CN208650033U CN201821196161.2U CN201821196161U CN208650033U CN 208650033 U CN208650033 U CN 208650033U CN 201821196161 U CN201821196161 U CN 201821196161U CN 208650033 U CN208650033 U CN 208650033U
Authority
CN
China
Prior art keywords
steel sleeve
sleeve
reinforced plastic
glass reinforced
solution cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821196161.2U
Other languages
Chinese (zh)
Inventor
徐高
王昌文
狄圣杰
陈春雨
任波
刘彦
冯炫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dacheng Kechuang Infrastructure Co Ltd
Original Assignee
Dacheng Kechuang Infrastructure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dacheng Kechuang Infrastructure Co Ltd filed Critical Dacheng Kechuang Infrastructure Co Ltd
Priority to CN201821196161.2U priority Critical patent/CN208650033U/en
Application granted granted Critical
Publication of CN208650033U publication Critical patent/CN208650033U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses shallow covering karst strata ruggedized constructions, for passing through the spiral-digging pore filling pile construction of solution cavity in shallow covering karst strata, include: steel sleeve, be vertically embedded on Upper Plate of Karst Cave, the upper end of the steel sleeve is concordant or the earth's surface of slightly higher than overlying rock;Glass reinforced plastic sleeve, outer diameter are slightly less than the internal diameter of the steel sleeve, are coaxially arranged in the steel sleeve, and the glass reinforced plastic sleeve passes through solution cavity, are fixed on lower part supporting course;Grouting layer is set to the gap between steel sleeve and glass reinforced plastic sleeve.The utility model is directed to large-scale solution cavity, sets simply, low cost saves the construction time.

Description

Shallow covering karst strata ruggedized construction
Technical field
The utility model relates to the realm of building construction.More specifically, the utility model relates to a kind of shallow covering karst regions Layer ruggedized construction.
Background technique
It needs the problem of handling karst hole, generally to penetrate using cast-in-situ bored pile carrying out engineering construction on karst strata Karst hole is supported in stable rock stratum, and conventional construction is aided with mud using reacting cycle convolution drilling or percussion drilling pore-forming Retaining wall, for crack in limestone and small hole, the fillers such as throwing clay slabstone are simultaneously tamped, at the spillage of filling borehole periphery. Due to solution cavity spillage, a large amount of mud need to be consumed, slurries leakage causes underground environmental pollution, while mud conditioning is also the difficulty of construction Point.
Utility model content
The purpose of the utility model is to provide shallow covering karst strata ruggedized constructions to set simply, make for large-scale solution cavity Valence is low, saves the construction time.
In order to realize these purposes and other advantages according to the present utility model, provides shallow covering karst strata and reinforce knot Structure, for passing through the spiral-digging pore filling pile construction of solution cavity in shallow covering karst strata, comprising:
Steel sleeve is vertically embedded on Upper Plate of Karst Cave, and the upper end of the steel sleeve is concordant or slightly higher than overlying rock Earth's surface;
Glass reinforced plastic sleeve, outer diameter are slightly less than the internal diameter of the steel sleeve, are coaxially arranged in the steel sleeve, described Glass reinforced plastic sleeve passes through solution cavity, is fixed on lower part supporting course;
Grouting layer is set to the gap between steel sleeve and glass reinforced plastic sleeve.
Preferably, the medial surface at the top of the steel sleeve is fixed with hoop of putting more energy into, and the width of the hoop of putting more energy into is 5cm.
Preferably, the outer diameter of the steel sleeve is 20-30cm bigger than the stake diameter of bored concrete pile, and the wall thickness of the steel sleeve is 10-12mm。
Preferably, further include multiple injected holes, be vertically installed in around the steel sleeve, filling in the injected hole There is slurry, the lower end of the injected hole is close to Upper Plate of Karst Cave.
The utility model is include at least the following beneficial effects: the shallow covering karst strata ruggedized construction in the application uses glass Glass steel sleeve guarantees that pile body is complete regardless of solution cavity size cases are controllable.Cost is saved compared to clay filling, concrete fill method.It is logical Crossing glass reinforced plastic sleeve can guarantee pile body integrity, to improve a stress and power transmission effect is good.
The further advantage, target and feature of the utility model will be partially reflected by the following instructions, and part will also pass through Research and practice to the utility model and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of shallow covering karst strata ruggedized construction;
Fig. 2 is the setting schematic diagram of injected hole.
Appended drawing reference:
1- steel sleeve, 2- glass reinforced plastic sleeve, 3- grouting layer, 4- injected hole, 101- overlying rock, 102- solution cavity, under 103- Portion's supporting course.
Specific embodiment
The following describes the utility model in further detail with reference to the accompanying drawings, to enable those skilled in the art referring to explanation Book text can be implemented accordingly.
In the description of the present invention, term " transverse direction ", " longitudinal direction ", "upper", "lower", "front", "rear", "left", "right", The orientation or positional relationship of the instructions such as "vertical", "horizontal", "top", "bottom", "inner", "outside" be orientation based on the figure or Positional relationship is merely for convenience of describing the present invention and simplifying the description, and is not the device or member of indication or suggestion meaning Part must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
As shown in Figure 1, the utility model provides shallow covering karst strata ruggedized construction, for passing through shallow covering karst strata The spiral-digging pore filling pile construction of middle solution cavity 102, the shallow structure for covering karst strata: upper part is overlying rock 101, middle part is Large-scale solution cavity 102, lower part are lower part supporting course 103.
Ruggedized construction includes:
Steel sleeve 1 is vertically embedded on 102 top plate of solution cavity, and the upper end of the steel sleeve 1 concordantly or on being slightly higher than is covered The earth's surface of rock stratum 101;The outer diameter of the steel sleeve 1 is 20-30cm bigger than the stake diameter of bored concrete pile, and the wall thickness of the steel sleeve 1 is 10- 12mm。
Glass reinforced plastic sleeve, outer diameter are slightly less than the internal diameter of the steel sleeve 1, are coaxially arranged in the steel sleeve 1, institute Glass reinforced plastic sleeve 2 is stated across solution cavity 102, is fixed on lower part supporting course 103, for glass reinforced plastic sleeve 2 due to light weight, intensity is big, holds It easily sets, reduces the generation in crack, to reduce the time that fracture punishment is spent.
Grouting layer 3 is set to the gap between steel sleeve 1 and glass reinforced plastic sleeve 2.Grouting layer 3 uses water ash mass ratio It is made of 0.5~0.6 cement slurry.
In the above-mentioned technical solutions, to include: 1, steel sleeve 1 be made of rolling steel pipe the construction procedure of ruggedized construction, is led to It crosses 25t crane to sling steel sleeve 1,1 bottom of steel sleeve is carried out by positioning centering using guide pile, adjusts the verticality of steel sleeve 1, Steel sleeve 1 is placed in steel sleeve 1 down toward designated depth, then with vibrohammer with digging machine cooperation crane, carries out vibration-sunk, The verticality of steel sleeve 1 should be adjusted during follow-up in time, the oscillation point of vibration hammer should repeatedly transfer, under guaranteeing that steel pile casting is uniform It is sink to 102 top of solution cavity.2, churning driven continues to creep into, and is then implanted into glass reinforced plastic sleeve in 102 hollow section of solution cavity, will using crane Glass reinforced plastic sleeve is sling, since fiber glass reinforced plastic cover length of tube is longer, every lower 6m, then with two theodolites in two vertical planes Detection gradient, when glass reinforced plastic sleeve sinks down into 102 bottom of solution cavity, is assisted down to adjust at any time using vibration hammer It puts, until glass reinforced plastic sleeve squeezes into soil body certain depth.3, the gap progress slip casting between glass reinforced plastic sleeve and steel sleeve 1 is filled out Reinforcing is filled, grouting layer 3 is formed, ruggedized construction can be realized, it is glutinous that the ruggedized construction of the application is not necessarily to the throwing in large-scale solution cavity 102 The fillers such as native slabstone can greatly reduce the generation in crack for mud off structure, improve construction efficiency, reduce Operating expenses.After the completion of ruggedized construction, steel reinforcement cage and grouting pile-forming can be transferred in glass reinforced plastic sleeve 2.
In another technical solution, the medial surface at the top of the steel sleeve 1 is fixed with hoop of putting more energy into, the hoop of putting more energy into Width is 5cm, after the setting for hoop of putting more energy into, increases the bonding strength between grouting layer 3 and steel sleeve 1 and glass reinforced plastic sleeve 2.
In another technical solution, as shown in Fig. 2, further including multiple injected holes 4, it is vertically installed in the steel sleeve Around 1, it is filled with slurry in the injected hole 4, the lower end of the injected hole 4 is close to 102 top plate of solution cavity.Slurry uses water grey matter Amount ratio is made of 0.5~0.6 cement slurry.It prevents 102 top of solution cavity around stake holes loose, improves integral strength.
It is not only in the description and the implementation although the embodiments of the present invention have been disclosed as above Listed utilization, it can be applied to various fields suitable for the present invention completely, for those skilled in the art, Other modifications may be easily implemented, therefore without departing from the general concept defined in the claims and the equivalent scope, this reality It is not limited to specific details and legend shown and described herein with novel.

Claims (4)

1. shallowly covering karst strata ruggedized construction, the spiral-digging pore bored concrete pile for passing through solution cavity in shallow covering karst strata is applied Work characterized by comprising
Steel sleeve is vertically embedded on Upper Plate of Karst Cave, and the upper end of the steel sleeve is concordant or the ground of slightly higher than overlying rock Table;
Glass reinforced plastic sleeve, outer diameter are slightly less than the internal diameter of the steel sleeve, are coaxially arranged in the steel sleeve, the glass Steel sleeve passes through solution cavity, is fixed on lower part supporting course;
Grouting layer is set to the gap between steel sleeve and glass reinforced plastic sleeve.
2. covering karst strata ruggedized construction as described in claim 1 shallow, which is characterized in that the top of the steel sleeve it is interior Side is fixed with hoop of putting more energy into, and the width of the hoop of putting more energy into is 5cm.
3. shallow covering karst strata ruggedized construction as claimed in claim 2, which is characterized in that the outer diameter of the steel sleeve is than filling The big 20-30cm of stake diameter of stake is infused, the wall thickness of the steel sleeve is 10-12mm.
4. shallow covering karst strata ruggedized construction as described in claim 1, which is characterized in that it further include multiple injected holes, It is vertically installed in around the steel sleeve, slurry is filled in the injected hole, the lower end of the injected hole is close to Upper Plate of Karst Cave.
CN201821196161.2U 2018-07-26 2018-07-26 Shallow covering karst strata ruggedized construction Active CN208650033U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821196161.2U CN208650033U (en) 2018-07-26 2018-07-26 Shallow covering karst strata ruggedized construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821196161.2U CN208650033U (en) 2018-07-26 2018-07-26 Shallow covering karst strata ruggedized construction

Publications (1)

Publication Number Publication Date
CN208650033U true CN208650033U (en) 2019-03-26

Family

ID=65786413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821196161.2U Active CN208650033U (en) 2018-07-26 2018-07-26 Shallow covering karst strata ruggedized construction

Country Status (1)

Country Link
CN (1) CN208650033U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111997620A (en) * 2020-07-28 2020-11-27 中铁第四勘察设计院集团有限公司 Grouting construction system and method for karst collapse area

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111997620A (en) * 2020-07-28 2020-11-27 中铁第四勘察设计院集团有限公司 Grouting construction system and method for karst collapse area

Similar Documents

Publication Publication Date Title
CN103835284B (en) A kind of Pile In Drill In Karst Terrain structure and construction method
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN103015413B (en) Construction method of composite pile with implanting-in rigid-body embedded into hard bearing stratum
CN107975375B (en) A kind of miniature steel pipe pile reinforced soft foundation construction method of city tunnel
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN104863131A (en) Polygonal cement-soil stirring pile and formation method thereof
CN105544512A (en) Reinforced sack grouting stone-breaking pile with heat transferring tube buried therein and construction method
CN203741820U (en) Cast-in-situ bored pile structure for karst area
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN206784372U (en) Injection forming club-footed pile
CN104863132A (en) Bougainvillea spectabilis willd-shaped cement-soil mixing pile and shaping method thereof
CN105672307A (en) Expanded-base combination end pile bearing foundation
CN104294821B (en) Pile forming method for confined reinforced cement soil pile
CN108797578A (en) Crushed stone grouting pile and its construction method with classification enlarged footing
CN105386610A (en) Protective construction method for natural-foundation ancient architectures at top of asymmetric deep foundation pit
CN208650033U (en) Shallow covering karst strata ruggedized construction
CN102808407A (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN103410529B (en) A kind of support of tunnel arch springing ruggedized construction for weak surrounding rock and construction method
CN206503157U (en) The embedding rock mixing pile foundation of offshore wind farm
CN104480932A (en) Saline alkali muddy soil ground cement mixing pile construction method
CN105370306B (en) The massif tunnel excavation construction method of vertical pre-reinforcement processing
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit
CN208545745U (en) Crushed stone grouting pile with classification enlarged footing
CN102767177A (en) Construction method for cast-in-place concrete pile of soft soil foundation with stone layer
CN209066518U (en) A kind of constructing structure of section of stake forced-landing tilt correcting structure and miniature steel pipe pile