CN208648576U - A kind of hanging apparatus for strip bulk foam - Google Patents

A kind of hanging apparatus for strip bulk foam Download PDF

Info

Publication number
CN208648576U
CN208648576U CN201821151896.3U CN201821151896U CN208648576U CN 208648576 U CN208648576 U CN 208648576U CN 201821151896 U CN201821151896 U CN 201821151896U CN 208648576 U CN208648576 U CN 208648576U
Authority
CN
China
Prior art keywords
lead screw
longitudinal
main lead
fixture
transverse shifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821151896.3U
Other languages
Chinese (zh)
Inventor
贾洪
李业光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Helite Technology Co Ltd
Original Assignee
Harbin Helite Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Helite Technology Co Ltd filed Critical Harbin Helite Technology Co Ltd
Priority to CN201821151896.3U priority Critical patent/CN208648576U/en
Application granted granted Critical
Publication of CN208648576U publication Critical patent/CN208648576U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

A kind of hanging apparatus for strip bulk foam, it is related to a kind of hanging apparatus.The utility model is that there are synchronism and stability difference and occupied space are big in order to solve the problems, such as existing lifting mode.The horizontal mobile device of the utility model is mounted in workshop along its length, longitudinal moving device is movably mounted to the lower end of horizontal mobile device along workshop width direction, lifting grabbing device is mounted on the lower end of longitudinal moving device, fixture crossbeam liftable is lifted on the lower end of longitudinal moving device, the main lead screw of lifting grabbing device is threaded through in fixture crossbeam, multiple clamp assemblies are equidistantly mounted on main lead screw, main lead screw driving motor is mounted on fixture crossbeam, the output end of main lead screw driving motor is connect with lifting crawl motor drive wheel, main lead screw transmission wheel is mounted on main lead screw, pass through lifting crawl chain connection between lifting crawl motor drive wheel and main lead screw transmission wheel.The utility model is used for the lifting of strip bulk foam.

Description

A kind of hanging apparatus for strip bulk foam
Technical field
The utility model relates to a kind of hanging apparatus, and in particular to a kind of hanging apparatus for strip bulk foam.
Background technique
During foam production, mixed liquor is in shaping channel with the forward movement of lining paper and lining form, side Xiang Qianyi Dynamic Bian Qifa.Starting is had been completed when being transported to the outlet of shaping channel Deng the strip bulk foam distributed and is vented Journey.Its face shaping has been formed, but physical mechanical strength is also lower.Strip bulk foam also needs to continue the long fortune of another item It is moved forward on dynamic carrier bar.The normal output that can guarantee subsequent foam in this way, ensures that the rear solidification of the foam first come out Degree and self-strength further increase, then smoothly to carry out severing and to remove the strip bulk foam that severing is got off Being put into designated position from carrier bar is that subsequent foam bulk makes way.And so on until foaming process terminates.Strip is big Block foam moves away from carrier bar, and there are three types of methods at present: first is that the end in long carrier bar installs a disconnected bubble machine, strip bulk foam fortune Break bubble when moving at disconnected bubble machine, and bubble chance of breaking is by specific length (usually 1.5 meters either 3.0 meters).By strip bulk foam It sequentially disconnects, the foam piece under then being broken with trolley rapidly pulls away, and is sent to designated place and puts down, and uniformly arranges.Second is that Disconnected bubble machine is preposition, and (usually 50-100 meters) disconnect foam when strip bulk foam reaches a specific length, then Whole foam under will be disconnected is quickly fed forward a distance, using two or more common hangings, lifts one long Type heavy type fixture, the strip bulk foam fixture folder under breaking are walked to place designated place, then wait after clamping under teasel root Strip bulk foam.Third is that installing row's railcar in carrier bar middle-end, which is wanted by production using the form of railcar It asks, attachment rail wheel under specific length (usually 50-100 meters) vehicle is made, wheel is placed on the rail that several is transversely mounted It can make railcar translation track vehicle case structure, a built-in conveyer belt, the discharge end of conveyer belt can be gone up and down.Cutting Strip bulk foam afterwards is fed rapidly into railcar.The outlet end alignment storage block shelf of railcar conveyer belt, store goods Frame is one three layers or four-layer structure, and each layer is that a length is 50-100 meters, and the conveyer belt that width is 2 meters or so forms (the strip bulk foam of the utility model refers to that length is 50-100 meters, the foam that width is 2 meters), such multilayered structure Many column can be placed side by side, if what the strip bulk foam from railcar all filled the shelf of a layer multi-layer structure Words, railcar can has accepted bubble block after, move in parallel the inlet of another column multilayered structure, toward the shelf on conveying grow Which shelf dress bulk foam needs toward, and railcar just moves to that shelf and loaded and unloaded, used according to production needs at any time Railcar unloads strip bulk foam, carries out following process, has vacant shelf to arrange foam production again, be full of, these Storage block shelf are to solidify section again after can be used as strip bulk foam to can be used for the storage of strip bulk foam.
In conclusion existing lifting mode has that synchronism and stability difference and occupied space are big.
Utility model content
Purpose of the utility model is to solve existing lifting modes there are synchronism and stability difference and to occupy The big problem in space, and then a kind of hanging apparatus for strip bulk foam is provided.
The technical solution of the utility model is:
A kind of hanging apparatus for strip bulk foam includes horizontal mobile device, longitudinal moving device and lifting crawl Device, horizontal mobile device are mounted in workshop along its length, and longitudinal moving device is along workshop width direction removable installation In the lower end of horizontal mobile device, the lower end that grabbing device is mounted on longitudinal moving device is gone up and down;
Lifting grabbing device includes main lead screw driving motor, lifting crawl motor drive wheel, lifting crawl chain, main lead screw Driving wheel, main lead screw, fixture crossbeam and multiple clamp assemblies, fixture crossbeam liftable are lifted on the lower end of longitudinal moving device, Main lead screw is threaded through in fixture crossbeam, and multiple clamp assemblies are equidistantly mounted on main lead screw, and main lead screw driving motor is mounted on On fixture crossbeam, the output end of main lead screw driving motor is connect with lifting crawl motor drive wheel, and main lead screw transmission wheel is mounted on On main lead screw, pass through lifting crawl chain connection between lifting crawl motor drive wheel and main lead screw transmission wheel;
Each clamp assembly includes fixture strutbeam, roll adjustment lead screw, commutator and gripper assembly, and fixture strutbeam is mounted on folder Has the lower end of crossbeam, fixture strutbeam is mounted in gripper assembly, and roll adjustment lead screw is mounted on fixture strutbeam, and commutator is sleeved on tune Away from lead screw.
Further, gripper assembly includes clamp rod backplate, two clamp rods and traveling wheel, the removable peace of clamp rod backplate On main lead screw, traveling wheel is mounted in clamp rod backplate, and two clamp rods are oppositely arranged and the lower end with clamp rod backplate Connection.
Further, two clamp rods are oppositely arranged, and the distance between two clamp rods from top to bottom successively decrease.
Further, the distance between two clamp rods from top to bottom successively decrease 0.5-1.5cm.
Further, the bottom face of two clamp rods is equipped with horizontal shelf.
Further, horizontal mobile device includes more transverse beams, multiple pulleys, multiple transverse shifting coasters, laterally moves Fly block mandrel, transverse shifting traction electric machine, coaster driving chain sprocket, two transverse beam axis of traction and transverse shifting chain;
More transverse beams are arranged side by side, and each transverse shifting coaster can by the multiple pulleys being mounted in a transverse beam It is slidably connected, is connected between multiple transverse shifting coasters by transverse shifting coaster mandrel, the fixed peace of transverse shifting traction electric machine On workshop inner sidewall, the output end of transverse shifting traction electric machine is connected by the first sprocket wheel and a wherein transverse beam axis of traction It connects, the length direction of two transverse beam axis of traction transversely beam is mounted on the both ends of transverse beam, two transverse beam axis of traction difference One the second sprocket wheel is installed, is connected between two the second sprocket wheels by transverse shifting chain, transverse shifting chain passes through laterally Movable block is simultaneously connect with transverse shifting coaster.
Further, longitudinal moving device includes longitudinal beam, multiple longitudinal beam pulleys, multiple longitudinal movement coasters, longitudinal direction Movable block mandrel, more wirerope, longitudinal traction motor, longitudinal traction chain, two longitudinal traction sprocket wheels, longitudinal movement chain Item and fixture lifting motor;
Longitudinal beam is mounted on the lower end of multiple transverse shifting coasters, and movable block passes through multiple longitudinal beam pulleys longitudinally in each It is movably mounted on longitudinal beam, longitudinal movement coaster mandrel is threaded through the lower part of multiple transverse shifting coasters, fixture lifting electricity The output end of machine is connect with one end of longitudinal movement coaster mandrel;
Longitudinal traction motor is mounted on longitudinal beam, and the length direction of two longitudinal traction sprocket wheels beam along longitudinal direction is mounted on vertical To the both ends of beam, the output end of longitudinal traction motor is connect with third sprocket wheel, third sprocket wheel and one of longitudinal traction sprocket wheel Between by longitudinal movement chain connection, connected by longitudinal traction chain between two longitudinal traction sprocket wheels, each laterally shifting The lower end of fly block is connect by steel cable with the clamp assembly for going up and down grabbing device.
Further, gripper assembly further includes multiple fixture cross bars, and multiple fixture cross bars are from top to bottom sequentially arranged at folder Have on bar.
The utility model has the effect that compared with prior art
1, the synchronism of the utility model is good, stable efficient: due to the lateral operation rail of the utility model highest point Road is by house beam quantitative design, and the spacing of house beam is mostly 6 meters or so, therefore in 100 meters long of strip foam operation workshop 16 towing points are had, as tractating bar drives traction chain to be rotated, 16 towing points and suspension centre are simultaneously by same power Traction, entire long queue shape hanging device can accomplish while transverse shifting, ensure that synchronous and stablizes, if using common hanging Hanging device, since the quantity and suspension centre quantity of hanging are all less, generally only 2-3, and suspension centre is few, elongated fixture must have There is the higher skeleton structure of intensity, to make skeleton structure intensity high, materials must be coarse thick and heavy, thus causes common hanging Effective elongated fixture weight, the elongated fixture than the utility model weighs more than twice.Hanging is independently mounted at close to workshop On the rail that two sides are added, when being connected to run signal, all there is a small time difference, elongated fixture in the starting of each hanging Upper some starting meeting vibration wave direction other end transmitting as caused by starting, shakes entire stone tongs during traveling Endlessly, and plus fixture is heavier shock range being exacerbated, this had both caused the bad operation of drop point of the strip bulk foam of lifting, Security risk is increased again.Have to it is slow in seek to stable, and the hanging device of the utility model using transverse shifting, longitudinal movement and The structure of multiple suspension centres, compared to common hanging rapidly and efficiently, safety and stability.
2, compact-sized, saving storage space of the utility model: in original three kinds of transmission modes, the first is will be rigid The strip foam bulk of transporting chain plate is cut into small pieces (length is generally 1.5 meters -3 meters) at once and then solidifies after being transported to trolley out Section uniformly separated static solidification takes up a large area, and due to being that fritter is separated in the cross-sectional area that foam is cut Domain can generate obvious destruction of edition type in static solidification section, and the effective dimensions of foam will receive influence, generate biggish wave Take.The stacking storage of fritter foam after solidification is also very time-consuming and laborious, and occupied area is also stored up compared with the stacking of strip foam bulk Depositing will greatly much, because to reserve fork truck channel, foam has once been cut into fritter, and size can not be changed, if necessary to special ruler Very little or strip foamed material (both foam coiled materials) it will cause big waste or can not be accomplished, and the use for reducing foam is used On the way.Current this mode is just gradually banned.Second method is to lift strip foam bulk, the fortune of hanging using common hanging Row track is sitting on two rails, this two rails are either still in the vertical of the workshop framework of exacerbation on newly-increased column The space that certain workshop two sides can be all wasted on column, there are also hangings itself and lifting all to have certain altitude, the two height The mutually distance added with nearly two meters or so is compared with the lifting of design equipment, and available height space reduces 1.5 meters of left sides It is right.The third method is railcar mode, and the product for the width that the length of railcar can be moved in parallel with it is newly-increased accounts for Ground area.Shelf storing method also occupies more spaces than stacking storing method simultaneously, and entire use space is approximately 3 times of the design On.Therefore the integrated use of various movements can be utilized use space to greatest extent, accomplished by the hanging device of the utility model In the case where equal efficiency, use space is minimum.
3, the manufacturing expense of the utility model is low: comparing with common hanging, since the utility model makes full use of genuine factory The bearing capacity of room house beam does not need sturdy thick and heavy frame structure, does not need operation rail, does not need corresponding rail support knot Structure does not need hanging and lifting cucurbit costly, therefore its comprehensive cost is only equivalent to the one third of common hanging equipment, It is compared with railcar mode, price advantage then becomes apparent.Due to not needing expensive railcar and corresponding greatly across running track, Block frame can be stored up by not needing a fairly large number of cut with disengaging, and the comprehensive cost of the stone tongs of the design is railcar mode 1/20th.
Detailed description of the invention
Fig. 1 is the overall structure main view of the utility model;Fig. 2 is the side view of Fig. 1.
Specific embodiment
Specific embodiment 1: illustrate present embodiment in conjunction with Fig. 1 to Fig. 2, present embodiment include horizontal mobile device, Longitudinal moving device and lifting grabbing device, horizontal mobile device are mounted in workshop along its length, longitudinal moving device edge Workshop width direction is movably mounted to the lower end of horizontal mobile device, and lifting grabbing device is mounted under longitudinal moving device End;
Lifting grabbing device include main lead screw driving motor 24, lifting crawl motor drive wheel 23, lifting crawl chain 22, Main lead screw transmission wheel 21, main lead screw 11, fixture crossbeam 10 and multiple clamp assemblies, 10 liftable of fixture crossbeam are lifted on longitudinal shifting The lower end of dynamic device, main lead screw 11 are threaded through in fixture crossbeam 10, and multiple clamp assemblies are equidistantly mounted on main lead screw 11, main Lead screw driving motor 24 is mounted on fixture crossbeam 10, the output end and lifting crawl motor drive wheel of main lead screw driving motor 24 23 connections, main lead screw transmission wheel 21 is mounted on main lead screw 11, lifting crawl motor drive wheel 23 and main lead screw transmission wheel 21 it Between by lifting crawl chain 22 connect;
Each clamp assembly includes fixture strutbeam 18, roll adjustment lead screw 13, commutator 12 and gripper assembly, fixture strutbeam 18 are mounted on the lower end of fixture crossbeam 10, and fixture strutbeam 18 is mounted in gripper assembly, and roll adjustment lead screw 13 is mounted on fixture strutbeam On 18, commutator 12 is sleeved on roll adjustment lead screw 13.
Specific embodiment 2: illustrating that present embodiment, the gripper assembly of present embodiment include folder in conjunction with Fig. 1 to Fig. 2 Tool 14, two clamp rods 15 of bar backplate and traveling wheel 19, clamp rod backplate 14 are movably mounted on main lead screw 11, traveling wheel 19 It is mounted in clamp rod backplate 14, two clamp rods 15 are oppositely arranged and connect with the lower end of clamp rod backplate 14.So set, It is easy to implement the crawl work to strip bulk foam.Other compositions and connection relationship are same as the specific embodiment one.
Specific embodiment 3: illustrating present embodiment, two 15 phases of clamp rod of present embodiment in conjunction with Fig. 1 to Fig. 2 To setting, and the distance between two clamp rods 15 from top to bottom successively decrease.So set, convenient for guaranteeing in crawl strip bulk bubble Prevent foam from falling when foam.Other compositions and connection relationship are the same as one or two specific embodiments.
Specific embodiment 4: illustrate present embodiment in conjunction with Fig. 1 to Fig. 2, two clamp rods 15 of present embodiment it Between distance from top to bottom successively decrease 0.5-1.5cm.So set, while can ensure against foam and fall, also maximum limit The deformation for reducing foam of degree.Other compositions and connection relationship are identical as specific embodiment one, two or three.
Specific embodiment 5: illustrate present embodiment in conjunction with Fig. 1 to Fig. 2, two clamp rods 15 of present embodiment Bottom face is equipped with horizontal shelf.So set, being lifted by crane convenient for providing a support for the lifting process of strip bulk foam When prevent grip not enough and caused by part foam fall.Other compositions and connection relationship and specific embodiment one, two, three or Four is identical.
Specific embodiment 6: illustrating present embodiment, the horizontal mobile device packet of present embodiment in conjunction with Fig. 1 to Fig. 2 Include more transverse beams 1, multiple pulleys 2, multiple transverse shifting coasters 3, transverse shifting coaster mandrel 4, transverse shifting traction electric machine 17,16, two transverse beam axis of traction of coaster driving chain sprocket and transverse shifting chain;
More transverse beams 1 are arranged side by side, and each transverse shifting coaster 3 passes through multiple cunnings for being mounted in a transverse beam 1 2 slidable connections are taken turns, are connected between multiple transverse shifting coasters 3 by transverse shifting coaster mandrel 4, transverse shifting traction electricity Machine 17 is fixedly mounted on workshop inner sidewall, and the output end of transverse shifting traction electric machine 17 passes through the first sprocket wheel and a wherein cross Axis connection is drawn to beam, the length direction of two transverse beam axis of traction transversely beam 1 is mounted on the both ends of transverse beam 1, two cross It is separately installed with second sprocket wheel to beam axis of traction, is connected between two the second sprocket wheels by transverse shifting chain, is laterally moved Dynamic chain passes through transverse shifting coaster 3 and connect with transverse shifting coaster 3.So set, being easy to implement lifting strip bulk bubble Transverse shifting after foam.Other compositions and connection relationship and specific embodiment one, two, three or four are identical.
Specific embodiment 7: illustrating present embodiment, the longitudinal moving device packet of present embodiment in conjunction with Fig. 1 to Fig. 2 It includes longitudinal beam 5, multiple longitudinal beam pulleys 6, multiple longitudinal movement coasters 7, longitudinal movement coaster mandrel 8, more wirerope 9, indulge To traction electric machine 29,26, two longitudinal traction sprocket wheels 27 of longitudinal traction chain, longitudinal movement chain 28 and fixture lifting motor 25;
Longitudinal beam 5 is mounted on the lower end of multiple transverse shifting coasters 3, and movable block 7 passes through multiple longitudinal beams longitudinally in each Pulley 6 is movably mounted on longitudinal beam 5, and longitudinal movement coaster mandrel 8 is threaded through the lower part of multiple transverse shifting coasters 3, folder The output end for having lifting motor 25 is connect with one end of longitudinal movement coaster mandrel 8;
Longitudinal traction motor 29 is mounted on longitudinal beam 5, two longitudinal traction sprocket wheels 27 along longitudinal direction beam 5 length direction peace Mounted in the both ends of longitudinal beam 5, the output end of longitudinal traction motor 29 is connect with third sprocket wheel, third sprocket wheel and one of longitudinal direction It is connected between driving chain sprocket 27 by longitudinal movement chain 28, passes through longitudinal traction chain 26 between two longitudinal traction sprocket wheels 27 The lower end of connection, each transverse shifting coaster 3 is connect by steel cable 9 with the clamp assembly for going up and down grabbing device.So Setting, the longitudinal movement after driving lifting strip foam, while passing through the liter of the drive lifting grabbing device of fixture lifting motor 25 Drop movement.Other compositions and connection relationship and specific embodiment one, two, three or four are identical.
Specific embodiment 8: illustrating that present embodiment, the gripper assembly of present embodiment further include in conjunction with Fig. 1 to Fig. 2 Multiple fixture cross bars 20, multiple fixture cross bars 20 are from top to bottom sequentially arranged on clamp rod 15.So set, being entire strip Bulk foam provides a total lateral support, guarantees the stability of lifting.Other compositions and connection relationship and specific embodiment party Formula one, two, three or four are identical.
Working principle of the utility model is:
In the production process of horizontal continuous soft polyurethane foam, the mixture after stirring flows on base stock from mixing head, Base stock support mixed liquor be transmitted carrier bar be transported to sizing channel in.In channel, mixed liquor starting sizing becomes one Constantly forward strip rectangle foam bulk, as long as mixture continues to flow out mixing head, transporting chain plate long enough, it can always to Preceding operation, when strip foam bulk can not continue to extend, must just be used since workshop is limited according to workshop place and foam Concrete condition when strip foam bulk is reached suitable length (generally 50-100 a meter), carry out severing.Then have One hanging device or conveying equipment will cut out lower foam bulk and remove and place appropriate, and then equipment return is again etc. next Continue to move it to designated position after the foam severing of specific length.It loops back and forth like this, until foaming process terminates.
The safe and efficient strip bulk foam hanging device of the utility model is exactly used for use above, its overall structure As depicted in figs. 1 and 2.Its course of work is as follows:
Entire stone tongs is moved to by the driving of transverse beam coaster traction electric machine 17 and longitudinal beam traction electric machine 29 Then the surface of strip foam bulk to be removed passes through the driving of fixture lifting motor 25, putting down wirerope 9 presss from both sides elongated Tool straddles in strip foam bulk, opens main lead screw driving motor 24 and main lead screw 11 is driven to rotate.Main lead screw 11 passes through commutation Device 12 drives roll adjustment lead screw 13, and roll adjustment lead screw 13 drives clamp rod inwardly to move, until strip foam bulk is clamped.Again by leading Lead screw driving motor 24 drives wirerope 9, makes the elongated fixture uplink of entrained bubbles bulk, is drawn respectively by transverse beam coaster The designated position that is transported to of foam bulk fast and steady is carried out wirerope 9 by the cooperation driving of motor 17 and longitudinal beam traction electric machine The corresponding operatings such as downlink and release fixture, strip foam bulk is put down, then carries out lifting work next time, Zhi Daofa again Bubble terminates.

Claims (8)

1. a kind of hanging apparatus for strip bulk foam, it is characterised in that: it includes horizontal mobile device, longitudinal movement dress Grabbing device is set and goes up and down, horizontal mobile device is mounted in workshop along its length, and longitudinal moving device is along workshop width side To the lower end for being movably mounted to horizontal mobile device, the lower end that grabbing device is mounted on longitudinal moving device is gone up and down;
Lifting grabbing device includes main lead screw driving motor (24), lifting crawl motor drive wheel (23), lifting crawl chain (22), main lead screw transmission wheel (21), main lead screw (11), fixture crossbeam (10) and multiple clamp assemblies, fixture crossbeam (10) can rise Drop is lifted on the lower end of longitudinal moving device, and main lead screw (11) is threaded through in fixture crossbeam (10), and multiple clamp assemblies are equidistant It is mounted on main lead screw (11), main lead screw driving motor (24) is mounted on fixture crossbeam (10), main lead screw driving motor (24) Output end with lifting crawl motor drive wheel (23) connect, main lead screw transmission wheel (21) is mounted on main lead screw (11), go up and down It is connect between crawl motor drive wheel (23) and main lead screw transmission wheel (21) by lifting crawl chain (22);
Each clamp assembly includes fixture strutbeam (18), roll adjustment lead screw (13), commutator (12) and gripper assembly, fixture strutbeam (18) it is mounted on the lower end of fixture crossbeam (10), fixture strutbeam (18) is mounted in gripper assembly, and roll adjustment lead screw (13) is mounted on On fixture strutbeam (18), commutator (12) is sleeved on roll adjustment lead screw (13).
2. a kind of hanging apparatus for strip bulk foam according to claim 1, it is characterised in that: gripper assembly packet It includes clamp rod backplate (14), two clamp rods (15) and traveling wheel (19), clamp rod backplate (14) and is movably mounted to main lead screw (11) on, traveling wheel (19) is mounted in clamp rod backplate (14), two clamp rods (15) be oppositely arranged and with clamp rod backplate (14) lower end connection.
3. a kind of hanging apparatus for strip bulk foam according to claim 2, it is characterised in that: two clamp rods (15) it is oppositely arranged, and the distance between two clamp rods (15) are from top to bottom successively decreased.
4. a kind of hanging apparatus for strip bulk foam according to claim 3, it is characterised in that: two clamp rods The distance between (15) 0.5-1.5cm that from top to bottom successively decreases.
5. a kind of hanging apparatus for strip bulk foam according to claim 4, it is characterised in that: two clamp rods (15) bottom face is equipped with horizontal shelf.
6. a kind of hanging apparatus for strip bulk foam according to claim 5, it is characterised in that: transverse shifting dress It sets including more transverse beams (1), multiple pulleys (2), multiple transverse shifting coasters (3), transverse shifting coaster mandrel (4), transverse direction Mobile traction electric machine (17), coaster driving chain sprocket (16), two transverse beam axis of traction and transverse shifting chain;
More transverse beams (1) are arranged side by side, and each transverse shifting coaster (3) is multiple on a transverse beam (1) by being mounted on Pulley (2) slidable connection is connected between multiple transverse shifting coasters (3), transverse shifting by transverse shifting coaster mandrel (4) Traction electric machine (17) is fixedly mounted on workshop inner sidewall, the output end of transverse shifting traction electric machine (17) by the first sprocket wheel with Axis connection is drawn in wherein transverse beam, and the length direction of two transverse beam axis of traction transversely beam (1) is mounted on transverse beam (1) Both ends, two transverse beam axis of traction are separately installed with second sprocket wheel, pass through transverse shifting chain between two the second sprocket wheels Item connection, transverse shifting chain pass through transverse shifting coaster (3) and connect with transverse shifting coaster (3).
7. a kind of hanging apparatus for strip bulk foam according to claim 6, it is characterised in that: longitudinal movement dress It sets including longitudinal beam (5), multiple longitudinal beam pulleys (6), multiple longitudinal movement coasters (7), vertically move coaster mandrel (8), more Root wirerope (9), longitudinal traction motor (29), longitudinal traction chain (26), two longitudinal traction sprocket wheels (27), longitudinal movement chain Item (28) and fixture lifting motor (25);
Longitudinal beam (5) is mounted on the lower end of multiple transverse shifting coasters (3), and movable block (7) passes through multiple longitudinal directions longitudinally in each Beam pulley (6) is movably mounted on longitudinal beam (5), and longitudinal movement coaster mandrel (8) is threaded through multiple transverse shifting coasters (3) Lower part, the output end of fixture lifting motor (25) connect with one end of longitudinal movement coaster mandrel (8);
Longitudinal traction motor (29) is mounted on longitudinal beam (5), the length side of two longitudinal traction sprocket wheels (27) beam (5) along longitudinal direction To the both ends for being mounted on longitudinal beam (5), the output end of longitudinal traction motor (29) is connect with third sprocket wheel, third sprocket wheel with wherein It is connected between one longitudinal traction sprocket wheel (27) by longitudinal movement chain (28), is passed through between two longitudinal traction sprocket wheels (27) The lower end of longitudinal traction chain (26) connection, each transverse shifting coaster (3) passes through steel cable (9) and lifting grabbing device Clamp assembly connection.
8. a kind of hanging apparatus for strip bulk foam according to claim 2 or 7, it is characterised in that: clamping group Part further includes multiple fixture cross bars (20), and multiple fixture cross bars (20) are from top to bottom sequentially arranged on clamp rod (15).
CN201821151896.3U 2018-07-19 2018-07-19 A kind of hanging apparatus for strip bulk foam Active CN208648576U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821151896.3U CN208648576U (en) 2018-07-19 2018-07-19 A kind of hanging apparatus for strip bulk foam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821151896.3U CN208648576U (en) 2018-07-19 2018-07-19 A kind of hanging apparatus for strip bulk foam

Publications (1)

Publication Number Publication Date
CN208648576U true CN208648576U (en) 2019-03-26

Family

ID=65785296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821151896.3U Active CN208648576U (en) 2018-07-19 2018-07-19 A kind of hanging apparatus for strip bulk foam

Country Status (1)

Country Link
CN (1) CN208648576U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112551344A (en) * 2020-12-21 2021-03-26 山东中清智能科技股份有限公司 Lifting mechanism of ice block gripping apparatus
CN113830663A (en) * 2021-11-29 2021-12-24 山东绅联药业有限公司 Special hoisting equipment with adjusting capacity

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112551344A (en) * 2020-12-21 2021-03-26 山东中清智能科技股份有限公司 Lifting mechanism of ice block gripping apparatus
CN113830663A (en) * 2021-11-29 2021-12-24 山东绅联药业有限公司 Special hoisting equipment with adjusting capacity

Similar Documents

Publication Publication Date Title
CN208648576U (en) A kind of hanging apparatus for strip bulk foam
CN108688875B (en) Elevator guide rail packaging production line
CN110883559B (en) Coil stock cutting device
CN202245352U (en) Green brick clamping and stacking system with intelligent robot
CN111807210A (en) Special crane for carrying steel coils
CN202575250U (en) Material vertical-lift conveyer
CN108972861A (en) A kind of wallboard production line
CN201959914U (en) Slurry scraping machine for surface coating of EPS (expanded polystyrene) line member
CN112777329A (en) Reciprocating vertical conveyor
CN201659634U (en) Curbstone production line
CN210650901U (en) Foam cutting machine
JPH039843B2 (en)
CN109112963A (en) A kind of bridge hoisting equipment
CN209224272U (en) A kind of wallboard production line
CN207129670U (en) A kind of glass conveyer belt
CN106426539B (en) Without supporting plate Intelligentized automatic production line
CN206154767U (en) Molding machine mold platform positioning element
CN201483640U (en) Hanging column production line
US7921985B2 (en) Conveying method for artificial stone process
CN210028109U (en) Magnetic core production is with packagine machine
CN210418251U (en) Automatic arrangement marshalling device
CN104647116B (en) Equipment for metal plate cutting machine auxiliary feeding
CN209585763U (en) A kind of vehicle conveying device
CN209585751U (en) A kind of vehicle conveying device
CN105501623B (en) A kind of aerated concrete products transferring pallet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant