CN208668430U - A kind of pile for prestressed pipe and steel-pipe pile built pile supporting construction - Google Patents
A kind of pile for prestressed pipe and steel-pipe pile built pile supporting construction Download PDFInfo
- Publication number
- CN208668430U CN208668430U CN201820929823.6U CN201820929823U CN208668430U CN 208668430 U CN208668430 U CN 208668430U CN 201820929823 U CN201820929823 U CN 201820929823U CN 208668430 U CN208668430 U CN 208668430U
- Authority
- CN
- China
- Prior art keywords
- pile
- pipe
- steel
- prestressed
- prestressed pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a kind of pile for prestressed pipe and steel-pipe pile built pile supporting construction, one combination pilework is alternately connected to become by least one steel-pipe pile and at least one pile for prestressed pipe, wherein two end faces of steel-pipe pile are welded with steel-pipe pile connection end respectively, prefabricated pile for prestressed pipe is also respectively kept with pile for prestressed pipe connection end at both ends, can be bolted together steel-pipe pile connection end and pile for prestressed pipe connection end by connecting bolt.Supporting construction provided by the utility model not only meets permanent, gib requirement, and have the following technical effect that 1, pile for prestressed pipe and steel-pipe pile built pile support form belong to prefabricated assembled support form, it is faster than traditional support form speed of application, the curing time for eliminating concrete, is greatly saved the duration;2, after pile for prestressed pipe and steel-pipe pile built pile support form are as gib, the steel-pipe pile of top half can be recycled, to reduce project cost.
Description
Technical field
The utility model relates to a kind of pile for prestressed pipe and steel-pipe pile built pile supporting construction, belong to architectural engineering supporting skill
Art field.
Background technique
With the fast development of building trade, super high-rise building constantly gushes, and the infrastructure underground space is opened up for depth
The support technology of foundation pit proposes very high requirement, the especially deep foundation pit support of city busiest section with greater need for there is super new branch
Shield technology is as support.The multiple material handling method of deep foundation pit in China generally uses at present: campshed supporting, diaphram wall, gravity type water
Soil barricade, soil nail wall etc..Although above-mentioned support technology can satisfy actual requirement of engineering, many ask is still remained
Topic is concentrated mainly on some: (1) carrying out construction according to traditional support technology and have long construction period, and what is involved great expense lacks
Point;(2) belong in underground opening space operation, the total quality of supporting construction be not easy control (such as: ground-connecting-wall joint area
Concrete strength it is low, may cause deformation it is excessive, there is drainage);(3) development of assembled support technology is slower, and
And the disadvantages of structure type is single, technique is immature.
Utility model content
To solve the above-mentioned problems, the utility model provides a kind of pile for prestressed pipe and steel-pipe pile built pile supporting construction,
It is that prefabricated pile for prestressed pipe is bolted together with steel-pipe pile, short construction period, project cost are low, architecture quality is easy
Control.
In order to achieve the above technical purposes, the utility model adopts the following technical solution: a kind of pile for prestressed pipe and steel pipe
Stake built pile supporting construction is alternately connected to become a built pile knot by least one steel-pipe pile and at least one pile for prestressed pipe
Structure, wherein the two of steel-pipe pile end face is welded with steel-pipe pile connection end respectively, and prefabricated pile for prestressed pipe also stays respectively at both ends
There is pile for prestressed pipe connection end, steel-pipe pile connection end and pile for prestressed pipe connection end bolt can be existed by connection bolt
Together.
Preferably, the steel-pipe pile connection end is identical with pile for prestressed pipe connection end structure, specific structure are as follows: whole
In lantern ring shape, as steel pipe grommet for being plugged into inside steel-pipe pile or pile for prestressed pipe, the other end is equipped with flange ring for one end,
Bolt hole is circumferentially formed on flange ring.
Preferably, the reinforcement structure being made of deep floor and circular reinforcing rib is connected on flange ring, wherein
Circular reinforcing rib is arranged concentrically with flange ring, using several deep floors it is equidistant be connected to vertically circular reinforcing rib with
Between flange ring.
Supporting construction provided by the utility model not only meets permanent, gib requirement, but also has following technology effect
Fruit: 1, pile for prestressed pipe and steel-pipe pile built pile support form belong to prefabricated assembled support form, than traditional supporting shape
Formula speed of application is fast, eliminates the curing time of concrete, the duration is greatly saved;2, pile for prestressed pipe and steel-pipe pile built pile
After support form is as gib, the steel-pipe pile of top half can be recycled, to reduce project cost.
Detailed description of the invention
Fig. 1 is the perspective view of the utility model supporting construction.
Fig. 2 is the plan view of the utility model supporting construction.
Fig. 3 is the perspective view of the utility model steel-pipe pile connection end or pile for prestressed pipe connection end.
Fig. 4 is the flat body figure of the utility model steel-pipe pile connection end or pile for prestressed pipe connection end.
Specific embodiment
With reference to the accompanying drawing, the utility model is described further.
A kind of pile for prestressed pipe as depicted in figs. 1 and 2 and steel-pipe pile built pile supporting construction, by 1 He of steel-pipe pile
One pile for prestressed pipe 4 is alternately connected to become a combination pilework, and wherein the two of steel-pipe pile 1 end face is welded with steel-pipe pile respectively
Connection end 2, prefabricated pile for prestressed pipe 4 are also respectively kept with pile for prestressed pipe connection end 3 at both ends, by connecting bolt 5
Steel-pipe pile connection end 2 and pile for prestressed pipe connection end 3 can be bolted together.
As shown in Figure 3 and Figure 4, the steel-pipe pile connection end 2 is identical with 3 structure of pile for prestressed pipe connection end, specifically
Structure are as follows: whole is in lantern ring shape, and one end is used to be plugged into inside steel-pipe pile 1 or pile for prestressed pipe 4 as steel pipe grommet 14, separately
One end is equipped with flange ring 11, is circumferentially formed with bolt hole 13 on flange ring 11.It is connected on flange ring 11 by deep floor
12 reinforcement structures constituted with circular reinforcing rib 15, wherein circular reinforcing rib 15 is arranged concentrically with flange ring 11, if using
Dry deep floor 12 is equidistant is connected between circular reinforcing rib 15 and flange ring 11 vertically.
The construction procedure of the utility model is as follows:
(1) firstly, 1 interface position of steel-pipe pile should carry out necessary derusting cleaning, welded steel pipe pile connecting pin after groove is beaten
First 2, it checks the quality of weld seam, guarantees the intensity requirement of connection;
(2) pile for prestressed pipe 4 will also install pile for prestressed pipe connection end 3 in prefabrication process, guarantee its installation
Firmness makes the two form an overall structure, and pile for prestressed pipe connection end 3 can be simultaneously as the anchor pad of presstressed reinforcing steel
Plate;
(3) when pile for prestressed pipe 4 is connect with steel-pipe pile 1, it is ensured that the firmness of connecting end surface, not due to sinking to construction
It causes to deform excessive, influences to remove.
Surveying setting-out work is carried out before formal construction according to the position of supporting construction, determines the point of each support pile,
It is in place to adjust drilling machine, after progress pilot hole pore-forming operation meets pile sinking requirement, is first inserted into pile for prestressed pipe 4 and meets the vertical of specification
Degree require, when sink to need pile extension when, according to Fig. 1 connection type carry out pile extension operation, it is ensured that connection it is sufficiently tight
Rear can proceed with pile sinking operation until reaching the supporting depth of design.It, can after constructing as temporary support structures
The bolt 5 of connecting node is unclamped, steel-pipe pile 1 can be recycled, project cost can be reduced.
A kind of pile for prestressed pipe and steel-pipe pile built pile supporting construction provided by the utility model, the built pile supporting knot
Structure type can have " pile for prestressed pipe+steel-pipe pile ", " steel-pipe pile+pile for prestressed pipe ", " steel-pipe pile+answer in advance to structure from bottom to top
Solenoid stake+steel-pipe pile " and " pile for prestressed pipe+steel-pipe pile+pile for prestressed pipe " etc., the built pile form of selection should be according to geology
Condition, soil layer situation, supporting depth, structure type in hole etc. are because usually considering.1 built pile of pile for prestressed pipe 4 and steel-pipe pile
Difficult point be connectivity problem between the two, in order to guarantee the simple of type of attachment, bolt of the proposed adoption similar to form of flanges
Connection type.
The pile for prestressed pipe 4 and 1 built pile support form of steel-pipe pile compare traditional campshed, ground-connecting-wall support form tool
There are short time limit, quality to be easy to many advantages such as guarantee, cheap;It, can be whole if upper part is using steel-pipe pile 1
It recycles and is used in turn, to reduce project cost.
Above embodiment is the preferred embodiment of the utility model, is not the implementation for limiting the utility model
With interest field, all equivalence changes and modification made according to content described in present utility model application scope of patent protection,
It should be included in present utility model application the scope of the patents.
Claims (3)
1. a kind of pile for prestressed pipe and steel-pipe pile built pile supporting construction, it is characterised in that: by least one steel-pipe pile (1) and extremely
A few pile for prestressed pipe (4) is alternately connected to become a combination pilework, and wherein two end faces of steel-pipe pile (1) are welded with respectively
Steel-pipe pile connection end (2), prefabricated pile for prestressed pipe (4) are also respectively kept with pile for prestressed pipe connection end (3) at both ends, lead to
Steel-pipe pile connection end (2) and pile for prestressed pipe connection end (3) can be bolted together by crossing connection bolt (5).
2. a kind of pile for prestressed pipe as described in claim 1 and steel-pipe pile built pile supporting construction, it is characterised in that: the steel
Tubular pole connection end (2) is identical with pile for prestressed pipe connection end (3) structure, specific structure are as follows: whole is in lantern ring shape, one end
Internal for being plugged into steel-pipe pile (1) or pile for prestressed pipe (4) as steel pipe grommet (14), the other end is equipped with flange ring (11),
Bolt hole (13) are circumferentially formed on flange ring (11).
3. a kind of pile for prestressed pipe as described in claim 1 and steel-pipe pile built pile supporting construction, it is characterised in that: flange ring
(11) reinforcement structure being made of deep floor (12) and circular reinforcing rib (15) is connected on, wherein circular reinforce
Muscle (15) is arranged concentrically with flange ring (11), and using several, deep floor (12) is equidistant is connected to circular reinforcing rib vertically
(15) between flange ring (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820929823.6U CN208668430U (en) | 2018-06-15 | 2018-06-15 | A kind of pile for prestressed pipe and steel-pipe pile built pile supporting construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820929823.6U CN208668430U (en) | 2018-06-15 | 2018-06-15 | A kind of pile for prestressed pipe and steel-pipe pile built pile supporting construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208668430U true CN208668430U (en) | 2019-03-29 |
Family
ID=65824348
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820929823.6U Active CN208668430U (en) | 2018-06-15 | 2018-06-15 | A kind of pile for prestressed pipe and steel-pipe pile built pile supporting construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208668430U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112502160A (en) * | 2020-11-24 | 2021-03-16 | 中铁第四勘察设计院集团有限公司 | Post-tensioning precast concrete supporting member, inner supporting system and construction method |
-
2018
- 2018-06-15 CN CN201820929823.6U patent/CN208668430U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112502160A (en) * | 2020-11-24 | 2021-03-16 | 中铁第四勘察设计院集团有限公司 | Post-tensioning precast concrete supporting member, inner supporting system and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104018518B (en) | The method of prefabricated diaphragm wall and construction outer wall of basement and floor | |
CN106013517A (en) | Fabricated reinforced concrete shear wall and manufacturing method thereof | |
CN203834739U (en) | End steel board connection, positioning and assembly type shear wall structure | |
CN103306289A (en) | Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof | |
CN207812741U (en) | Pre-manufactured steel structure overlapped shear wall | |
CN204000925U (en) | Prefabricated diaphragm wall | |
CN107443550A (en) | Prefabricated cushion cap template and its installation method | |
CN208668430U (en) | A kind of pile for prestressed pipe and steel-pipe pile built pile supporting construction | |
CN104074197A (en) | Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof | |
CN201077988Y (en) | Hidden beam-column type prestressing force earth nail wall | |
CN108166629A (en) | A kind of detachable assembling type steel core concrete column-connected mode and its construction method | |
CN114108694B (en) | Micro-disturbance anti-floating underground cylindrical structure and construction method thereof | |
CN203559419U (en) | Prestressed concrete precast pile | |
CN205591210U (en) | Formula cast member and construction assembly are spliced to underground | |
CN210529963U (en) | Mortise and tenon self-locking connection structure for upper layer and lower layer of steel concrete combined pipe | |
CN109653193B (en) | Reverse construction method for underground continuous wall | |
CN209723230U (en) | The connecting node of steel plate combined shear wall and not equal higher baselines | |
CN106088762A (en) | The prefabricated assembled circular underground granary of a kind of insertion slot type encased steel plate | |
CN107100615B (en) | Radial prestress drilling well wall structure and construction method thereof | |
CN206752690U (en) | The attachment structure of vertical precast concrete | |
CN204000837U (en) | A kind of prefabricated diaphragm wall | |
CN216515729U (en) | Combined anti-floating underground supporting structure | |
CN210712821U (en) | Grouting type underground continuous wall with prefabricated wall boards | |
CN104032732A (en) | Cast-in-place type prestress steel plate concrete pile, construction method thereof and support pile wall | |
CN209975738U (en) | Assembled beam and plate connecting node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |