CN208701457U - Pavement bricks, the pavement using pavement bricks and engineering road - Google Patents

Pavement bricks, the pavement using pavement bricks and engineering road Download PDF

Info

Publication number
CN208701457U
CN208701457U CN201821098348.9U CN201821098348U CN208701457U CN 208701457 U CN208701457 U CN 208701457U CN 201821098348 U CN201821098348 U CN 201821098348U CN 208701457 U CN208701457 U CN 208701457U
Authority
CN
China
Prior art keywords
pavement
road
bricks
layer
brick body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821098348.9U
Other languages
Chinese (zh)
Inventor
许安辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huida Construction Engineering Co Ltd
Original Assignee
Shenzhen Huida Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Huida Construction Engineering Co Ltd filed Critical Shenzhen Huida Construction Engineering Co Ltd
Priority to CN201821098348.9U priority Critical patent/CN208701457U/en
Application granted granted Critical
Publication of CN208701457U publication Critical patent/CN208701457U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of pavement bricks, the pavement using pavement bricks and engineering roads, belong to road field, its key points of the technical solution are that pavement bricks include brick body, card slot and fixture block;A kind of pavement using pavement bricks includes pavement bricks, further includes ground, cement sand bed, fine sand layer and kerbstone;A kind of engineering road on pavement comprising pavement bricks and application pavement bricks includes pavement, further includes substrate, 6% cement stabilized grading crushed stones layer, Glass Fibre Earth Grid, middle grain formula asphalt concrete layer and particulate formula modified asphalt concrete layer.The technical issues of surface that the utility model solves pavement in engineering road under the prior art is easily loosened by rain drop erosion, the pavement surface in engineering road that can reduce reached loosen effect, are applied in engineering road construction.

Description

Pavement bricks, the pavement using pavement bricks and engineering road
Technical field
The utility model relates to road fields, more specifically, it is related to a kind of pavement bricks, the people using pavement bricks Trade and engineering road.
Background technique
With the development of science and technology and social progress, engineering road has run through beautiful rivers and mountains of one's country, and motherland is each Place has connected, and forms a width beautiful picture.There are the pavement for pedestrian's walking, pavement mostly by road On be mostly equipped with pavement bricks, it is both beautiful by walking convenient for people.However vast territory and abundant resources for motherland, pregnant with beauty and productive of talent, weather is also packet Luo Wanxiang, when encountering the rainy day, rainwash can penetrate into the structure sheaf inside factory's road, and protrude into pavement, In addition especially rainwater can also penetrate into the inside on pavement from pavement surface, loosen the surface on pavement, pedestrian is difficult to Normal walking, this allow for needing it is regular pavement is overhauled, influence the normal use of engineering road, such as can The problems such as causing traffic congestion.It searches to the bottom, it is urgently to be resolved that the surface on the pavement in engineering road is loosened by rain drop erosion Problem.
Utility model content
In view of the deficienciess of the prior art, passing through card the purpose of this utility model is to provide a kind of pavement bricks The cooperation of slot and fixture block, which is realized, reduces the problem of pavement bricks loosen after the rain.
To achieve the above object, the utility model provides following technical solution: a kind of pavement bricks, including brick body, institute State a side bottom of brick body and form card slot to brick body inner recess, the brick body side opposite with card slot outwardly protrude to be formed and The fixture block of card slot cooperation, the bottom surface of the fixture block and the bottom surface of brick body are concordant.
By using above-mentioned technical proposal, the card slot between two adjacent pavement bricks by a brick body is clamped another The fixture block of a brick body realizes connection, so the connection relationship between two adjacent pavement bricks is just not only existing routine Side wall in technological means mutually abuts against, but abutting as the condition limited mutually in existing horizontal direction, and has vertically Direction mutually abuts against come to provide limit condition mutually, so after heavy rain washes away, it is more difficult to pavement bricks loosening occur The problem of.
Preferable: the bottom surface of brick body is offered in groove cross and through brick body side wall.
By using above-mentioned technical proposal, the occluded water in gap between brick body bottom and brick and brick can be effectively excluded, simultaneously It can also block and exclude the underground water on reverse osmosis, further weaken the occurrence condition for causing pavement bricks to loosen.
Preferable: a kind of pavement using pavement bricks further includes ground, describedly including above-mentioned pavement bricks Base is the rectangular-shape cubic metre of earth and stone structure that the 6% cement stabilized grading crushed stones accumulation not less than 9cm thickness is in, paving above the ground Equipped with the 1:3 cement sand bed for being not less than 2cm thickness, it is equipped with the fine sand layer not less than 3cm thickness above the 1:3 cement mortar, The pavement bricks are layed in the road for being formed above the fine sand layer and being walked for people, people's row by the cooperation of card slot and fixture block The side for the road for people's walking that road brick is laid to is equipped with kerbstone.
By using above-mentioned technical proposal, pavement can be made more by being used cooperatively by ground and 1:3 cement sand bed It is difficult to happen the problem of collapsing, reduces the problem of collapsing bring ponding and pavement bricks loosening, while by being laid with fine sand Layer can further increase the drainage effect of pavement bricks bottom, further reduce the loosening of pavement bricks on pavement, drop The low revision rate on pavement.
It is preferable: to offer level on the side for the side wall that the kerbstone face is abutted with the road walked for people and set It sets and the arc-shaped water-flowing trough that is recessed inwardly.
By using above-mentioned technical proposal, roadside rainwater can be reduced when rainy and spring up and then overflow pavement surface pair The possibility on pavement reduces the water erosion that pavement surface is subject in existing routine techniques, and then reduce people's row The loosening of road brick improves the stability of pavement surface.
Preferable: the side for the road of people's walking offers one-way slope curb ramp, the one-way slope curb ramp The positive slope ratio of slope be 1:12.
It, can be convenient for pavement above and below vehicle such as trolley or wheelchair by using above-mentioned technical proposal.
Preferable: the top surface middle position for the road of people's walking is equipped with linear blind way, and the blind way is being handed over It is disconnected at cross road mouth, blind way breaking part is equipped with plate of stopping, the top surface of the plate of stopping and the either flush of the blind way.
By using above-mentioned technical proposal, the walking of vision disorder personage on pavement can be convenient for by blind way, led to Security risk of the vision disorder personage directly through intersection when can be reduced by crossing plate of stopping.
Preferable: a kind of engineering road further includes substrate including above-mentioned pavement, and the substrate is not less than 12cm 5% cement stabilized grading crushed stones accumulate the cubic metre of earth and stone structure for being in, 6% cement not less than 18cm is equipped with above the substrate Stationary level matches metalling, is equipped with Glass Fibre Earth Grid, the glass geotechnique lattice above the 6% cement stabilized grading crushed stones layer It is equipped with the middle grain formula asphalt concrete layer not less than 5cm above grid, is equipped with not above the middle grain formula asphalt concrete layer Particulate formula modified asphalt concrete layer less than 4cm, the road for people's walking are located at the particulate formula modified asphalt concrete Layer side.
Pass through substrate, 6% cement stabilized grading crushed stones layer, Glass Fibre Earth Grid, middle grain by using above-mentioned technical proposal Formula asphalt concrete layer and particulate formula modified asphalt concrete layer can increase the stability of engineering road, reduce engineering road Road collapses possibility, and then reduces influence of the engineering road collapsion to side structure of sidewalk, reduces pavement surface It loosens, reduces the repair rate of engineering road.
It is preferable: stone is coated with above the middle grain formula asphalt concrete layer below the particulate formula modified asphalt concrete layer Grey Emulsificated asphalt water-proof painting material layer.
By using above-mentioned technical proposal, infiltration of the rainwater to engineering road can be reduced, and then reduce rainwater from work Cheng Daolu infiltrates into the possibility of pavement internal structure layer, reduces pavement surface and loosens unstable, the high problem of revision rate.
In conclusion the utility model have the advantages that compared with the prior art 1. by card slot and fixture block with And groove can reduce loosening of the pavement bricks after by rain drop erosion;2. passing through ground and 1:3 cement sand bed and fine sand layer Cooperation can reduce collapsing for pavement after rain drop erosion, and then improved the stability of pavement top surface, reduced people The loosening on trade surface.
Detailed description of the invention
Fig. 1 is the axonometric drawing of embodiment one;
Fig. 2 is the axonometric drawing of embodiment two;
It is to indicate the schematic diagram of hardened structure of stopping that Fig. 3, which is in embodiment two,;
It is the schematic diagram for indicating curb structure that Fig. 4, which is in embodiment two,;
It is the schematic diagram for indicating structure of sidewalk that Fig. 5, which is in embodiment two,;
Fig. 6 is the schematic diagram of embodiment three.
Appended drawing reference: 1, brick body;11, card slot;12, fixture block;13, groove;14, for the road of people's walking;2, blind way; 21, it stops plate;22, raised;3, kerbstone;31, water-flowing trough;32, one-way slope curb ramp;4, fine sand layer;5, cement sand bed; 6, ground;7, substrate;71,6% cement stabilized grading crushed stones layer;72, Glass Fibre Earth Grid;73, middle grain formula asphalt concrete layer; 74, lime emulsifying asphalt waterproofing paint layer;75, particulate formula modified asphalt concrete layer.
Specific embodiment
Embodiment one: a kind of pavement bricks, referring to Fig. 1, including brick body 1, the bottom of the side of brick body 1, which is equipped with, to be outwardly protruded Fixture block 12, fixture block 12 is in a rectangular parallelepiped shape.The bottom of the side opposite with the side for being connected with fixture block 12 of brick body 1 opens up oriented brick 1 inner recess of body and the card slot 11 cooperated with fixture block 12.The groove 13 in crosswise is offered in the bottom of brick body 1, is in cross Mutually perpendicular two parts of the groove 13 of shape are arranged along the length direction and width direction of brick body 1 respectively, and groove 13 will The side wall of brick body 1 runs through.
The working principle when pavement bricks use is as follows: when the pavement bricks are laid on road surface, by fixture block 12 Length direction along brick body 1 is connected in the card slot 11 of the brick body 1 adjacent with the pavement bricks, makes two adjacent pavement bricks In previous brick body 1 fixture block 12 in latter brick body 1 is pressed under brick body 1 by card slot 11, enhance between pavement bricks Bonding strength, the loosening for reducing brick body 1 turn over.It can be excluded in 1 bottom gap of brick body by the groove 13 of crosswise simultaneously Occluded water, while the underground water on reverse osmosis can also be blocked and exclude, reducing brick body 1 and being washed away by rainwater or underground water causes Loosening turn over.
Embodiment two: a kind of pavement using pavement bricks, referring to figs. 2 and 3, including being laid with brick body on the ground 1, brick body 1 is laid to mutually the road 14 walked for people in the same plane.For the middle line upper berth of the road 14 of people's walking Equipped with blind way 2, is disconnected at 2 infalls of blind way, that is, intersection and its part disconnected is equipped with plate 21 of stopping, plate 21 of stopping The cube of equally distributed four protrusions 22 is had in top, the top for plate 21 of stopping is concordant with the top of blind way 2.Brick body 1 One lateral edge of the road 14 for people's walking that laying is formed is equipped with road for the edge length direction for the road 14 that people walks Kerb 3, the top surface of kerbstone 3 and the either flush of brick body 1.The edge of kerbstone 3 is equipped with for the road 14 of people's walking One-way slope curb ramp 32 is offered, the positive slope ratio of slope of one-way slope curb ramp 32 is 1:12, one-way slope curb ramp 32 The edge of the road 14 for people's walking at place is not laid with kerbstone 3.
Referring to fig. 2 and Fig. 4, kerbstone 3 is back to offering towards for people's row on the side for the road 14 walked for people The water-flowing trough 31 that the road 14 walked is recessed, the section of water-flowing trough 31 are arc-shaped.
It is the fine sand layer 4 of 4cm thickness referring to Fig. 5, below the road 14 for people's walking being laid to by brick body 1, brick body 1 is spread Above fine sand layer 4.The lower section of fine sand layer 4 is connected with the cement sand bed 5 that the cement mortar weight ratio of 3cm thickness is 1:3, road The bottom surface of kerb 3 is abutted with the top surface of cement sand bed 5, and fine sand layer 4 is layed in the top surface of cement sand bed 5.Cement sand bed 5 Lower section be connected with 6% cement stabilized grading crushed stones of 10cm thickness and accumulate the ground 6 to be formed, cement sand bed 5 is layed in ground 6 Top surface.
This is as follows using the working principle on the pavement of pavement bricks: the support on basis is provided for pavement by ground 6, The supporting condition for keeping smooth reduction to collapse is provided for pavement by cement sand bed 5, by being laid with fine sand below brick body 1 The laying that layer 4 keeps brick body 1 more firm, and to provide preferable drainage condition below brick body 1.For vision disorder, personage can To walk on blind way 2, plate 21 of stopping when by intersection can prompt pedestrian, reduce dangerous generation.
Embodiment three: a kind of engineering road, referring to Fig. 5, including substrate 7, substrate 7 is by 5% cement stabilizing of 12cm thickness The cubic metre of earth and stone structure in cuboid shape that graded broken stone is piled into, the top surface of substrate 7 are equipped with 6% cement stabilizing grade of 18cm thickness With metalling 71, the top surface of 6% cement stabilized grading crushed stones layer 71 is equipped with layer of glass fiber TGXG 72, Glass Fibre Earth Grid 72 top surface is equipped with the middle grain formula asphalt concrete layer 73 of 6cm, and grain formula pitch is mixed in the middle use of grain formula asphalt concrete layer 73 The top surface of solidifying soil (AC-20C), middle grain formula asphalt concrete layer 73 is coated with lime emulsifying asphalt waterproofing paint layer 74, milk of lime The top surface for changing asphalt waterproofing paint layer 74 is equipped with the particulate formula modified asphalt concrete layer 75 of 4cm thickness, particulate formula modified pitch Concrete layer 75 uses particulate formula modified asphalt concrete (SBS AC-13C).
The working principle of the engineering road is as follows: in the substrate 7 and substrate 7 be piled by 5% cement stabilized grading crushed stones 6% cement stabilized grading crushed stones layer 71 supporting role on basis can be provided for the engineering road, and intensity is higher, it is freeze proof and Impervious effect is preferable, by having the Glass Fibre Earth Grid 72 of warp, the two-way very high tensile strength of latitude and lower elongation percentage to increase Strong basis bottom 7 and 6% cement stabilized grading crushed stones layer 71, keep engineering road more firm, are more difficult to be recessed, by dripping in middle grain formula The lime emulsifying asphalt waterproofing paint layer 74 coated on green concrete layer 73 can further decrease the infiltration of rainwater, make the engineering Road is more firm, reduces and overhauls number.
The above is only the preferred embodiment of the utility model, and the protection scope of the utility model is not limited merely to Above-described embodiment, technical solution belonging to the idea of the present invention belong to the protection scope of the utility model.It should refer to Out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and Retouching, these improvements and modifications also should be regarded as the protection scope of the utility model.

