CN102767177A - Construction method for cast-in-place concrete pile of soft soil foundation with stone layer - Google Patents
Construction method for cast-in-place concrete pile of soft soil foundation with stone layer Download PDFInfo
- Publication number
- CN102767177A CN102767177A CN2012102736294A CN201210273629A CN102767177A CN 102767177 A CN102767177 A CN 102767177A CN 2012102736294 A CN2012102736294 A CN 2012102736294A CN 201210273629 A CN201210273629 A CN 201210273629A CN 102767177 A CN102767177 A CN 102767177A
- Authority
- CN
- China
- Prior art keywords
- steel sleeve
- concrete
- pile
- construction method
- stone layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a construction method for a cast-in-place concrete pile of a soft soil foundation with a stone layer. The construction method comprises the following steps: 1), determining the centre position of a cast-in-place reinforcement concrete pile; 2), using a vibration sunken tube method to sink the precast pile tip to the designed position, and enabling the bottom elevation of a steel sleeve to be parallel to that of the pile; 3), putting a reinforcement cage to the steel sleeve; 4), pouring concrete to the designed elevation of the pile top; and 5), waiting for 1-2 hours, pulling out the steel sleeve to form the cast-in-place reinforcement concrete pile. The construction method is simple and easy to operate, high in efficiency, convenient to control project quality, and safe and reliable, thereby the construction cost is greatly reduced, the working efficiency is improved, and manpower, material resources and financial resources are saved; moreover, the construction method is applicable to construction environments such as the soft soil foundation, regions abundant in underground water and the like.
Description
Technical field
The present invention relates to a kind of deposited reinforced concrete pile job practices, particularly relate to a kind of soft foundation concrete filling pile construction method with block stone layer.
Background technology
General deposited reinforced concrete pile adopts boring method to construct; The hole phenomenon of in soft foundation deposited reinforced concrete pile pore forming process, collapsing is very general; Concrete amount increases during pile, and fullness coefficient increases, and needs all to use steel sleeve or overlength steel sleeve; The steel sleeve distortion of block stone layer zone is very big having, and can't pass through block stone layer.Silt depth is darker in the coastal area, and the block stone layer buried depth is big, considers from construction technology and engineering cost two aspects, needs to explore the deposited reinforced concrete pile job practices that makes new advances.
Summary of the invention
The present invention provides a kind of soft foundation concrete filling pile construction method with block stone layer for solving the technical problem that exists in the known technology, and this method is convenient to the Control Engineering quality.
The technical scheme that the present invention takes for the technical problem that exists in the solution known technology is: a kind of soft foundation concrete filling pile construction method with block stone layer may further comprise the steps:
One) confirms the center of deposited reinforced concrete pile;
Two) adopt the vibration sinking tube method that prefabricated stake point is sunk to design attitude with steel sleeve, and make the end absolute altitude of steel sleeve concordant with stake end absolute altitude;
Three) reinforcing cage is placed in the steel sleeve;
Four) concrete perfusion to stake top design elevation;
Five) wait for 1~2 hour, extract steel sleeve, form deposited reinforced concrete pile.
Upper end one side of said steel sleeve is provided with the concrete spouting mouth, in said step 4) in, concrete pours in the steel sleeve from said concrete spouting mouth; In said step 5) in; Extract steel sleeve while vibrating, owing to make concrete more closely knit and because the extracting of steel sleeve in the vibration processes, in the stake hole, form the concrete space of sinking; Adopt the reinforced method in high-altitude to fill up sagging space, form deposited reinforced concrete pile with concrete.
In said step 3) in, reinforcing cage is to inject in the steel sleeve the hole in the middle of two vibrators.
Advantage and good effect that the present invention has are: 1) adopt the vibration sinking tube method can pass block stone layer fast; 2) adopt the reinforced concrete pile point, the heavy steel sleeve construction of combining vibration, speed of fulfiling hole is faster than other rig pore-forming; 3) reinforcing cage is installed simple; 4) the concrete fullness coefficient can be effectively controlled, and reduces construction cost; 5) the present invention is applicable to construction environments such as soft foundation and the more rich area of underground water; 6) the present invention is simple and easy to do, efficient is high, be convenient to Control Engineering quality, safe and reliable, has reduced construction cost to a great extent, has improved operating efficiency, has saved human and material resources and financial resources.
Description of drawings
The reinforced concrete pile point sketch map that Fig. 1 adopts for the present invention;
Fig. 2 and Fig. 3 are step 2 of the present invention) sketch map;
Fig. 4 is a step 3 of the present invention) sketch map;
Fig. 5 is a step 4 of the present invention) sketch map;
Fig. 6 is a step 5 of the present invention) sketch map.
Among the figure: 1, stake point, 2, walking vibrator pipe sinking cast-in-place pile machine, 3, block stone layer, 5, steel sleeve, 6, autocrane, 7, deposited reinforced concrete pile, 8, concrete mixing and transporting car, 5-1, concrete spouting mouth, 7-1, reinforcing cage, 7-2, concrete.
The specific embodiment
For further understanding summary of the invention of the present invention, characteristics and effect, the following examples of giving an example now, and conjunction with figs. specifies as follows:
See also Fig. 1~Fig. 6, a kind of soft foundation concrete filling pile construction method with block stone layer may further comprise the steps:
One) confirms the center of deposited reinforced concrete pile 7;
Two) adopt the vibration sinking tube method that prefabricated stake point 1 usefulness steel sleeve 5 is sunk to design attitude, and make the end absolute altitude of steel sleeve 5 concordant with stake end absolute altitude;
In the present embodiment, upper end one side of said steel sleeve 5 is provided with concrete spouting mouth 5-1.Adopt walking vibrator pipe sinking cast-in-place pile machine 2, configuration DZ110kw vibrating hammer is pressed in steel sleeve 5 on the stake point 1, sinks to a hole, and steel sleeve 5 passes block stone layer 3 with stake point 1.
Three) reinforcing cage 7-1 is placed in the steel sleeve 5;
In the present embodiment, adopt autocrane 6 lifting reinforcing cage 7-1, put into steel sleeve 5 from the middle hole of two vibrators.
Four) concrete perfusion 7-2 is to a top design elevation;
In the present embodiment, field by using concrete mixing and transporting car 8 transportation concrete sevens-2 are filled into concrete seven-2 in the steel sleeve 5 from said concrete spouting mouth 5-1.
Five) wait for 1~2 hour, extract steel sleeve 5, form deposited reinforced concrete pile 7.
In the present embodiment; Steel sleeve 5 is to extract while vibrating; Extracting of concrete closely knit and steel sleeve 5 of internal cause forms the concrete space of sinking in the stake hole, and present embodiment adopts the reinforced method in high-altitude to fill up sagging space with concrete, forms deposited reinforced concrete pile 7.
Six) inspection pile quality.
Although combine accompanying drawing that the preferred embodiments of the present invention are described above; But the present invention is not limited to the above-mentioned specific embodiment, and the above-mentioned specific embodiment only is schematically, is not restrictive; Those of ordinary skill in the art is under enlightenment of the present invention; Not breaking away under the scope situation that aim of the present invention and claim protect, can also make a lot of forms, these all belong within protection scope of the present invention.
Claims (3)
1. the soft foundation concrete filling pile construction method with block stone layer is characterized in that, may further comprise the steps:
One) confirms the center of deposited reinforced concrete pile;
Two) adopt the vibration sinking tube method that prefabricated stake point is sunk to design attitude with steel sleeve, and make the end absolute altitude of steel sleeve concordant with stake end absolute altitude;
Three) reinforcing cage is placed in the steel sleeve;
Four) concrete perfusion to stake top design elevation;
Five) wait for 1~2 hour, extract steel sleeve, form deposited reinforced concrete pile.
2. the soft foundation concrete filling pile construction method with block stone layer according to claim 1; It is characterized in that; Upper end one side of said steel sleeve is provided with the concrete spouting mouth, in said step 4) in, concrete pours in the steel sleeve from said concrete spouting mouth; In said step 5) in, extract steel sleeve while vibrating, in the stake hole, form the sagging space of concrete, adopt the reinforced method in high-altitude to fill up sagging space with concrete, form deposited reinforced concrete pile.
3. the soft foundation concrete filling pile construction method with block stone layer according to claim 1 is in said step 3) in, reinforcing cage is to inject in the steel sleeve the hole in the middle of two vibrators.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102736294A CN102767177A (en) | 2012-08-02 | 2012-08-02 | Construction method for cast-in-place concrete pile of soft soil foundation with stone layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102736294A CN102767177A (en) | 2012-08-02 | 2012-08-02 | Construction method for cast-in-place concrete pile of soft soil foundation with stone layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102767177A true CN102767177A (en) | 2012-11-07 |
Family
ID=47094727
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102736294A Pending CN102767177A (en) | 2012-08-02 | 2012-08-02 | Construction method for cast-in-place concrete pile of soft soil foundation with stone layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102767177A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195052A (en) * | 2013-03-27 | 2013-07-10 | 天津市市政工程设计研究院 | Cast-in-place pile used in high concentration saline solution corrosion environment and construction method thereof |
CN103541352A (en) * | 2013-08-02 | 2014-01-29 | 中冶集团武汉勘察研究院有限公司 | Underground and overground continuous construction method for major-diameter high flat bed pile in sandy soil stratum |
CN107476295A (en) * | 2016-06-08 | 2017-12-15 | 宜兴市周铁镇生力钻探机械厂 | A kind of Concrete Grouting Pale technique |
CN112663610A (en) * | 2020-12-15 | 2021-04-16 | 大连理工大学 | Construction method of vibration stamping equipment for efficient construction of broken belt micro-piles |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1326136A (en) * | 1970-12-15 | 1973-08-08 | Frankignoul Pieux Armes | Casting concrete piles |
CN85202198U (en) * | 1985-06-08 | 1986-04-02 | 城乡建设环境保护部长沙建筑机械研究所 | Vibratory pile-driver with falling hammer |
CN201850546U (en) * | 2010-06-27 | 2011-06-01 | 江苏省交通科学研究院股份有限公司 | Vibration sinking pipe pile |
-
2012
- 2012-08-02 CN CN2012102736294A patent/CN102767177A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1326136A (en) * | 1970-12-15 | 1973-08-08 | Frankignoul Pieux Armes | Casting concrete piles |
CN85202198U (en) * | 1985-06-08 | 1986-04-02 | 城乡建设环境保护部长沙建筑机械研究所 | Vibratory pile-driver with falling hammer |
CN201850546U (en) * | 2010-06-27 | 2011-06-01 | 江苏省交通科学研究院股份有限公司 | Vibration sinking pipe pile |
Non-Patent Citations (3)
Title |
---|
乔中鑫: "沉管灌注桩施工及工程实例", 《山西建筑》 * |
彭振斌: "《灌注桩工程设计计算与施工》", 31 July 1997, 中国地质大学出版社 * |
徐波 等: "《建筑业10项新技术(2005)应用指南》", 31 August 2005, 中国建筑工业出版社 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195052A (en) * | 2013-03-27 | 2013-07-10 | 天津市市政工程设计研究院 | Cast-in-place pile used in high concentration saline solution corrosion environment and construction method thereof |
CN103541352A (en) * | 2013-08-02 | 2014-01-29 | 中冶集团武汉勘察研究院有限公司 | Underground and overground continuous construction method for major-diameter high flat bed pile in sandy soil stratum |
CN103541352B (en) * | 2013-08-02 | 2015-08-26 | 中冶集团武汉勘察研究院有限公司 | A kind of at ground, sandy soil stratum major diameter Vertical spots underground continuous construction method |
CN107476295A (en) * | 2016-06-08 | 2017-12-15 | 宜兴市周铁镇生力钻探机械厂 | A kind of Concrete Grouting Pale technique |
CN112663610A (en) * | 2020-12-15 | 2021-04-16 | 大连理工大学 | Construction method of vibration stamping equipment for efficient construction of broken belt micro-piles |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104179174B (en) | A kind of multiple holes grouting pipe shaped pile and pile making method thereof | |
CN103993598B (en) | One is drawn hole and is implanted cloth bag crushed stone grouting pile and construction method | |
CN203213136U (en) | Caisson and pile combined foundation of consolidated subsoil | |
CN103321244A (en) | Construction method for additionally arranged basement in existing building on sand foundation | |
CN107246005A (en) | Super-large diameter bores and buries steel pipe hollow foundation pile and its construction method | |
CN105200879A (en) | Water-permeable foam concrete pile compound foundation | |
CN102808407B (en) | Construction method of soft-foundation reinforced concrete cast-in-place pile | |
CN102767177A (en) | Construction method for cast-in-place concrete pile of soft soil foundation with stone layer | |
CN101718098B (en) | A kind of micro-pile combined excavation and excavation composite foundation and its construction method | |
CN109680671A (en) | A kind of liquefaction foundation treatment method based on building waste | |
CN108797578A (en) | Crushed stone grouting pile and its construction method with classification enlarged footing | |
CN102561329B (en) | Construction method of underwater concrete cast-in-place pipe pile | |
CN104480956A (en) | Small-diameter mold-bagged concrete pile composite foundation | |
CN106988317A (en) | One kind is used for underground pipe gallery method for processing foundation | |
CN204000848U (en) | A kind of socketed pile for subaqueous construction | |
CN103981863B (en) | The construction method of a kind of discrete material pile and the upper and lower consubstantiality compound pile of concrete pile | |
CN108316288A (en) | Half casing guncreting pile construction equipment and construction method | |
CN208650033U (en) | Shallow covering karst strata ruggedized construction | |
CN104746507B (en) | Construction waste regeneration drainage CFG pile foundation and construction method thereof | |
CN203247580U (en) | Construction structure of cast-in-place concrete pile of deep soft soil foundation bridge girder | |
CN207121898U (en) | Super-large diameter bores and buries steel pipe hollow foundation pile | |
CN207109804U (en) | A kind of quick spreading structure configuration of soft soil foundation bored concrete pile | |
CN103306277B (en) | A kind of construction method utilizing rigid pile to embed Low Intensity Concrete Piles making compound water stop curtain | |
CN106245641A (en) | PHC pile tube post grouting construction technique and PHC pile tube composite pile | |
CN202202325U (en) | Compaction expansion micro mortar pile forming device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20121107 |