CN208748909U - 现场组装骨架外墙 - Google Patents
现场组装骨架外墙 Download PDFInfo
- Publication number
- CN208748909U CN208748909U CN201821229709.9U CN201821229709U CN208748909U CN 208748909 U CN208748909 U CN 208748909U CN 201821229709 U CN201821229709 U CN 201821229709U CN 208748909 U CN208748909 U CN 208748909U
- Authority
- CN
- China
- Prior art keywords
- steel joist
- lightgage steel
- vertical
- outside
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
Abstract
本实用新型公开一种施工操作简单,可保证施工速度及墙体质量的现场组装骨架墙体。现场组装骨架外墙有间隔设置的多列竖向外侧轻钢龙骨(1),与竖向外侧轻钢龙骨(1)相对设置有竖向内侧轻钢龙骨(2),在竖向外侧轻钢龙骨(1)与内侧轻钢龙骨(2)之间有断桥连接的多排桁架支撑件(3),在竖向外侧轻钢龙骨(1)外侧设有多个挂件(4),与挂件(4)相接有外饰面层(5),与外饰面层(5)内侧相接有防水保温层(6),与竖向内侧轻钢龙骨(2)的外侧相接有免拆模板(7),在防水保温层(6)与免拆模板(7)之间填充有轻质混凝土层(8)。
Description
技术领域
本实用新型涉及建筑领域,尤其是一种施工操作简单,可保证施工速度及墙体质量的现场组装骨架墙体。
背景技术
目前,建筑外墙有砌筑类外墙、预制类外墙及建筑幕墙等,无论何种外墙,施工时均需要在钢结构框架或混凝土框架上构筑墙体,然后做保温处理、再做外面层装饰,最后做内墙面处理。不仅工序繁多、操作复杂、工期长,而且在建筑使用过程中还经常出现外饰面板脱落等现象,难以保证建筑质量。
发明内容
本实用新型是为了解决现有技术所存在的上述技术问题,提供一种施工操作简单,可保证施工速度及墙体质量的现场组装骨架墙体。
本实用新型的技术解决方案是:一种现场组装骨架外墙,有间隔设置的多列竖向外侧轻钢龙骨,与竖向外侧轻钢龙骨相对设置有竖向内侧轻钢龙骨,在竖向外侧轻钢龙骨与内侧轻钢龙骨之间有断桥连接的多排桁架支撑件,在竖向外侧轻钢龙骨外侧设有多个挂件,与挂件相接有外饰面层,与外饰面层内侧相接有防水保温层,与竖向内侧轻钢龙骨的外侧相接有免拆模板,在防水保温层与免拆模板之间填充有轻质混凝土层。
本实用新型解决了预制外墙整体性和安全性差的难题,确保墙砌及外饰面板无通缝、不空鼓、不开裂、不渗漏及不脱落;高效保温材料与轻质混凝土双重复合,满足节能75%的标准要求;轻钢龙骨与实心墙体双重构造,安全可靠;多道工序一体化施工,缩短工期50%以上;造价低,比国家装配式建筑定额至少低10% 。
附图说明
图1是本实用新型实施例1的结构示意图。
图2是本实用新型实施例1应用在钢结构框架上的横向截面图。
图3是本实用新型实施例1应用在钢结构框架上的纵向截面图。
图4是本实用新型实施例1应用在钢结构框架上的俯视图。
图5是本实用新型实施例2的结构示意图。
图6是本实用新型实施例2应用在混凝土框架上的横向截面图。
图7是本实用新型实施例2应用在混凝土框架上的纵向截面图。
图8是本实用新型实施例2应用在混凝土框架上的俯视图。
具体实施方式
实施例1:
本实用新型的现场组装骨架墙体实施例1如图1所示:有间隔设置的多列竖向外侧轻钢龙骨1,与竖向外侧轻钢龙骨1相对设置有竖向内侧轻钢龙骨2,在竖向外侧轻钢龙骨1与内侧轻钢龙骨2之间有断桥连接的多排桁架支撑件3,在竖向外侧轻钢龙骨1外侧设有多个挂件4,与挂件4相接有外饰面层5,与外饰面层5内侧相接有防水保温层6,与竖向内侧轻钢龙骨2的外侧相接有免拆模板7,在防水保温层6与免拆模板7之间填充有轻质混凝土层8。
本实用新型的现场组装骨架外墙的施工工艺,是在钢结构框架上进行施工,如图2、图3、图4所示,按照如下步骤进行:
a. 在钢结构横梁13内侧水平安装天龙骨及在地面上安装间距与钢结构横梁13厚度一致的两根地龙骨;
b. 将竖向外侧轻钢龙骨1上端与钢结构横梁13外侧通过绝热材料等断桥相接、下端与外侧地龙骨相接,在天龙骨与内侧地龙骨之间安装与竖向外侧轻钢龙骨1对应的竖向内侧轻钢龙骨2;
c. 在竖向外侧轻钢龙骨1及竖向内侧轻钢龙骨2之间断桥连接多排桁架支撑件3;
d. 在竖向外侧轻钢龙骨1的外侧安装挂件4;
e. 将块状外饰面层5安装在挂件4上拼接成整个外饰面层5并对外饰面层
5拼缝打胶处理;
f. 在外饰面层5内侧铺设防水保温层6,防水保温层6可以通过喷射高效防
水保温涂料形成;
g. 在竖向内侧轻钢龙骨2的外侧安装免拆模板7,遇到钢结构桩9时,可通过在钢结构桩9内侧加装龙骨结构的形式,将免拆模板7牢固固定在钢结构桩9内侧周围;
h. 在防水保温层6与免拆模板7之间浇注混凝泡沫混凝土,形成轻质混凝土层8,即形成具有外装饰面的外墙体,可按照现有技术对墙面进行后续处理。
实施例2:
本实用新型的现场组装骨架外墙实施例2如图4所示,基本结构如实施例1,与实施例1所不同的是,为加强外饰面层5的强度,可在外饰面层5内安装加强背板10。
本实用新型实施例2的现场组装骨架外墙的施工工艺,是在混凝土框架上进行施工,如图5、图6所示,按照如下步骤进行:
a. 在混凝土横梁14的外侧安装横向间隔设置的埋件板11,在混凝土横梁14内侧水平安装天龙骨15及在地面上安装间距与混凝土横梁14厚度一致的两根地龙骨16;
b. 竖向外侧轻钢龙骨1上端通过角钢、垫片等与埋件板11断桥相接、下端与地龙骨16相接,在天龙骨与地龙骨16之间安装与竖向外侧轻钢龙骨1对应的竖向内侧轻钢龙骨2;
c. 在竖向外侧轻钢龙骨1及竖向内侧轻钢龙骨2之间断桥连接多排桁架支撑件3;
d. 在竖向外侧轻钢龙骨1的外侧安装挂件4;
e. 将块状外饰面层5安装在挂件4上拼接成整个外饰面层5并对外饰面层
5拼缝打胶处理以及加固背板10;
f. 在外饰面层5内侧铺设防水保温层6,防水保温层6可以是喷射高效防水
保温涂料层外加表面塑料薄膜构成;
g. 在竖向内侧轻钢龙骨2的外侧安装免拆模板7,免拆模板7可采用钢丝网加背楞结构,遇到混凝土桩12时,可通过在混凝土桩内侧加装龙骨结构的形式,将免拆模板7牢固固定在混凝土桩12内侧周围;
h. 在防水保温层6与免拆模板7之间浇注混凝泡沫混凝土,形成轻质混凝土层8,即形成具有外装饰面的外墙体,可按照现有技术对墙面进行后续处理。
Claims (1)
1.一种现场组装骨架外墙,其特征在于:有间隔设置的多列竖向外侧轻钢龙骨(1),与竖向外侧轻钢龙骨(1)相对设置有竖向内侧轻钢龙骨(2),在竖向外侧轻钢龙骨(1)与内侧轻钢龙骨(2)之间有断桥连接的多排桁架支撑件(3),在竖向外侧轻钢龙骨(1)外侧设有多个挂件(4),与挂件(4)相接有外饰面层(5),与外饰面层(5)内侧相接有防水保温层(6),与竖向内侧轻钢龙骨(2)的外侧相接有免拆模板(7),在防水保温层(6)与免拆模板(7)之间填充有轻质混凝土层(8)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821229709.9U CN208748909U (zh) | 2018-08-01 | 2018-08-01 | 现场组装骨架外墙 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821229709.9U CN208748909U (zh) | 2018-08-01 | 2018-08-01 | 现场组装骨架外墙 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208748909U true CN208748909U (zh) | 2019-04-16 |
Family
ID=66058648
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821229709.9U Active CN208748909U (zh) | 2018-08-01 | 2018-08-01 | 现场组装骨架外墙 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208748909U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589975A (zh) * | 2018-08-01 | 2018-09-28 | 大连正锐装配式住宅发展股份有限公司 | 现场组装骨架外墙及施工工艺 |
-
2018
- 2018-08-01 CN CN201821229709.9U patent/CN208748909U/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589975A (zh) * | 2018-08-01 | 2018-09-28 | 大连正锐装配式住宅发展股份有限公司 | 现场组装骨架外墙及施工工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101818527B (zh) | 装配整体式剪力墙结构体系及其施工方法 | |
CN108589975A (zh) | 现场组装骨架外墙及施工工艺 | |
CN104005502B (zh) | 一种预制轻质楼盖板及工业化建筑房屋楼层板结构 | |
CN201687102U (zh) | 装配整体式剪力墙结构体系 | |
CN110792203B (zh) | 加气混凝土复合保温墙板系统及其施工方法 | |
CN107044179B (zh) | 装饰面板和模板一体化的保温装饰复合墙体及其建造方法 | |
CN102535846B (zh) | 房屋建筑整体浇注一次成型施工工艺 | |
CN106522406A (zh) | 装配式现浇混凝土外保温墙体钢骨架模板系统及连接件 | |
CN101629440A (zh) | 整体预制复合外墙板及其制作方法 | |
CN104695662B (zh) | 石材饰面预制外墙板及其生产方法及外墙体系 | |
CN210152069U (zh) | 一种装配式高层钢结构住宅体系 | |
CN101131002A (zh) | 模卡式拼装防水保温板及施工方法 | |
CN104652668A (zh) | 铠装一体化墙体及其施工方法 | |
CN105696744A (zh) | 蒸压加气混凝土整体墙板及其生产工艺 | |
CN109138227A (zh) | 无外模板外墙保温与结构一体化浇筑成型施工工艺 | |
CN2931627Y (zh) | 框架、墙板组合楼房 | |
CN103883022B (zh) | 围护结构内外墙抗震与隔音抗裂一体化构造的施工方法 | |
KR20110104589A (ko) | 조립식 벽체 패널 및 이를 이용한 벽체의 설치방법 | |
CN208748909U (zh) | 现场组装骨架外墙 | |
CN205502377U (zh) | 一种整体装配式轻质半嵌挂式墙板 | |
KR101646527B1 (ko) | 석재가 일체로 형성된 건축 및 토목 구조물과 그 시공방법 | |
CN104032865A (zh) | 建筑保温逆作法中填充墙现浇泡沫混凝土使用的龙骨组件及施工方法 | |
CN210395756U (zh) | 一种外墙板系统 | |
CN211690962U (zh) | 一种装配式保温装饰一体化外挂墙板及连接节点 | |
CN2683743Y (zh) | 玻纤增强水泥包复发泡砼建筑墙板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230926 Address after: 116000 maoyinzi village, Dalian Bay Street, Ganjingzi District, Dalian City, Liaoning Province Patentee after: Centennial housing (Dalian) Construction Technology Development Co.,Ltd. Address before: 116113 Lashufang, Dalian Wan Town, Ganjingzi District, Dalian City, Liaoning Province Patentee before: DALIAN ZHENGRUI ASSEMBLY HOUSE DEVELOPMENT Co.,Ltd. |