Claims (8)

1. a kind of pavement bricks, including brick body (1), it is characterised in that: a side bottom of brick body (1) is internal to brick body (1) Recess is formed card slot (11), and brick body (1) and card slot (11) opposite side outwardly protrude to be formed and card slot (11) cooperation The bottom surface of fixture block (12), the fixture block (12) is concordant with the bottom surface of brick body (1).
2. pavement bricks according to claim 1, it is characterised in that: the bottom surface of brick body (1) is offered in cross And run through the groove (13) of brick body (1) side wall.
3. a kind of pavement using pavement bricks, it is characterised in that: including the people as described in claim 1 or claim 2 Footway brick further includes ground (6), and the ground (6) is the length that the 6% cement stabilized grading crushed stones accumulation not less than 9cm thickness is in Cube shape cubic metre of earth and stone structure, ground (6) top are equipped with the 1:3 cement sand bed (5) not less than 2cm thickness, the 1:3 water The fine sand layer (4) not less than 3cm thickness is equipped with above silt particle pulp layer (5), pavement bricks pass through card slot (11) and fixture block (12) Cooperation is layed in the road (14) for being formed above the fine sand layer (4) and being walked for people, pavement bricks be laid to for people's row The side for the road (14) walked is equipped with kerbstone (3).
4. the pavement according to claim 3 using pavement bricks, it is characterised in that: kerbstone (3) face with The horizontally disposed and arc-shaped water-flowing trough that is recessed inwardly is offered on side for the side wall of road (14) abutting of people's walking (31)。
5. the pavement according to claim 3 using pavement bricks, it is characterised in that: for the road (14) of people's walking Side offer one-way slope curb ramp (32), the positive slope ratio of slope of the one-way slope curb ramp (32) is 1:12.
6. the pavement according to claim 3 using pavement bricks, it is characterised in that: for the road (14) of people's walking Top surface middle position be equipped with linear blind way (2), the blind way (2) disconnects at intersection, blind way (2) disconnecting unit It is arranged with plate of stopping (21), the top surface of plate of stopping (21) and the either flush of the blind way (2).
7. a kind of engineering road, it is characterised in that: further include base including the described in any item pavements of the claim 3 ~ 6 Bottom (7), the substrate (7) are that 5% cement stabilized grading crushed stones not less than 12cm accumulate the cubic metre of earth and stone structure for being in, the substrate (7) top is equipped with the 6% cement stabilized grading crushed stones layer (71) not less than 18cm, the 6% cement stabilized grading crushed stones layer (71) top is equipped with Glass Fibre Earth Grid (72), and the middle grain not less than 5cm is equipped with above the Glass Fibre Earth Grid (72) Formula asphalt concrete layer (73), it is modified that middle grain formula asphalt concrete layer (73) top is equipped with the particulate formula not less than 4cm Asphalt concrete layer (75), the road (14) for people's walking are located at the particulate formula modified asphalt concrete layer (75) one Side.
8. engineering road according to claim 7, it is characterised in that: under the particulate formula modified asphalt concrete layer (75) Lime emulsifying asphalt waterproofing paint layer (74) is coated with above the middle grain formula asphalt concrete layer (73) of side.
CN201821098348.9U 2018-07-11 2018-07-11 Pavement bricks, the pavement using pavement bricks and engineering road Expired - Fee Related CN208701457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821098348.9U CN208701457U (en) 2018-07-11 2018-07-11 Pavement bricks, the pavement using pavement bricks and engineering road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821098348.9U CN208701457U (en) 2018-07-11 2018-07-11 Pavement bricks, the pavement using pavement bricks and engineering road

Publications (1)

Publication Number Publication Date
CN208701457U true CN208701457U (en) 2019-04-05

Family

ID=65938280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821098348.9U Expired - Fee Related CN208701457U (en) 2018-07-11 2018-07-11 Pavement bricks, the pavement using pavement bricks and engineering road

Country Status (1)

Country Link
CN (1) CN208701457U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116575284A (en) * 2023-06-05 2023-08-11 杭州利环环境集团有限公司 Assembled integrated pavement flexible pavement and construction method thereof
CN116575284B (en) * 2023-06-05 2024-04-30 杭州利环环境集团有限公司 Assembled integrated pavement flexible pavement and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116575284A (en) * 2023-06-05 2023-08-11 杭州利环环境集团有限公司 Assembled integrated pavement flexible pavement and construction method thereof
CN116575284B (en) * 2023-06-05 2024-04-30 杭州利环环境集团有限公司 Assembled integrated pavement flexible pavement and construction method thereof

Similar Documents

Publication Publication Date Title
CN106758638A (en) A kind of city sponge brick and its construction technology
CN105887609A (en) Method for constructing ecological infiltration pavement in sponge city
CN108532406A (en) Can rapid construction high-bearing capacity pervious surface and laying method
KR101027006B1 (en) Soak block structure
CN105401504A (en) Concrete pavement brick capable of achieving gap water permeation and self water permeation
KR100889252B1 (en) Block having a load divergence function and manufacturing and road constructing method for the same
CN209211198U (en) A kind of urban environmental protection road surface
CN208701457U (en) Pavement bricks, the pavement using pavement bricks and engineering road
CN216551386U (en) New old bituminous paving basic unit of environment-friendly links up structure
CN215758320U (en) Sponge city gap formula structure of mating formation that permeates water
CN206902506U (en) Multifunctional permeable water storage brick
CN212077526U (en) Green structure of saying suitable for wetland park
CN212389098U (en) Ecological parking lot adopting green cutting technology
CN212895755U (en) Urban road sidewalk drainage device
CN107268368A (en) Latch gap water-permeable brick
CN211079810U (en) Avoid pitch highway of ponding
CN106758678A (en) Multifunctional permeable water storage brick
CN106996063A (en) A kind of pavement structure of permeable road
CN209114263U (en) A kind of waterproof anti-settling highway subgrade
CN208250846U (en) Surface drainage
RU2422581C1 (en) Method to repair and construct arterial highways
CN110158396B (en) Construction method of permeable pavement
CN104195918A (en) Method for paving face bricks on pavement of pedestrian walkway
CN205474652U (en) Road with hardened verge cross slope indulges bank
CN210657853U (en) Non-motor vehicle lane road surface structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190405

Termination date: 20200711

CF01 Termination of patent right due to non-payment of annual fee