CN208605204U CN201821208561.0U CN201821208561U CN208605204U CN 208605204 U CN208605204 U CN 208605204U CN 201821208561 U CN201821208561 U CN 201821208561U CN 208605204 U CN208605204 U CN 208605204U
Authority
CN
China
Prior art keywords
backform
translation
stull
block
side form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821208561.0U
Other languages
Chinese (zh)
Inventor
刘顺成
王可增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 15th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Original Assignee
China Railway 15th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 15th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd filed Critical China Railway 15th Bureau Group Co Ltd
Priority to CN201821208561.0U priority Critical patent/CN208605204U/en
Application granted granted Critical
Publication of CN208605204U publication Critical patent/CN208605204U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a kind of piecemeal pin-connected panel variable cross-section lining trolley, including arc formwork, the shape of arc formwork matches with tunnel cross-section shape, arc formwork includes backform and side form, backform is spliced by middle part backform, backform addition block and side backform, backform adds there are two blocks, two backform addition blocks are located at the two sides of middle part backform, there are two side backforms, two side backforms are located at the lower part of two backform addition blocks, side form is located at the lower part of two side backforms, and side form lower part is provided with angle mould addition block.It can be convenient for changing addition block by setting translation sliding sleeve group, the deviation of trolley and Tunnel Design section is reduced, ensure that construction quality, while also ing save construction cost, strong operability, construction speed is fast, can satisfy the lining construction requirement in the multibreak face in tunnel.

Description

A kind of piecemeal pin-connected panel variable cross-section lining trolley
Technical field
The utility model belongs to constructing tunnel apparatus field, and in particular to a kind of piecemeal pin-connected panel variable cross-section lining trolley.
Background technique
In constructing tunnel design, due to the difference of geological type, tunnel turning radius is also variant, and different tunnels is cut Face size is different, and each section of sectional dimension can also change in same tunnel.During Tunnel Second Lining Construction, single line iron Road tunnel cross-section space is small, section widen variation it is more, there is also sections of casting anchor for long distance tunnel, meet tunnel with 1 trolley The two lining constructions in multibreak face, trolley design difficulty are bigger.Need trolley portal-framed structure type selecting, column and lead screw connection and More reasonable design method is selected in the add wide way of template, comprehensively considers the design object to realize trolley.
In narrow space, to guarantee vehicle pass-through space, portal-framed structure will compress.Door frame sectional dimension reduces, Resist torque ability just becomes smaller, and when pouring side wall concrete construction, door frame lower part is easy to produce interior crowded deformation, to prevent door frame Deforming at present has following three kinds of design methods.
Method one: for template lower anchor on short abutment wall embedded bar, this method template power transmission is most directly also most simple Single design method, but need that embedded bar is installed in the construction of short abutment wall, process is increased, construction teams and groups are reluctant using this Kind method.
Method two: side form lower part is connected on the outside of walking beam by lead screw, increases horizontal screw lead between door frame walking beam Support, when construction, are convenient for disassembly and assembly easy to operate, are most common design methods.This method makes trolley serve as a contrast concrete two Passing through for vehicle is hindered when pouring construction, is in fact single line channel in tunnel, is guaranteed in the solidifying native pouring construction of two linings The supply of concrete, only a current tank car no longer passes through other vehicles.
Method three: trolley increases channel base plate, is withstood on bottom plate in side form bottom by diagonal brace, and vehicle leads on bottom plate Row.Trolley in this way does not influence the passage of vehicle, but increases the gross weight of trolley, and bottom plate has 20-30cm's Thickness, to guarantee that vehicle passes through space it is necessary to improve the big depth of beam of door frame, often space limitation cannot be met the requirements.Therefore This method is not used generally.
Since space limits, door frame column sectional dimension is smaller, and the space between side form is relatively narrow, between door frame and side form Lead screw connects design comparison difficulty, and usually there are two types of design methods.
Method one: welding variable cross-section composite box column, lead screw connection pedestal are hidden in cabinet.Advantage is column rigidity Good, lead screw is connected to column center, and stress is direct;The disadvantage is that require technique high when column is processed, when construction the peace of lead screw tear open and It adjusts inconvenient.
Method two: selecting suitable H profile steel, welds gusset, reinforces column, and lead screw connects tube chamber welds with base column side.It is excellent Point is processing and fabricating simplicity, easy to control the quality;Lead screw peace is torn open and is adjusted and is easy to operate when construction;Disadvantage column poor rigidity, lead screw top In column side, stress is bad, and lead screw connection pedestal is easily deformed.
What general trolley widened use is all that side form is constant, the method for widening of replacement addition block among backform, but to sky Between narrow section, especially section variation be more and the biggish section of changing value, trolley section and tunnel can be made in this way Road design section deviation is larger, is unable to satisfy construction requirement.
Utility model content
Purpose of the utility model is to solve the above-mentioned problems of the prior art, provide a kind of piecemeal pin-connected panel change Section lining trolley.
To achieve the above objectives, the present invention adopts the following technical solutions: a kind of piecemeal pin-connected panel variable cross-section lining cutting platform Vehicle, including arc formwork, shape and the tunnel cross-section shape of arc formwork match, and arc formwork includes backform and side form, top Mould is spliced by middle part backform, backform addition block and side backform, and backform adds there are two blocks, two backform addition blocks point Not Wei Yu middle part backform two sides, there are two side backforms, and two side backforms are located at the lower part of two backforms addition block, Side form is located at the lower part of two side backforms, and side form lower part is provided with angle mould addition block;Support group, support group are provided in backform Including a stull and two perpendicular supports, stull both ends are connected with stull addition block, and the stull addition block at stull both ends is fixed on top On the side backform of mould two sides, perpendicular support bottom is connected with perpendicular support addition block, and perpendicular support is fixed on the backform of middle part, erects support addition Block lower part is fixed in stull.
It is bolted between middle part backform, backform addition block and side backform, leads between side form and side backform Articulated connection is crossed, side form adds block with angle mould and is bolted, and stull is bolted with stull addition block, erects support and erects Support addition block is bolted, and is bolted between stull and backform, is bolted between perpendicular support and backform.
Stull bottom is provided with translation stringer stull bottom and is fixed on translation stringer, and translation stringer bottom is provided with cunning Block, translation stringer are connected on door frame by the sliding block of bottom, are translated and are provided with translation oil cylinder between stringer and door frame.
Translation stringer top is provided with translation sliding sleeve group, and translation sliding sleeve group includes two translation sliding sleeves, each translation sliding sleeve It is inside provided with a translation slide bar, translation slide bar is connected with translation oil cylinder, and the one end for translating sliding sleeve is fixed on the backform of side, The other end is not connected with side backform, and two translation sliding sleeves are separately fixed on the side backform of two sides, translates the bottom of sliding sleeve group Portion is fixed on translation stringer.
There are three the quantity of the translation stringer, and the quantity of support group has nine, and nine support groups are uniformly arranged on arc In template, there are two the quantity that translate sliding sleeve group, is separately positioned between second and third support group and the 7th and the Between eight support groups.
Door frame includes upper beam, lower beam, column and walking beam, is connected between upper beam and lower beam by the column of two sides It connects, is connect at the top of upper beam bottom and column, lower beam end is connect with column side, and walking beam setting is in column bottom, row It walks and is provided with jacking cylinder in beam, side form oil cylinder is provided between side form and column.
It is connected by lead screw between side form and column upper and lower part, is connected between side form and walking beam by lead screw It connects.
Walking beam bottom is equipped with addition block.
The utility model has the beneficial effects that: piecemeal pin-connected panel variable cross-section lining trolley provided by the invention is in order to meet The lining construction requirement in the multibreak face in tunnel replaces addition block using in backform two sides, and increases addition block in stull and perpendicular support, It can be convenient for changing addition block by setting translation sliding sleeve group, the deviation of trolley and Tunnel Design section is reduced, ensure that and apply Working medium amount, while construction cost is also ad save, strong operability, construction speed is fast, reduces labor intensity, improves work effect Rate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is backform side view.
Fig. 3 is translation sliding sleeve group connection schematic diagram.
Fig. 4 is translation shift sleeve structure schematic diagram.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
As shown in Figure 1, the utility model provides a kind of piecemeal pin-connected panel variable cross-section lining trolley, including arc formwork, arc The shape of shape template matches with tunnel cross-section shape, and arc formwork includes backform and side form 4, and backform is by middle part backform 1, backform Addition block 2 and side backform 3 are spliced, and backform adds there are two blocks 2, and two backform addition blocks 2 are located at middle part top The two sides of mould 1, there are two side backforms 3, and two side backforms 3 are located at the lower part of two backforms addition block 2, and side form 4 In the lower part of two side backforms 3,4 lower part of side form is provided with angle mould addition block 5;Support group, support group packet are provided in backform A stull 7 and two perpendicular supports 6 are included, 7 both ends of stull are connected with stull addition block 9, and the stull addition block 9 at 7 both ends of stull is fixed On the side backform 3 of backform two sides, 6 bottoms of perpendicular support are connected with perpendicular support addition block 8, and perpendicular 6 top of support is fixed on middle part backform 1 On, perpendicular support addition 8 lower part of block is fixed in stull 7, and 7 bottom of stull is fixed on translation stringer 10, and translation 10 bottom of stringer is set It is equipped with sliding block, translation stringer 10 is connected on door frame by the sliding block of bottom, is translated and is provided with translation between stringer 10 and door frame Oil cylinder 19.
Is bolted between middle part backform 1, backform addition block 2 and side backform 3, side form 4 and side backform 3 it Between be bolted by articulated connection, side form 4 and angle mould addition block 5, stull 7 and stull are added block 9 and are bolted, Perpendicular support 6 is bolted with perpendicular support addition block 8, is bolted between stull 7 and backform, erects and leads between support 6 and backform It crosses and is bolted.
Translation 10 top of stringer is provided with translation sliding sleeve group, and translation sliding sleeve group includes two translation sliding sleeves 20, each translation A translation slide bar 21 is provided in sliding sleeve 20, translation slide bar 21 is connected with translation oil cylinder 19, and one end of translation sliding sleeve 20 is solid It is scheduled on side backform 3, the other end is not connected with side backform 3, and two translation sliding sleeves 20 are separately fixed at the side top of two sides On mould 3, the bottom of translation sliding sleeve group is fixed on translation stringer 10.
There are three the quantity for translating stringer 10, and the quantity of support group has nine, and nine support groups are uniformly arranged on arc mould In plate, there are two the quantity that translate sliding sleeve group, is separately positioned between second and third support group and the 7th and the 8th Between a support group.
Door frame includes upper beam 11, lower beam 12, column 13 and walking beam 15, is passed through between upper beam 11 and lower beam 12 The column 13 of two sides connects, and connects at the top of 11 bottom of upper beam and column 13, and 12 end of lower beam is connect with 13 side of column, row It walks the setting of beam 15 and is provided with jacking cylinder 16 in 13 bottom of column, walking beam 15, be provided with side form between side form 4 and column 13 Oil cylinder 17 is connected between 13 upper and lower part of side form 4 and column by lead screw 18, passes through silk between side form 4 and walking beam 15 Thick stick 18 is connected.
15 bottom of walking beam is equipped with addition block 22, and addition block bottom is equipped with sleeper 14.
Increase and widen all lesser condition of construction of value compared with standard section for section is widened, is slided by stretching translation Set 20 replaces the backform addition block 2, perpendicular support addition block 8 and stull addition block 9 of corresponding section.When tunnel cross-section widens variation, Concrete operation step are as follows: jacking cylinder 16 is reduced to minimum, the protection stroke of reserved 5cm, all lead screws on dismounting side form 4 18, side form oil cylinder 17 is reduced to most short connection spiral shell between dismounting backform addition block 2 and stull addition block 9 and side form backform 3 Bolt stretches out the translation sliding sleeve 20 in translation sliding sleeve group, opens side backform 3, and block 9 is added in replacement stull, successively will top Mould two sides are widened;Then the connection bolt for removing perpendicular support addition block 8 and stull 7, is jacked up middle part backform 1 by jack, more Perpendicular support addition block 8 is changed, replacement backform adds block 2, and middle part backform 1 and side backform 3 are added block 2 by backform and are connected to one It rises, backform is made to form entirety;Then all lead screws 18 on side form 4 are installed, side form oil cylinder 17 and jacking cylinder 16 are stretched to Variable cross-section lining trolley is widened in appropriate location, completion.
For section face of casting anchor and the biggish condition of construction of standard section height difference, also need while widening backform in walking beam 15 increase addition block 22 below, corresponding to add block 5 in 4 bottom of side form replacement angle mould.
The above is preferred embodiments of the present invention, it is noted that for those skilled in the art, The present utility model is not limited to the above embodiments, under the premise of not departing from the utility model general idea, can also make Several changes and improvements, these also should be considered as the protection scope of the utility model.

Claims (8)

1. a kind of piecemeal pin-connected panel variable cross-section lining trolley, including arc formwork, the shape and tunnel cross-section shape of arc formwork Match, it is characterised in that: arc formwork includes backform and side form, and backform is pushed up by middle part backform, backform addition block and side Mould is spliced, and backform adds there are two blocks, and two backform addition blocks are located at the two sides of middle part backform, and side backform has two A, two side backforms are located at the lower part of two backforms addition block, and side form is located at the lower part of two side backforms, under side form Portion is provided with angle mould addition block;Support group is provided in backform, support group includes a stull and two perpendicular supports, and stull both ends connect It is connected to stull addition block, the stull addition block at stull both ends is fixed on the side backform of backform two sides, and perpendicular support bottom is connected with Perpendicular support addition block, perpendicular support are fixed on the backform of middle part, and perpendicular support addition block lower part is fixed in stull.
2. piecemeal pin-connected panel variable cross-section lining trolley as described in claim 1, it is characterised in that: middle part backform, backform addition It is bolted between block and side backform, is added between side form and side backform by articulated connection, side form and angle mould Block is bolted, and stull is bolted with stull addition block, and perpendicular support is bolted with perpendicular support addition block, stull It is bolted between backform, is bolted between perpendicular support and backform.
3. piecemeal pin-connected panel variable cross-section lining trolley as described in claim 1, it is characterised in that: stull lower part is provided with translation Crossbeam, stull bottom are fixed on translation stringer, and translation stringer bottom is provided with sliding block, and translation stringer is connected by the sliding block of bottom It connects on door frame, translates and be provided with translation oil cylinder between stringer and door frame.
4. piecemeal pin-connected panel variable cross-section lining trolley as claimed in claim 3, it is characterised in that: translation stringer top is provided with Sliding sleeve group is translated, translation sliding sleeve group includes two translation sliding sleeves, is provided with a translation slide bar in each translation sliding sleeve, translates Slide bar is connected with translation oil cylinder, and the one end for translating sliding sleeve is fixed on the backform of side, and the other end is not connected with side backform, and two Translation sliding sleeve is separately fixed on the side backform of two sides, and the bottom of translation sliding sleeve group is fixed on translation stringer.
5. piecemeal pin-connected panel variable cross-section lining trolley as claimed in claim 4, it is characterised in that: the quantity of the translation stringer There are three, the quantity of support group has nine, and nine support groups are uniformly arranged in arc formwork, and the quantity of translation sliding sleeve group has two It is a, be separately positioned between second and third support group and the 7th and the 8th support group between.
6. piecemeal pin-connected panel variable cross-section lining trolley as described in claim 1, it is characterised in that: door frame include upper beam, under Crossbeam, column and walking beam are connected between upper beam and lower beam by the column of two sides, are connected at the top of upper beam bottom and column It connects, lower beam end is connect with column side, and walking beam setting is provided with jacking cylinder, side form in column bottom, walking beam Side form oil cylinder is provided between column.
7. piecemeal pin-connected panel variable cross-section lining trolley as claimed in claim 6, it is characterised in that: side form and column top and under It is connected by lead screw between portion, is connected between side form and walking beam by lead screw.
8. piecemeal pin-connected panel variable cross-section lining trolley as claimed in claim 6, it is characterised in that: walking beam bottom, which is equipped with, to be added Add block.
CN201821208561.0U 2018-07-28 2018-07-28 A kind of piecemeal pin-connected panel variable cross-section lining trolley Active CN208605204U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821208561.0U CN208605204U (en) 2018-07-28 2018-07-28 A kind of piecemeal pin-connected panel variable cross-section lining trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821208561.0U CN208605204U (en) 2018-07-28 2018-07-28 A kind of piecemeal pin-connected panel variable cross-section lining trolley

Publications (1)

Publication Number Publication Date
CN208605204U true CN208605204U (en) 2019-03-15

Family

ID=65671292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821208561.0U Active CN208605204U (en) 2018-07-28 2018-07-28 A kind of piecemeal pin-connected panel variable cross-section lining trolley

Country Status (1)

Country Link
CN (1) CN208605204U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004838A (en) * 2019-05-16 2019-07-12 成都建工路桥建设有限公司 A kind of ovum type underpass bridge cast-in-situ box beam bracket template system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004838A (en) * 2019-05-16 2019-07-12 成都建工路桥建设有限公司 A kind of ovum type underpass bridge cast-in-situ box beam bracket template system
CN110004838B (en) * 2019-05-16 2023-11-10 成都建工路桥建设有限公司 Egg-shaped lower through road bridge cast-in-situ box girder support template system

Similar Documents

Publication Publication Date Title
CN106089253A (en) A kind of all-hydraulic template system poured for culvert
CN101408019B (en) Low altitude prefabricated case beam internal mold construction method
CN100489269C (en) Full automatic hydraulic lining trolley
CN204984438U (en) Tunnel lining platform truck with adjustable
CN104763446A (en) Multi-functional trolley for subway station construction
CN208605204U (en) A kind of piecemeal pin-connected panel variable cross-section lining trolley
CN206801592U (en) Hydraulic lining trolley for cut-and-cover tunnel concreting
CN108556122A (en) PC track beam moulds
CN201496074U (en) Portal type hydraulic steel mould trolley
CN106050268B (en) Round rectangle section tunnel concrete liner telescoping steel form
CN206916622U (en) A kind of combined steel formwork of precast segmental beam
CN103302723B (en) Adsorption type precast bridge bed die vibration chassis
CN208451859U (en) PC track beam mould
CN206794706U (en) A kind of auxiliary outgoing line device of horizontal casting cast iron profile material
CN206636581U (en) A kind of shield tunnel Second Lining Construction chassis
CN202016109U (en) Hydraulic internal mold shared by inclined web box girders with different heights
CN105970823B (en) A kind of box girder inner formwork system that body is distorted for large span, superelevation
CN206464534U (en) A kind of tilting gravity force casting machine
CN201614939U (en) Three-dimensional space curved surface steel mould trolley
CN206034307U (en) Steel bones RACK and template system top push away system
CN204532374U (en) The multi-functional chassis of metro station construction
CN211948026U (en) Cast-in-place splayed wall template system of apron culvert
CN209510341U (en) A kind of master keeps away hole integral type lining trolley
CN112746857A (en) Full-hydraulic highway tunnel cable trench lining construction device and construction method
CN207212361U (en) A kind of combined steel mould trolley