KR100659728B1 - Earth of building land-side protection wall structure - Google Patents
Earth of building land-side protection wall structure Download PDFInfo
- Publication number
- KR100659728B1 KR100659728B1 KR1020060094805A KR20060094805A KR100659728B1 KR 100659728 B1 KR100659728 B1 KR 100659728B1 KR 1020060094805 A KR1020060094805 A KR 1020060094805A KR 20060094805 A KR20060094805 A KR 20060094805A KR 100659728 B1 KR100659728 B1 KR 100659728B1
- Authority
- KR
- South Korea
- Prior art keywords
- earth
- earth retaining
- coupled
- protective cap
- earth wall
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2220/00—Temporary installations or constructions
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
도 1은 본 발명에 따른 흙막이 구조를 보인 사시도.1 is a perspective view showing a structure of a mud block according to the present invention.
도 2는 본 발명에 따른 흙막이 구조를 보인 분해사시도.Figure 2 is an exploded perspective view showing a structure of a mud block according to the present invention.
도 3은 본 발명에 따른 흙막이 구조의 설치상태를 보인 단면도.Figure 3 is a cross-sectional view showing the installation state of the retaining structure according to the present invention.
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
10 ; 강재말뚝 20 ; 보호캡10;
21 ; 토류벽유입부 22 ; 체결공21; Earth
23 ; 삽입부 30a, 30b ; 제1토류벽23; Inserting
31 ; 삽입홈 32 ; 체결공31;
33 ; 결합공 40 ; 제2토류벽33;
41 ; 단턱 42 ; 체결공41;
43 ; 결합공 50 ; 지지편43;
51 ; 체결공 52 ; 볼트51; Fastener 52; volt
60 ; 강봉60; Steel bar
본 발명은 건축물의 흙막이구조에 관한 것으로, 더욱 상세하게는 타설되는 강재말뚝의 상부에 토류벽유입부를 갖는 보호캡을 씌워 타설시에 강재말뚝의 파손을 방지토록 함은 물론, 그 보호캡의 토류벽유입부로 끼움결합되는 토류벽은 이중으로 결합하고, 그 내측면에서 다수 개의 지지편을 지그재그 형식으로 결합하여 토류벽을 지지토록 하므로서, 토류벽의 붕괴를 방지할 수 있도록 하며, 조립 및 해체가 간편하도록 한 건축물의 흙막이구조에 관한 것이다.The present invention relates to the structure of the earthenware of a building, and more particularly, to cover the upper portion of the steel pile to be poured with a protective cap having the earth wall inlet portion to prevent damage of the steel pile during casting, as well as the earth wall inflow of the protective cap The earth wall, which is fitted into the part, is double-coupled, and a plurality of support pieces are combined in a zigzag form on the inner side thereof to support the earth wall, thereby preventing the collapse of the earth wall, and simplifying assembly and disassembly. It is about a structure of a retainer.
일반적으로 건축현장에서 콘크리트구조물의 축조 또는 수로 및 각종 관로 매설공사에 따른 지반 굴착공사시 굴착 배면의 토사붕괴나 침하방지 및 변위 억제를 통해 인접지반의 안정성을 유지하기 위한 방안으로 가설 흙막이 공사를 하게 되며, 이러한 흙막이공사는 안전성과 시공성은 물론 경제성도 동시에 고려하여 설치하여 한다.In general, when constructing concrete structures or waterways and laying various pipelines in the construction site, the temporary earthquake works should be used to maintain the stability of the adjacent ground by preventing soil disintegration, sinking and restraining displacement of the back of the excavation. This earthwork should be installed considering safety and constructability as well as economic feasibility.
즉, 건물이 밀집된 도심지의 경우에는 기존 건물에 근접 시공이 많아짐에 따라 지반 굴착으로 인한 지반이 침하되거나 붕괴되는 등 주변 건물의 안정성에 대한 문제가 크기 때문에 가설 흙막이 공사의 중요성이 어느 때보다 중요한 것이다.In other words, in the case of dense urban centers, the temporary construction is more important than ever because there are many problems with the stability of the surrounding buildings, such as settlement or collapse of the ground due to the excavation of the ground due to the increased construction of existing buildings. .
이를 위한 흙막이 공사로는 토류벽공법과 토류벽 지지공법으로 분류되는데 그중 도심지에서의 건축공사에 가장 적합한 토류벽공법은 지반붕괴 방지 및 굴착배면 지하수위의 저하및 토사유출을 방지하여 인접지반의 변위 및 인접건물의 침하를 최소화할 수 있어야 한다.The earth wall construction method is classified into earth wall method and earth wall support method. Among them, the earth wall method most suitable for building works in urban areas is to prevent ground decay, to reduce the groundwater level of excavation back ground, and to prevent the outflow of soil. It should be possible to minimize the sinking.
하지만, 상기 토류벽공법은 양단에 토류벽요입부가 구비된 강재말뚝을 다수 개 지반에 타설하여 설치 후 도랑 등 터파기 굴착 작업을 진행하면서 상기 다수의 강재말뚝 사이에 목재 등으로 된 토류벽을 횡방향으로 다수 개 끼워 넣어 벽체를 형성하여 토사의 붕괴를 막아주는 흙막이 공사를 하는 것이나 이러한 종래의 흙막이 구조는 많은 문제점이 있는 것이다.However, in the earth wall method, a plurality of steel piles equipped with earth wall indents at both ends are installed on a plurality of grounds, and then a trench wall excavation work such as a ditch is carried out, and a plurality of earth walls made of wood or the like are disposed between the plurality of steel piles in the transverse direction. There is a lot of problems with the construction of the earth block to prevent the collapse of the soil by inserting the dog to form a wall.
첫째, 강재말뚝을 타설하기 위해 타설 장비가 필요하게 되었고, 타설 작업으로 인하여 소음과 진동이 발생하게 됨은 물론, 타설에 따른 부작용으로 강재말뚝이 파손되는 문제점이 발생하게 되었다.First, in order to pour steel piles, pour equipment was needed, and noise and vibration were generated due to the pouring work, and the steel piles were damaged due to side effects of the casting.
둘째, 종래에는 강재말뚝에 형성된 토류벽요입부에 토류벽을 별도의 지지구조 없이 단순히 끼워서 상기 토류벽 자체 강성만으로 토사의 토압을 견디도록 한 것이나 이는 토압이 작용하면 토류벽은 자체 강성이 크지 않아 휨이나 전단파괴 등이 발생하게 되었고, 장기간 설치시에는 함수율변화에 따른 강도가 약화 되게 되었으며, 이런 경우 토류벽이 길이방향의 중간부위가 그대로 절단되면서 토사가 밀려오는 것인바 이러한 흙막이 시설물인 토류벽의 붕괴는 곧 대형 참사로 이어지는 것이다.Second, conventionally, the earth wall is inserted into the earth wall indentation formed in the steel pile without a separate supporting structure to endure the earth pressure of the earth by only the earth wall itself rigidity. In the case of long-term installation, the strength is weakened due to the change of moisture content. In this case, the earth wall is pushed out as the middle part of the earth wall is cut in the longitudinal direction as it is. Will lead to.
셋째, 토류벽은 건축공사가 끝나게 되면 제거하거나 그대로 매입하게 되는데, 토류벽을 제거하는 경우에는 토류벽이 설치되었던 자리를 메꿔주어야 하나 되메우기 작업이 완벽하게 이루어지지 않아 건축물에 누수현상이 발생되거나 또는 토사가 흘러내리는 등 해체 작업시에 토압에 따른 위험이 발생하는 문제점과 더불어, 토류벽 등 반복 사용이 불가능하여 시공비가 많이 소요되고, 작업자가 직접 설치해야됨에 따라 시공이 전체적으로 균일하지 않을 뿐만 아니라 시공이 어렵고, 시공 속도도 떨어지는 문제점이 발생하게 되었다.Third, the earth wall is removed or purchased as soon as the construction work is completed. When the earth wall is removed, it is necessary to fill the place where the earth wall was installed. In addition to the problem that the risk of earth pressure occurs during dismantling work such as lowering, it is impossible to use it repeatedly such as earth wall, which requires a lot of construction cost, and the construction is not only uniform, but also difficult to install. The problem of falling speed also occurred.
또, 그대로 매입하여 건축물의 보조 외벽으로 사용하는 경우에는 토류벽의 강성이 너무 약하여 장마철과 같은 우수기에는 더욱 토사의 흘러내림을 제대로 차단하지 못하고 붕괴되어 건축물의 안전을 위협하는 문제점이 있다.In addition, when it is purchased as it is used as an auxiliary outer wall of the building, the stiffness of the earth wall is too weak, there is a problem that the collapse of the earth and sand does not properly block the flow of the earth in the rainy season, it is collapsed and threaten the safety of the building.
본 발명은 상기와 같은 문제점을 해결하기 위한 것으로, 그 주된 목적으로는 타설되는 강재말뚝의 상부에 토류벽유입부를 갖는 보호캡을 씌워 타설시에 강재말뚝의 파손을 방지토록 함은 물론, 그 보호캡의 토류벽유입부로 끼움결합되는 토류벽은 이중으로 결합하고, 그 내측면에서 다수 개의 지지편을 지그재그 형식으로 결합하여 토류벽을 지지토록 하므로서, 토류벽의 붕괴를 방지할 수 있도록 하며, 조립 및 해체가 간편하도록 한 건축물의 흙막이구조를 제공하는 데 있다.The present invention is to solve the above problems, the main purpose is to cover the upper portion of the steel pile to be poured with a protective cap having the earth wall inlet to prevent damage of the steel pile during casting, of course, the protective cap The earth wall, which is fitted into the earth wall inlet part of the earth wall, is double-coupled, and a plurality of support pieces are combined in a zigzag form at the inner side thereof to support the earth wall, thereby preventing the collapse of the earth wall, and to facilitate assembly and disassembly. It is to provide the structure of an earth block.
상기 목적을 달성하기 위한 본 발명은The present invention for achieving the above object
지반에 타설되는 강재말뚝과;Steel piles being poured on the ground;
저면에 형성되는 삽입부를 통해 상기 강재말뚝의 상부에 씌워지게 결합되며, 외주면에는 토류벽유입부가 형성되는 사각형상의 보호캡과; A rectangular protective cap coupled to the upper portion of the steel pile through an insertion portion formed at a bottom thereof, and having an earth wall inflow portion formed at an outer circumferential surface thereof;
한 쌍으로 이루어져, 상기 보호캡의 토류벽유입부에 끼워지게 결합되어지되, 내측 단부가 서로 일정간격 이격되게 결합되며, 각각의 내부에는 중간부에 결합공이 형성되는 삽입홈이 경사지게 형성되고, 양단부에는 체결공이 형성되는 한 쌍의 제1토류벽과;Consists of a pair, which is coupled to be fitted to the earth wall inlet portion of the protective cap, the inner ends are coupled to be spaced apart from each other by a predetermined interval, each of the inside is formed inclined insertion grooves are formed in the middle of the coupling hole, both ends A pair of first earth walls on which fastening holes are formed;
상기, 제1토류벽 사이의 상부에서 삽입결합되어지되, 중앙부 양측으로 단턱이 형성되고, 그 단턱의 양측에는 복수 개의 체결공이 형성되며, 상부면에는 복수 개의 결합공이 형성되는 역사다리꼴 형상의 제2토류벽과; The first earth wall is inserted into the coupling between the upper, but the stepped portion is formed on both sides of the central portion, a plurality of fastening holes are formed on both sides of the stepped, the upper trapezoidal shape of the second trapezoidal second wall is formed and;
상기, 제1토류벽에 제2토류벽이 결합된 상태에서 내측면에 결합되며, 제1,2토류벽에 형성되는 체결공에 볼트를 통해 지그재그로 결합되는 복수 개의 지지편과;A plurality of support pieces that are coupled to the inner surface in a state in which the second earth wall is coupled to the first earth wall, and zigzag coupled to the fastening holes formed in the first and second earth walls through bolts;
상기, 제1토류벽에 제2토류벽이 결합된 상태에서 제2토류벽 상부의 결합공에 끼움결합되는 강봉;으로 이루어진다.The steel rod is fitted to the coupling hole in the upper portion of the second earth wall in a state where the second earth wall is coupled to the first earth wall.
즉, 타설되는 강재말뚝의 상부에 토류벽유입부를 갖는 보호캡을 씌워 타설토록 하므로서, 강재말뚝의 파손을 방지토록 할 수 있게 된다.In other words, by placing a protective cap having the earth wall inflow portion in the upper portion of the steel pile to be poured, it is possible to prevent damage to the steel pile.
또한, 보호캡의 토류벽유입부로 끼움결합되는 토류벽은 이중으로 결합되도록 하고, 내측면에서 다수 개의 지지편을 지그재그 형식으로 결합하여 토류벽을 지지토록 하므로서, 토류벽의 붕괴를 방지할 수 있도록 하며, 조립 및 해체를 간편하게 할 수 있게 된다.In addition, the earth wall to be fitted into the earth wall inlet portion of the protective cap is to be coupled to the double, and by combining a plurality of support pieces in a zigzag form on the inner side to support the earth wall, to prevent the collapse of the earth wall, assembly and Dismantling can be done easily.
이하 첨부된 도면을 참조하여 본 발명의 구성과 일실시예를 구체적으로 설명하면 다음과 같다.Hereinafter, a configuration and an embodiment of the present invention will be described in detail with reference to the accompanying drawings.
도 1은 본 발명에 따른 흙막이 구조를 보인 사시도이고,1 is a perspective view showing the structure of the earthenware according to the present invention,
도 2는 본 발명에 따른 흙막이 구조를 보인 분해사시도이며,Figure 2 is an exploded perspective view showing the structure of the earthen membrane according to the present invention,
도 3은 본 발명에 따른 흙막이 구조의 설치상태를 보인 단면도이다.3 is a cross-sectional view showing the installation state of the retaining structure according to the present invention.
본 발명에 따른 건축물의 흙막이 구조는 굴차지반에 강재말뚝(10)을 일정깊 이로 타설한 상태에서 강재말뚝(10)의 상부에는 사각형상의 보호캡(20)을 저면에 형성되는 삽입부(23)를 통해 씌워지게 결합토록 하되, 강재말뚝(10)의 상부에 씌워지게 결합되는 보호캡(20)의 외주면에는 다수의 체결공(22)을 갖는 토류벽유입부(21)가 형성되도록 한다.An earthquake structure of a building according to the present invention has an
이어, 보호캡(20)의 외주면에 형성되는 토류벽유입부(21)에는 한 쌍으로 이루어져 각각의 내부에는 중간부에 결합공(33)을 갖는 삽입홈(31)이 경사지게 형성되는 한 쌍의 제1토류벽(30a)(30b)을 끼워지게 결합하되, 내측 단부가 서로 일정간격 이격되게 결합되도록 한다.Subsequently, a pair of earth-wall inlet
이때, 보호캡(20) 외주면의 토류벽유입부(21)에 끼움 결합되는 한 쌍의 제1토류벽(30a)(30b)의 양단부에는 토류벽유입부(21)의 체결공(22)과 일치되어 볼트(52)를 통해 체결되는 체결공(32)이 형성된다.At this time, both ends of the pair of
이어, 상기 제1토류벽(30a)(30b) 사이에는 중앙부 양측으로 단턱(41)이 형성되고, 그 단턱(41)의 양측에는 복수 개의 체결공(42)이 형성되는 역사다리꼴 형상의 제2토류벽(40)을 상부에서 삽입결합하되, 상부면에는 서로 일정간격 유지되게 형성되는 복수 개의 결합공(43)을 형성토록 한다.Subsequently, the stepped 41 is formed between the
이때, 제2토류벽(40)의 중앙부 양측으로 형성되는 단턱(41)은 단턱(41) 사이의 중앙부가 돌출되고, 단턱(41)의 양측은 단이지게 형성하여 제1토류벽(30a)(30b)과의 결합시 양측의 단이진 면이 제1토류벽(30a)(30b)의 삽입홈(31)에 긴밀히 결합되도록 함은 물론, 단턱(41) 사이의 중앙부가 제1토류벽(30a)(30b) 사이에 위치되도록 하여 제1토류벽(30a)(30b)과 제2토류벽(40)의 결합상태에서 전체적으로 평편 한 상태를 유지할 수 있도록 한다.At this time, the
이어, 상기 제1토류벽(30a)(30b)에 제2토류벽(40)이 결합된 상태의 내측면에는 결합되는 제1,2토류벽(30a)(30b)(40)을 지지하기 위한 복수 개의 지지편(50)을 결합토록 하되, 제1,2토류벽(30a)(30b)(40)에 각각 형성되는 체결공(32)(42)에 볼트(52)를 통해 지그재그로 결합되도록 한다.Subsequently, a plurality of supports for supporting the first and
상기, 제1토류벽(30a)(30b)에 제2토류벽(40)이 결합된 상태에서 제2토류벽(40) 상부의 결합공(43)에는 강봉(60)을 수직방향으로 끼움결합하여 이루어진다.In the state where the
이와 같은 구성의 본 발명에 따른 건축물 흙막이 구조에 의하면 도 2 내지 도 3에 도시한 바와 같이 먼저, 복수 개의 강재말뚝(10)을 구비하여 그 강재말뚝(10)을 지면에 일정깊이로 타설한 다음, 그 강재말뚝(10)의 상부에 강재말뚝(10)을 보호하기 위한 사각형상의 보호캡(20)을 보호캡(20)의 저면에 형성되는 삽입부(23)를 통해 강재말뚝(10)의 상부에서 씌워지게 결합하고, 그 보호캡(20)의 상부에서 타설작업을 진행하여 강재말뚝(10)이 지면에 설정된 깊이로 매설되게 한다.According to the structure of the structure of the building block according to the present invention, as shown in Figs. 2 to 3, the
따라서, 강재말뚝(10)에 대한 직접 타설에 따른 강재말뚝(10)의 파손을 방지할 수 있게 된다.Therefore, it is possible to prevent the damage of the
이어, 보호캡(20)의 외주면에 형성되는 토류벽유입부(21)에는 내부에는 중간부에 결합공(33)을 갖는 삽입홈(31)이 경사지게 형성되는 한 쌍의 제1토류벽(30a)(30b)을 끼워지게 결합하되, 그 각각의 내측 단부가 서로 일정간격 이격되도록 결합한다.Subsequently, in the earth
이어, 상기 보호캡(20)의 토류벽유입부(21)에 결합되는 한 쌍의 제1토류 벽(30a)(30b) 사이에는 역사다리꼴형상의 제2토류벽(40)을 상부에서 삽입하여 결합하되, 제2토류벽(40)에서 단턱(41)의 양측에 단이지게 형성되는 부분을 제1토류벽(30a)(30b)의 삽입홈(31)에 결합되도록 하고, 단턱(41)의 양단부가 제1토류벽(30a)(30b)의 내측단부와 긴밀히 접촉하게 한다.Subsequently, between the pair of
또, 단턱(41) 사이의 중앙부가 제1토류벽(30a)(30b) 사이에 위치되도록 하므로서, 제1토류벽(30a)(30b)과 제2토류벽(40)이 결합된 상태에서는 전체적으로 평편한 상태를 유지할 수 있도록 한다.In addition, since the central portion between the stepped
이어, 상기 제1토류벽(30a)(30b)에 제2토류벽(40)이 결합된 상태에서는 그 내측면에 복수 개의 지지편(50)을 결합하여 제1,2토류벽(30a)(30b)(40)을 지지토록 한다.Subsequently, in a state in which the
이때, 제1,2토류벽(30a)(30b)(40) 내측면에 결합되는 복수 개의 지지편(50)의 결합은 도 2내지 도 3에서와 같이, 지그재그 방식으로 결합하여 견고한 결합을 이룰 수 있도록 하되, 보호캡(20)에 형성되는 토류벽유입부(21)의 체결공(22)과, 제1토류벽(30a)(30b)의 양단부에 형성되는 체결공(32)을 서로 일치되도록 하고, 그 체결공(22)(32)과 제2토류벽(40)의 단턱(41) 내측에 위치한 체결공(42)에 지지편(50) 양단의 체결공(51)을 일치시켜 볼트(52)로 결합하여 토류벽유입부(21)과 제2토류벽(40)을 결합토록 한다.In this case, the coupling of the plurality of
또, 상기와 같이 토류벽유입부(21)의 체결공(22)과 제2토류벽(40)의 체결공(42)에 지지편(50)이 결합된 상태에서 그 결합된 지지편(50)의 사이에는 제2토류벽(40)의 단턱(41) 양측에 형성되는 체결공(42)과 제2토류벽(40)이 삽입되는 제1토 류벽(30a)(30b)의 체결공(32)을 서로 일치시키고, 그 각각의 체결공(32)(42)에는 지지편(50) 양단의 체결공(51)을 일치시켜 볼트(52)로 결합하여 제1토류벽(30a)(30b)과 제2토류벽(40)을 견고하게 결합토록 한다.In addition, in the state in which the
이어, 상기 제1,2토류벽(30a)(30b)(40)이 결합되고, 복수 개의 지지편(50)의 지지된 상태에서는 제2토류벽(40) 상부의 결합공(43)에 강봉(60)을 수직방향으로 끼움결합하여 구성되는 것으로서, 이를 통해 토류벽의 붕괴를 방지할 수 있도록 하며, 흙막이 구조의 조립 및 해체를 간편하게 할 수 있게 된다.Subsequently, the first and
그리고, 본 발명은 첨부된 도면 및 구체적인 실시 예와 관련하여 설명하였지만, 본 발명은 이에 의하여 특별히 제한되는 것은 아니며 본 발명의 기술적 사상의 범위 내에서 당해 분야의 당업자에 의하여 다양한 변형이 이루어질 수 있다.In addition, although the present invention has been described with reference to the accompanying drawings and specific embodiments, the present invention is not particularly limited thereto and various modifications may be made by those skilled in the art within the scope of the technical idea of the present invention.
이상에서와 같이 본 발명의 흙막이 구조에 의하면, 타설되는 강재말뚝의 상부에 토류벽유입부를 갖는 보호캡을 씌워 타설토록 하므로서, 강재말뚝의 파손을 방지토록 할 수 있는 효과가 있다.As described above, according to the structure of the earth block of the present invention, by placing a protective cap having the earth wall inflow portion in the upper portion of the steel pile to be poured, there is an effect that can prevent the damage to the steel pile.
또한, 보호캡의 토류벽유입부로 끼움결합되는 토류벽은 이중으로 결합되도록 하고, 내측면에서 다수 개의 지지편을 지그재그 형식으로 결합하여 토류벽을 지지토록 하므로서, 토류벽의 붕괴를 방지할 수 있도록 하며, 조립 및 해체를 간편하게 할 수 있는 효과가 있다.In addition, the earth wall to be fitted into the earth wall inlet portion of the protective cap is to be coupled to the double, and by combining a plurality of support pieces in a zigzag form on the inner side to support the earth wall, to prevent the collapse of the earth wall, assembly and It is easy to dismantle.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060094805A KR100659728B1 (en) | 2006-09-28 | 2006-09-28 | Earth of building land-side protection wall structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060094805A KR100659728B1 (en) | 2006-09-28 | 2006-09-28 | Earth of building land-side protection wall structure |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100659728B1 true KR100659728B1 (en) | 2006-12-20 |
Family
ID=37815008
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020060094805A KR100659728B1 (en) | 2006-09-28 | 2006-09-28 | Earth of building land-side protection wall structure |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100659728B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103225307A (en) * | 2013-04-08 | 2013-07-31 | 广东省基础工程公司 | Construction method for dynamic steel supporting system of deep foundation pit |
CN110004977A (en) * | 2019-04-16 | 2019-07-12 | 国网江苏省电力有限公司太仓市供电分公司 | A kind of cable trench gang form |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5758728A (en) | 1980-09-22 | 1982-04-08 | Nippon Steel Metal Prod Co Ltd | Temporary coffering work for river |
KR100563272B1 (en) | 2005-08-24 | 2006-03-27 | 주식회사 진광건설 엔지니어링 건축사사무소 | Equipment of steel mold for construction foundation work |
KR100599245B1 (en) | 2006-04-05 | 2006-07-13 | (주)원건축사사무소 | Apartment house foundation work drainage member structure |
KR20060098779A (en) * | 2005-03-07 | 2006-09-19 | 윤은중 | Structure and assembly for protecting landslide |
-
2006
- 2006-09-28 KR KR1020060094805A patent/KR100659728B1/en not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5758728A (en) | 1980-09-22 | 1982-04-08 | Nippon Steel Metal Prod Co Ltd | Temporary coffering work for river |
KR20060098779A (en) * | 2005-03-07 | 2006-09-19 | 윤은중 | Structure and assembly for protecting landslide |
KR100563272B1 (en) | 2005-08-24 | 2006-03-27 | 주식회사 진광건설 엔지니어링 건축사사무소 | Equipment of steel mold for construction foundation work |
KR100599245B1 (en) | 2006-04-05 | 2006-07-13 | (주)원건축사사무소 | Apartment house foundation work drainage member structure |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103225307A (en) * | 2013-04-08 | 2013-07-31 | 广东省基础工程公司 | Construction method for dynamic steel supporting system of deep foundation pit |
CN103225307B (en) * | 2013-04-08 | 2014-12-24 | 广东省基础工程公司 | Construction method for dynamic steel supporting system of deep foundation pit |
CN110004977A (en) * | 2019-04-16 | 2019-07-12 | 国网江苏省电力有限公司太仓市供电分公司 | A kind of cable trench gang form |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101274974B1 (en) | Earth retaining wall and construction method thereof | |
KR100884289B1 (en) | Composite type steel temporary construction and construction method thereof | |
KR100243401B1 (en) | A supporting structure for laying pipes under the ground | |
KR101973565B1 (en) | Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate | |
KR100862977B1 (en) | Precast concrete file and method for constructing thereof | |
KR100659599B1 (en) | Apartment house foundation work drainage member structure | |
KR20130006420A (en) | Method of constructing underground structure to be newly built | |
KR20200124949A (en) | Anchor Tension way sheathing structure and sheathing method of construction | |
KR101262357B1 (en) | Inclined Earth Retaining Structure Method | |
JP2005009210A (en) | Reinforced structure of masonry wall and its reinforcing method | |
KR102220613B1 (en) | Freestanding retaining wall construction method | |
KR100869764B1 (en) | Earth of building land-side protection wall structure | |
KR100659728B1 (en) | Earth of building land-side protection wall structure | |
JP2803409B2 (en) | Liquefaction countermeasure structure for embankment | |
JP2000144769A (en) | Method of landslide protection work for preparing housing lot | |
KR100986582B1 (en) | Shoring installations for construction work | |
KR100487838B1 (en) | Prefabricated retaining wall and it's construction method | |
KR100592102B1 (en) | Reinforcement structure of a wall for foundation retaining of earth of building | |
JP2006219947A (en) | Ground excavation method | |
KR100744972B1 (en) | Earth of building land-side protection wall structure | |
KR102195496B1 (en) | Pile for earth self-retaining wall using cast in place concrete pile with double I beam | |
JP4834649B2 (en) | Construction structure of embankment structure, retaining wall block for construction of embankment structure and construction method of embankment structure | |
JP2004092049A (en) | Foundation structure for structure | |
KR200369479Y1 (en) | The land-side protection wall panel | |
KR20090078684A (en) | Composite wall using angled channel and constructing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
N231 | Notification of change of applicant | ||
A302 | Request for accelerated examination | ||
N231 | Notification of change of applicant | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121231 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20140109 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20150112 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20151228 Year of fee payment: 10 |
|
LAPS | Lapse due to unpaid annual fee |