to realize, working efficiency is improved, is current this field skill Art personnel technical problem urgently to be resolved.
Utility model content
In view of this, the purpose of this utility model is to provide canopy is poured after one kind, it is easy for construction to realize, improve work Efficiency.The another object of the utility model is to provide a kind of precast reinforced concrete frame beam.
In order to achieve the above object, the utility model provides the following technical solutions:
Canopy, including precast reinforced concrete frame beam and canopy steel bar stress are poured after one kind, wherein described precast reinforced Concrete frame beam includes frame beam body, and embedded bar mechanical sleeves, the embedded bar are arranged in the frame beam body Mechanical sleeves are connect with canopy steel bar stress embedded section, and it is mechanical that the end of thread of the canopy steel bar stress is inserted into the embedded bar It is connected in sleeve.
Preferably, above-mentioned canopy steel bar stress is arranged as 12@300 of φ.
Preferably, it further includes that stress indulges muscle, horizontal distribution muscle and distribution reinforcing rib that canopy is poured after above-mentioned.
Preferably, above-mentioned stress indulges muscle and is set as 6@100 of φ.
Preferably, above-mentioned horizontal distribution muscle is set as 8@200 of φ.
Preferably, above-mentioned distribution reinforcing rib is set as 3 φ, 8@100.
The utility model also provides a kind of precast reinforced concrete frame beam, including frame beam body, the Vierendeel girder master Embedded bar mechanical sleeves are set on body, and the embedded bar mechanical sleeves are connect with canopy steel bar stress embedded section.
Preferably, the exposed junction of above-mentioned embedded bar mechanical sleeves is provided with sealing device.
Preferably, the exposed junction of above-mentioned embedded bar mechanical sleeves is blocked using rubber stopper.
Canopy, including precast reinforced concrete frame beam and canopy steel bar stress are poured after provided by the utility model, wherein The precast reinforced concrete frame beam includes frame beam body, and embedded bar mechanical sleeves are arranged in the frame beam body, The embedded bar mechanical sleeves are connect with canopy steel bar stress embedded section, described in the end of thread insertion of the canopy steel bar stress It is connected in embedded bar mechanical sleeves.
Canopy is poured after provided by the utility model relative to conventional structure, beneficial effect includes:
1) embedded bar mechanical sleeves quantity greatly reduces, component production, construct it is convenient, it is low-cost.
2) precast frame beam sides embedded bar mechanical sleeves reduce 2/3rds, big to Vierendeel girder damage and destroying infection Big to reduce, corresponding error is also easier to control.
3) because embedded bar mechanical sleeves greatly reduce, precast frame beam sides mold punches and also accordingly reduces, and mold is raw Difficulty is produced to substantially reduce.
4) mold side, which punches, greatly reduces, prefabricated components production, casting concrete when, sealing hole rubber stopper quantity is also Corresponding to reduce, process is more succinct.
5) in order to control overhanging plank split, stress indulges muscle direction and separately adds 6 100 up and down, but does not anchor into prefabricated frame and set a roof beam in place, only Scene is needed directly to bind, it is convenient to construct.
6) reinforce cantilevered plate root, encrypt three, i.e. 3 8@100 in stress maximum distribution bar, be conducive to it is whole by Crack at power deformation and control new-old concrete contact surface.
7) because embedded bar mechanical sleeves greatly reduce and without getting rid of muscle outside template, prefabricated components production and later period transport, Lifting workload mitigates significantly.
8) embedded bar mechanical sleeves greatly reduce, the processing of new-old concrete contact surface dabbing, more convenient.
9) when later period site operation, steel bar stress middle embedded bar mechanical sleeves of directly setting a roof beam in place with prefabricated frame are connect, remaining Reinforcing rib, the normal binding in construction distributing reinforcement etc. scene, setting a roof beam in place on former prefabricated frame disturbance and influences almost without after being easy to implement Pour the construction of canopy.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is this Some embodiments of utility model, for those of ordinary skill in the art, without creative efforts, also Other drawings may be obtained according to these drawings without any creative labor.
Fig. 1 be it is provided by the embodiment of the utility model after pour the structural schematic diagram of canopy;
Fig. 2 is the A-A schematic cross-sectional view of Fig. 1;
Fig. 3 is the B-B schematic cross-sectional view of Fig. 1;
Fig. 4 is the portion the A enlarged structure schematic diagram of Fig. 1.
In figure 1 above-Fig. 4:
Precast reinforced concrete frame beam 1, after pour canopy 2, canopy steel bar stress 3, stress indulge muscle 4, distribution reinforcing rib 5, Horizontal distribution muscle 6, embedded bar mechanical sleeves 7.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Based on the implementation in the utility model Example, every other embodiment obtained by those of ordinary skill in the art without making creative efforts belong to The range of the utility model protection.
Please refer to Fig. 1-Fig. 4, Fig. 1 be it is provided by the embodiment of the utility model after pour the structural schematic diagram of canopy;Fig. 2 is figure 1 A-A schematic cross-sectional view;Fig. 3 is the B-B schematic cross-sectional view of Fig. 1;Fig. 4 is the portion the A enlarged structure schematic diagram of Fig. 1.
Canopy, including precast reinforced concrete frame beam 1 and canopy steel bar stress 3 are poured after provided by the utility model, In, 1 beam of precast reinforced concrete frame includes frame beam body, and embedded bar mechanical sleeves 7 are arranged in frame beam body, pre-buried Reinforcing steel bar machinery sleeve 7 is connect with canopy steel bar stress embedded section, and the end of thread of canopy steel bar stress 3 is inserted into embedded bar machinery set It is connected in cylinder 7.
Wherein, canopy steel bar stress 3 is arranged as 12@300 of φ.It further includes that stress indulges muscle 4, level that canopy is poured after above-mentioned Distributing reinforcement 6 and distribution reinforcing rib 5.The vertical muscle 4 of stress is set as 6@100 of φ, and end does not anchor into precast reinforced concrete frame beam 1.Horizontal distribution muscle 6 is set as 8@200 of φ.Distribution reinforcing rib 5 is set as 3 φ, 8@100.
Canopy is poured after provided by the utility model relative to conventional structure, beneficial effect includes:
1) canopy steel bar stress 3 is arranged as 12@300 of φ, is connected using embedded bar mechanical sleeves 7 (I grade of connector), set Barrel spacing 300mm, 7 quantity of embedded bar mechanical sleeves greatly reduce, component production, construct it is convenient, it is low-cost.
2) precast frame beam sides embedded bar mechanical sleeves 7 reduce 2/3rds, to Vierendeel girder damage and destroying infection It greatly reduces, corresponding error is also easier to control.
3) because embedded bar mechanical sleeves 7 greatly reduce, precast frame beam sides mold punches and also accordingly reduces, and mold is raw Difficulty is produced to substantially reduce.
4) mold side, which punches, greatly reduces, prefabricated components production, casting concrete when, sealing hole rubber stopper quantity is also Corresponding to reduce, process is more succinct.
5) in order to control overhanging plank split, 3 direction of canopy steel bar stress separately adds stress to indulge 4 φ 6 100 of muscle, but not anchor up and down Enter precast reinforced concrete frame beam 1, only scene is needed directly to bind, it is convenient to construct.
6) reinforce cantilevered plate root, distribution reinforcing rib 5 is set in stress maximum and encrypts three, i.e. 3 φ, 8@100, favorably Crack at whole stress deformation and control new-old concrete contact surface.
7) because embedded bar mechanical sleeves 7 greatly reduce and without getting rid of muscle outside template, prefabricated components production and later period transport, Lifting workload mitigates significantly.
8) embedded bar mechanical sleeves 7 greatly reduce, the processing of new-old concrete contact surface dabbing, more convenient.
9) when later period site operation, canopy steel bar stress 3 directly with embedded bar machine in precast reinforced concrete frame beam 1 Tool sleeve 7 connects, remaining reinforcing rib, the normal binding in construction distributing reinforcement etc. scene, and setting a roof beam in place on former prefabricated frame disturbance and influences several Do not have, the construction of canopy is poured after being easy to implement.
The utility model also provides a kind of precast reinforced concrete frame beam, including frame beam body, in frame beam body Embedded bar mechanical sleeves 7 are set, and embedded bar mechanical sleeves 7 are connect with canopy steel bar stress embedded section.
Wherein, the exposed junction of embedded bar mechanical sleeves 7 is provided with sealing device.
Wherein, the exposed junction of embedded bar mechanical sleeves 7 is blocked using rubber stopper.
Specifically, in practical application:
Step 1: according to design requirement, canopy steel bar stress hole is opened up in precast frame beam mould side, spacing 300, on Under each row.It is contemplated herein that embedded bar mechanical sleeves 7 are reduced, easy to produce and construction is replaced by force using larger diameter reinforcing bar etc. Generation former steel bar stress.
Step 2: manufacture be embedded in prefabricated frame set a roof beam in place in canopy steel bar stress 3.Referred to herein as awning plate stress Reinforcing bar 3 needs to meet the anchoring requirement in precast reinforced concrete frame beam 1.
Step 3: when making precast reinforced concrete frame beam 1, when factory's assembling reinforcement, according to mold cavity position Side embedded bar mechanical sleeves 7 (I grade of connector), canopy steel bar stress embedded section connect with embedded bar mechanical sleeves 7 and finishes, Accurate positioning is bound using special tooling or with reinforcing bar in beam, it is fixed.
It wherein, is that canopy steel bar stress 3 is same according to mold cavity position side embedded bar mechanical sleeves 7 (I grade of connector) Required by the overlap joint of section;Canopy steel bar stress embedded section connect with embedded bar mechanical sleeves 7 and finishes, using special tooling or with Reinforcing bar binds accurate positioning in beam.It is fixed, it refers to guaranteeing the requirement of 7 position error of embedded bar mechanical sleeves.
Step 4: the exposed junction of embedded bar mechanical sleeves 7 carries out sealing, mortar leakage prevention, blend rubber plug will be outside sleeve Reveal hole to block, prevent sundries from entering reinforcing steel bar machinery sleeve, guarantees the component quality of production and the convenient needs of construction in later period.
Step 5: finish to prefabricated frame binding of setting a roof beam in place, all built-in fittings are placed complete, and after fixed, factory pours mixed Solidifying soil.
Step 6: prefabricated components maintenance, demoulding, lifting, are then transported to scene.
Step 7: after prefabricated components on-site hoisting, awning plate formwork.
Step 8: using one end threaded canopy steel bar stress 3 be φ 12 300, with prefabricated frame set a roof beam in place in pre-buried steel Muscle mechanical sleeves 7 are connected and fixed.Main steel bar stress herein, the i.e. quality of connection of canopy steel bar stress 3 are had to I grade of guarantee and are connect Head requires, and directly affects the general safety of after-pouring canopy.
Step 9: scene binding separately adds stress to indulge 6@100 of muscle φ, distribution 3 φ of stiffener, 8@100, horizontal distribution muscle φ 8@200。
Step 10: cast in situs canopy board concrete.
The foregoing description of the disclosed embodiments can be realized professional and technical personnel in the field or using originally practical new Type.Various modifications to these embodiments will be readily apparent to those skilled in the art, and determine herein The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause This, the present invention will not be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The widest scope consistent with features of novelty.

Claims (9)

1. pouring canopy after one kind, which is characterized in that including precast reinforced concrete frame beam and canopy steel bar stress,
Wherein, the precast reinforced concrete frame beam includes frame beam body, and embedded bar is arranged in the frame beam body Mechanical sleeves, the embedded bar mechanical sleeves are connect with canopy steel bar stress embedded section,
The end of thread of the canopy steel bar stress is inserted into the embedded bar mechanical sleeves and connects.
2. pouring canopy after according to claim 1, which is characterized in that the canopy steel bar stress is arranged as 12@of φ 300。
3. pouring canopy after according to claim 1, which is characterized in that further include that stress indulges muscle, horizontal distribution muscle and distribution Reinforcing rib.
4. pouring canopy after according to claim 3, which is characterized in that the vertical muscle of the stress is set as 6@100 of φ.
5. pouring canopy after according to claim 3, which is characterized in that the horizontal distribution muscle is set as 8@200 of φ.
6. pouring canopy after according to claim 3, which is characterized in that the distribution reinforcing rib is set as 3 φ, 8@100.
7. a kind of precast reinforced concrete frame beam, which is characterized in that including frame beam body, be arranged in the frame beam body Embedded bar mechanical sleeves, the embedded bar mechanical sleeves are connect with canopy steel bar stress embedded section.
8. precast reinforced concrete frame beam according to claim 7, which is characterized in that the embedded bar mechanical sleeves Exposed junction be provided with sealing device.
9. precast reinforced concrete frame beam according to claim 7, which is characterized in that the embedded bar mechanical sleeves Exposed junction using rubber stopper block.
CN201820627860.1U 2018-04-28 2018-04-28 Canopy and its precast reinforced concrete frame beam are poured after one kind Active CN208759772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820627860.1U CN208759772U (en) 2018-04-28 2018-04-28 Canopy and its precast reinforced concrete frame beam are poured after one kind

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820627860.1U CN208759772U (en) 2018-04-28 2018-04-28 Canopy and its precast reinforced concrete frame beam are poured after one kind

Publications (1)

Publication Number Publication Date
CN208759772U true CN208759772U (en) 2019-04-19

Family

ID=66125919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820627860.1U Active CN208759772U (en) 2018-04-28 2018-04-28 Canopy and its precast reinforced concrete frame beam are poured after one kind

Country Status (1)

Country Link
CN (1) CN208759772U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108582465A (en) * 2018-04-28 2018-09-28 上海宝冶集团有限公司 After pour canopy, precast reinforced concrete frame beam and after pour canopy manufacturing method
CN109577198A (en) * 2018-11-07 2019-04-05 同济大学 Fastener Fabricated platform awning skeleton suitable for section assembling construction bridges

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108582465A (en) * 2018-04-28 2018-09-28 上海宝冶集团有限公司 After pour canopy, precast reinforced concrete frame beam and after pour canopy manufacturing method
CN109577198A (en) * 2018-11-07 2019-04-05 同济大学 Fastener Fabricated platform awning skeleton suitable for section assembling construction bridges

Similar Documents

Publication Publication Date Title
CN105735325B (en) A kind of intensive permanent support assembled basement structure system and construction method
CN102758451B (en) Concrete cable channel construction process
CN108582465A (en) After pour canopy, precast reinforced concrete frame beam and after pour canopy manufacturing method
CN108360678B (en) A kind of assembled beam-column node tenon connection structure
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN208759772U (en) Canopy and its precast reinforced concrete frame beam are poured after one kind
CN106836262A (en) A kind of construction method of packaged type bridges substructure
CN102808414B (en) Bonded post-tensioned prestressed anchoring construction method for cast-in-place concrete structure
CN112064676A (en) Movable formwork structure and construction method thereof
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN208072390U (en) A kind of connection structure of the stake of bridge support and underwater binder
CN110295552A (en) A kind of gate-type assembled box culvert and construction method
CN106149878A (en) Attachment structure at concrete frame structure prefabricated post and beam slab node and method
CN109098278A (en) The connecting structure and construction method of prefabricated beam column
CN211080782U (en) Grouting sleeve
CN209703418U (en) Assembled flood-control wall
CN109083184A (en) A kind of prefabricated cushion cap of land sectional type and its production and installation method
CN107100322A (en) Post stretching vertical prestressing cast-in-place concrete rod structure and construction method
CN109763658A (en) A kind of support device and its construction method for arrangement material distributing machine in elevator
CN211447004U (en) Reinforced GRC plate and pipe ditch foundation formwork system combining same
CN206233359U (en) A kind of assembled architecture reinforced concrete member
CN215055273U (en) A assembled template for installing support bracket embedded box
CN206319632U (en) A kind of assembled architecture foundation pole rib precise positioning instrument
CN206000021U (en) Attachment structure at concrete frame structure prefabricated post and beam slab node
CN105421780B (en) A kind of construction method of prefabricated concrete structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant