- CN204983125U CN204983125U CN201520653187.5U CN201520653187U CN204983125U CN 204983125 U CN204983125 U CN 204983125U CN 201520653187 U CN201520653187 U CN 201520653187U CN 204983125 U CN204983125 U CN 204983125U
- Authority
- CN
- China
- Prior art keywords
- tank body
- daily
- blowdown
- rainwater
- pumping plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
Dirty confluence pump station of integration rain, including the blowdown drum body, sewage pipes, trunk line and the main jar of body, the blowdown drum body sets up in main jar internal bottom, blowdown drum body bottom with main jar of body bottom links to each other, the internal bottom of blowdown drum is provided with daily dredge pump, sewage pipes one end is in the internal portion of blowdown drum to be connected with daily dredge pump, other end access trunk line, trunk line upper portion is provided with the delivery port, the trunk line is prefabricated pump station trunk line. The utility model discloses simple structure, convenient operation really accomplishes to collaborate the pump station, the reposition of redundant personnel is discharged, has both practiced thrift the energy, has also prolonged the life of equipment.
Description
Technical field
The utility model belongs to plumbing technical field, is specifically related to integrated confluence of rainwater and sewage pumping plant.
Background technology
Integrated prefabricated pumping plant is turn-key project, usually adopts the glass steel material of advanced thickening type intermediate density to make.Be a kind of easy to use, reliable in quality, construction work is few, lower-cost novel all-in-one equipment of pumping station, and volume optimization is its most significant feature.Be widely used in municipal engineering, industry or other all can not rely on Action of Gravity Field directly the building of discharge of wastewater to sewage disposal system.Wherein, municipal drainage is applicable to the midway pumping plants such as sewage pumping station, drainage pumping plant, interflow pumping plant.Wherein confluence of rainwater and sewage pumping plant is by rainwater and the same pumping plant discharge of sewage intercepting well, configures multiple dredge pump, passes through sensor, the corresponding different water yields, start corresponding water pump, the object done like this is in the discharge of daily sewage and a large amount of rainwater, accomplishes the object of energy conservation.But, due to the restriction of the volume of pumping plant own, multistage water pump can not be settled, but meet the needs of rainwater peak value, therefore just may there is larger situation in the power of each water pump, and this is greater than the needs of daily effluent discharge, therefore just cause the waste of the energy, reduce the application life of equipment simultaneously.
Utility model content
For above-mentioned problems of the prior art, the utility model aims to provide that a kind of operating cost is low, the integrated confluence of rainwater and sewage pumping plant of long service life.
To achieve these goals, the utility model takes following technical scheme:
Integration confluence of rainwater and sewage pumping plant, comprises blowdown tank body, blow-off line, main pipeline and main tank body.
Described blowdown tank body is arranged on main tank body inner bottom part, and described blowdown tank base is connected with described main tank base.
Described blowdown tank body inner bottom part is provided with daily dredge pump, and daily dredge pump acceptor pumping station controlling system controls.
Described blow-off line one end is in blowdown tank interior and is connected with daily dredge pump, other end access main pipeline.
Described main pipeline top is provided with delivery port, and described main pipeline is prefabricated pumping plant main pipeline.After described blow-off line access main pipeline, by described delivery port water outlet.
Further, described blowdown tank interior is provided with pump hole, and described daily dredge pump is arranged in pump hole.
Further, described blowdown tank body adopts glass steel material.
Further, described blowdown tank body adopts stainless steel and carbon steel skeleton, glass fiber reinforced plastic tank body.
Further, described daily dredge pump adopts stainless steel, its blowdown flow rate be less than 100 cubes per hour.
Further, described blowdown drum body is positioned at main tank body inner bottom part center.
During use, daily sewage enters blowdown tank body, and daily dredge pump starts to start, and sewage enters main pipeline by blow-off line, is got rid of by delivery port.When the water yield that rainwater enters blowdown tank body exceedes the volume of blowdown tank body, too much sewage can spill in main tank body, and at this moment the large-scale sewage pump of main tank body starts and carries out drainage works.
The beneficial effects of the utility model are: structure is simple, easy to operate, really accomplish to collaborate pumping plant, shunting discharge.The design of canister meets the needs of daily effluent discharge, and large submersible sewage pump avoids idle state simultaneously, is immersed in sewage, holds flimsy problem, both saved the energy, also extend the application life of equipment.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Reference numeral: 1-blowdown tank body, the daily dredge pump of 2-, 3-blow-off line, 4-main pipeline, 5-delivery port, the main tank body of 6-.
Detailed description of the invention
For the ease of understanding, below in conjunction with accompanying drawing, by embodiment, technical solutions of the utility model are further described in detail:
As shown in Figure 1, integrated confluence of rainwater and sewage pumping plant, comprises blowdown tank body 1, daily dredge pump 2, blow-off line 3, main pipeline 4 and main tank body 6.
Blowdown tank body 1 is arranged on main tank body 6 inner bottom part, is positioned at main tank body 6 center, is connected bottom it with bottom main tank body 6.
Blowdown tank body 1 inner bottom part is provided with daily dredge pump 2.
Daily dredge pump 2 is provided with blow-off line 3, and blow-off line 3 one end is in blowdown tank body 1 inside and is connected with daily dredge pump 2, blow-off line 3 other end access main pipeline 4.
Daily dredge pump 2 is arranged in the pump hole of blowdown tank body 1 inside, is connected with blow-off line 3, and daily dredge pump 2 acceptor pumping station controlling system controls.
Main pipeline 4 is prefabricated pumping plant main pipeline, and main pipeline 4 top is provided with delivery port 5.After blow-off line 3 accesses main pipeline 4, by delivery port 5 water outlet.
Blowdown tank body 1 adopts glass steel material, and volume can design according to daily sewage quantity.Daily dredge pump 2 adopts stainless steel, blowdown flow rate be less than 100 cubes per hour.
During use, daily sewage enters blowdown tank body 1, and daily dredge pump 2 starts to start, and sewage enters main pipeline 4 by blow-off line 3, is got rid of by delivery port 5.When the water yield that rainwater enters blowdown tank body 1 exceedes the volume of blowdown tank body 1, too much sewage can spill in main tank body 6, and at this moment the large-scale sewage pump of main tank body 6 starts and carries out drainage works.
Above-described embodiment just illustrating or explaining technical solutions of the utility model, and the restriction that should not be construed as technical solutions of the utility model, obviously, those skilled in the art can carry out various modifications and variations to the utility model and not depart from spirit and scope of the present utility model.If these amendments and modification belong within the scope of the utility model claim and equivalent technologies thereof, then the utility model also comprises these amendment and modification.
Claims (6)
1. integrated confluence of rainwater and sewage pumping plant, comprise blowdown tank body, blow-off line, main pipeline and main tank body, described blowdown tank body is arranged on main tank body inner bottom part, described blowdown tank base is connected with described main tank base, described blowdown tank body inner bottom part is provided with daily dredge pump, described blow-off line one end is in blowdown tank interior and is connected with daily dredge pump, and other end access main pipeline, described main pipeline top is provided with delivery port.
2. integrated confluence of rainwater and sewage pumping plant according to claim 1, is characterized in that: described blowdown tank interior is provided with pump hole, and described daily dredge pump is arranged in pump hole.
3. integrated confluence of rainwater and sewage pumping plant according to claim 2, is characterized in that: described blowdown tank body adopts glass steel material.
4. integrated confluence of rainwater and sewage pumping plant according to claim 2, is characterized in that: described blowdown tank body adopts stainless steel and carbon steel skeleton, glass fiber reinforced plastic tank body.
5. integrated confluence of rainwater and sewage pumping plant according to claim 2, is characterized in that: described daily dredge pump adopts stainless steel, its blowdown flow rate be less than 100 cubes per hour.
6. the integrated confluence of rainwater and sewage pumping plant according to any one of claim 1-5, is characterized in that: described blowdown drum body is positioned at main tank body inner bottom part center.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520653187.5U CN204983125U (en) | 2015-08-27 | 2015-08-27 | Dirty confluence pump station of integration rain |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520653187.5U CN204983125U (en) | 2015-08-27 | 2015-08-27 | Dirty confluence pump station of integration rain |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204983125U true CN204983125U (en) | 2016-01-20 |
Family
ID=55117507
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520653187.5U Active CN204983125U (en) | 2015-08-27 | 2015-08-27 | Dirty confluence pump station of integration rain |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204983125U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108842905A (en) * | 2018-07-16 | 2018-11-20 | 合肥清原自控科技有限公司 | A kind of external integrated sewage disposal pumps external water storage device and its working method |
-
2015
- 2015-08-27 CN CN201520653187.5U patent/CN204983125U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108842905A (en) * | 2018-07-16 | 2018-11-20 | 合肥清原自控科技有限公司 | A kind of external integrated sewage disposal pumps external water storage device and its working method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105507410A (en) | Vacuum sewage collecting and treating system | |
CN105442668A (en) | Roof rainwater recycling system | |
CN105439379B (en) | A kind of domestic sewage treatment process | |
CN204983125U (en) | Dirty confluence pump station of integration rain | |
CN201376918Y (en) | Large-area hydrolytic acidification tank sludge removing device | |
CN203462518U (en) | Separating type prefabricated pump station | |
CN210528587U (en) | Cooperative application system for sewage treatment and sewage irrigation | |
CN205133375U (en) | Glass -tampered manure pit | |
CN202063751U (en) | Wastewater recycling device for water purifier | |
CN204918330U (en) | Imitate filtration type glass tempering manure pit by force | |
CN202594887U (en) | Aggregate-arranged sludge water treatment comprehensive facility | |
CN205348353U (en) | Sewage vacuum collection processing system | |
CN205100292U (en) | Prefabricated pump station with self - cleaning function | |
CN105198073A (en) | Integrated sewage treatment system | |
CN203755435U (en) | Integrated prefabricated pump station with large-rubbish removal function | |
CN206486408U (en) | A kind of low energy consumption, operator-less, module type sewage processing system | |
CN208633131U (en) | Building foundation pit precipitation recycling device | |
CN203296162U (en) | Buried prefabricated pump station | |
CN210974063U (en) | Novel water decanter | |
CN207738612U (en) | Improve three-grid septic tank | |
CN207016654U (en) | New explosion-proof septic tank | |
CN205170627U (en) | High effective microbe handles all -in -one | |
CN205689987U (en) | Wastewater influent pipeline decompressor | |
CN216336638U (en) | Combined sewage treatment device | |
CN213863830U (en) | Prevent municipal sludge temporary storage pond of bottom seepage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |