CN208751574U - A kind of engineering surveying control point structure - Google Patents
A kind of engineering surveying control point structure Download PDFInfo
- Publication number
- CN208751574U CN208751574U CN201821737568.1U CN201821737568U CN208751574U CN 208751574 U CN208751574 U CN 208751574U CN 201821737568 U CN201821737568 U CN 201821737568U CN 208751574 U CN208751574 U CN 208751574U
- Authority
- CN
- China
- Prior art keywords
- control point
- concrete
- engineering surveying
- fence
- center
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
A kind of engineering surveying control point structure, concrete pedestal and protection fence including concrete cushion located underground, pile body and markstone, and on ground;The bottom at control point is arranged in concrete cushion; pile body and markstone are successively poured on concrete cushion; surrounding puddled backfill is to ground elevation; cast-in-place concrete pedestal and center protector; drainage duct and fence jack are preset on concrete pedestal; cross mark in control point is squeezed into the protector of center, fence is protected in installation on fence jack, and warning paint face is brushed on the side wall of concrete pedestal.Relative to conventional control point design, the construction method of the utility model is simple, strengthens the disturbance rejection and warning performance at control point, adverse effect caused by avoiding because of dominating pair of vertices normal construction.
Description
Technical field
The utility model relates to engineering measurement fields, and in particular to a kind of engineering surveying control point structure.
Background technique
Engineering surveying control point is widely used, and is related to all Large Scale Construction Engineerings, due to the period one of big construction item
As it is longer, measure the service life at control point through entire process of construction, service life is also longer.
General construction project is often directly arranged in control point concrete surface relatively stable in construction area, using quarter
It draws, be implanted into the forms such as steel nail, or even withouyt maintenance prevention.By constructing and site traffic is influenced, especially bulk transport vehicle
It is current or carry on construction work at night it is current etc. influence, be easy to cause the disturbance, destruction or loss at control point.Engineering survey is construction
Primary process, be that each link of engineering project is able to the guarantee smoothly carried out, engineering surveying control network has control global and limit
The effect of measurement error processed accumulation, once be affected project construction may be caused it is unfavorable.Therefore it is applied in design and control point
Working hour is considered as factors, in addition to its Position Design should avoid the construction area that may be disturbed as far as possible, should also reinforce measurement control
The durability and accuracy of system point itself, this just needs to be solved from the robustness and warning design aspect at control point.
Utility model content
The purpose of this utility model is that being directed to above-mentioned the problems of the prior art, a kind of engineering surveying control point knot is provided
Structure, the disturbance rejection that can be tightened control a little and warning performance, adverse effect caused by avoiding because of dominating pair of vertices normal construction.
To achieve the goals above, the utility model engineering surveying control point structure, including concrete mats located underground
Layer, pile body and markstone, and concrete pedestal and protection fence on ground;The concrete cushion setting is being controlled
The bottom of point is made, successively pours pile body and markstone, surrounding puddled backfill to ground elevation, cast-in-place concrete base on concrete cushion
Seat and center protector preset drainage duct and fence jack on concrete pedestal, control are squeezed into the protector of center
Point cross identifies, installation protection fence on the fence jack, brushes warning paint face on the side wall of the concrete pedestal.
Center protector opening capping above control point cross mark has cover sheet.
The concrete cushion depth of burying is greater than the standard frost penetration of construction project region.
The concrete cushion, pile body poured with markstone together with height not less than 1.5m.
The strength grade of the concrete cushion is not less than C15, and the strength grade of pile body and markstone is not less than C25.
The bottom surface of the center protector is lower than the bottom surface of concrete pedestal, and cross mark in control point is located at center protector
Center.
Two drainage ducts are provided on the concrete pedestal, two drainage ducts are opened up in diagonal position.
The warning paint face is formed using yellow dirty oil paint brushing, and the protection fence is made of steel pipe.
The construction method of the utility model engineering surveying control point structure, comprising the following steps:
Step 1: determining control point position and an outer contour are put in measurement;
Step 2: excavation pit;
Step 3: bottom of foundation ditch carries out compacting processing, compacted density reaches 0.95 or more after compacting, is laid with concrete mats
Layer;
Step 4: formwork and cast-in-place concrete pile body and markstone;
Step 5: the surrounding compaction in layers of pile body, compacting factor is not less than 0.90, is backfilled to ground elevation, single layer backfill
Thickness is not more than 300cm;
Step 6: control point cross mark is squeezed into, and the point centered on control point cross mark, central point outer contour range
Interior excavate is not less than 15cm, formwork cast-in-place concrete pedestal and center protector lower than ground, and embedded by predetermined position in advance
Twice drainage duct and protection fence jack, two drainage ducts are opened up in diagonal position;
Step 7: installation protection fence, the brushing warning paint face on the side wall of concrete pedestal, and be center protector
It installs cover sheet additional, completes the construction of engineering surveying control point structure.
The outer contour at the control point is not less than 1.3m × 1.3m.
In the step two excavation of foundation pit depth be not less than 1.5m, and be greater than construction project regional standard frost penetration with
Under, excavation of foundation pit carries out slope according to geological conditions.
Compared with prior art, the utility model by underground be arranged concrete cushion, then concrete cushion successively
Pile body and markstone are poured, concrete pedestal is equipped on ground and opens up center protector in center, enhances measurement control
The whole performance of noiseproof of point is made, warning paint face is brushed on the side wall of concrete pedestal, protection is installed on concrete pedestal and is enclosed
Column enhances warning performance, and cross mark in control point is located in the protector of center and increases protective cover plate, enhances cross
The disturbance rejection and anti-damage performance of knowledge add drainage duct in the protector of center, can effectively avoid being impregnated in slot by rainwater.Phase
For conventional control point design, the utility model construction method is simple, greatly improves disturbance rejection and the police at control point
The property shown.
Detailed description of the invention
The stereoscopic schematic diagram of Fig. 1 the utility model engineering surveying control point structure;
The diagrammatic cross-section of Fig. 2 the utility model engineering surveying control point structure;
In attached drawing: 1- concrete cushion;2- pile body;3- markstone;4- drainage duct;5- fence jack;6- concrete pedestal;
The center 7- protector;The control point 8- cross mark;9- protects fence;10- warns paint face;11- cover sheet.
Specific embodiment
The following describes the utility model in further detail with reference to the accompanying drawings.
Referring to Fig. 1, Fig. 2, the engineering surveying control point structure of the utility model include concrete cushion 1 located underground,
Pile body 2 and markstone 3, and concrete pedestal 6 and protection fence 9 on ground.Concrete cushion 1 is arranged at control point
Bottom, successively pour pile body 2 and markstone 3, surrounding puddled backfill to ground elevation on concrete cushion 1.Cast-in-place concrete base
Seat 6 and center protector 7 are preset drainage duct 4 and fence jack 5 on concrete pedestal 6, are beaten in center protector 7
Enter control point cross mark 8, fence 9 is protected in installation on fence jack 5, the police of brushing yellow black on the side wall of concrete pedestal 6
Show paint face 10.7 opening of center protector capping above control point cross mark 8 has cover sheet 11.
In view of the needs of disturbance rejection, the contour line of concrete pedestal 6 is no less than 1.3m × 1.3m, and excavation of foundation pit is deep
Degree is no less than 1.5m in principle, and the bed course depth of burying should be greater than the standard frost penetration of construction project region, standard
Frost penetration should determine that excavation of foundation pit slope is answered according to the relevant regulations in " Code for design of building " (GB50007)
Require to carry out according to the slope that proposes in the report of construction project geotechnical engineering investigation, after excavation of foundation pit should surrounding add fence into
Row protection.
Bottom of foundation ditch first carries out compacting processing, and compacted density should reach 0.95 or more after compacting, then concrete cushion of constructing
1, the thickness of concrete cushion 1 is no less than 20cm, and strength grade of concrete is not lower than C15, reaches to blinding concrete intensity
To be not less than design strength 75% when, can supporting module, continue construct top pour pile body and markstone, pile body 2 and markstone 3
Strength grade of concrete be not lower than C25, when concrete strength reaches 75% not less than design strength, demoulding can be carried out
Operation is backfilled, the backfill of stake week should be layered implementation, and single layer backfill thickness should not exceed 300cm, and every layer is both needed to be compacted, and compacting factor is not
It should be less than 0.90, be backfilled to ground elevation.
The point centered on control point cross mark 8 excavates in the outer contour of control point lower than ground not less than 15cm,
Formwork cast-in-place concrete pedestal, form height are no less than 35cm, and it is not small that guarantee pours the above concrete pedestal thickness in rear ground
In 20cm, center protection slot template should be maked somebody a mere figurehead and is reliably fixed, and template 10~15cm of depth, the height that is above the ground level is not less than 5cm,
Center protector 7 is in design square or rectangular, and drainage duct 4 is diagonally arranged in protection trench bottom, and drainage duct 4 should diagonally be set
It sets, the ground to the outside of pedestal is arranged in bottom.
The fence jack 5 of protection fence 9 is located on pedestal, and jack plastics or steel angle nest are inserted into after concreting,
Then plastering leveling base-plates surface, it is contemplated that actual use is convenient three angles for placing measurement tripod are arranged in base-plates surface
Nest, angle nest can be in positive side triangular arrangement.The square design of fence 9 is protected, mating with pedestal jack, fence welding should be smooth
It is straight, it first derusts and brushes twice of reflecting at night paint afterwards, first pass can be brushed second time after parching, or paste reflecting at night police
Show band.
First pedestal is all brushed when face 10 is painted in the warning of painted concrete pedestal 6 as yellow, stickup paint after parching
Isolating bar, then it is spaced brushing black paint, paint removes isolating bar after parching.
The above overall dimensions design can make the appropriate adjustments according to the actual situation according to site condition, execution conditions etc., but
It should not be reduced in size design.
The rigidity that the utility model measures control point is big, can effectively prevent external disturbance, not outstanding vulnerable to construction infection
It is to carry on construction work at night or vehicular traffic damage, and design to whole construction project engineering surveying control points and construction, which have, uses for reference meaning
Justice.
The above content is combine specific embodiment further detailed description of the utility model, and it cannot be said that
Specific embodiment of the present utility model is only limitted to this, all within the principle of the utility model, can also make several simple
Deduction or replace, these simple deduction or replace all shall be regarded as belonging to the patent determined by submitted claims and protect
Protect range.
Claims (7)
1. a kind of engineering surveying control point structure, it is characterised in that: including concrete cushion (1) located underground, pile body (2) and
Markstone (3), and concrete pedestal (6) and protection fence (9) on ground;Concrete cushion (1) setting
In the bottom at control point, pile body (2) and markstone (3) are successively poured on concrete cushion (1), surrounding puddled backfill to ground is marked
Height, cast-in-place concrete pedestal (6) and center protector (7), preset drainage duct (4) on concrete pedestal (6) and fence is inserted
Control point cross mark (8) is squeezed into hole (5) at center in protector (7), installation protection is enclosed on the fence jack (5)
Warning paint face (10) is brushed on column (9) on the side wall of the concrete pedestal (6).
2. engineering surveying control point structure according to claim 1, it is characterised in that: in control point cross mark (8)
Center protector (7) the opening capping of side has cover sheet (11).
3. engineering surveying control point structure according to claim 1, it is characterised in that: the concrete cushion (1) buries
If depth is greater than the standard frost penetration of construction project region.
4. engineering surveying control point structure according to claim 1 or 3, it is characterised in that: the concrete cushion (1),
Pile body (2) and markstone (3) pour height together not less than 1.5m;The strength grade of the concrete cushion (1) is not less than
The strength grade of C15, pile body (2) and markstone (3) is not less than C25.
5. engineering surveying control point structure according to claim 1, it is characterised in that: the bottom of the center protector (7)
Face is lower than the bottom surface of concrete pedestal (6), and control point cross mark (8) is located at the center of center protector (7).
6. engineering surveying control point structure according to claim 1, it is characterised in that: on the concrete pedestal (6)
Two drainage ducts (4) are provided with, two drainage ducts (4) open up in diagonal position.
7. engineering surveying control point structure according to claim 1, it is characterised in that: warning paint face (10) is adopted
It is formed with yellow dirty oil paint brushing, the protection fence (9) is made of steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821737568.1U CN208751574U (en) | 2018-10-25 | 2018-10-25 | A kind of engineering surveying control point structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821737568.1U CN208751574U (en) | 2018-10-25 | 2018-10-25 | A kind of engineering surveying control point structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208751574U true CN208751574U (en) | 2019-04-16 |
Family
ID=66086208
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821737568.1U Active CN208751574U (en) | 2018-10-25 | 2018-10-25 | A kind of engineering surveying control point structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208751574U (en) |
-
2018
- 2018-10-25 CN CN201821737568.1U patent/CN208751574U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107059667A (en) | Door shape assembled armored concrete box culvert and its construction method | |
CN104074199A (en) | Underwater bearing platform construction method | |
CN111236299B (en) | Municipal road pipeline reinforcement protection system and construction method thereof | |
CN110258582A (en) | Bearing diagonal foundation pit supporting construction and construction method based on steel-pipe pile Yu Larsen steel plate | |
CN108221528B (en) | Roadbed building overlapping structure and construction method | |
CN210262555U (en) | Light soil road structure | |
CN110016919A (en) | A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional | |
CN208751574U (en) | A kind of engineering surveying control point structure | |
CN112281873A (en) | Construction method of anchoring pile | |
CN109163716A (en) | A kind of engineering surveying control point structure and its construction method | |
CN206591535U (en) | Combined type cofferdam | |
JP2013083144A (en) | Liquefaction preventing structure | |
JP6095840B1 (en) | Drainage basin, U-shaped side gutter and construction method | |
CN210737555U (en) | Underground pipeline in-situ protection mechanism for foundation pit supporting system | |
CN108589770B (en) | Subway station retaining wall inward-moving construction method | |
CN106906829A (en) | A kind of horizontal soil body reinforcement means of subway open-cut foundation ditch | |
CN207228130U (en) | A kind of city integrated piping lane foundation pit backfill processing combined system | |
KR100561716B1 (en) | A drain at slope | |
KR100659728B1 (en) | Earth of building land-side protection wall structure | |
KR100515788B1 (en) | Slope protection breast of prefabricated for building development | |
CN213837861U (en) | Lower foundation pit packway structure | |
CN214460528U (en) | Protective structure is administered to anti-skidding slope | |
CN210737592U (en) | Temporary soil retaining protective facility | |
CN220503956U (en) | Driving corner well of individual layer calandria | |
CN217419689U (en) | Soil body high slope outer buttress formula barricade anchor rope reinforced structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |