CN105970823B CN201610413958.2A CN201610413958A CN105970823B CN 105970823 B CN105970823 B CN 105970823B CN 201610413958 A CN201610413958 A CN 201610413958A CN 105970823 B CN105970823 B CN 105970823B
Authority
CN
China
Prior art keywords
internal model
die
angle mould
flat
mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610413958.2A
Other languages
Chinese (zh)
Other versions
CN105970823A (en
Inventor
邓安华
向继华
潘文铭
曾宪柳
王胜利
种爱秀
王辉
汪勇
徐洲
郭信锋
许哲
饶天宽
杨瑞峰
谭永安
唐如蜜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201610413958.2A priority Critical patent/CN105970823B/en
Publication of CN105970823A publication Critical patent/CN105970823A/en
Application granted granted Critical
Publication of CN105970823B publication Critical patent/CN105970823B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of for large span, the box girder inner formwork system of superelevation distortion body, it includes the interior mould bases with heavily loaded cross direction moving device and the internal model in interior mould bases;Internal model includes top plate, upper angle mould, middle part flat-die and lower angle mould;Upper angle mould is connected to above the flat-die of middle part;Lower angle mould is connected to below the flat-die of middle part;Top plate is overlapped on angle mould upper end;The steel truss and interior mould bases upper frame for support internal mould are provided with interior mould bases;The internal model hydraulic system for adjusting internal model is provided with steel truss;The internal model tommy system for finely tuning and fixing internal model is additionally provided between interior mould bases and internal model.The present invention can meet the needs of the prefabricated various structure changes of large-scale section box girder, solve superelevation distortion body section spar-box beam inner core template and change various problem, while box beam quality is ensured, reduce the security risk of construction, process and assemble man-hour is shortened, significantly reduces labourer's intensity of worker.

Description

A kind of box girder inner formwork system that body is distorted for large span, superelevation
Technical field
The present invention relates to a kind of box girder inner formwork system, belongs to bridge prefabrication box girder webs technical field, more particularly to a kind of Box beam horizontal slope is fine-tuning, while adapts to height and web all in the Novel box beam-ends modular system of change.
Background technology
It is beam prefabricated for short-term matching segment, at present both at home and abroad on straight line, contour uiform section segment girder precast short-term Stencil design and using comparative maturity, but the large span for occurring in recent years, segment girder precast template on easement curve, If deck transverse slope is in the long scope of 65m bridges, horizontal slope is gradient to -2% by+2%.It is superelevation in K6+666.779~K6+731.779 Transition, long 65m, left width bridge horizontal slope are -2%, and right width bridge horizontal slope is+2%, now according to box beam of the prior art Prefabricated steel-template system is just needed according to the prefabricated multigroup different types of end modular system of different segment of bridge to adapt to bridge Pour, so undoubtedly drastically increase construction material cost, add the input of large lifting equipment, reduce construction effect, Extend construction period, it is difficult to ensure the quality of box section varying dimensions required precision.
A kind of railway is disclosed in Chinese invention patent specification CN101302739B, highways and streets bridge is used The hydraulic internal mold car of prestressed concrete box girder, it includes combined inner mold plate, some hydraulic jack groups, vertical shift dolly and some groups Strut, vertical shift dolly are arranged in the internal cavities of combined inner mold plate, the top template in combined inner mold plate respectively with mould in left and right The end face of plate abuts;In top template telescopic oil cylinder and left and right template telescopic oil cylinder respectively with vertical shift dolly and top template and in The inner surface of template is relatively connect, and left and right lower template telescopic oil cylinder is hinged with lower template and middle template respectively;After combined inner mold plate is propped, Supported with some struts.In the invention template employ with backform identical move linearly stripping means, make the stripping of template more Add easily, the space required for template motion is smaller, so as to adapt to energy more easily by box beam endplate preformed hole, inner formwork system Power is stronger, and hydraulic jack arrangement is more reasonable.But the invention can not meet that various structures become when large-scale section box girder is prefabricated The needs of change, meanwhile, the invention can not also directly apply to large span, the box beam of superelevation distortion body makes.
Known clearly disclosed in Chinese invention patent specification CN102001127B a kind of combined box beam hydraulic internal mold, including mould Plate, guide pillar, girder, support base, the template are connected by adjustable column with guide pillar, and guide pin bushing, its bottom are equipped with the girder Equipped with guide rail, the guide pillar is installed in the guide pin bushing and can slided in it, and it is traversing that bob-weight load is provided with the support base Device, the girder bears to carry on cross direction moving device and can slide in the bob-weight by guide rail hauls out beam body by internal model.The invention Internal model is provided with guide rail on girder, has subtracted other the step of laying shifting formwork track, has improved operating efficiency.And due to not Template with position employs different receipts mould modes, makes each section template to meet to receive mould requirement.The invention have operation, It is easy to use, the features such as box beam Forming Quality is good, and stripping rate is fast, and production efficiency is high;But the invention is only suitable only for of the same race Used in the box girder inner formwork design of type, can not meet that large span, the box beam of superelevation distortion body make, and the internal model branch of the invention Support is not enough to support large span, the box beam of superelevation distortion body.
The content of the invention
In view of the above-mentioned drawbacks of the prior art, the technical problem to be solved in the present invention is to provide one kind be used for greatly across The box girder inner formwork system of degree, superelevation distortion body, it can be effectively real-time according to the Specific construction situation of the different segment of bridge Adjust internal model position so as to meet large span, superelevation distortion body box beam make.
In order to solve the above technical problems, present invention employs such a in large span, the box beam of superelevation distortion body Modular system, it includes the interior mould bases with heavily loaded cross direction moving device and the internal model in interior mould bases;The internal model include top plate, on Angle mould, middle part flat-die and lower angle mould;The upper angle mould is connected to above the middle part flat-die;The lower angle mould be connected to it is described in Below portion's flat-die;The top plate is overlapped on the upper angle mould upper end;It is provided with the interior mould bases for supporting the internal model Steel truss and interior mould bases upper frame;The internal model hydraulic system for adjusting internal model is provided with the steel truss;The interior mould bases and The internal model tommy system for finely tuning and fixing internal model is additionally provided between the internal model.
In a kind of preferred embodiment of the present invention, the internal model hydraulic system includes upper angle mould governor motion, middle part Flat-die governor motion and lower angle mould governor motion.
In a kind of preferred embodiment of the present invention, the upper angle mould governor motion includes vertical hydraulic cylinder and horizontal liquid Cylinder pressure;One end of the vertical hydraulic cylinder is fixed in steel truss, and the other end is hinged with interior mould bases upper frame;The horizontal hydraulic cylinder One end is connected on interior mould bases upper frame, and the other end is connected with upper angle mould;The interior mould bases upper frame is slidably matched with the upper angle mould Connection.
In a kind of preferred embodiment of the present invention, the middle part flat-die governor motion includes being used to adjust middle part flat-die The horizontal brace walking beam and middle part flat-die Level tune hydraulic cylinder of spacing, the vertical push rod for adjusting middle part flat-die height; Described horizontal brace walking beam one end is fixed on steel truss, and the other end is slidably connected with vertical push rod;The middle part flat-die water Heibei provincial opera section hydraulic cylinder one end is hinged with steel truss, and the other end is connected with internal model;The fixing end and internal model of the vertical push rod are affixed; The threaded adjusting end of the vertical push rod is located above the horizontal brace walking beam.
In a kind of preferred embodiment of the present invention, the vertical push rod includes being oriented to fixed mount;Described be oriented to is fixed The vertical chute to coordinate with the horizontal brace walking beam is provided with frame;Vertically set on the guiding fixed mount It is equipped with adjustable for height screw rod;The guiding fixed mount is fixed in the internal model and connected with middle part flat-die Level tune hydraulic cylinder Connect;Described be oriented in the vertical chute of fixed mount is connected with the horizontal brace walking beam;The screw rod can be with the water Flat stull walking beam, which coordinates, jacks the internal model.
In a kind of preferred embodiment of the present invention, the horizontal brace walking beam is with the guiding fixed mount by inserting Pin is fixedly connected.
In a kind of preferred embodiment of the present invention, the lower angle mould governor motion includes bottom hydraulic cylinder;The bottom Portion hydraulic cylinder one end is hinged with lower angle mould, and the other end is hinged with the steel truss.
In a kind of preferred embodiment of the present invention, the internal model tommy system includes vertical swing arm, level rotation Bar, oblique swing arm and assistant reinforcement swing arm;The vertical swing arm, the horizontal swing arm and described tiltedly equal one end of swing arm three with it is described Steel truss is hinged, and the other end is hinged with the internal model;The assistant reinforcement swing arm is hinged between lower angle mould.
In a kind of preferred embodiment of the present invention, it is provided with the interior mould bases upper frame for connecting the upper angle mould Guide wheel;The chute that can coordinate with the guide wheel is provided with the upper angle mould.
In a kind of preferred embodiment of the present invention, the middle part flat-die includes fixed flat-die and replaceable flat-die;Institute Fixed flat-die is stated to be fixed in below the upper angle mould;The replaceable flat-die is removably attachable to below the fixed flat-die.
The beneficial effects of the invention are as follows:The present invention can meet the needs of the prefabricated various structure changes of large-scale section box girder, Solve superelevation distortion body section spar-box beam inner core template and change various problem, while box beam quality is ensured, reduce and apply The security risk of work, process and assemble man-hour is shortened, significantly reduce labourer's intensity of worker, to large span minor radius bridge In beam during the freeboard section construction of superelevation distortion body section box beam, the present invention is by setting the interior module system of internal model tommy system System is realizing hydraulic pressure automated construction, and latch-up structure after and can fine adjustment, construction precision is high, securely and reliably, while has good Good adaptability.
Brief description of the drawings
Fig. 1 is that the embodiment of the present invention is a kind of for large span, the structural representation of the box girder inner formwork system of superelevation distortion body;
Fig. 2 is that a kind of A-A for large span, the box girder inner formwork system of superelevation distortion body of the embodiment of the present invention is cutd open in Fig. 1 View (display internal model hydraulic system structure);
Fig. 3 is that a kind of B-B for large span, the box girder inner formwork system of superelevation distortion body of the embodiment of the present invention is cutd open in Fig. 1 View (display internal model tommy system architecture);
Fig. 4 is that the embodiment of the present invention is a kind of for large span, the internal model hydraulic pressure system of the box girder inner formwork system of superelevation distortion body System structural representation;
Fig. 5 is that a kind of middle part flat-die for large span, the box girder inner formwork system of superelevation distortion body of the embodiment of the present invention is adjusted Whole view;
Fig. 6 is that a kind of middle part flat-die for large span, the box girder inner formwork system of superelevation distortion body of the embodiment of the present invention is adjusted Whole view;
Fig. 7 is that a kind of middle part flat-die for large span, the box girder inner formwork system of superelevation distortion body of the embodiment of the present invention is adjusted Whole view;
Fig. 8 is that the embodiment of the present invention is a kind of for large span, the vertical push rod knot of the box girder inner formwork system of superelevation distortion body Structure schematic diagram;
Fig. 9 is that the embodiment of the present invention is a kind of for large span, the lower angle mould regulation of the box girder inner formwork system of superelevation distortion body Structural scheme of mechanism;
Figure 10 is that a kind of internal model structure for large span, the box girder inner formwork system of superelevation distortion body of the embodiment of the present invention shows It is intended to;
Figure 11 is that the embodiment of the present invention is a kind of for large span, the internal model structure master of the box girder inner formwork system of superelevation distortion body View;
Figure 12 is that the embodiment of the present invention is a kind of for large span, the upper angle mould adjustment of the box girder inner formwork system of superelevation distortion body Schematic diagram;
Figure 13 is that the embodiment of the present invention is a kind of for large span, the upper angle mould adjustment of the box girder inner formwork system of superelevation distortion body Schematic diagram;
Figure 14 is that the embodiment of the present invention is a kind of for large span, the internal model hydraulic pressure system of the box girder inner formwork system of superelevation distortion body Internal model receives mould schematic diagram during off working state of uniting;
Figure 15 is that the embodiment of the present invention is a kind of for large span, the internal model hydraulic pressure system of the box girder inner formwork system of superelevation distortion body Internal model hold mode schematic diagram during working condition of uniting;
Figure 16 is that the embodiment of the present invention is a kind of for large span, the internal model screw thread rotation of the box girder inner formwork system of superelevation distortion body Lever system off working state internal model receives mould schematic diagram;
Figure 17 is that the embodiment of the present invention is a kind of for large span, the internal model screw thread rotation of the box girder inner formwork system of superelevation distortion body Lever system working condition internal model hold mode schematic diagram;
In figure:1- interior mould bases;2- internal models;3- internal model hydraulic systems;4- internal model tommy systems;1.1- steel truss; 1.2- interior mould bases upper frames;2.1- top plate;The upper angle moulds of 2.2-;Flat-die in the middle part of 2.3-;Angle mould under 2.4-;The upper angle mould governor motions of 3a-; Flat-die governor motion in the middle part of 3b-;Angle mould governor motion under 3c-;3a-1- vertical hydraulic cylinders;3a-2- horizontal hydraulic cylinders;3b-1- water Flat stull walking beam;Flat-die Level tune hydraulic cylinder in the middle part of 3b-2-;The vertical push rods of 3b-3-;3c-1- bottoms hydraulic cylinder;301- is led To fixed mount;302- screw rods;The vertical swing arms of 4a-;The horizontal swing arms of 4b-;The oblique swing arms of 4c-;4d- assistant reinforcement swing arms;101- guide wheels; 102- chutes;201- fixes flat-die;The replaceable flat-dies of 202-.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, not For limiting the present invention.
Knowable to a kind of structural representation of box girder inner formwork system for distorting body for large span, superelevation as shown in Figure 1, this Inventing a kind of box girder inner formwork system for large span, superelevation distortion body includes the interior mould bases 1 with heavily loaded cross direction moving device and installation Internal model 2 in interior mould bases 1;Internal model 2 includes top plate 2.1, upper angle mould 2.2, middle part flat-die 2.3 and lower angle mould 2.4;Upper angle mould 2.2 are connected to the top of middle part flat-die 2.3;Lower angle mould 2.4 is connected to the lower section of middle part flat-die 2.3;Top plate 2.1 is overlapped on angle mould 2.2 upper end;The steel truss 1.1 and interior mould bases upper frame 1.2 for supporting the internal model 2 are provided with interior mould bases 1;Steel truss 1.1 On be provided with internal model hydraulic system 3 for adjusting internal model 2;It is additionally provided between interior mould bases 1 and internal model 2 for finely tuning and fixing The internal model tommy system 4 of internal model 2.
Internal model hydraulic system structure sectional view as shown in Figure 2 understands that internal model hydraulic system 3 includes upper angle mould governor motion 3a, middle part flat-die governor motion 3b and lower angle mould governor motion 3c.Wherein upper angle mould governor motion 3a includes vertical hydraulic cylinder 3a- 1 and horizontal hydraulic cylinder 3a-2;Vertical hydraulic cylinder 3a-1 one end is fixed in steel truss 1.1, and the other end is cut with scissors with interior mould bases upper frame 1.2 Connect;Horizontal hydraulic cylinder 3a-2 one end is connected on interior mould bases upper frame 1.2, and the other end is connected with upper angle mould 2.2;Interior mould bases upper frame 1.2 are slidably connected with upper angle mould 2.2.During work, interior mould bases upper frame 1.2 is jacked using vertical hydraulic cylinder 3a-1 so as to realize The change of internal model whole height, horizontal hydraulic cylinder 3a-2 work after jacking in place, so as to realize the regulation of the width of internal model 2, finally Top plate 2.1 is taken and is placed on upper angle mould 2.2.Middle part flat-die governor motion 3b includes being used for the water for adjusting middle part flat-die spacing Flat stull walking beam 3b-1 and middle part flat-die Level tune hydraulic cylinder 3b-2, the vertical push rod for adjusting middle part flat-die height 3b-3;Horizontal brace walking beam 3b-1 one end is fixed on steel truss 1.1, and the other end is slidably connected with vertical push rod 3b-3;In Portion flat-die Level tune hydraulic cylinder 3b-2 one end is be hinged with steel truss 1.1, and the other end is connected with internal model 2;Vertical push rod 3b-3's Fixing end and internal model 2 are affixed;Vertical push rod 3b-3 threaded adjusting end is located above horizontal brace walking beam 3b-1.Vertical push rod 3b-3 includes being oriented to fixed mount 301;It is vertical to coordinate with horizontal brace walking beam 3b-1 to be provided with guiding fixed mount 301 Chute;It is oriented on fixed mount 301 and is vertically provided with adjustable for height screw rod 302;It is oriented to fixed mount 301 and is fixed in internal model It is connected on 2 and with middle part flat-die Level tune hydraulic cylinder 3b-2;It is oriented in the vertical chute of fixed mount 301 described in being connected with Horizontal brace walking beam 3b-1;Screw rod 302 can coordinate with horizontal brace walking beam 3b-1 jacks the internal model 2.Horizontal brace is lived Dynamic beam 3b-1 is fixedly connected with being oriented to fixed mount 301 by latch.Its structure and working condition are as shown in Fig. 5 to Fig. 8.Due in The volume of portion's flat-die 2.3 is larger, so multiple middle part flat-die governor motion 3b can be set on the flat-die of middle part, while for the ease of upper Angle mould 3a regulation, middle part flat-die governor motion 3b can also be set between two upper angle mould 3a, to aid in 3a regulation.Under Angle mould governor motion 3c includes bottom hydraulic cylinder 3c-1;Bottom hydraulic cylinder 3c-1 one end is be hinged with lower angle mould 2.4, the other end and steel Truss 1.1 is be hinged.
Internal model tommy system is additionally provided with order to improve the integrally-built rigidity of the present invention and construction precision, the present invention 4, as shown in Figure 16 and Figure 17, it includes vertical swing arm 4a, horizontal swing arm 4b, oblique swing arm 4c and assistant reinforcement swing arm 4d;Vertically Swing arm 4a, horizontal swing arm 4b and the equal one end of oblique swing arm 4c three and steel truss 1.1 are be hinged, and the other end is be hinged with internal model 2;Auxiliary adds Strong swing arm 4d is hinged between lower angle mould 2.4.In the system swing arm structure include be provided at both ends with internal thread hollow sleeve and It is connected to the joint at hollow sleeve both ends;Joint is threadedly coupled with hollow sleeve, is connected to the hollow sleeve not joint of homonymy External screw thread is oppositely oriented.
For the ease of the operation of the present invention, it is provided with interior mould bases upper frame 1.2 of the invention for connecting upper angle mould 2.2 Guide wheel 101;The chute 102 that can coordinate with guide wheel 101 is provided with upper angle mould 2.2, the wherein guiding is not limited in not Invention figure Shown mechanism, as long as be able to can meet to require to the water guided in translation of interior mould bases upper frame 1.2.Middle part flat-die 2.3 includes fixing Flat-die 201 and replaceable flat-die 202;Fixed flat-die 201 is fixed in the lower section of upper angle mould 2.2;Replaceable flat-die 202 is detachable Ground is connected to the lower section of fixed flat-die 201.Equally lower angle mould can also be replaced according to different segment beam.
Use comprising the following steps that for the present invention:
(1) the vertical hydraulic cylinder 3a-1 of internal model, horizontal brace walking beam 3b-1, horizontal hydraulic cylinder 3a-2, bottom liquid are tightened up Cylinder pressure 3c-1, using interior mould bases bottom dolly, internal model is transported to rough location.
(2) adjust internal model vertical hydraulic cylinder 3a-1, slowly pushing tow and on, while adjustment be connected on angle mould 2.2 Vertical push rod 3b-3 opens internal model horizontal hydraulic cylinder 3a-2 to auxiliary adjustment, and upper angle mould 2.2 is first supportted design position Put.Then upper angle mould 2.2 is fixed using the vertical swing arm 4a, horizontal swing arm 4b, oblique swing arm 4c that are connected on upper angle mould 2.2.
(3) regulation horizontal hydraulic cylinder 3a-2 and middle part flat-die Level tune hydraulic cylinder 3b-2 holds out against internal model level, then profit Middle part flat-die 2.3 is strutted and fixed with the horizontal swing arm 4b being connected in internal model 2.
(4) regulation is connected to the bottom hydraulic cylinder 3c-1 expansion inferior horns on lower angle mould 2.4, it may be necessary in lower angle mould Assistant reinforcement swing arm 4d is set to be aided between 2.4.
(5) each vertical swing arm 4a, horizontal swing arm 4b, oblique swing arm 4c, the assistant reinforcement of internal model tommy system 4 are revolved Bar 4d is gradually locked from top to bottom.
Processing for freeboard section, first regulation are connected to the vertical swing arm 4a on angle mould 2.2 to determine upper angle mould Height and position, the horizontal swing arm 4b and oblique swing arm 4c that then fine setting is connected on angle mould 2.2 are fitted to design position step by step Put.
It should be appreciated that protection scope of the present invention is not limited thereto, any those skilled in the art exist Disclosed herein technical scope in, the change or replacement that can readily occur in, should all cover protection scope of the present invention it It is interior.

Claims (8)

1. it is a kind of for large span, superelevation distortion body box girder inner formwork system, including the interior mould bases (1) with heavily loaded cross direction moving device and Internal model (2) in interior mould bases (1);The internal model (2) includes top plate (2.1), upper angle mould (2.2), middle part flat-die (2.3) With lower angle mould (2.4);The upper angle mould (2.2) is connected to above the middle part flat-die (2.3);Lower angle mould (2.4) connection Below the middle part flat-die (2.3);The top plate (2.1) is overlapped on upper angle mould (2.2) upper end;It is characterized in that:Institute State the steel truss (1.1) and interior mould bases upper frame (1.2) being provided with interior mould bases (1) for supporting the internal model (2);The steel truss The internal model hydraulic system (3) for adjusting internal model (2) is provided with frame (1.1);The interior mould bases (1) and the internal model (2) it Between be additionally provided with for finely tuning and fixing the internal model tommy system (4) of internal model (2);The internal model hydraulic system (3) includes Upper angle mould governor motion (3a), middle part flat-die governor motion (3b) and lower angle mould governor motion (3c);The middle part flat-die regulation Mechanism (3b) includes being used for the horizontal brace walking beam (3b-1) and middle part flat-die Level tune hydraulic pressure for adjusting middle part flat-die spacing Cylinder (3b-2), the vertical push rod (3b-3) for adjusting middle part flat-die height;Described horizontal brace walking beam (3b-1) one end is solid It is connected on steel truss (1.1), the other end is slidably connected with vertical push rod (3b-3);The middle part flat-die Level tune hydraulic cylinder (3b-2) one end is be hinged with steel truss (1.1), and the other end is connected with internal model (2);The fixing end of the vertical push rod (3b-3) with Internal model (2) is affixed;The threaded adjusting end of the vertical push rod (3b-3) is located above the horizontal brace walking beam (3b-1).
It is 2. according to claim 1 a kind of for large span, the box girder inner formwork system of superelevation distortion body, it is characterised in that: The upper angle mould governor motion (3a) includes vertical hydraulic cylinder (3a-1) and horizontal hydraulic cylinder (3a-2);The vertical hydraulic cylinder The one end of (3a-1) is fixed in steel truss (1.1), and the other end is be hinged with interior mould bases upper frame (1.2);Horizontal hydraulic cylinder (the 3a- 2) one end is connected on interior mould bases upper frame (1.2), and the other end is connected with upper angle mould (2.2);The interior mould bases upper frame (1.2) with Upper angle mould (2.2) sliding connection.
It is 3. according to claim 1 a kind of for large span, the box girder inner formwork system of superelevation distortion body, it is characterised in that: The vertical push rod (3b-3) includes being oriented to fixed mount (301);Be provided with guiding fixed mount (301) to the water The vertical chute that flat stull walking beam (3b-1) coordinates;Vertically being provided with height on the guiding fixed mount (301) can The screw rod (302) of tune;It is described guiding fixed mount (301) be fixed in the internal model (2) and with middle part flat-die Level tune hydraulic pressure Cylinder (3b-2) connects;Described be oriented in the vertical chute of fixed mount (301) is connected with the horizontal brace walking beam (3b- 1);The screw rod (302) can coordinate with the horizontal brace walking beam (3b-1) jacks the internal model (2).
It is 4. according to claim 3 a kind of for large span, the box girder inner formwork system of superelevation distortion body, it is characterised in that: The horizontal brace walking beam (3b-1) is fixedly connected with the guiding fixed mount (301) by latch.
It is 5. according to claim 1 a kind of for large span, the box girder inner formwork system of superelevation distortion body, it is characterised in that: The lower angle mould governor motion (3c) includes bottom hydraulic cylinder (3c-1);Described bottom hydraulic cylinder (3c-1) one end and lower angle mould (2.4) it is hinged, the other end is be hinged with the steel truss (1.1).
It is 6. according to claim 1 a kind of for large span, the box girder inner formwork system of superelevation distortion body, it is characterised in that: The internal model tommy system (4) includes vertical swing arm (4a), horizontal swing arm (4b), oblique swing arm (4c) and assistant reinforcement swing arm (4d);The vertical swing arm (4a), the horizontal swing arm (4b) and described tiltedly equal one end of swing arm (4c) three and the steel truss (1.1) it is hinged, the other end is be hinged with the internal model (2);The assistant reinforcement swing arm (4d) is hinged between lower angle mould (2.4).
It is 7. according to claim 1 a kind of for large span, the box girder inner formwork system of superelevation distortion body, it is characterised in that: The guide wheel (101) for connecting the upper angle mould (2.2) is provided with the interior mould bases upper frame (1.2);The upper angle mould (2.2) On be provided with can with the guide wheel (101) coordinate chute (102).
It is 8. according to claim 1 a kind of for large span, the box girder inner formwork system of superelevation distortion body, it is characterised in that: The middle part flat-die (2.3) includes fixed flat-die (201) and replaceable flat-die (202);The fixed flat-die (201) is fixed in institute State below angle mould (2.2);The replaceable flat-die (202) is removably attachable to below the fixed flat-die (201).
CN201610413958.2A 2016-06-13 2016-06-13 A kind of box girder inner formwork system that body is distorted for large span, superelevation Active CN105970823B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610413958.2A CN105970823B (en) 2016-06-13 2016-06-13 A kind of box girder inner formwork system that body is distorted for large span, superelevation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610413958.2A CN105970823B (en) 2016-06-13 2016-06-13 A kind of box girder inner formwork system that body is distorted for large span, superelevation

Publications (2)

Publication Number Publication Date
CN105970823A CN105970823A (en) 2016-09-28
CN105970823B true CN105970823B (en) 2017-11-24

Family

ID=57010460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610413958.2A Active CN105970823B (en) 2016-06-13 2016-06-13 A kind of box girder inner formwork system that body is distorted for large span, superelevation

Country Status (1)

Country Link
CN (1) CN105970823B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110553127A (en) * 2019-08-15 2019-12-10 中铁上海工程局集团有限公司 Adjustable support device and use method thereof
CN111958781A (en) * 2020-08-18 2020-11-20 郑州大学 Auxiliary forming device for prefabricated section beam

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB183477A (en) * 1921-07-20 1923-10-18 Gabriel Marcel Gouyaud Method of constructing arches of reinforced concrete without using any moulds, archedfalseworks or scaffoldings
AT256920B (en) * 1964-07-02 1967-09-11 Ast Ed Ing & Co Process for the production of bridge structures or the like.
IT1282248B1 (en) * 1995-03-01 1998-03-16 Rivoli Spa FORMWORK PROCEDURE FOR THE CREATION OF CANTILEVER ELEMENTS IN HOME PRODUCTS AND RELATED FORMWORK SYSTEM
CN102001127B (en) * 2010-10-26 2012-07-04 湖南中铁五新钢模有限责任公司 Combined box girder hydraulic internal mould
CN202702379U (en) * 2012-06-29 2013-01-30 浙江工业大学 Curved bridge prefabricated small box girder adjustable template
CN102828468B (en) * 2012-09-13 2015-03-25 永升建设集团有限公司 Construction method for controlling prefabricated crack of high-strength thin-walled box girder under high-temperature dry condition
CN204414305U (en) * 2014-12-10 2015-06-24 中交第二航务工程局有限公司 A kind of prefab-form system for many casees corrugated steel web case beam that broadens
CN204690605U (en) * 2015-03-20 2015-10-07 宇杰集团股份有限公司 The self-propelled triangular truss hanging basket of large span beam bridge

Also Published As

Publication number Publication date
CN105970823A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN107387122A (en) A kind of formwork jumbo and its construction method for the construction of piping lane tunneling boring
CN207143755U (en) A kind of adjustable bracket for No. 0 block of bridge pier
CN201196094Y (en) Hydraulic template trolley for rail tunnel liner concrete
CN108004927B (en) Double-limb triangular hanging basket and construction method for cantilever beam section of large-span continuous rigid frame bridge
CN106089253A (en) A kind of all-hydraulic template system poured for culvert
CN206246129U (en) A kind of hydraulic template trolley for pouring construction after rail against the wind road
CN102022123A (en) Integral lining method for tunnel with altered diameter by model board trolley
CN202658533U (en) Movable formwork of curved bridge with variable width
CN102660925A (en) Moveable formwork for variable-width curved bridge
CN103352710A (en) Suspension overturn type tunnel inverted arch formwork trolley and construction method thereof
CN105970823B (en) A kind of box girder inner formwork system that body is distorted for large span, superelevation
CN205223976U (en) Irrigation gallery concrete slipform device
CN202412422U (en) Template system for prefabricating simply-supported box girder
CN108556122A (en) PC track beam moulds
CN110130937B (en) Tunnel construction trolley
CN205936645U (en) A full liquid die plate system for culvert is pour
CN109235265A (en) System for track girder of constructing
CN211547804U (en) Cantilever type retaining wall rapid construction device
CN102528910A (en) Template system of prefabricated simply support box beam
CN104141264A (en) Plate-type ballastless track laying precision keeping method
CN212335790U (en) Large cantilever bent cap construction trolley
CN206636581U (en) A kind of shield tunnel Second Lining Construction chassis
CN206736636U (en) The moveable overall transfering type straddle-type monorail PC track beam forms of bed die
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete
CN108098979A (en) A kind of PK sections concrete box girder precast segment template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant