CN208633131U - Building foundation pit precipitation recycling device - Google Patents

Building foundation pit precipitation recycling device Download PDF

Info

Publication number
CN208633131U
CN208633131U CN201821256773.6U CN201821256773U CN208633131U CN 208633131 U CN208633131 U CN 208633131U CN 201821256773 U CN201821256773 U CN 201821256773U CN 208633131 U CN208633131 U CN 208633131U
Authority
CN
China
Prior art keywords
water
foundation pit
settling pond
control valve
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821256773.6U
Other languages
Chinese (zh)
Inventor
裴畅荣
潘辰荣
韩学礼
许园林
宁志军
郎永强
土文艳
王运
申鸣
申一鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Construction Investment Group Co Ltd
Original Assignee
Shanxi Construction Investment Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Construction Investment Group Co Ltd filed Critical Shanxi Construction Investment Group Co Ltd
Priority to CN201821256773.6U priority Critical patent/CN208633131U/en
Application granted granted Critical
Publication of CN208633131U publication Critical patent/CN208633131U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a kind of building foundation pit precipitation recycling devices, belong to technical field of building construction, provide a kind of underground water that can effectively recycle in foundation pit, for fire-fighting, the building foundation pit precipitation recycling device of construction and domestic water, used technical solution be include the water tank and second-level settling pond for being embedded in the first stage precipitation tank of underground and ground being set, suction pump is provided in first stage precipitation tank, suction pump is connected by pipeline with second-level settling pond, the top exit of second-level settling pond is connected with water tank, the bottom of water tank is provided with outlet pipe, pressure pump is installed on outlet pipe, the water outlet of pressure pump is connected by forcing pipe with pressurized canister, branch pipe is provided on forcing pipe, the water outlet of pressurized canister is provided with the first control valve, pressure gauge is provided in pressurized canister, the water inlet of pressure pump The second control valve and third control valve are respectively arranged with water outlet;The utility model is widely used in groundwater treatment in building foundation pit.

Description

Building foundation pit precipitation recycling device
Technical field
The utility model relates to a kind of building foundation pit precipitation recycling devices, belong to technical field of building construction.
Background technique
Water is the essential energy of human survival, and restricts the valuable source of today's society economic development.China is The country of one more water shortage, the world water resource of per capita Jin Zhan per capita 1/4.Drought and water shortage, flood and water environment are disliked Changing becomes China faces three big water problems together and constrains the sustainable development of economic growth and society to a certain extent Exhibition.
The research and development of underground water recycling facility system are target to push Green Development, sustainable development, around raising The level of resources utilization reduces pollutant emission, captures environmental pollution, and the key of energy saving, water-saving, comprehensive utilization of resources etc. is total Property technology, to build a resource-conserving society, improving the ecological environment, developing a circular economy provides technical support.
Currently, needing excavation pit during construction, bottom surface is excavated when level of ground water is higher than, underground water can not It is disconnected to penetrate into hole.Existing mode mainly passes through base pit dewatering and handles underground water, in this way to underground water It causes to waste.Effective use how is carried out to it has become the problem of people constantly pay close attention in recent years.By to groundwater reclaim, The waste of water resource can be not only avoided to a certain extent, mitigated municipal ductwork pressure, can also be solved to a certain extent The impurity adulterated in underground water pollutes the problem of with blocking.
Utility model content
To solve technical problem of the existing technology, the utility model provides one kind and can effectively recycle in foundation pit Underground water, the building foundation pit precipitation recycling device for fire-fighting, construction and domestic water.
To achieve the above object, technical solution used by the utility model is building foundation pit precipitation recycling device, Including being embedded in the first stage precipitation tank of underground and the water tank and second-level settling pond on ground being arranged in, the second-level settling pond is located at The top of water tank, suction pump is provided in the first stage precipitation tank, and the suction pump is connected by pipeline with second-level settling pond Logical, the top exit of the second-level settling pond is connected with water tank, and the bottom of the water tank is provided with outlet pipe, it is described out Pressure pump is installed, the water outlet of the pressure pump is connected by forcing pipe with pressurized canister, the forcing pipe on water pipe On be provided with the branch pipe connecting with user pipe, the water outlet of the pressurized canister is provided with the first control valve, is arranged in pressurized canister There is pressure gauge, the inlet and outlet of the pressure pump are respectively arranged with the second control valve and third control valve, the pumping Water pump, pressure pump, the first control valve, pressure gauge, the second control valve and third control valve are connected with control cabinet.
Preferably, the top of water tank is provided with overflow port, and the overflow port is connected with first stage precipitation tank, the overflow It is provided with flowmeter on mouthful, the flowmeter is connected with control cabinet.
Preferably, the height of the second-level settling pond is 10m at least higher than the height of water tank.
Preferably, the pressure pump uses light-duty vertical type centrifugal multistage pump multiple centrifugal pump.
Preferably, the first stage precipitation tank is made using glass reinforced plastic, and second-level settling pond and water tank are all made of stainless Steel or steel plate are welded, and the pressurized canister is welded using the steel bushing of 3mm thickness, and the quantity of pressurized canister is 2.
Compared with prior art, the utility model has following technical effect that the utility model structure is simple, user Just, by by building foundation pit underground water carry out Multistage settling processing, be then stored in water tank, need using when pass through Pressure pump supplies water, and effectively increases the utilization rate of underground water, improves the utilization rate of water resource.And it uses and adds when supplying water Pressure tank supplies water, effectively save electric energy, and operating cost is low.
In addition, in this way dewatering operation can also be carried out to foundation pit, new approaches are provided for base pit dewatering.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the attachment structure schematic diagram of pressurized canister in the utility model.
Specific embodiment
In order to which technical problem to be solved in the utility model, technical solution and beneficial effect is more clearly understood, with Lower combination accompanying drawings and embodiments, the present invention will be further described in detail.It should be appreciated that specific reality described herein It applies example to be only used to explain the utility model, is not used to limit the utility model.
As shown in Figure 1 and Figure 2, building foundation pit precipitation recycling device, including be embedded in underground first stage precipitation tank 1 and The water tank 2 and second-level settling pond 3 on ground are set, and second-level settling pond 3 is located at the top of water tank 2, is arranged at water storage The position of box top 10m high, suction pump 4 is provided in first stage precipitation tank 1, and suction pump 4 is connected by pipeline with second-level settling pond 3 Logical, the top exit of second-level settling pond 3 is connected with water tank 2, and the bottom of water tank 2 is provided with outlet pipe 5, on outlet pipe 5 Pressure pump 6 is installed, the water outlet of pressure pump 6 is connected by forcing pipe 7 with pressurized canister 8, be provided on forcing pipe 7 and The branch pipe 9 of user pipe connection, the water outlet of pressurized canister 8 are provided with the first control valve 10, are provided with pressure gauge in pressurized canister 8 11, the inlet and outlet of pressure pump 6 are respectively arranged with the second control valve 12 and third control valve 13, suction pump 4, pressurization Water pump 6, the first control valve 10, pressure gauge 11, the second control valve 12 and third control valve 13 are connected with control cabinet 14.
Wherein, the top of water tank 2 is additionally provided with overflow port 15, and overflow port 15 is connected with first stage precipitation tank 1, overflow port Flowmeter 16 is provided on 15, flowmeter 16 is connected with control cabinet 14.Overflow port is full to water tank water apart from case top 200mm Automatic overflow flows directly into first stage precipitation tank 1 afterwards, while flowmeter generates flow signal, and suction pump is closed in control cabinet control.
First stage precipitation tank is made using glass reinforced plastic in the utility model, and second-level settling pond and water tank are all made of stainless Steel or steel plate are welded, and pressurized canister is welded using the steel bushing of 3mm thickness, and the quantity of pressurized canister is 2.Pressure pump Using light-duty vertical type centrifugal multistage pump multiple centrifugal pump.
When specifically used, the first step, by backflow of underground water in foundation pit to first stage precipitation tank, first stage precipitation tank uses glass reinforced plastic Production is directly embedded in underground, to be precipitated to be recovered to second-level settling pond by suction pump afterwards.
Second step, the water in second-level settling pond enter water tank by water outlet, and water storage lower box part is installed downcomer, is lauched Pipe is connect with light-duty vertical type centrifugal multistage pump multiple centrifugal pump.
Third step, centrifugal pump water outlet are directly accessed pressurized canister using PPR pipe road, and pressurized canister uses the steel bushing after 3mm Two sides welding steel is made, and specific length is not less than 1.2 meters, and diameter is not less than 500mm, and end is using PPR pipe road and adds Press the connection of tank water inlet.Pressurized canister quantity is 2, installs pressure gauge and electric power starting device at an upper portion thereof.Electric power starting device It is controlled, usually 6.5 megapascal, can also be adjusted as needed by pressure gauge reading index.
4th step flows back into another water outlet in the PPR pipe road, then branch by the water resource after pressurized canister secondary pressurized Access fire demand water pipeline, construction site spray system pipeline, toilet spray system pipeline and domestic water line.To pressure When meter reading is greater than 6.5 megapascal, electric power starting device is closed, and centrifugal multistage pump multiple centrifugal pump stops working, and engineering life, industrial water are main It supplies water by pressurized canister.But when pressure gauge reading drops to 6.5 megapascal or less, electric power starting device starts, at this moment centrifugal multistage pump multiple centrifugal pump It starts to work, to guarantee that construction life, industrial water are normally carried out.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should all wrap in the utility model model within the spirit and principle of utility model In enclosing.

Claims (5)

1. building foundation pit precipitation recycling device, it is characterised in that: first stage precipitation tank and setting including being embedded in underground exist The water tank and second-level settling pond on ground, the second-level settling pond are located at the top of water tank, setting in the first stage precipitation tank There is suction pump, the suction pump is connected by pipeline with second-level settling pond, the top exit and water storage of the second-level settling pond Case is connected, and the bottom of the water tank is provided with outlet pipe, and pressure pump, the pressure pump are equipped on the outlet pipe Water outlet be connected by forcing pipe with pressurized canister, the branch pipe connecting with user pipe is provided on the forcing pipe, it is described The water outlet of pressurized canister is provided with the first control valve, is provided with pressure gauge in pressurized canister, the water inlet of the pressure pump and goes out The mouth of a river is respectively arranged with the second control valve and third control valve, the suction pump, pressure pump, the first control valve, pressure gauge, Two control valves and third control valve are connected with control cabinet.
2. building foundation pit precipitation recycling device according to claim 1, it is characterised in that: the top of water tank is arranged There is overflow port, the overflow port is connected with first stage precipitation tank, and flowmeter, the flowmeter and control are provided on the overflow port Cabinet processed is connected.
3. building foundation pit precipitation recycling device according to claim 1, it is characterised in that: the second-level settling pond Height is 10m at least higher than the height of water tank.
4. building foundation pit precipitation recycling device according to claim 1, it is characterised in that: the pressure pump uses Light-duty vertical type centrifugal multistage pump multiple centrifugal pump.
5. building foundation pit precipitation recycling device according to claim 1, it is characterised in that: the first stage precipitation tank is adopted It is made with glass reinforced plastic, second-level settling pond and water tank is all made of stainless steel or steel plate is welded, the pressurized canister uses The steel bushing of 3mm thickness is welded, and the quantity of pressurized canister is 2.
CN201821256773.6U 2018-08-06 2018-08-06 Building foundation pit precipitation recycling device Expired - Fee Related CN208633131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821256773.6U CN208633131U (en) 2018-08-06 2018-08-06 Building foundation pit precipitation recycling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821256773.6U CN208633131U (en) 2018-08-06 2018-08-06 Building foundation pit precipitation recycling device

Publications (1)

Publication Number Publication Date
CN208633131U true CN208633131U (en) 2019-03-22

Family

ID=65740475

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821256773.6U Expired - Fee Related CN208633131U (en) 2018-08-06 2018-08-06 Building foundation pit precipitation recycling device

Country Status (1)

Country Link
CN (1) CN208633131U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110093930A (en) * 2019-05-21 2019-08-06 中国葛洲坝集团第一工程有限公司 Base pit engineering energy-saving and emission-reduction water system and method for supplying water

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110093930A (en) * 2019-05-21 2019-08-06 中国葛洲坝集团第一工程有限公司 Base pit engineering energy-saving and emission-reduction water system and method for supplying water

Similar Documents

Publication Publication Date Title
CN204001088U (en) A kind of building rainwater and daily life sewage intermediate water reuse system
JP6873444B2 (en) A system that uses the energy storage pipes of multiple high-rise buildings to generate electricity
CN208168933U (en) A kind of buried Underwater Traffic Tunnel wastewater disposal basin dischargeable capacity optimization structure of Mining Method
CN208633131U (en) Building foundation pit precipitation recycling device
CN105887966A (en) Domestic water-saving system
CN205242500U (en) System of recycling that handles is collected to rainwater
CN208787174U (en) A kind of percolate and biogas joint guide system
CN206607654U (en) The vacuum collecting and processing unit of a kind of house refuse
CN205862244U (en) Pulp-water device is taken out in a kind of wine brewing automatically
CN206069599U (en) A kind for the treatment of of dyeing wastewater equipment
CN202390881U (en) Device for recycling rainwater and field-produced waste water
CN213143304U (en) Along river village domestic sewage negative pressure separation collecting system
CN205100292U (en) Prefabricated pump station with self - cleaning function
CN201554067U (en) Water power automatic control pipe network pressure-superposed water supply equipment
CN201190160Y (en) Methane pool for automatic isolation of floating slag and broken shell
CN207295964U (en) A kind of horizontal prefabricated pumping plant of integration
CN210658529U (en) Integrated horizontal axial-flow pump station
CN202531240U (en) Wind pressure drainage device for long and large tunnel
CN201704734U (en) Municipal network and homemade well sharing water supply system
CN204983125U (en) Dirty confluence pump station of integration rain
CN205838597U (en) Nitrogen fertilizer plant's fertilizer heap penetrant collects recovery system
CN214693625U (en) Automatic underground water extraction and chemical oxidation repair and injection integrated system
CN2134517Y (en) Efficience negative pressure pumping apparatus
CN205116382U (en) Prefabricated pump station of integration with deodorizing device
CN211037129U (en) Alternating waste water recovery bath water tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190322