CN202531240U - Wind pressure drainage device for long and large tunnel - Google Patents

Wind pressure drainage device for long and large tunnel Download PDF

Info

Publication number
CN202531240U
CN202531240U CN2012201786272U CN201220178627U CN202531240U CN 202531240 U CN202531240 U CN 202531240U CN 2012201786272 U CN2012201786272 U CN 2012201786272U CN 201220178627 U CN201220178627 U CN 201220178627U CN 202531240 U CN202531240 U CN 202531240U
Authority
CN
China
Prior art keywords
tunnel
tank body
air compressor
storage tank
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201786272U
Other languages
Chinese (zh)
Inventor
彭雁兵
余俊
贾朝辉
任栓院
陈伟峰
武晓东
赵明
张晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Electrification Engineering Group Co Ltd
Original Assignee
China Railway Electrification Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Electrification Engineering Group Co Ltd filed Critical China Railway Electrification Engineering Group Co Ltd
Priority to CN2012201786272U priority Critical patent/CN202531240U/en
Application granted granted Critical
Publication of CN202531240U publication Critical patent/CN202531240U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a wind pressure drainage device for a long and large tunnel. The wind pressure drainage device comprises an air compressor gas storage tank and a tank body bracket, wherein a high pressure gas inlet pipe opening and a water inlet pipe opening are formed above a tank body of the air compressor gas storage tank 1; a water drainage pipe opening and a pollution discharging pipe opening are arranged below the tank body of the air compressor gas storage tank; and a gate valve is arranged on each pipe opening. A pressure gauge and a pressure releasing pipe are connected to the tank body of the air compressor gas storage tank. The wind pressure drainage device for the long and large tunnel, disclosed by the utility model, has the advantages as follows: a device is provided to change water drainage method of the long and large tunnel, so that the working efficiency is increased and water drainage cost in tunnel construction is reduced.

Description

The tunnel blast dewatering installation of growing up
Technical field:
The utility model relates to the drainage in the tunnel of growing up, and is specially the tunnel blast dewatering installation of growing up.
Background technology:
In the constructing tunnel, the existence owing to crevice water, underground water, covered conduit underground river etc. not only increases difficulty of construction, reduces efficiency of construction; Worsen construction environment,, cause the immersion of ponding country rock like untimely pump drainage; Reduce country rock intensity, tunnel structure is constituted a threat to, bring potential safety hazard.The constructing tunnel draining is a very important ring in the constructing tunnel work.
In the tunnel counter-slope construction more than 1 kilometer, owing to be counter-slope, water can't flow out from the tunnel voluntarily.Counter-slope tunnel drainage commonly used is to utilize one or more water pump series connection that water pump drainage to hole is effluxed water system discharging (meaning as shown in Figure 1) through the tunnel.Multistage draining is taked in the counter-slope draining; Every grade of draining length is about 300 meters; Be per 300 meters a catch basin is set, each catch basin is installed a foul water pump, through foul water pump from first order catch basin pump drainage to the second level catch basin;, to the third level water is expelled to outside the hole step by step by second level catch basin pump drainage.But along with deepening continuously of the constructing tunnel of growing up, draining length strengthens gradually, when length above 1 kilometer; After forming multistage draining; Common meeting is inconsistent because of draining beats at different levels, the reasons such as corrupted of water pump, causes drainage efficiency to reduce, and draining is untimely; Satisfied not the needs of draining, caused ponding in the tunnel and influence safety for tunnel engineering.And in multistage drainage procedure, the frequency that water pump damages is quite high, and when water yield was big in the tunnel, every two-stage catch basin even each catch basin just need send a workman to carry out continual drain operation, make the cost increase very big.
The utility model content:
The utility model will solve provides a kind of tunnel blast dewatering installation of growing up, and changes the operating type that multistage draining is taked in counter-slope draining now.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is:
The tunnel blast dewatering installation of growing up comprises air compressor air storage tank and tank body support, and air compressor air storage tank 1 tank body top is provided with the high pressure gas air inlet mouth of pipe and water inlet pipe mouth; Air compressor air storage tank tank body below is provided with the draining mouth of pipe and end-of-the-pipe, on each mouth of pipe gate valve is set.
Be connected with pressure meter on the said air compressor air storage tank tank body, and relief tube.
Use the utility model tunnel blast dewatering installation mode of growing up: a catch basin is being set from about 5 meters of tunnel tunnel face; With the ponding in the tunnel; Crevice water, underground water, the construction water ejectments such as cooling water that boring is used like excavation that comprise country rock in the hole to this catch basin, with a small pump with the water pump drainage through this device water inlet to tank body, in the tank body water completely after; Stop into water; Close the gate valve of water inlet pipe mouth, open delivery port mouth gate valve earlier after, open admission valve and utilize high-pressure blast that water punching press in the jar is discharged.High-pressure blast comes from air compressor machine outside the tunnel; Introduce in the tunnel through the high-pressure blast pipeline; Should be supplied to the air pressure gun pneumatic pick of face to use, it is to supply the equipment of tunnel excavation and supporting to use that high-pressure blast mainly acts on, and is applied to originally make the utility model draining just to utilize few part wherein.Because therefore blast, need not adopt multistage discharging much larger than the lift pressure of water pump; The single-stage draining just can be with outside the disposable discharge of water in the hole hole; And utilize the high-pressure blast punching press can water in the jar all be drained, comprise the impurity in the water, have residue hardly in jar.When if the pressure in the pressurized tank is excessive, opens the mouth of pipe that loses heart pressure is reduced; Clear up the regular gate valve of end-of-the-pipe is opened.Whole drainage procedure only needs a workman to monitor, and is easy and simple to handle, is prone to grasp.
The economic effect of the utility model: multistage dewatering installation commonly used, for the little tunnel of displacement, multistage drainage pattern commonly used, the about 5t of each hour draining, about 600 yuan of expense, the maintenance of make-up water pump etc. again, 20 yuan of water effluent costs promptly per ton.If the tunnel water yield is bigger, also need more powerful water pump, then expense is higher; Utilizing the draining of blast dewatering installation mainly is to utilize high-pressure blast; The sub-fraction wind that the used high-pressure blast that draws water just utilizes airduct to divide does not need independent consumes electric power, only needs artificial switch that carries out the gate valve of device; The high pressure pumping device that at present utilizes high pressure to draw water per hour can be discharged 120t; Expense is 360 yuan, adds upper level catch basin pump maintenance expense, about 3 yuan of water effluent cost per ton.Disposable input aspect, multistage draining and need many water pumps, power line and switchboxs, about 5000 yuan of disposable input, and blast drainage pattern, device is simple, easy making process, cost is 1000 yuan of less thaies, and is not fragile, can have enough to meet the need to recycle.Article one, grow up the tunnel according to 100,000 cubes of calculating of draining, adopt the blast draining can practice thrift 1,700,000 surplus yuan.
The good effect of the utility model is: a kind of device is provided, and the change of the tunnel drainage mode that realized growing up has improved operating efficiency, reduces constructing tunnel draining cost.
Description of drawings:
Fig. 1, counter-slope tunnel drainage system sketch map.
Fig. 2, the utility model tunnel blast dewatering installation structural representation of growing up.
The specific embodiment:
The tunnel blast dewatering installation of growing up of meaning as shown in Figure 1 comprises air compressor air storage tank 1 and tank body support 2, and air compressor air storage tank 1 tank body top is provided with the high pressure gas air inlet mouth of pipe 3 and water inlet pipe mouth 4; Air compressor air storage tank 1 tank body below is provided with the draining mouth of pipe 5 and end-of-the-pipe 8, on each mouth of pipe gate valve is set.Be connected with pressure meter 6 on said air compressor air storage tank 1 tank body, and relief tube 7.
The above record is merely the embodiment that utilizes the utility model technology contents, and modification, variation that any people who is familiar with this technology uses the utility model to do all belong to the claim that the utility model is advocated, and be not limited to embodiment.

Claims (2)

1. the tunnel blast dewatering installation of growing up comprises air compressor air storage tank (1) and tank body support (2), it is characterized in that: air compressor air storage tank (1) tank body top is provided with the high pressure gas air inlet mouth of pipe (3) and water inlet pipe mouth (4); Air compressor air storage tank (1) tank body below is provided with the draining mouth of pipe (5) and end-of-the-pipe (8), on each mouth of pipe gate valve is set.
2. the tunnel blast dewatering installation of growing up according to claim 1 is characterized in that: be connected with pressure meter (6) on said air compressor air storage tank (1) tank body, and relief tube (7).
CN2012201786272U 2012-04-24 2012-04-24 Wind pressure drainage device for long and large tunnel Expired - Fee Related CN202531240U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201786272U CN202531240U (en) 2012-04-24 2012-04-24 Wind pressure drainage device for long and large tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201786272U CN202531240U (en) 2012-04-24 2012-04-24 Wind pressure drainage device for long and large tunnel

Publications (1)

Publication Number Publication Date
CN202531240U true CN202531240U (en) 2012-11-14

Family

ID=47132430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201786272U Expired - Fee Related CN202531240U (en) 2012-04-24 2012-04-24 Wind pressure drainage device for long and large tunnel

Country Status (1)

Country Link
CN (1) CN202531240U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165673A (en) * 2017-05-18 2017-09-15 中铁隧道勘测设计院有限公司 A kind of buried Underwater Traffic Tunnel waste water Fractional Collections grading, lifting construction of Mining Method
CN112985741A (en) * 2021-02-07 2021-06-18 中国空气动力研究与发展中心超高速空气动力研究所 Piston type wind tunnel special gas inflation method utilizing compressed air power

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165673A (en) * 2017-05-18 2017-09-15 中铁隧道勘测设计院有限公司 A kind of buried Underwater Traffic Tunnel waste water Fractional Collections grading, lifting construction of Mining Method
CN107165673B (en) * 2017-05-18 2023-07-04 中铁第六勘察设计院集团有限公司 Mine method deep buried underwater traffic tunnel wastewater sectional collection and grading lifting structure
CN112985741A (en) * 2021-02-07 2021-06-18 中国空气动力研究与发展中心超高速空气动力研究所 Piston type wind tunnel special gas inflation method utilizing compressed air power
CN112985741B (en) * 2021-02-07 2022-05-10 中国空气动力研究与发展中心超高速空气动力研究所 Piston type wind tunnel special gas inflation method utilizing compressed air power

Similar Documents

Publication Publication Date Title
CN106595802A (en) Method of monitoring of underground water outside deep foundation pit, warning and automatic recharge construction
CN103541345A (en) Vacuum preloading method and vacuum preloading device for water-air separation
CN206290281U (en) A kind of mine gas extraction pipe negative pressure automatic drainage device
CN203146015U (en) Ascending drilling hole orifice drainage device
CN202531240U (en) Wind pressure drainage device for long and large tunnel
CN209354193U (en) Constructing tunnel moves pump drainage water installations
CN201722698U (en) Quick well sinking and water precipitating device
CN105040648A (en) Reservoir emptying tunnel for over 200-meter ultrahigh dam and arrangement method and application thereof
CN208633131U (en) Building foundation pit precipitation recycling device
CN214089939U (en) Foundation pit gas lift reverse circulation precipitation device
CN205297646U (en) Automatic water discharging device of gas drainage pipe remote control
CN204511793U (en) A kind of low water head energy collecting device
CN208793039U (en) A kind of cleaning of tunnel ponding utilizes device
CN211547778U (en) Centralized drainage system for water burst of subway station deep foundation pit step-by-step excavation
CN203891129U (en) Automatic water tower
CN203783548U (en) Movable compressor gas lift
CN210127460U (en) Water delivery pipeline installed on reservoir culvert pipe
CN203412625U (en) Underground coal mine drainage facility
CN203361128U (en) Exhaust and drainage device suitable for vacuum preloading foundation treatment
CN202391461U (en) Gas drainage tail-end system
CN202832648U (en) Water discharging device for coal mine thousand-meter drilling
CN208056080U (en) A kind of deep-foundation pit engineering Yield rainfall relation supercharging captation
CN2134517Y (en) Efficience negative pressure pumping apparatus
CN203128518U (en) Methane cooling and drying machine
CN205838597U (en) Nitrogen fertilizer plant's fertilizer heap penetrant collects recovery system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121114

Termination date: 20150424

EXPY Termination of patent right or utility model